CN215760225U - Floor pipeline type garbage clearing device in building main body construction - Google Patents

Floor pipeline type garbage clearing device in building main body construction Download PDF

Info

Publication number
CN215760225U
CN215760225U CN202121796509.3U CN202121796509U CN215760225U CN 215760225 U CN215760225 U CN 215760225U CN 202121796509 U CN202121796509 U CN 202121796509U CN 215760225 U CN215760225 U CN 215760225U
Authority
CN
China
Prior art keywords
floor
wall
construction
corrugated pipe
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121796509.3U
Other languages
Chinese (zh)
Inventor
陈刚
车海宝
王昊淼
王翠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Original Assignee
China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd filed Critical China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Priority to CN202121796509.3U priority Critical patent/CN215760225U/en
Application granted granted Critical
Publication of CN215760225U publication Critical patent/CN215760225U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model belongs to a garbage clearing device in a building site, in particular to a floor pipeline type garbage clearing device in the construction of a building main body, which comprises floors in the construction of the main body, wherein an upright corrugated pipe with the diameter of 300mm is fixedly arranged on an outer wall of each floor or by means of a steel structure arranged on the outer wall through uniformly distributed wall-penetrating clamps or U-shaped clamps, the lower opening of the corrugated pipe is 1-1.5m away from the ground, the upper opening of the corrugated pipe is matched with the lower end face of an opening for clearing garbage on the outer wall of each floor, and the uniformly distributed wall-penetrating clamps or U-shaped clamps for fixedly arranging the corrugated pipe have the interval of 1.5 m. The utility model has reasonable structure and convenient assembly and disassembly, can replace the original conventional unloading platform and put an end to the high-altitude throwing method, improves the working efficiency and reduces the cost.

Description

Floor pipeline type garbage clearing device in building main body construction
Technical Field
The utility model belongs to a garbage clearing device for a building site, and particularly relates to a floor pipeline type garbage clearing device in construction of a building main body.
Background
At present, the construction waste of each floor is still adopted in the construction process of a construction engineering main body and a secondary structure main body, the traditional unloading platform is used for transporting, and part of workers are thrown upstairs at will, so that serious potential safety hazards are brought to downstairs construction operators.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a floor pipeline type garbage clearing device in building main body construction, which has the advantages of reasonable structure and convenience in mounting and dismounting, can replace the original conventional unloading platform and a method for preventing high-altitude dumping, improves the working efficiency and reduces the cost.
The purpose of the utility model is realized as follows: a floor pipeline type garbage clearing device in building main body construction comprises floors in main body construction, wherein upright corrugated pipes with the diameter of 300mm are fixedly arranged on outer walls of the floors or by means of steel structures arranged on the outer walls through uniformly distributed wall penetrating fixtures or U-shaped clamps, the lower openings of the corrugated pipes are 1-1.5m away from the ground, the upper openings of the corrugated pipes are matched with the lower end faces of openings for clearing and transporting garbage on the outer walls of the floors, and the distances between the uniformly distributed wall penetrating fixtures or U-shaped clamps for fixedly arranging the corrugated pipes are 1.5 m.
The utility model is formed by combining DN300 corrugated pipes, reinforcing steel bars 14-16 and the like. The pipeline type garbage transporting device is fast installed and dismantled, and the processes of reinforcement and the like are convenient to install and dismantle and can be repeatedly used.
Has the advantages that:
1. convenient to mount and dismount and outstanding in transportation effect
As a method for quickly installing and detaching a pipeline type garbage transportation pipeline, the conventional unloading platform and high-altitude throwing method are replaced, a turnover part is adopted, a corrugated pipe is installed on an outer wall, the upper opening is lifted along with the height of a floor, the distance from the upper opening to the ground is 1.2 meters, and the distance between stirrups is 1.5 meters. The mounting and dismounting operations are simple and convenient, and the forming effect is obvious;
2. saving material, being able to be reused and reducing engineering cost
Each fixing part is simple and convenient to manufacture, the steel bar, the finished U-shaped hoop and the finished corrugated pipe are combined to form the combined part, and materials such as the steel bar, the finished U-shaped hoop and the finished corrugated pipe can be recycled among engineering projects, so that the labor force and the construction material cost are saved, and the cost is reduced.
The utility model has reasonable structure and convenient assembly and disassembly, replaces the original conventional unloading platform and avoids the method of high-altitude throwing, improves the working efficiency and reduces the cost.
Drawings
The utility model will be further described with reference to the accompanying drawings, in which fig. 1 is a schematic structural view of embodiment 1 of the utility model, fig. 2 is a schematic perspective structural view of embodiment 2 of the utility model, and fig. 3 is a schematic structural view of a wall-penetrating clamp.
Detailed Description
A floor pipeline type garbage clearing device in building main body construction is shown in figures 1, 2 and 3 and comprises floors in main body construction, wherein an upright corrugated pipe 3 with the diameter of 300mm is fixedly arranged on an outer wall 1 of each floor or by means of a steel structure 5 arranged on the outer wall through wall penetrating clamps 2 or U-shaped clamps 6 which are uniformly distributed, the lower opening of the corrugated pipe 3 is 1-1.5m away from the ground, the upper opening of the corrugated pipe 3 is matched with the lower end face of an opening for clearing garbage on the outer wall of each floor, and the space between the wall penetrating clamps 2 or the U-shaped clamps 6 which are uniformly distributed and fixedly provided with the corrugated pipe is 1.5 m. The wall-through fixture 2 is structurally characterized in that a reinforcing steel bar 7 with the diameter of 14-16mm is arranged, an arc hoop 8 matched with the outer circumference of the corrugated pipe 3 is arranged at one end of the wall-through fixture, a hook 10 bent for 180 degrees is arranged at the end of the arc hoop 8, the hook 10 is matched with the reinforcing steel bar 7 to lock the corrugated pipe 3 positioned in the arc hoop 8, a screw rod 9 is arranged at the other end of the reinforcing steel bar 7 penetrating through the outer wall 1, the screw rod 9 is matched with a through hole of the right-angle bent baffle 4, and the corrugated pipe 3 is fixedly arranged on the outer wall 1 of a floor through nut fastening. Bellows 3 cooperatees with the circular arc hoop of U type clamp 6, and two drag link of U type clamp 6 pass steel construction 5 and the through-hole of right angle baffle 4 of bending, and the screw rod that the drag link tip set up passes through nut fastening connection. Along with the rise of the height of the floor, the lengthened corrugated pipe 3 is connected to the upper opening of the corrugated pipe 3 fixedly arranged on the outer wall 1 of the floor.

Claims (4)

1. The utility model provides a floor pipeline formula rubbish clearance device in building main part construction, includes the floor in the main part construction, characterized by: upright corrugated pipes (3) with the diameter of 300mm are fixedly arranged on the outer wall (1) of a floor or by means of steel structures (5) arranged on the outer wall through uniformly distributed wall penetrating clamps (2) or U-shaped clamps (6), the lower openings of the corrugated pipes (3) are 1-1.5m away from the ground, the upper openings of the corrugated pipes (3) are matched with the lower end face of an opening for clearing and transporting garbage on the outer wall of the floor, and the uniformly distributed wall penetrating clamps (2) or U-shaped clamps (6) fixedly arranged with the corrugated pipes have the interval of 1.5 m.
2. The floor pipe type garbage removing device in the construction of the building main body according to claim 1, characterized in that: the wall-through clamp (2) is structurally characterized in that a reinforcing steel bar (7) with the diameter of 14-16mm is arranged, an arc hoop (8) matched with the outer circumference of the corrugated pipe (3) is arranged at one end of the reinforcing steel bar, a hook (10) bent for 180 degrees is arranged at the end of the arc hoop (8), the hook (10) is matched with the reinforcing steel bar (7) to lock the corrugated pipe (3) positioned in the arc hoop (8), a screw rod (9) is arranged at the other end of the reinforcing steel bar (7) penetrating through the outer wall (1), the screw rod (9) is matched with a through hole of a right-angle bending baffle (4), and the corrugated pipe (3) is fixedly arranged on the outer wall (1) of a floor through nut fastening.
3. The floor pipe type garbage removing device in the construction of the building main body according to claim 1, characterized in that: bellows (3) cooperate with the circular arc hoop of U type clamp (6), and two drag links of U type clamp (6) pass steel construction (5) and the through-hole of right angle baffle (4) of bending, and the screw rod that the drag link tip set up passes through nut fastening connection.
4. The floor pipe type garbage removing device in the construction of the building main body according to claim 1, characterized in that: along with the rise of the height of the floor, the lengthened corrugated pipe (3) is connected to the upper opening of the corrugated pipe (3) fixedly arranged on the outer wall (1) of the floor.
CN202121796509.3U 2021-08-03 2021-08-03 Floor pipeline type garbage clearing device in building main body construction Active CN215760225U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121796509.3U CN215760225U (en) 2021-08-03 2021-08-03 Floor pipeline type garbage clearing device in building main body construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121796509.3U CN215760225U (en) 2021-08-03 2021-08-03 Floor pipeline type garbage clearing device in building main body construction

Publications (1)

Publication Number Publication Date
CN215760225U true CN215760225U (en) 2022-02-08

Family

ID=80109555

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121796509.3U Active CN215760225U (en) 2021-08-03 2021-08-03 Floor pipeline type garbage clearing device in building main body construction

Country Status (1)

Country Link
CN (1) CN215760225U (en)

Similar Documents

Publication Publication Date Title
CN104074352A (en) Wall body template supporting method in position with narrow space
WO2022166164A1 (en) Cast-in-place ultra-high performance concrete (uhpc) composite shielding shell
CN215760225U (en) Floor pipeline type garbage clearing device in building main body construction
CN210086553U (en) Dry-type connected precast concrete wall and foundation connection node
CN215760469U (en) Building structure movement joint position shear force wall aluminum mould board location reinforcement device
CN211283408U (en) Combined hoisting stress piece
CN107700494B (en) Deep foundation pit steel pipe inner support prestress applying device
CN212984631U (en) Plate lowering hanging die
CN201339320Y (en) High-altitude overhanging hanging reinforced concrete hanging bracket
CN212405943U (en) Novel be convenient for clear up building rubbish device
CN201386113Y (en) Cantilever type smoke baffle wall
CN206205768U (en) Combined type hangs cat ladder
CN205743035U (en) Assembled anchorage joint structure for spherical steel net frame integral hoisting
CN112095801A (en) Modular detachable assembly type steel structure frame
CN212863692U (en) Attachment structure of construction elevator in building crack
CN211496684U (en) Wall-attached limiting hoop of internal climbing tower crane
CN212924291U (en) Forklift type electromechanical engineering pipeline installation lifting device
CN111663796A (en) PC component bracing base location reinforcing apparatus
CN211338597U (en) Wall-attached connecting piece of internal climbing tower crane
CN210418967U (en) Connecting device for I-steel rail of crane
CN210217036U (en) Construction waste transportation device
CN216142043U (en) Foundation pit support system
CN219973849U (en) Can have enough to meet need shaping instrument formula elevator shaft operation platform
CN217108497U (en) High side slope waist roof beam concrete placement is with pump line auxiliary fixture
CN212452686U (en) Assembled concrete pipe bearing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant