CN218881474U - Telescopic construction waste channel - Google Patents

Telescopic construction waste channel Download PDF

Info

Publication number
CN218881474U
CN218881474U CN202223519835.7U CN202223519835U CN218881474U CN 218881474 U CN218881474 U CN 218881474U CN 202223519835 U CN202223519835 U CN 202223519835U CN 218881474 U CN218881474 U CN 218881474U
Authority
CN
China
Prior art keywords
fixing
pipe
inlet pipe
wall
telescopic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223519835.7U
Other languages
Chinese (zh)
Inventor
王海朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Chute Equipment Co ltd
Original Assignee
Qingdao Chute Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Chute Equipment Co ltd filed Critical Qingdao Chute Equipment Co ltd
Priority to CN202223519835.7U priority Critical patent/CN218881474U/en
Application granted granted Critical
Publication of CN218881474U publication Critical patent/CN218881474U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model provides a telescopic building rubbish passageway, including the inlet pipe, the division board has all been welded to the inner wall both sides of inlet pipe, outer wall one side of inlet pipe is provided with the pan feeding mouth, the welding of the surperficial both sides of inlet pipe has the mounting panel, the fixed orifices has been seted up on the surface of mounting panel, the both ends of inlet pipe all are provided with flexible pipe. This telescopic building rubbish passageway, through first fixed block, the dead lever, the fixed slot, the second fixed block, threaded rod and fixation nut's setting, can make things convenient for flexible pipe to fix at the optional position, in flexible pipe adjustment position, the dead lever can remove at the threaded rod through the fixed slot, then when suitable position is adjusted to flexible pipe, rotatory fixation nut, cooperation threaded rod locks the dead lever, thereby fix the position of flexible pipe at the inlet pipe, make flexible pipe can be at optional position and concatenation union coupling, can ensure that the inlet pipe is installed in suitable position.

Description

Telescopic construction waste channel
Technical Field
The utility model relates to a building rubbish passageway is related technical field, especially relates to a telescopic building rubbish passageway.
Background
The building garbage refers to muck, abandoned soil, discarded materials, sludge and other wastes generated in the process of building, laying, dismantling and repairing various buildings, structures, pipe networks and the like by a construction unit or an individual, wherein in the super high-rise building, if the building garbage is transported layer by layer, not only is time spent, but also more manpower and material resources are spent, in order to adapt to the situation, a specific building garbage channel is generally installed on most super high-rise buildings, the garbage can be directly transmitted through the channel in a sliding manner on the outer side of the building, the building needs to pour the garbage into the channel at different floor heights, a channel capable of pouring the garbage is required to be installed on different building floors, but the building garbage channel is generally formed by splicing a plurality of pipelines, the distance between the upper floor and the lower floor is fixed, if the spliced pipelines can not just meet the floor distance, the installation position of a feeding pipe has inevitable deviation, and the telescopic building channel is particularly required.
However, in the use process of the existing telescopic construction waste channel, most of the construction waste channels are formed by splicing multiple sections of pipelines, the distance between an upper floor and a lower floor is fixed, and if the spliced pipelines cannot just meet the floor distance, the installation positions of the feeding pipes cannot be deviated.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a telescopic building rubbish passageway to solve the current telescopic building rubbish passageway that proposes in the above-mentioned background art, but current telescopic building rubbish passageway, in the use, most building rubbish passageways are because all are formed by the concatenation of multistage pipeline, and the interval of upper and lower floor is fixed, if the pipeline of concatenation can not just accord with the problem that the mounted position of inlet pipe so of floor interval can have the deviation unavoidably.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a telescopic building rubbish passageway, includes the inlet pipe, the division board has all been welded to the inner wall both sides of inlet pipe, outer wall one side of inlet pipe is provided with the pan feeding mouth, the welding of the surperficial both sides of inlet pipe has the mounting panel, the fixed orifices has been seted up on the surface of mounting panel, the both ends of inlet pipe all are provided with flexible pipe, the one end outer lane of flexible pipe is provided with the spacing ring, the other end outer lane of flexible pipe is provided with the go-between, the outer wall both sides of inlet pipe are provided with fixed establishment, the outer wall both sides welding of go-between has first fixed plate, first connecting hole has been seted up on the surface of first fixed plate, the one end of go-between is provided with the concatenation pipe, the outer wall skin weld of concatenation pipe has the second fixed plate, the second connecting hole has been seted up on the second fixed plate surface, the one end of first connecting hole is provided with the spring, the couple has all been welded at the both ends of spring.
Preferably, one end of the feeding port is attached to the surface of the partition plate, and the fixing holes are distributed on the surface of the mounting plate at equal intervals.
Preferably, the telescopic pipe forms a telescopic structure with the inlet pipe through a limiting ring, and the size of the outer ring of the limiting ring is matched with that of the inner ring of the inlet pipe.
Preferably, fixed establishment includes first fixed block, dead lever, fixed slot, second fixed block, threaded rod and fixation nut, first fixed block has all been welded to the outer wall both sides of inlet pipe, one side fixed mounting of first fixed block has the dead lever, the fixed slot has been seted up on the surface of dead lever, the second fixed block has all been welded to the outer wall both sides of go-between, the skin weld of second fixed block has the threaded rod, the one end of threaded rod is connected with fixation nut.
Preferably, one end of the threaded rod penetrates through the fixing groove and is in threaded connection with the fixing nut, and the first fixing block and the second fixing block are symmetrically arranged.
Preferably, the splicing pipe is tightly attached to one end of the connecting ring, the first fixing plate and the second fixing plate correspond in position, and the first connecting hole and the second connecting hole are identical in size.
Preferably, the hook and the spring form a telescopic structure, and the hook is connected with the first connecting hole and the second connecting hole.
Compared with the prior art, the beneficial effects of the utility model are that: this telescopic building rubbish passageway, setting through flexible pipe and spacing ring, when the inlet pipe is installed, can stretch out and draw back in the one end of inlet pipe through flexible pipe, then connect through go-between and concatenation pipe, secondly through first fixed block, the dead lever, the fixed slot, the second fixed block, threaded rod and fixation nut's setting, can make things convenient for flexible pipe to fix at the optional position, in flexible pipe adjustment position, the dead lever can remove through going on of fixed slot at the threaded rod, then when suitable position is adjusted to flexible pipe, rotatory fixation nut, cooperation threaded rod locks the dead lever, thereby fix flexible pipe at the position of inlet pipe, make flexible pipe can be at optional position and concatenation union coupling, can ensure to install in suitable position at the inlet pipe.
Drawings
FIG. 1 is a schematic view of the side view appearance structure of the present invention;
FIG. 2 is a schematic view of the structure of the feed pipe and the partition plate of the present invention;
FIG. 3 is a schematic view of the fixing mechanism of the present invention;
fig. 4 is an enlarged schematic structural view of a portion a in fig. 1 according to the present invention.
In the figure: 1. a feed pipe; 2. a partition plate; 3. a feeding port; 4. mounting a plate; 5. a fixing hole; 6. a telescopic pipe; 7. a limiting ring; 8. a connecting ring; 9. a fixing mechanism; 901. a first fixed block; 902. fixing the rod; 903. fixing grooves; 904. a second fixed block; 905. a threaded rod; 906. fixing a nut; 10. a first fixing plate; 11. a first connection hole; 12. splicing the tubes; 13. a second fixing plate; 14. a second connection hole; 15. a spring; 16. and (4) hanging hooks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a telescopic building rubbish passageway, including inlet pipe 1, division board 2 has all been welded to inlet pipe 1's inner wall both sides, outer wall one side of inlet pipe 1 is provided with pan feeding mouth 3, the welding of inlet pipe 1's surperficial both sides has mounting panel 4, fixed orifices 5 has been seted up on mounting panel 4's surface, inlet pipe 1's both ends all are provided with flexible pipe 6, the one end outer lane of flexible pipe 6 is provided with spacing ring 7, flexible pipe 6's other end outer lane is provided with go-between 8, inlet pipe 1's outer wall both sides are provided with fixed establishment 9, the welding of go-between 8's outer wall both sides has first fixed plate 10, first connecting hole 11 has been seted up on the surface of first fixed plate 10, go-between 8's one end is provided with concatenation pipe 12, the outer wall skin weld of concatenation pipe 12 has second fixed plate 13, second connecting hole 14 has been seted up on second fixed plate 13 surface, the one end of first connecting hole 11 is provided with spring 15, couple 16 has all been welded at spring 15's both ends.
Further, the one end of pan feeding mouth 3 is laminated with division board 2 surface mutually, and fixed orifices 5 are equidistant distribution on mounting panel 4 surface, and through the setting of mounting panel 4, inlet pipe 1 can be together fixed through fixed orifices 5 and the building on mounting panel 4 surface.
Furthermore, flexible pipe 6 passes through spacing ring 7 and constitutes extending structure with inlet pipe 1, and the outer lane size of spacing ring 7 is identical with the inner circle size of inlet pipe 1, and through flexible pipe 6 and spacing ring 7's setting, flexible pipe 6 is when inlet pipe 1 one end is flexible, and spacing ring 7 can increase stability, and the one end of spacing ring 7 can also be inconsistent with division board 2 simultaneously, prevents to block the pan feeding position of pan feeding mouth 3.
Further, the fixing mechanism 9 comprises a first fixing block 901, a fixing rod 902, a fixing groove 903, a second fixing block 904, a threaded rod 905 and a fixing nut 906, the first fixing block 901 is welded on two sides of the outer wall of the feed pipe 1, the fixing rod 902 is fixedly installed on one side of the first fixing block 901, the fixing groove 903 is formed in the surface of the fixing rod 902, the second fixing block 904 is welded on two sides of the outer wall of the connecting ring 8, the threaded rod 905 is welded on the surface of the second fixing block 904, one end of the threaded rod 905 is connected with the fixing nut 906, the fixing rod 902, the fixing groove 903, the second fixing block 904, the threaded rod 905 and the fixing nut 906 are arranged through the first fixing block 901, the fixing rod 902 can be conveniently fixed at any position of the telescopic pipe 6, when the telescopic pipe 6 is adjusted in position, the fixing rod 902 can move on the threaded rod 905 through the fixing groove 903, then when the telescopic pipe 6 is adjusted to a proper position, the fixing nut 906 is rotated, the fixing rod 902 is locked through the matching with the threaded rod 905, and the telescopic pipe 6 is fixed at the position of the feed pipe 1, so that the telescopic pipe 6 can be connected with the splicing pipe 12, and the feed pipe 1 can be installed at a proper position.
Furthermore, one end of the threaded rod 905 penetrates through the fixing groove 903 and is in threaded connection with the fixing nut 906, the first fixing block 901 and the second fixing block 904 are symmetrically arranged, and the threaded rod 905 can be conveniently fixed at any position through the arrangement of the fixing groove 903.
Further, the splicing pipe 12 is closely attached to one end of the connecting ring 8, the positions of the first fixing plate 10 and the second fixing plate 13 are corresponding, the sizes of the first connecting hole 11 and the second connecting hole 14 are identical, the splicing pipe 12 can be matched with the springs 15 and the hooks 16 to be spliced through the second fixing plate 13 and the second connecting hole 14 through the arrangement of the splicing pipe 12, and meanwhile, the splicing pipe can be connected with the connecting ring 8.
Further, 16 and the spring 15 constitute extending structure, 16 and first connecting hole 11 and second connecting hole 14 homogeneous phase interconnect of couple, through the setting of spring 15 and couple 16, 16 can stretch out and draw back through spring 15, under the power is tightened up to spring 15, make flexible pipe 6 and concatenation pipe 12 or a plurality of concatenation pipes 12 between themselves be connected.
The working principle is as follows: the position of the telescopic pipe 6 can be adjusted at two ends of the feeding pipe 1, then when the position of the telescopic pipe 6 is adjusted, the fixed rod 902 can move on the threaded rod 905 through the fixed groove 903, then when the telescopic pipe 6 is adjusted to a proper position, the fixed nut 906 is rotated, the fixed rod 902 is locked through the matched threaded rod 905, so that the telescopic pipe 6 is fixed at the position of the feeding pipe 1, the telescopic pipe 6 can be connected with the splicing pipe 12 at any position, then the splicing pipe 12 can be connected with the second connecting hole 14 through the second fixed plate 13, the matched spring 15 and the hook 16 are spliced in a plurality of ways, finally, the feeding pipe 1 can be fixed with a building through the fixed hole 5 in the surface of the mounting plate 4, and thus the telescopic building garbage channel is completed.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. A telescopic construction waste passageway, includes inlet pipe (1), its characterized in that: division board (2) have all been welded to the inner wall both sides of inlet pipe (1), outer wall one side of inlet pipe (1) is provided with pan feeding mouth (3), the skin both sides welding of inlet pipe (1) has mounting panel (4), fixed orifices (5) have been seted up on the surface of mounting panel (4), the both ends of inlet pipe (1) all are provided with flexible pipe (6), the one end outer lane of flexible pipe (6) is provided with spacing ring (7), the other end outer lane of flexible pipe (6) is provided with go-between (8), the outer wall both sides of inlet pipe (1) are provided with fixed establishment (9), the outer wall both sides welding of go-between (8) has first fixed plate (10), first connecting hole (11) has been seted up on the surface of first fixed plate (10), the one end of go-between (8) is provided with splicing pipe (12), the outer wall skin weld of splicing pipe (12) has second fixed plate (13), second connecting hole (14) have been seted up on second fixed plate (13) surface, the one end of first connecting hole (11) is provided with spring (15), the both ends of spring (15) have all welded and have couple (16).
2. The telescopic construction waste channel according to claim 1, wherein one end of the material inlet (3) is attached to the surface of the partition plate (2), and the fixing holes (5) are distributed on the surface of the mounting plate (4) at equal intervals.
3. The telescopic construction waste channel according to claim 1, wherein the telescopic pipe (6) forms a telescopic structure with the feeding pipe (1) through a limiting ring (7), and the size of the outer ring of the limiting ring (7) is matched with that of the inner ring of the feeding pipe (1).
4. The telescopic construction waste channel according to claim 1, wherein the fixing mechanism (9) comprises a first fixing block (901), a fixing rod (902), a fixing groove (903), a second fixing block (904), a threaded rod (905) and a fixing nut (906), the first fixing block (901) is welded on two sides of the outer wall of the feeding pipe (1), the fixing rod (902) is fixedly installed on one side of the first fixing block (901), the fixing groove (903) is formed in the surface of the fixing rod (902), the second fixing block (904) is welded on two sides of the outer wall of the connecting ring (8), the threaded rod (905) is welded on the surface of the second fixing block (904), and the fixing nut (906) is connected to one end of the threaded rod (905).
5. The retractable construction waste channel as claimed in claim 4, wherein one end of the threaded rod (905) penetrates through the fixing groove (903) and is in threaded connection with the fixing nut (906), and the first fixing block (901) and the second fixing block (904) are symmetrically arranged.
6. The retractable construction waste chute according to claim 1, wherein the splicing pipe (12) is closely attached to one end of the connecting ring (8), the first fixing plate (10) and the second fixing plate (13) are correspondingly positioned, and the first connecting hole (11) and the second connecting hole (14) are matched in size.
7. A telescopic construction waste chute according to claim 1, c h a r a c t e r i z e d in that the hook (16) forms a telescopic structure with the spring (15), the hook (16) interconnecting the first connection hole (11) and the second connection hole (14).
CN202223519835.7U 2022-12-29 2022-12-29 Telescopic construction waste channel Active CN218881474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223519835.7U CN218881474U (en) 2022-12-29 2022-12-29 Telescopic construction waste channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223519835.7U CN218881474U (en) 2022-12-29 2022-12-29 Telescopic construction waste channel

Publications (1)

Publication Number Publication Date
CN218881474U true CN218881474U (en) 2023-04-18

Family

ID=85956272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223519835.7U Active CN218881474U (en) 2022-12-29 2022-12-29 Telescopic construction waste channel

Country Status (1)

Country Link
CN (1) CN218881474U (en)

Similar Documents

Publication Publication Date Title
CN209891485U (en) Cast-in-place concrete external wall insulation integration template bearing structure
CN212026786U (en) Fastener device suitable for detachable steel bar truss building carrier plate
CN209891244U (en) Prefabricated assembled concrete assembles utility tunnel from top to bottom
CN218881474U (en) Telescopic construction waste channel
CN203188611U (en) Bi-directional self-supporting building template system
CN215563028U (en) Vertical interim water supply pipe device of floor
CN214462450U (en) Double-groove supporting and hanging type connecting piece
CN213946929U (en) Autoclaved aerated concrete piping distribution plate
CN211117975U (en) All-round adjustable over-and-under type equipment pipeline fixed bracket support
CN210342650U (en) Combined aluminum alloy template
CN212405943U (en) Novel be convenient for clear up building rubbish device
CN209723610U (en) A kind of pipeline that adjustable recycles hangs mould
CN213637278U (en) Pedal motor assembly mounting structure convenient to dismouting
CN210086743U (en) Combined vertical pipe placing device in high-rise pipe well
CN114059707A (en) High strength building engineering concrete wallboard
CN219808707U (en) Template supporting system of arc side wall under cover plate
CN206685859U (en) A kind of cable holder stand column being fixed on furrow bank
CN218149726U (en) Exquisite regularization steel form of building of expansion joint
CN212137234U (en) Assembled prefabricated insulating cable pit
CN215888983U (en) Upper reinforcing mesh supporting and positioning device
CN109707159A (en) A kind of pipeline that adjustable recycles hangs mould
CN216075722U (en) Assembled reinforced concrete heat preservation composite wall structure
CN215830012U (en) Aluminum mould beam bottom tapping-free wire pipe positioner
CN217028091U (en) Reserved hole hanging die reinforcing device
CN220666460U (en) Assembled ditch

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant