CN212405943U - Novel be convenient for clear up building rubbish device - Google Patents

Novel be convenient for clear up building rubbish device Download PDF

Info

Publication number
CN212405943U
CN212405943U CN201922191013.2U CN201922191013U CN212405943U CN 212405943 U CN212405943 U CN 212405943U CN 201922191013 U CN201922191013 U CN 201922191013U CN 212405943 U CN212405943 U CN 212405943U
Authority
CN
China
Prior art keywords
passage
convenient
material guide
novel
annular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922191013.2U
Other languages
Chinese (zh)
Inventor
王雷
祝洪祥
祁晓杰
陈勇斌
贺彬
江兴璐
张哲夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Shandong Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Shandong Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd, China Railway Construction Engineering Group Shandong Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN201922191013.2U priority Critical patent/CN212405943U/en
Application granted granted Critical
Publication of CN212405943U publication Critical patent/CN212405943U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a novel be convenient for clear up building rubbish device, a plurality of passage including interconnect, adjacent two all be equipped with connecting device between the passage, adjacent two all be equipped with positioner between the passage, be located the bottom rotatable two supporting legs of installing of symmetry on the passage, two all be equipped with fixing device on the supporting leg, be located the top rotatable two locating levers of installing of symmetry on the passage. The utility model discloses in connect interconnect's passage slope between floor and ground, through the passage can be convenient, quick with the building rubbish transportation to subaerial on the building, convenient operation not only, the conveying efficiency is high moreover to very big acceleration the construction progress, reasonable in design.

Description

Novel be convenient for clear up building rubbish device
Technical Field
The utility model relates to a construction technical field especially relates to a novel be convenient for clear up building rubbish device.
Background
The construction waste refers to dregs, spoil, waste materials, sludge and other wastes generated in the process of constructing, laying, dismantling and repairing various buildings, structures, pipe networks and the like by construction, construction units or individuals, and the materials are not helpful for the buildings per se, but are substances generated in the process of the buildings and need to be correspondingly treated, so that the ideal engineering project construction can be achieved.
When the building that the floor is lower and do not have the elevator is built, mostly adopt artifical picking or the mode of loop wheel machine handling to transport construction waste to subaerial from the building, not only troublesome poeration, the conveying efficiency is low moreover to very big influence the construction progress, consequently need to improve to this.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the conveying efficiency is low when building rubbish is transported to the ground from the building without the elevator among the prior art, and the novel device of being convenient for clear up building rubbish that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a novel be convenient for clear up building rubbish device, includes a plurality of passage of interconnect, adjacent two all be equipped with connecting device between the passage, adjacent two all be equipped with positioner between the passage, be located the bottom the rotatable two supporting legs of installing of symmetry on the passage, two all be equipped with fixing device on the supporting leg, be located the top the rotatable two locating levers of installing of symmetry on the passage.
Preferably, the connecting device comprises two annular connecting plates fixedly mounted on the outer side walls of the opposite ends of the two material guide pipes, a plurality of connecting screw rods are inserted into the two annular connecting plates together, each connecting screw rod is in threaded connection with a fastening nut, and the fastening nuts are in close contact with the annular connecting plates.
Preferably, the positioning device comprises an annular positioning block fixedly mounted at one end of each material guide pipe, and an annular positioning groove in clearance fit with the annular positioning block is formed in one end, far away from the annular positioning block, of each material guide pipe.
Preferably, the supporting leg includes the dead lever, the top of dead lever is movably inserted and is equipped with the movable rod, and the top of movable rod is rotatable installs on the passage of bottom, threaded connection has the first fastening bolt who mutually supports with the movable rod on the lateral wall on dead lever top.
Preferably, the fixing device comprises a bottom plate fixedly installed at the bottom end of the supporting leg, a plurality of second fastening bolts are evenly inserted into the top wall of the bottom plate, and the bottom ends of the second fastening bolts are all in threaded connection with the ground.
Preferably, the material guide pipe is made of stainless steel material.
Compared with the prior art, the utility model discloses there is following beneficial effect:
1. the material guide pipes which are connected with each other are obliquely connected between floors and the ground, so that the construction waste on the building can be conveniently and quickly transported to the ground through the material guide pipes, the operation is convenient, the transportation efficiency is high, the construction progress is greatly accelerated, and the design is reasonable;
2. simple structure, can be convenient to install the baffle pipe and dismantle to can be according to the building height with the baffle pipe interconnect of suitable number, convenient operation, application scope is wide.
Drawings
Fig. 1 is a schematic front structural view of a novel device for conveniently cleaning construction waste provided by the utility model;
FIG. 2 is a front sectional view of the novel device for conveniently cleaning construction waste of the present invention;
fig. 3 is the enlarged view of the structure of the part a of the novel device convenient for cleaning building rubbish.
In the figure: the device comprises a material guide pipe 1, an annular connecting plate 2, a connecting screw rod 3, a fastening nut 4, an annular positioning block 5, an annular positioning groove 6, a fixed rod 7, a movable rod 8, a first fastening bolt 9, a bottom plate 10, a second fastening bolt 11 and a positioning rod 12.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a novel device convenient for cleaning construction waste comprises a plurality of material guiding pipes 1 which are connected with each other, wherein the material guiding pipes 1 are made of stainless steel materials, the material is light, the mechanical strength is high, the use effect is good, the service life is long, a connecting device is arranged between two adjacent material guiding pipes 1, the connecting device comprises two annular connecting plates 2 which are fixedly arranged on the outer side walls of the opposite ends of the two material guiding pipes 1, a plurality of connecting screw rods 3 are commonly inserted on the two annular connecting plates 2, each connecting screw rod 3 is in threaded connection with a fastening nut 4, the fastening nuts 4 are in close contact with the annular connecting plates 2, the two adjacent annular connecting plates 2 are in close contact with each other, the two adjacent annular connecting plates 2 are connected with each other by the connecting screw rods 3 and fixed by the fastening nuts 4, and the two adjacent material guiding pipes 1 can be conveniently connected with each other, the material guide pipes 1 can be conveniently assembled and disassembled, so that the material guide pipes 1 with proper number can be connected with each other according to the height of a building, the operation is convenient, and the application range is wide.
All be equipped with positioner between two adjacent passage 1, positioner includes annular locating piece 5 of fixed mounting in passage 1 one end, and annular locating piece 5's annular locating groove 6 with annular locating piece 5 clearance fit each other is all seted up to the one end that every passage 1 kept away from annular locating piece 5, and both accurate, the quick connection to two adjacent passage 1 of being convenient for can promote the joint strength between two adjacent passage 1 again.
Be located the rotatable two supporting legs of installing of symmetry on the passage 1 of bottom, the supporting leg includes dead lever 7, the top of dead lever 7 is mobile to be inserted and is equipped with movable rod 8, and the rotatable installation in the passage 1 of bottom in top of movable rod 8, threaded connection has a fastening bolt 9 with the mutual complex of movable rod 8 on the lateral wall on dead lever 7 top, the length of regulation supporting leg that can be convenient to the bottom and the ground in close contact with of supporting leg of being convenient for.
All be equipped with fixing device on two supporting legs, fixing device includes bottom plate 10 of fixed mounting in the supporting leg bottom, evenly inserts on the roof of bottom plate 10 and is equipped with a plurality of second fastening bolt 11, and the equal threaded connection in bottom of second fastening bolt 11 subaerial, can be convenient with bottom plate 10, supporting leg and be located the passage 1 of bottom fixed.
Two positioning rods 12 are symmetrically and rotatably arranged on the material guide pipe 1 at the top end, the material guide pipe 1 at the top end is in mutual contact with the floor of a building, and then the positioning rods 12 are pressed and fixed by using a heavy object, so that the material guide pipe 1 at the top end can be fixed.
In the utility model, the annular positioning block 5 is inserted into the corresponding annular positioning groove 6 and the two adjacent annular connecting plates 2 are mutually closely contacted, the two adjacent annular connecting plates 2 are mutually connected by the connecting screw rod 3 and fixed by the fastening nut 4, so that the two adjacent guide tubes 1 can be conveniently mutually connected, the guide tubes 1 with proper number are mutually connected according to the height of the building, the guide tubes 1 at the top end are mutually contacted with the floor of the building, then the positioning rod 12 is tightly pressed and fixed by a heavy object, so that the guide tubes 1 at the top end can be fixed, the first fastening bolt 9 is loosened and the bottom plate 10 is closely contacted with the ground, then the first fastening bolt 9 is turned tightly to fix the movable rod 8, the bottom plate 10, the supporting leg and the guide tubes 1 at the bottom end are fixed by the second fastening bolt 11, so that the guide tubes 1 which are mutually connected can be obliquely connected between the building and the ground, building garbage is poured into the material guide pipe 1 at the top end, and the building garbage can slide down to the ground along the inclined side wall of the material guide pipe 1.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a novel be convenient for clear up building rubbish device, includes a plurality of passage (1) of interconnect, its characterized in that: all be equipped with connecting device between adjacent two passage (1), adjacent two all be equipped with positioner between passage (1), be located the bottom passage (1) goes up the rotatable two supporting legs of installing of symmetry, two all be equipped with fixing device on the supporting leg, be located the top passage (1) goes up the rotatable two locating levers (12) of installing of symmetry.
2. The novel device convenient for cleaning construction waste of claim 1, characterized in that: the connecting device comprises two annular connecting plates (2) fixedly mounted on the outer side walls of the opposite ends of the two material guide pipes (1), a plurality of connecting screw rods (3) are jointly inserted into the annular connecting plates (2), each connecting screw rod (3) is connected with a fastening nut (4) in a threaded mode, and the fastening nuts (4) are in close contact with the annular connecting plates (2) mutually.
3. The novel device convenient for cleaning construction waste of claim 1, characterized in that: the positioning device comprises annular positioning blocks (5) fixedly mounted at one ends of the material guide pipes (1), and annular positioning grooves (6) which are in clearance fit with the annular positioning blocks (5) are formed in one ends, far away from the annular positioning blocks (5), of the material guide pipes (1).
4. The novel device convenient for cleaning construction waste of claim 1, characterized in that: the supporting legs comprise fixed rods (7), movable rods (8) are movably inserted in the top ends of the fixed rods (7), the top ends of the movable rods (8) are rotatably installed on the material guide pipes (1) at the bottom ends, and first fastening bolts (9) matched with the movable rods (8) are connected to the outer side walls of the top ends of the fixed rods (7) in a threaded mode.
5. The novel device convenient for cleaning construction waste of claim 1, characterized in that: the fixing device comprises a bottom plate (10) fixedly installed at the bottom end of the supporting leg, a plurality of second fastening bolts (11) are evenly inserted into the top wall of the bottom plate (10), and the bottom ends of the second fastening bolts (11) are connected to the ground in a threaded mode.
6. The novel device convenient for cleaning construction waste of claim 1, characterized in that: the material guide pipe (1) is made of stainless steel materials.
CN201922191013.2U 2019-12-10 2019-12-10 Novel be convenient for clear up building rubbish device Expired - Fee Related CN212405943U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922191013.2U CN212405943U (en) 2019-12-10 2019-12-10 Novel be convenient for clear up building rubbish device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922191013.2U CN212405943U (en) 2019-12-10 2019-12-10 Novel be convenient for clear up building rubbish device

Publications (1)

Publication Number Publication Date
CN212405943U true CN212405943U (en) 2021-01-26

Family

ID=74401125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922191013.2U Expired - Fee Related CN212405943U (en) 2019-12-10 2019-12-10 Novel be convenient for clear up building rubbish device

Country Status (1)

Country Link
CN (1) CN212405943U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113501104A (en) * 2021-08-05 2021-10-15 上海外高桥造船有限公司 Mail steamer heavy object garbage throwing device and dock building system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113501104A (en) * 2021-08-05 2021-10-15 上海外高桥造船有限公司 Mail steamer heavy object garbage throwing device and dock building system

Similar Documents

Publication Publication Date Title
CN110425342B (en) Super high-rise concrete pumping pipe installation structure and installation method thereof
CN212405943U (en) Novel be convenient for clear up building rubbish device
CN113073746B (en) C-shaped sleeve detachable and replaceable reinforced concrete column-column connecting structure and construction method
CN110630016A (en) Adjustable building die carrier
CN209585609U (en) Late poured band support structure
CN213058609U (en) Garbage collector for construction of constructional engineering
CN204040457U (en) Wooden frame plastic formwork system
CN218952694U (en) Floor rubbish conveying channel
CN208733622U (en) A kind of template of simple type Fast Installation manhole retaining wall
CN219808707U (en) Template supporting system of arc side wall under cover plate
CN210217036U (en) Construction waste transportation device
CN109386295B (en) Underground rectangular cross section tunnel structure template construction equipment
CN211172065U (en) Shared equipment foundation for multi-pipeline space
CN215716905U (en) Perpendicular refuse chute of assembled floor
CN211396634U (en) Formwork opposite-pulling-free perforating and reinforcing device for climbing formwork system with chimney and other cylinder structures
CN212452686U (en) Assembled concrete pipe bearing structure
CN215760225U (en) Floor pipeline type garbage clearing device in building main body construction
CN211541661U (en) Concrete internal mold supporting device
CN218834784U (en) Civil engineering construction waste treatment device
CN219992986U (en) Can have enough to meet need assembled floor rubbish passageway and wash pump waste fitting discharging concurrently
CN220008175U (en) Precast slab hole mud jacking frock
CN215594895U (en) Be applied to mould shell of close rib structure superstructure building
CN109594573B (en) Assembled type crown beam structure of foundation pit enclosure wall
CN216893475U (en) Steel construction house concrete floor side form bearing structure
CN217028091U (en) Reserved hole hanging die reinforcing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210126