CN218909367U - Cable pay-off for electric power construction - Google Patents
Cable pay-off for electric power construction Download PDFInfo
- Publication number
- CN218909367U CN218909367U CN202223360759.XU CN202223360759U CN218909367U CN 218909367 U CN218909367 U CN 218909367U CN 202223360759 U CN202223360759 U CN 202223360759U CN 218909367 U CN218909367 U CN 218909367U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- cable
- rod
- electric power
- power construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/82—Recycling of waste of electrical or electronic equipment [WEEE]
Landscapes
- Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)
Abstract
The utility model relates to the field of electric power construction and discloses a cable paying-off device for electric power construction, which comprises a bottom plate, wherein the top of the bottom plate is fixedly connected with a fixed plate, the inner top wall of the fixed plate is fixedly connected with a fixed rod, the inner bottom wall of the fixed plate is fixedly connected with a first motor, the output shaft of the first motor is fixedly connected with a screw rod through a coupler, and the outer wall of the screw rod is movably connected with a screw tube. This cable pay-off for electric power construction, through bottom plate, fixed plate, dead lever, first motor, screw rod, screwed pipe, slide bar, movable frame, connecting rod and movable block, make this cable pay-off can be convenient for adjust, thereby when using this cable pay-off to pay-off lay the cable, can make things convenient for people to adjust this cable pay-off's height, thereby alleviateed people's operating pressure, satisfied people's work demand, improved this cable pay-off's work efficiency, the work of giving people has brought convenience.
Description
Technical Field
The utility model relates to the field of power construction, in particular to a cable paying-off device for power construction.
Background
In the production process of the electric wires and the cables, the cables are generally wound on a cable drum for convenient production and transportation, and a paying-off machine is required to be used for paying off when the subsequent cables are laid; the cable laying can be divided into overhead, underground (pipelines and direct burial), underwater, wall, tunnel and other laying modes according to the use occasions; the reasonable choice of the cable laying mode is very important to ensure the transmission quality, the reliability, the construction maintenance and the like of the line.
In the chinese utility model patent: the cable paying-off device for electric power construction, as in CN201910342364.0, is characterized in that upright posts are arranged at two ends of a bottom plate, a guide rail is arranged at one side of each upright post, an air cylinder is fixedly arranged on the bottom plate, a first sliding block is arranged at the upper end of a piston rod of the air cylinder, and the upper ends of the upright posts at two sides are connected through a top plate; two ends of a second connecting rod are placed on the first sliding block, and a plurality of cable reels are arranged on the second connecting rod; a plurality of second brackets are arranged on one side of the top plate, a first rotating shaft is arranged on the second brackets, a plurality of first winding wheels are movably arranged on the first rotating shaft, the number of the first winding wheels is equal to that of the cable reels, and the first winding wheels axially slide along the first rotating shaft between the second brackets. According to the utility model, the cable drum is jacked up by the air cylinder, so that the cable drum is prevented from being contacted with the ground, the friction force between the cable drum and the ground is avoided, the difficulty in paying off the cable is reduced, a plurality of groups of cable drums are arranged on the second connecting rod for paying off simultaneously, the labor intensity of workers is reduced, and the cable laying efficiency is greatly improved.
The following problems exist in the prior art:
1. the cable pay-off device for power construction in the prior art is inconvenient to adjust, so that when the cable pay-off device is used for laying a cable, people cannot effectively adjust the height of the cable pay-off device according to the working requirement, the working pressure of people is increased, the working requirement of people is not met, and the working efficiency of the cable pay-off device is reduced;
2. the cable pay-off for electric power construction among the prior art is not convenient for remove fixedly to when using cable pay-off to lay the cable, can't effectually make things convenient for people to remove and fix cable pay-off's position according to the demand of work, thereby increased people's operating pressure, do not satisfy people's work demand, reduced cable pay-off's work efficiency.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the utility model provides a cable paying-off device for power construction, which has the advantages of convenient adjustment and the like, and solves the problems in the background art.
(II) technical scheme
In order to achieve the aim of convenient adjustment, the utility model provides the following technical scheme: the utility model provides a cable pay-off for electric power construction, includes the bottom plate, the top fixedly connected with fixed plate of bottom plate, the interior roof fixedly connected with dead lever of fixed plate, the interior bottom wall fixedly connected with first motor of fixed plate, the output shaft of first motor passes through shaft coupling fixedly connected with screw rod, the outer wall swing joint of screw rod has the screwed pipe.
The outer wall fixedly connected with slide bar of screwed pipe, the one end fixedly connected with movable frame of slide bar, one side fixedly connected with connecting rod of movable frame, the one end fixedly connected with movable block of connecting rod makes this cable pay-off can be convenient for adjust to when using this cable pay-off to pay-off lay the cable, can make things convenient for people to adjust this cable pay-off's height, thereby alleviateed people's operating pressure, satisfied people's work demand, improved this cable pay-off's work efficiency, brought the facility for people's work.
Preferably, one side fixedly connected with second motor of movable frame, the output shaft of second motor passes through shaft coupling fixedly connected with movable rod, the outer wall fixedly connected with gyro wheel of movable rod drives movable rod and gyro wheel through the second motor and rotates, conveniently unwrappes wire the cable.
Preferably, the bottom fixedly connected with pulley of bottom plate, the top fixedly connected with electric putter of bottom plate, electric putter's output fixedly connected with backup pad makes this cable pay-off be convenient for remove fixedly to when using this cable pay-off to lay the cable, can make things convenient for people to remove fixedly this cable pay-off's position according to the demand of work, thereby alleviateed people's operating pressure, satisfied people's work demand, improved this cable pay-off's work efficiency, brought the facility for people's work.
Preferably, the through hole has been seted up at the top of bottom plate, and electric putter's output runs through the bottom plate through the through-hole, makes things convenient for electric putter to run through the bottom plate through the through-hole and moves about.
Preferably, the limiting hole is formed in the top of the movable block, the fixing rod penetrates through the movable block through the limiting hole, and the fixing rod penetrates through the movable block conveniently through the limiting hole, so that the movable block can be limited conveniently.
Preferably, the shape and the size of the screw are matched with those of the screw, and the screw is movably connected with the fixed plate through the screw. The screw is conveniently driven to move up and down by the rotation of the screw.
Preferably, one end of the sliding rod penetrates through the fixed plate, and the movable frame is movably connected with the fixed plate through the sliding rod, so that the movable frame is conveniently driven to move up and down.
(III) beneficial effects
Compared with the prior art, the utility model provides a cable paying-off device for power construction, which has the following beneficial effects:
1. this cable pay-off for electric power construction, through bottom plate, fixed plate, dead lever, first motor, screw rod, screwed pipe, slide bar, movable frame, connecting rod and movable block, make this cable pay-off can be convenient for adjust, thereby when using this cable pay-off to pay-off lay the cable, can make things convenient for people to adjust this cable pay-off's height, thereby alleviateed people's operating pressure, satisfied people's work demand, improved this cable pay-off's work efficiency, the work of giving people has brought convenience.
2. This cable pay-off for electric power construction, through bottom plate, pulley, electric putter and backup pad, make this cable pay-off can be convenient for remove fixedly to when using this cable pay-off to lay the cable, can make things convenient for people to remove fixedly this cable pay-off's position according to the demand of work, thereby alleviateed people's operating pressure, satisfied people's work demand, improved this cable pay-off's work efficiency, brought the facility for people's work.
Drawings
FIG. 1 is a cross-sectional view of a cable payout device of the present utility model;
FIG. 2 is a front view of the cable payout device of the present utility model;
FIG. 3 is a schematic view of a movable frame according to the present utility model;
FIG. 4 is a schematic view of the connection structure of the movable block and the fixed plate of the present utility model;
fig. 5 is a schematic perspective view of a fixing rod according to the present utility model.
In the figure: 1. a bottom plate; 2. a pulley; 3. an electric push rod; 4. a support plate; 5. a fixing plate; 6. a fixed rod; 7. a first motor; 8. a screw; 9. a solenoid; 10. a slide bar; 11. a movable frame; 12. a connecting rod; 13. a movable block; 14. a second motor; 15. a movable rod; 16. and a roller.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1
The preferred embodiments of the cable pay-off device for power construction provided by the utility model are shown in fig. 1 to 5: the utility model provides a cable pay-off for electric power construction, includes bottom plate 1, the top fixedly connected with fixed plate 5 of bottom plate 1, the interior roof fixedly connected with dead lever 6 of fixed plate 5, the interior bottom wall fixedly connected with first motor 7 of fixed plate 5, the output shaft of first motor 7 passes through shaft coupling fixedly connected with screw rod 8, the outer wall swing joint of screw rod 8 has screwed pipe 9.
The outer wall fixedly connected with slide bar 10 of screwed pipe 9, the one end fixedly connected with movable frame 11 of slide bar 10, one side fixedly connected with connecting rod 12 of movable frame 11, the one end fixedly connected with movable block 13 of connecting rod 12 makes this cable pay-off can be convenient for adjust to when using this cable pay-off to pay-off lay the cable, can make things convenient for people to adjust this cable pay-off's height, thereby alleviateed people's operating pressure, satisfied people's work demand, improved this cable pay-off's work efficiency, the work of giving people has brought convenience.
In this embodiment, one side of the movable frame 11 is fixedly connected with a second motor 14, an output shaft of the second motor 14 is fixedly connected with a movable rod 15 through a coupling, an outer wall of the movable rod 15 is fixedly connected with a roller 16, and the movable rod 15 and the roller 16 are driven to rotate through the second motor 14, so that a cable is conveniently paid out.
Example 2
On the basis of embodiment 1, a preferred embodiment of the cable paying-off device for electric power construction provided by the utility model is shown in fig. 1 to 5: the bottom fixedly connected with pulley 2 of bottom plate 1, the top fixedly connected with electric putter 3 of bottom plate 1, electric putter 3's output fixedly connected with backup pad 4 makes this cable pay-off be convenient for remove fixedly to when using this cable pay-off to lay the cable, can make things convenient for people to remove fixedly this cable pay-off's position according to the demand of work, thereby alleviateed people's operating pressure, satisfied people's work demand, improved this cable pay-off's work efficiency, the work of giving people has brought convenience.
In this embodiment, the through hole has been seted up at the top of bottom plate 1, and the output of electric putter 3 runs through bottom plate 1 through the through hole, makes things convenient for electric putter 3 to run through bottom plate 1 through the through hole and moves about.
Further, the limiting hole is formed in the top of the movable block 13, the fixed rod 6 penetrates through the movable block 13 through the limiting hole, and the fixed rod 6 penetrates through the movable block 13 conveniently through the limiting hole, so that the movable block 13 can be limited conveniently.
Further, the shape and the size of the screw tube 9 are matched with those of the screw rod 8, and the screw tube 9 is movably connected with the fixed plate 5 through the screw rod 8. The screw pipe 9 is conveniently driven to move up and down by the rotation of the screw rod 8.
In addition, one end of the sliding rod 10 penetrates through the fixed plate 5, and the movable frame 11 is movably connected with the fixed plate 5 through the sliding rod 10, and penetrates through the fixed plate 5 through the sliding rod 10, so that the movable frame 11 is conveniently driven to move up and down.
When the device is used, the pulley 2 is used for moving the device to a designated position, the electric push rod 3 is started, the supporting plate 4 is driven to move downwards to support the device, the device is fixed, the first motor 7 is started, the electric screw rod 8 is rotated, the spiral tube 9 is rotated through the screw rod 8 to move up and down, the movable frame 11 is driven by the sliding rod 10 to move up and down, and when the movable frame 11 moves, the movable block 13 is driven by the connecting rod 12 to perform limiting movement on the fixed rod 6 to perform limiting, so that the height adjustment of the device is realized. The second motor 14 is started to drive the movable rod 15 and the roller 16 to rotate, so that the cable wound on the outer wall of the roller 16 is paid out.
To sum up, this cable pay-off for electric power construction can be convenient for adjust to when using this cable pay-off to pay off the cable and lay, can make things convenient for people to adjust this cable pay-off's height, can be convenient for remove fixedly, thereby when using this cable pay-off to lay the cable, can make things convenient for people to remove fixedly this cable pay-off's position according to the demand of work, thereby alleviateed people's operating pressure, satisfied people's work demand, improved this cable pay-off's work efficiency, the work of giving people has brought the facility.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a cable unreeling device for electric power construction, includes bottom plate (1), its characterized in that: the top of the bottom plate (1) is fixedly connected with a fixed plate (5), the inner top wall of the fixed plate (5) is fixedly connected with a fixed rod (6), the inner bottom wall of the fixed plate (5) is fixedly connected with a first motor (7), the output shaft of the first motor (7) is fixedly connected with a screw rod (8) through a coupler, and the outer wall of the screw rod (8) is movably connected with a screw tube (9);
the outer wall fixedly connected with slide bar (10) of screwed pipe (9), the one end fixedly connected with movable frame (11) of slide bar (10), one side fixedly connected with connecting rod (12) of movable frame (11), the one end fixedly connected with movable block (13) of connecting rod (12).
2. The cable pay-off device for electric power construction according to claim 1, wherein: one side of the movable frame (11) is fixedly connected with a second motor (14), an output shaft of the second motor (14) is fixedly connected with a movable rod (15) through a coupler, and the outer wall of the movable rod (15) is fixedly connected with a roller (16).
3. The cable pay-off device for electric power construction according to claim 1, wherein: the bottom of bottom plate (1) fixedly connected with pulley (2), the top fixedly connected with electric putter (3) of bottom plate (1), the output fixedly connected with backup pad (4) of electric putter (3).
4. A cable payout apparatus for electric power construction according to claim 3, wherein: the top of the bottom plate (1) is provided with a through hole, and the output end of the electric push rod (3) penetrates through the bottom plate (1) through the through hole.
5. The cable pay-off device for electric power construction according to claim 1, wherein: the top of the movable block (13) is provided with a limiting hole, and the fixed rod (6) penetrates through the movable block (13) through the limiting hole.
6. The cable pay-off device for electric power construction according to claim 1, wherein: the shape and the size of the screw tube (9) are matched with those of the screw rod (8), and the screw tube (9) is movably connected with the fixed plate (5) through the screw rod (8).
7. The cable pay-off device for electric power construction according to claim 1, wherein: one end of the sliding rod (10) penetrates through the fixed plate (5), and the movable frame (11) is movably connected with the fixed plate (5) through the sliding rod (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223360759.XU CN218909367U (en) | 2022-12-14 | 2022-12-14 | Cable pay-off for electric power construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223360759.XU CN218909367U (en) | 2022-12-14 | 2022-12-14 | Cable pay-off for electric power construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218909367U true CN218909367U (en) | 2023-04-25 |
Family
ID=86038713
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202223360759.XU Active CN218909367U (en) | 2022-12-14 | 2022-12-14 | Cable pay-off for electric power construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218909367U (en) |
-
2022
- 2022-12-14 CN CN202223360759.XU patent/CN218909367U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110061451B (en) | Cable pay-off is used in electric power construction | |
CN110890717B (en) | Method for releasing and laying cable from cable reel | |
CN109687349B (en) | Bypass cable wiring method and special equipment thereof | |
CN107520277B (en) | Automatic copper pipe winding and unwinding assembly line and copper pipe unwinding method using same | |
CN112158686B (en) | Multi-connection cable storage system | |
CN213802263U (en) | Cable traction device for electric power construction | |
CN113161923A (en) | Novel adjustable bridge cable laying system and laying method | |
CN107814256B (en) | Underground wire pulling equipment and using method thereof | |
CN114542903A (en) | Building monitoring device based on BIM | |
CN220306852U (en) | Cable traction device for cable laying | |
CN218909367U (en) | Cable pay-off for electric power construction | |
CN111675045A (en) | Automatic cable coiling machine | |
CN216335775U (en) | Cable laying device for transformer substation | |
CN208454115U (en) | A kind of coil winder of large-sized cable line | |
CN217577733U (en) | Cable laying and paying-off device for electric power installation engineering | |
KR102234797B1 (en) | Self propelled reel type hydraulic puller | |
CN213651509U (en) | Concatemer cable storage system | |
CN210914748U (en) | Steel wire rope coil not easy to tie off | |
CN111416303A (en) | Power engineering cable laying method and stranding and grinding machine for laying | |
CN216811046U (en) | Pay-off is used in civil engineering | |
CN216851084U (en) | Subway cable laying device | |
JP4248668B2 (en) | Method for laying wire rod and spiral wire feeding device used therefor | |
CN221587637U (en) | Auxiliary device for indoor cabling of electric appliance | |
CN219585515U (en) | Buried pipe paying-off device for laying water conservancy construction cables | |
CN220797651U (en) | Electrical construction threading device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |