CN215830012U - Aluminum mould beam bottom tapping-free wire pipe positioner - Google Patents

Aluminum mould beam bottom tapping-free wire pipe positioner Download PDF

Info

Publication number
CN215830012U
CN215830012U CN202122438193.7U CN202122438193U CN215830012U CN 215830012 U CN215830012 U CN 215830012U CN 202122438193 U CN202122438193 U CN 202122438193U CN 215830012 U CN215830012 U CN 215830012U
Authority
CN
China
Prior art keywords
bottom plate
aluminum
line pipe
sleeve
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122438193.7U
Other languages
Chinese (zh)
Inventor
仪明春
王勇
王通
王斌
孙东武
轩慎帅
赵雍
程健康
李明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Construction Engineering Group Co Ltd
Original Assignee
Xinjiang Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Construction Engineering Group Co Ltd filed Critical Xinjiang Construction Engineering Group Co Ltd
Priority to CN202122438193.7U priority Critical patent/CN215830012U/en
Application granted granted Critical
Publication of CN215830012U publication Critical patent/CN215830012U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a wire tube positioner without opening a hole at the bottom of an aluminum mould beam, which comprises a bottom plate, wherein the bottom plate is detachably and fixedly connected to an aluminum mould plate, at least one sleeve is fixedly connected to the bottom plate, and the outer diameter of the sleeve is equal to the inner diameter of a straight joint of a wire tube embedded in a cross beam. The bottom plate is fixedly connected to the aluminum template through a fastener. The bottom plate is provided with a counter bore for mounting a fastener. The aluminum template is provided with a groove for placing the bottom plate, so that the upper surface of the bottom plate is flush with the upper surface of the aluminum template when the bottom plate is placed in the groove. The device has simple structure and convenient construction.

Description

Aluminum mould beam bottom tapping-free wire pipe positioner
Technical Field
The utility model relates to the field of building construction equipment, in particular to an aluminum mould beam bottom perforating-free line pipe positioner.
Background
The aluminum template is a new generation template system following a plywood template, a combined steel template system, a steel frame wood (bamboo) plywood system, a large template system and an early-dismantling template system. The aluminum template is a template which is made of aluminum alloy profiles as main materials through processes of machining, welding and the like and is suitable for concrete engineering, and is formed by combining a panel, ribs, main body profiles, a plane template, a corner template and an early-dismantling device according to the 50mm modulus design. The design and construction application of the aluminum template are the innovation of the concrete engineering template technology, the promotion of the assembly type concrete technology and the realization of the industrialization of the construction technology.
When carrying out the electric wire tube pipe laying operation to the crossbeam, need trompil on the aluminium template, then fix the electric wire tube ligature on the steel reinforcement cage, such way has following defect: firstly, the electric wire pipes are difficult to ensure to be tidy, and the concrete pouring process is easy to be inclined, so that the subsequent wiring, pipe arrangement construction and attractiveness are affected; secondly, when the traditional construction method is used for construction, repeated punching is needed on the aluminum template, the aluminum template is damaged irreversibly, and if waste pipe holes are blocked in time in the pouring process, the slurry leakage phenomenon can be generated, the appearance is influenced, and the pollution is caused; thirdly, the buried distance of the buried electric wire pipes is uneven, the appearance of the wire pipes is poor after the form removal, and the guide pipes are easily broken off in the same direction during the form removal, so that subsequent masonry piping cannot be constructed, and the piping causes damage below the beam.
Disclosure of Invention
In view of the above, there is a need for a pipe positioner without hole at the bottom of an aluminum form beam, which has a simple structure and is convenient for construction.
In order to solve the technical problems, the technical scheme of the utility model is as follows: the utility model provides a trompil spool locator is exempted from at bottom of aluminium mould roof beam, includes the bottom plate, bottom plate detachable fixed connection is on aluminium template, at least one sleeve of fixedly connected with on the bottom plate, telescopic external diameter equals with the internal diameter of pre-buried spool straight joint in the crossbeam.
Furthermore, the bottom plate is fixedly connected to the aluminum template through a fastener.
Further, the bottom plate is provided with a counter bore for installing a fastener.
Furthermore, the aluminum template is provided with a groove for placing the bottom plate, so that when the bottom plate is placed in the groove, the upper surface of the bottom plate is flush with the upper surface of the aluminum template.
Furthermore, the bottom plate is made of galvanized flat steel, and the sleeve is made of a steel pipe.
Furthermore, the length of the sleeve is half of the length of the straight joint of the line pipe embedded in the cross beam.
Furthermore, at least one stud is fixedly connected to the bottom plate, and the sleeve is screwed on the stud.
Compared with the prior art, the utility model has the following beneficial effects: the device improves the pre-embedding quality of the line pipe and avoids aluminum mold opening. Convenient operation, locator reuse, practice thrift a large amount of manpowers, material resources, shorten secondary piping time. Meanwhile, friction among the main structure team, the secondary structure team and the water and electricity team is avoided, conflicts in construction are reduced, and the on-site construction quality can be better made.
In order to make the aforementioned and other objects, features and advantages of the utility model comprehensible, preferred embodiments accompanied with figures are described in detail below.
Drawings
Fig. 1 is a perspective view of a second embodiment of the present invention.
Fig. 2 is an exploded view of a second embodiment of the present invention.
Fig. 3 is a schematic structural diagram of a use state according to a second embodiment of the present invention.
In the figure: the method comprises the following steps of 1-aluminum template, 11-groove, 2-bottom plate, 21-stud, 22-sleeve, 23-counter bore, 3-line pipe straight joint and 4-beam.
Detailed Description
To further illustrate the technical means and effects of the present invention adopted to achieve the predetermined objects, the following detailed description of the embodiments, structures, features and effects according to the present invention will be made with reference to the accompanying drawings and preferred embodiments.
Example one
A wire tube positioner without hole on the bottom of aluminium die beam is composed of a base plate made of 40X 4 galvanized flat steel, multiple sleeves made of steel tubes and welded to said base plate, and the external diameter of said sleeve is equal to the internal diameter of straight joint of wire tube embedded in cross beam. The length of the sleeve is half of the length of the straight joint of the line pipe pre-buried in the cross beam. The bottom plate is fixedly connected on the aluminum template by screws.
This embodiment is initial design, and the use scene is comparatively single, in case pre-buried electric wire tube quantity in the crossbeam and when the pipe diameter changes, need make new locator that meets the requirements again. When the positioner and the aluminum template are disassembled together, a large concave part of the bottom plate is left at the bottom of the cross beam.
Example two
As shown in fig. 1-2, the aluminum die beam bottom non-perforated line pipe positioner comprises a bottom plate 2 made of 40 x 4 galvanized flat steel, five studs 21 are welded on the bottom plate 2, sleeves 22 made of steel pipes are screwed on the studs 21, and the outer diameter of each sleeve 22 is equal to the inner diameter of a line pipe straight joint 3 pre-buried in a cross beam 4. The length of the sleeve 22 is half of the length of the conduit straight joint 3 pre-buried in the cross beam 4.
The aluminum mould plate 1 is provided with a groove 11 for placing the bottom plate, so that when the bottom plate 2 is placed in the groove 11, the upper surface of the bottom plate 2 is flush with the upper surface of the aluminum mould plate 1.
Four countersunk holes 23 are dug on the periphery of the bottom plate 2, and the bottom plate 2 is fixed in the groove by countersunk screws in the countersunk holes 23.
Through the design of recess 11 and counter sink 23 for after crossbeam 4 pouring construction, after the form removal, crossbeam 4 surface is the parallel and level, can not remain the concave part.
The device is used in the following way, as shown in fig. 3:
1. manufacturing a wire tube positioner, namely manufacturing a base plate by adopting a plurality of pieces of 40 multiplied by 4 galvanized flat steel, digging four countersunk holes on the peripheral side of the base plate, and welding studs with different numbers on the base plate; the method is characterized in that steel pipes with different pipe diameters and lengths are made into sleeves with different pipe diameters and lengths, internal threads are tapped in the sleeves to enable the sleeves to be in threaded connection with studs, and a groove matched with a bottom plate is prefabricated on an aluminum template.
2. According to the specific construction requirements on site, selecting a corresponding bottom plate with a corresponding number of studs, and screwing a sleeve meeting the requirements of outer diameter and length; and fixing the positioner in the groove of the aluminum template by using a countersunk head screw.
3. And fixing the position of the aluminum template provided with the wire tube positioner according to the lowering position of the wire tube.
4. One end of the line pipe straight joint is sleeved on the line pipe positioner sleeve.
5. Binding and fixing the straight joint of the line pipe and the steel bar, and informing a first party and supervising, checking and accepting to reserve and pre-embed after the binding is qualified.
6. And after the concrete is beaten and the strength meets the requirement, the aluminum template and the line pipe positioner are removed. The electric wire tube is inserted from the position of the lower sleeve of the beam and is connected with the interior wiring box of the back wall to carry out subsequent installation.
The spool locator spool is buried the interval underground evenly, and the pre-buried takeover of later stage secondary brickwork is simple and convenient, has avoided the aluminium template trompil to cause the damage, and prefabricated component aluminium template has enough to meet the need in the lump when having enough to meet the need, can realize once fixing a position alright be applicable to all floors, has guaranteed the location accuracy, has gained good economic benefits. After the actual construction calculation on site: one residential building has 23 units, and 4 workers are needed for repairing the damaged conduit by each unit; another apartment building has 8 units, and 5 workers are required for repairing the damaged conduit in each unit. The labor cost is 300 yuan per person per day, and the cost is saved as follows: 23 × 4 × 300+8 × 5 × 300=39600 yuan.
Although the present invention has been described with reference to the preferred embodiments, it is to be understood that the utility model is not limited to the disclosed embodiments, but is intended to cover various modifications, equivalents and alternatives falling within the spirit and scope of the utility model.

Claims (7)

1. The utility model provides an opening spool locator is exempted from at bottom of aluminium mould roof beam which characterized in that: the aluminum pipe straight joint comprises a base plate, bottom plate detachable fixed connection is on the aluminum mould board, fixedly connected with at least one sleeve on the bottom plate, telescopic external diameter equals with the pre-buried spool straight joint's in the crossbeam internal diameter.
2. The aluminum mould beam bottom hole-free line pipe positioner according to claim 1, is characterized in that: the bottom plate is fixedly connected to the aluminum template through a fastener.
3. The aluminum die beam bottom tapping-free line pipe positioner as claimed in claim 2, wherein: the bottom plate is provided with a counter bore for mounting a fastener.
4. The aluminum mould beam bottom hole-free line pipe positioner according to claim 1, is characterized in that: the aluminum template is provided with a groove for placing the bottom plate, so that the upper surface of the bottom plate is flush with the upper surface of the aluminum template when the bottom plate is placed in the groove.
5. The aluminum mould beam bottom hole-free line pipe positioner according to claim 1, is characterized in that: the bottom plate is made of galvanized flat steel, and the sleeve is made of a steel pipe.
6. The aluminum mould beam bottom hole-free line pipe positioner according to claim 1, is characterized in that: the length of the sleeve is half of the length of the straight joint of the line pipe embedded in the cross beam.
7. The aluminum die beam bottom hole-free line pipe positioner according to any one of claims 1-6, wherein: the bottom plate is fixedly connected with at least one stud, and the sleeve is screwed on the stud.
CN202122438193.7U 2021-10-09 2021-10-09 Aluminum mould beam bottom tapping-free wire pipe positioner Expired - Fee Related CN215830012U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122438193.7U CN215830012U (en) 2021-10-09 2021-10-09 Aluminum mould beam bottom tapping-free wire pipe positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122438193.7U CN215830012U (en) 2021-10-09 2021-10-09 Aluminum mould beam bottom tapping-free wire pipe positioner

Publications (1)

Publication Number Publication Date
CN215830012U true CN215830012U (en) 2022-02-15

Family

ID=80202273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122438193.7U Expired - Fee Related CN215830012U (en) 2021-10-09 2021-10-09 Aluminum mould beam bottom tapping-free wire pipe positioner

Country Status (1)

Country Link
CN (1) CN215830012U (en)

Similar Documents

Publication Publication Date Title
CN107178210A (en) The accurate pre-embedded construction method of many line box of China Democratic National Construction Association's wall
CN106049537A (en) Comprehensive pipe gallery embedded part fixing device and fixing method thereof
CN105762728A (en) Method for pre-burying of strong and weak electricity box and electrical tubing
CN215830012U (en) Aluminum mould beam bottom tapping-free wire pipe positioner
CN110905117B (en) Precast concrete wallboard
CN211279058U (en) Prefabricated assembled concrete structure fast-assembling sleeve built-in fitting
CN210216827U (en) Partition plate installation component in prefabricated building
CN217949634U (en) Narrow tube well convenient to construction
CN111119233B (en) Concrete side wall embedded iron part fixing mechanism and using method thereof
CN215760424U (en) Be used for interior positioner of shear force wall template
CN210421923U (en) Electromechanical embedded sleeve positioning structure for top plate
CN210563409U (en) Face wall and hang hole construction structures
CN111997256A (en) High-strength lightweight concrete wallboard with embedded wire pipes
CN210563394U (en) Reserved hole opening fast hanging hole structure
CN211396110U (en) Shear wall with integrated profile steel as framework
CN212405726U (en) High-strength lightweight concrete wallboard with embedded wire pipes
CN214575695U (en) Auxiliary wire tube reserving device with aluminum template free of hole opening
CN112343336A (en) Concrete wall column template positioning device and construction method thereof
CN215498149U (en) Block terminal secretly applies pipe construction fixing device
CN219138364U (en) Concrete slab reserved hole template device
CN201116396Y (en) Die for manufacturing building pipeline preformed pore
CN215009497U (en) Pre-buried electric wire tube structure of opening a hole is exempted from at bottom of building engineering roof beam
CN212773485U (en) Embedded device for directly-embedded water supply points in shear wall
CN212561934U (en) Novel connecting device for avoiding collision between wire pipe and composite floor truss rib
CN215889073U (en) Assembled wallboard structure of central pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220215