CN218893394U - High-altitude construction device - Google Patents

High-altitude construction device Download PDF

Info

Publication number
CN218893394U
CN218893394U CN202221601835.9U CN202221601835U CN218893394U CN 218893394 U CN218893394 U CN 218893394U CN 202221601835 U CN202221601835 U CN 202221601835U CN 218893394 U CN218893394 U CN 218893394U
Authority
CN
China
Prior art keywords
mechanical arm
lifting
altitude construction
construction apparatus
grabbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221601835.9U
Other languages
Chinese (zh)
Inventor
雒平
王德武
刘鸿
刘涛
闫志奇
李星亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
Third Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Third Engineering Division filed Critical Third Construction Co Ltd of China Construction Third Engineering Division
Priority to CN202221601835.9U priority Critical patent/CN218893394U/en
Application granted granted Critical
Publication of CN218893394U publication Critical patent/CN218893394U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manipulator (AREA)

Abstract

The utility model belongs to the technical field of electromechanical installation engineering, and particularly provides a high-altitude construction device, which comprises: the walking system drives the lifting system to move; the lifting system is connected with a mechanical arm, and drives the mechanical arm to move up and down; the mechanical arm tail end is connected with a grabbing system for grabbing materials. The high-altitude construction device provided by the utility model can safely and efficiently finish equipment lifting work in the electromechanical installation process according to production requirements through the system integration and control structure, so that labor cost is saved, labor intensity is reduced, and safety in the construction process is ensured.

Description

High-altitude construction device
Technical Field
The utility model belongs to the technical field of electromechanical installation engineering, and particularly relates to an overhead construction device.
Background
In the construction process of the building engineering, the assembly operation of the electromechanical pipeline is very common, the assembly flow of the construction of the ground or underground pipeline is relatively convenient, but the pipeline installed at a high position needs a large amount of hoisting and high-altitude operation, and the electromechanical pipeline has large volume, large span and heavy weight, so that higher difficulty is brought to the operation of assembling the electromechanical pipeline at high altitude. In the existing electromechanical installation engineering, the lifting vehicle is mainly used for installing pipelines higher than the electromechanical equipment, but the installation method is low in efficiency and relatively high in operation danger. Therefore, the utility model provides a safe and efficient high-altitude construction device.
Disclosure of Invention
The utility model aims to solve the problems of low efficiency and high risk degree of the high-altitude installation technology in the existing electromechanical engineering construction process.
To this end, the present utility model provides an overhead construction apparatus comprising: the walking system drives the lifting system to move; the lifting system is connected with a mechanical arm, and drives the mechanical arm to move up and down; the mechanical arm tail end is connected with a grabbing system for grabbing materials.
Specifically, the high-altitude construction device further comprises a control system; the control system is respectively connected with the walking system, the lifting system, the mechanical arm and the grabbing system through control circuits.
Specifically, the high-altitude construction device further comprises a monitoring system for detecting the running environment.
Specifically, the traveling system comprises traveling wheels and a chassis; the walking wheels are arranged at the bottom of the chassis; the lifting system is arranged on the top of the chassis.
Specifically, the walking wheel is a lifting wheel.
Specifically, the traveling system is provided with a weight unit capable of adjusting weight.
Specifically, the lifting system comprises a lifting platform and a hydraulic cylinder for driving the lifting platform to move up and down; the mechanical arm is connected to the lifting platform.
Specifically, a rotary platform is connected between the lifting system and the mechanical arm.
Specifically, a rotating arm is connected between the mechanical arm and the grabbing system.
Specifically, the grabbing system is an electromagnetic chuck, an air chuck or a manipulator.
Compared with the prior art, the utility model has the following advantages and beneficial effects:
the high-altitude construction device provided by the utility model can safely and efficiently finish equipment lifting work in the electromechanical installation process according to production requirements through the system integration and control structure, so that labor cost is saved, labor intensity is reduced, and safety in the construction process is ensured.
The present utility model will be described in further detail with reference to the accompanying drawings.
Drawings
Fig. 1 is a schematic structural view of the high-altitude construction apparatus of the present utility model.
Reference numerals illustrate: 1. a walking wheel; 2. a chassis; 3. a hydraulic cylinder; 4. a lifting platform; 5. a rotary platform; 6. a mechanical arm; 7. a rotating arm; 8. a grabbing system; 9. and (5) material.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like indicate orientations or positional relationships based on the orientation or positional relationships shown in the drawings, merely to facilitate describing the present utility model and simplify the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model.
Referring to fig. 1, the present utility model provides an overhead construction apparatus comprising: the walking system drives the lifting system to move; the lifting system is connected with a mechanical arm 6, and drives the mechanical arm 6 to move up and down; the tail end of the mechanical arm 6 is connected with a grabbing system 8 for grabbing materials 9. When the mechanical arm 9 is actually used, the angle of the mechanical arm 6 is firstly adjusted, the grabbing system 8 is driven to grab the material 9 to be installed, then the lifting system, the mechanical arm 6 and the grabbing system 8 are moved to the position to be installed under the motion of the traveling system, the mechanical arm 6 is adjusted to a proper height through the up-and-down motion of the lifting system, and finally the grabbing system 8 is lifted to a proper installation angle under the action of the mechanical arm 6, so that the high-altitude installation operation of the material 9 is completed.
The high-altitude construction device provided by the utility model further comprises a control system; the control system is respectively connected with the walking system, the lifting system, the mechanical arm 6 and the grabbing system 8 through control circuits, an operator realizes the control of the whole device through the control system, and in the actual use process, the control system can operate through handheld equipment.
The high-altitude construction device provided by the utility model further comprises a monitoring system for detecting the running environment, and an operator adjusts the running state of the whole device by using the control system according to the information fed back by the monitoring system, for example, the stress of the running system is measured and fed back in the lifting process, and the safe lifting is realized by the control system.
Specifically, the traveling system comprises traveling wheels 1 and a chassis 2; the travelling wheels 1 are arranged at the bottom of the chassis 2, and one travelling wheel 1 is arranged at each of four corners of the chassis 2 to ensure stable operation; the lifting system is mounted on top of the chassis 2.
Preferably, the travelling wheels 1 are lifting wheels, driven by an in-wheel motor, and the steering system adopts crawler steering instead of steering by a steering machine. The height of each lifting wheel is adjusted according to the levelness of the ground in the construction environment during walking so as to adapt to the ground on site and ensure the stability of the device.
Further, the weight-adjustable counterweight unit is arranged on the traveling system, so that the weight of the chassis 2 can be automatically adjusted according to the requirement, and the risk of rollover of the high-altitude construction device in the operation process due to the fact that the chassis 2 is too light is avoided.
In a refined embodiment, the lifting system comprises a lifting platform 4 and a hydraulic cylinder 3; the mechanical arm 6 is connected to the lifting platform 4. The hydraulic cylinder 3 drives the lifting platform 4 to drive the mechanical arm 6 to move up and down, and the height of the material 9 is adjusted.
In order to realize the omnibearing dead-angle-free installation of the material 9, a rotary platform 5 is connected between the lifting system and the mechanical arm 6, and in addition, a rotary arm 7 can be connected between the mechanical arm 6 and the grabbing system 8, so that the material 9 can be installed and grabbed from various angles in the lifting process.
The grabbing system 8 is an electromagnetic chuck, an air chuck or a manipulator and other modules, and the modules can be replaced with each other as required. For example, when the material 9 to be mounted is an iron member such as an air duct or a bridge, the suction is preferably performed by using an electromagnetic chuck.
The foregoing examples are merely illustrative of the present utility model and are not intended to limit the scope of the present utility model, and all designs that are the same or similar to the present utility model are within the scope of the present utility model.

Claims (10)

1. An overhead construction apparatus, comprising: the walking system drives the lifting system to move; the lifting system is connected with a mechanical arm (6), and drives the mechanical arm (6) to move up and down; the tail end of the mechanical arm (6) is connected with a grabbing system (8) for grabbing materials (9).
2. The high altitude construction apparatus according to claim 1, wherein: the system also comprises a control system; the control system is respectively connected with the walking system, the lifting system, the mechanical arm (6) and the grabbing system (8) through control circuits.
3. The high altitude construction apparatus according to claim 2, wherein: a monitoring system for detecting an operating environment is also included.
4. The high altitude construction apparatus according to claim 1, wherein: the walking system comprises walking wheels (1) and a chassis (2); the walking wheels (1) are arranged at the bottom of the chassis (2); the lifting system is arranged on the top of the chassis (2).
5. The high altitude construction apparatus according to claim 4, wherein: the walking wheels (1) are lifting wheels.
6. The high altitude construction apparatus according to claim 1, wherein: the walking system is provided with a weight balancing unit capable of adjusting weight.
7. The high altitude construction apparatus according to claim 1, wherein: the lifting system comprises a lifting platform (4) and a hydraulic cylinder (3) for driving the lifting platform (4) to move up and down; the mechanical arm (6) is connected to the lifting platform (4).
8. The high altitude construction apparatus according to claim 1, wherein: a rotary platform (5) is connected between the lifting system and the mechanical arm (6).
9. The high altitude construction apparatus according to claim 1, wherein: a rotating arm (7) is connected between the mechanical arm (6) and the grabbing system (8).
10. The high altitude construction apparatus according to claim 1, wherein: the grabbing system (8) is an electromagnetic chuck, an air chuck or a manipulator.
CN202221601835.9U 2022-06-24 2022-06-24 High-altitude construction device Expired - Fee Related CN218893394U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221601835.9U CN218893394U (en) 2022-06-24 2022-06-24 High-altitude construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221601835.9U CN218893394U (en) 2022-06-24 2022-06-24 High-altitude construction device

Publications (1)

Publication Number Publication Date
CN218893394U true CN218893394U (en) 2023-04-21

Family

ID=85998540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221601835.9U Expired - Fee Related CN218893394U (en) 2022-06-24 2022-06-24 High-altitude construction device

Country Status (1)

Country Link
CN (1) CN218893394U (en)

Similar Documents

Publication Publication Date Title
CN102530734B (en) Movable portal crane
CN111661764B (en) High wheeled hoist of security
CN105152036A (en) Electric transportation trolley for automatic glass mounting
CN109795966A (en) A kind of axial caterpillar belt self-walking type aerial work platforms leveled at any time of energy two
CN218893394U (en) High-altitude construction device
CN103662704A (en) Rail-spanning transportation assembly wagon
CN203638615U (en) Cross-rail transport assembly vehicle
CN212503871U (en) Multifunctional electric power engineering vehicle
CN206144559U (en) Portable mining lifting support that fixes
CN2915820Y (en) High altitude operation vehicle
LU102796B1 (en) Apparatus for automatically mounting h-shaped steel column
CN204454333U (en) Wind-power tower manufactures special crawler belt suspension transferring machine
CN208856836U (en) A kind of planer-type component transportation vehicle
CN111764613A (en) High-altitude equipment installation device in rail traveling area of rail transit engineering and construction method
CN109384162B (en) Gantry type component transport vehicle and component transport method
CN203021214U (en) Tracked vehicle
CN214350743U (en) Automatic assembly system for main reducing component of drive axle
CN205023757U (en) Electronic floor truck of glass automatic installation
CN212271623U (en) Metal facade operation platform
CN108408586A (en) A kind of self correction formula Pneumatic hoisting haulage equipment
CN107344698A (en) A kind of extraordinary Dramatic Air Lifts
CN217172116U (en) Belt conveyor installs cylinder frock fast
CN218018496U (en) Intelligent mechanical arm system for installing and adjusting verticality of vertical prefabricated part
CN218809971U (en) Fixed large crane
CN213417444U (en) Track plate transporting and loading equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230421