CN218952694U - Floor rubbish conveying channel - Google Patents
Floor rubbish conveying channel Download PDFInfo
- Publication number
- CN218952694U CN218952694U CN202223290780.7U CN202223290780U CN218952694U CN 218952694 U CN218952694 U CN 218952694U CN 202223290780 U CN202223290780 U CN 202223290780U CN 218952694 U CN218952694 U CN 218952694U
- Authority
- CN
- China
- Prior art keywords
- corrugated pipe
- pipe
- fixing
- floor
- fixing mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/58—Construction or demolition [C&D] waste
Landscapes
- Refuse Collection And Transfer (AREA)
Abstract
The utility model relates to the technical field of garbage disposal, in particular to a floor garbage conveying channel, which comprises a corrugated pipe and a fixing mechanism, wherein the fixing mechanism is used for clamping and fixing the corrugated pipe and comprises a plurality of groups of fixing components, each group of fixing components comprises two pipe clamps clamped on the outer wall of the corrugated pipe.
Description
Technical Field
The utility model relates to the technical field of garbage treatment, in particular to a floor garbage conveying channel.
Background
When high-rise building construction, need carry the construction waste of construction production to the low floor by the high floor and then transport to the external world and handle, many now are all that the staff pours rubbish through the elevator shaft, but the security is low like this, and the construction waste of pouring can lead to the dust to fly around, and later stage collection is difficult, and there is the restriction in the use, therefore need a floor rubbish conveying passageway to solve above-mentioned problem.
Disclosure of Invention
The utility model aims to provide a floor garbage conveying channel so as to solve the problems in the background technology.
The technical scheme of the utility model is as follows: a floor waste conveying channel, comprising a corrugated pipe, further comprising:
the fixing mechanism is used for clamping and fixing the corrugated pipe and comprises a plurality of groups of fixing components, and each group of fixing components comprises two pipe clamps clamped on the outer wall of the corrugated pipe;
the support assembly comprises angle steel arranged at two ends of the corrugated pipe.
Preferably, two circular through holes are formed in the outer walls of two opposite sides of the pipe clamp, and the inner walls of the circular through holes opposite to the two pipe clamps are connected with the same opposite-pull screw in a sliding manner.
Preferably, both ends of the circumferential outer wall of the opposite-pulling screw are connected with locking nuts through threads in a rotating mode.
Preferably, the fixing mechanism further comprises two steel plates arranged between the pipe clamp and the angle steel, and the two steel plates are located on two sides of the corrugated pipe.
Preferably, the outer wall of one side of the corrugated pipe is provided with feed grooves which are distributed at equal intervals.
The utility model provides a floor garbage conveying channel through improvement, and compared with the prior art, the floor garbage conveying channel has the following improvement and advantages:
the utility model uses the corrugated pipe as the construction waste channel, has simple and convenient installation and convenient transportation of the pipeline, the waste pool is arranged at the bottom of the channel, the secondary transportation is not needed, the manual work is reduced, the cleaning and transportation are quick, the construction waste channel is fixed by adopting the angle steel, the steel plate, the pipe clamp and the opposite-pull screw rod and the construction scaffold of the elevator shaft as the supporting points, the excessive complex process is not needed, the safety of the construction environment is ensured, the dust is prevented from being scattered everywhere when the construction waste is poured, and the treatment efficiency of the construction waste is improved.
Drawings
The utility model is further explained below with reference to the drawings and examples:
FIG. 1 is a schematic perspective view of the present utility model;
fig. 2 is a schematic structural view of the fixing mechanism of the present utility model.
Reference numerals illustrate:
1. a fixing mechanism; 101. a steel plate; 102. a pipe clamp; 103. a counter-pulling screw; 104. a lock nut; 2. a feed chute; 3. angle steel; 4. a bellows.
Detailed Description
The following detailed description of the present utility model clearly and fully describes the technical solutions of the embodiments of the present utility model, and it is apparent that the described embodiments are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The utility model provides a floor garbage conveying channel through improvement, and the technical scheme of the utility model is as follows:
as shown in fig. 1-2, a floor garbage conveying channel comprises a corrugated pipe 4, and further comprises:
the fixing mechanism 1 is used for clamping and fixing the corrugated pipe 4, and the fixing mechanism 1 comprises a plurality of groups of fixing components, wherein each group of fixing components comprises two pipe clamps 102 clamped on the outer wall of the corrugated pipe 4;
the multiunit supporting component for to the support of fixed establishment 1, every supporting component of group is including setting up the angle steel 3 at 4 both ends of bellows, at first in elevator entrance to a cave fixed angle steel 3 do 4 reinforcing main stupefied of bellows, angle steel 3 one end is taken to the floor, and the other end utilizes the crab-bolt anchor to advance in the structure wall, angle steel 3 adopts L90 model angle steel.
Further, two circular through holes are formed on the outer walls of two opposite sides of the two pipe clamps 102, and the inner walls of the circular through holes of the two opposite pipe clamps 102 are slidably connected with the same opposite-pulling screw 103.
Further, lock nuts 104 are connected to two ends of the circumferential outer wall of the opposite-pulling screw 103 through threads in a rotating mode, and the opposite-pulling screw 103 can fix the corrugated pipe 4 through the opposite-pulling screw 103 and the lock nuts 104 by means of two pipe clamps 102.
Further, the fixing mechanism 1 further comprises two steel plates 101 arranged between the pipe clamp 102 and the angle steel 3, the two steel plates 101 are located on two sides of the corrugated pipe 4, the fixed pipe clamp 102 can be fixed, and the thin steel plates 101 serve as fixing devices of the corrugated pipe 4 to be embedded into peripheral grooves of the corrugated pipe 4, so that fixing and lifting effects are achieved.
Further, the feed chute 2 that equidistance was distributed has been seted up to bellows 4 one side outer wall, and feed chute 2 is located the elevator opening, can make things convenient for the staff to empty building rubbish into bellows 4, then in discharging the rubbish pond of piling up on the basement parking area.
Working principle: when the elevator is used, the angle steel 3 is fixed at the elevator opening to form a corrugated pipe 4 to reinforce the main edge, one end of the angle steel 3 is fixedly connected to a floor slab, the other end of the angle steel 3 is anchored into a structural wall body by an anchor bolt, then two pipe clamps 102 are sleeved outside the corrugated pipe 4, then the opposite-pull screw rods 103 are used to be inserted into the pipe clamps 102, the pipe clamps 102 are tightly pulled by the locking nuts 104 to fix the corrugated pipe 4, then the steel plate 101 is fixed below the pipe clamps 102 by the fixing screw rods, the steel plate 101 is fixed above the angle steel 3 by the fixing screw rods, the rapid fixation of the corrugated pipe 4 is realized, and then workers can pour building rubbish into the corrugated pipe 4 through the feeding groove 2 on the corrugated pipe 4, so that the building rubbish cannot fly around during transportation, the transportation environment is improved, and the cleaning efficiency of the building rubbish is improved.
Claims (5)
1. Floor rubbish conveying passage includes bellows (4), and its characterized in that still includes:
the fixing mechanism (1) is used for clamping and fixing the corrugated pipe (4), the fixing mechanism (1) comprises a plurality of groups of fixing components, and each group of fixing components comprises two pipe clamps (102) clamped on the outer wall of the corrugated pipe (4);
the support assembly comprises a plurality of groups of support assemblies and is used for supporting the fixing mechanism (1), wherein each group of support assemblies comprises angle steel (3) arranged at two ends of the corrugated pipe (4).
2. A floor waste conveyor tunnel according to claim 1, characterized in that: two circular through holes are formed in the outer walls of two opposite sides of the pipe clamp (102), and the inner walls of the circular through holes opposite to the two pipe clamp (102) are connected with the same opposite-pulling screw rod (103) in a sliding mode.
3. A floor waste conveyor tunnel according to claim 2, characterized in that: the two ends of the circumferential outer wall of the opposite-pull screw rod (103) are respectively connected with a lock nut (104) through threads in a rotating manner.
4. A floor waste conveyor tunnel according to claim 3, characterized in that: the fixing mechanism (1) further comprises two steel plates (101) arranged between the pipe clamp (102) and the angle steel (3), and the two steel plates (101) are positioned on two sides of the corrugated pipe (4).
5. A floor waste conveyor tunnel according to claim 1, characterized in that: the outer wall of one side of the corrugated pipe (4) is provided with feed grooves (2) which are distributed equidistantly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223290780.7U CN218952694U (en) | 2022-12-08 | 2022-12-08 | Floor rubbish conveying channel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223290780.7U CN218952694U (en) | 2022-12-08 | 2022-12-08 | Floor rubbish conveying channel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218952694U true CN218952694U (en) | 2023-05-02 |
Family
ID=86111130
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202223290780.7U Active CN218952694U (en) | 2022-12-08 | 2022-12-08 | Floor rubbish conveying channel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218952694U (en) |
-
2022
- 2022-12-08 CN CN202223290780.7U patent/CN218952694U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211366692U (en) | Municipal works construction lifts by crane transport anchor clamps | |
CN218952694U (en) | Floor rubbish conveying channel | |
CN101885208B (en) | System for manufacturing novel high-efficiency, energy-saving and environmentally-friendly centrifugal concrete pile | |
CN101358485B (en) | Structural system for reducing pre-stress before prestressed reinforcement tensioning unload by post-tensioning method | |
CN206158204U (en) | Construction equipment of chimney shaft | |
CN212405943U (en) | Novel be convenient for clear up building rubbish device | |
CN2832994Y (en) | Dedicated protection frame for construction of main structure | |
CN214995249U (en) | A grout sleeve for steel bar connection | |
CN209739898U (en) | Building rubbish clearing device in high-rise building construction floor | |
CN207032895U (en) | A kind of removable discharging platform with automatically-controlled door | |
CN210217036U (en) | Construction waste transportation device | |
CN107916790B (en) | System and method for dismantling guide pipe of assembled construction steel bar of building block | |
CN201339324Y (en) | Structural system for reducing prestressed force prior to releasing tension of post-tensioning prestressed reinforcement | |
CN206987205U (en) | Cast iron sleeve device for longitudinal reinforcement connection | |
CN216587831U (en) | Elevator shaft protection platform for construction | |
CN212503642U (en) | Portable hoisting device for prefabricated slab | |
CN217897267U (en) | Aluminum template system | |
CN218466982U (en) | Construction waste recovery system | |
CN211037849U (en) | Concrete chute | |
CN214834755U (en) | Novel plug-type constructional column pan feeding mouth of regularization turnover | |
CN220247597U (en) | Concrete beam slab pouring separation device with different strengths | |
CN213741207U (en) | Be used for basement outer wall to lead wall template reinforcing apparatus | |
CN215107469U (en) | Vertical stacking and transporting building block device capable of achieving rapid turnover | |
CN217079668U (en) | Anti-bank reinforced structure during building construction | |
CN209780243U (en) | Fastening device for assembling and hoisting FS composite heat-insulation external template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |