CN218758629U CN202222771481.9U CN202222771481U CN218758629U CN 218758629 U CN218758629 U CN 218758629U CN 202222771481 U CN202222771481 U CN 202222771481U CN 218758629 U CN218758629 U CN 218758629U
Authority
CN
China
Prior art keywords
wall body
scaffold
slider
type
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222771481.9U
Other languages
Chinese (zh)
Inventor
魏首相
贾宏斌
李超
谢鑫
李金徽
成健
白俊红
林弘旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cscec Power Engineering Shenzhen Co ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202222771481.9U priority Critical patent/CN218758629U/en
Application granted granted Critical
Publication of CN218758629U publication Critical patent/CN218758629U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a novel suspension type scaffold, including L type supporting framework, L type supporting framework installs in wall body one side, three equidistance screw thread through-hole is seted up to L type supporting framework riser one side, the wall body passes the screw thread through-hole through first bolt with L type supporting framework riser and fixes, set up the groove that runs through of two equidistance in the L type supporting framework diaphragm upper end, run through the inslot both sides and set up the spout, be equipped with the slider in the spout, slider upper end center department sets up threaded hole, the slider passes gasket threaded connection screw hole through the second bolt, slider lower extreme fixed connection support frame, L type supporting framework diaphragm one side lower extreme fixed connection scaffold, the beneficial effects of the utility model are that: the support frame moves through the slider, can all keep the firm to the wall body with the riser of braced skeleton under the different circumstances of wall body thickness, and T type bracing piece makes scaffold frame and wall body keep firm, and safety is protected during workman's construction.

Description

Novel suspension type scaffold
Technical Field
The utility model relates to a scaffold frame field specifically is a novel suspension type scaffold frame.
Background
The scaffold is a temporary building tool which is erected for workers to operate and solve vertical and horizontal transportation on a construction site, is mainly used for outer walls, interior decoration or places with higher floor height and incapable of direct construction, is mainly used for maintenance of safety nets of construction personnel for up and down drying or peripheral safety nets, high-altitude installation components and the like, and is made of bamboo, wood, steel pipes or synthetic materials and the like.
The workman leads to the produced safety hazard of the scaffold instability of putting up because of the difference of wall body thickness when putting up the scaffold in the work progress, and the workman is under construction in the higher place of floor, and the scaffold of putting up can lead to the scaffold to rock the personal safety that makes the workman can not obtain the guarantee because of putting up too high, consequently the utility model provides a novel suspension type scaffold solves the problem that the aforesaid was proposed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel suspension type scaffold to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a novel suspension type scaffold, includes L type braced frame, one side at the wall body is installed to L type braced frame, three equidistance screw thread through-hole has been seted up to L type braced frame riser one side, the wall body passes the screw thread through-hole through first bolt with L type braced frame riser and carries out the thread tightening, set up the groove that runs through of two equidistance in the L type braced frame diaphragm upper end, run through inslot both sides and seted up the spout, be equipped with the slider in the spout, slider upper end center department sets up threaded hole, the slider passes gasket threaded connection on the screw hole through the second bolt, slider lower extreme fixed connection support frame, L type braced frame diaphragm one side lower extreme fixedly connected with scaffold.
As an optimal technical scheme of the utility model, the other end of support frame passes through the through-hole of seting up in the riser four corners department of support frame through the third bolt and carries out fixed connection with the wall body.
As a preferred technical scheme of the utility model, the diaphragm that the scaffold frame includes six montants and the inside transverse connection of montant, all be equipped with the stiffener on the scaffold frame.
As a preferred technical scheme of the utility model, the equal fixedly connected with T type bracing piece in both sides that the scaffold frame lower extreme is close to the wall body.
As a preferred technical scheme of the utility model, the through-hole of seting up in the riser four corners department of T type bracing piece is passed through the third bolt to the other end of T type bracing piece carries out fixed connection with the wall body.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a, the support frame removes through the slider, all can keep the firm to the wall body with the riser of supporting framework under the different condition of wall body thickness, and T type bracing piece makes scaffold frame and wall body keep firm and do not rock, and safety obtains basic guarantee when making workman's construction.
Drawings
Fig. 1 is a front view of the structure of the present invention;
FIG. 2 is a left side view of the structure of the present invention;
fig. 3 is a top view of the structure of the present invention;
fig. 4 is an enlarged sectional view of a portion a of fig. 1.
In the figure: 1. a wall body; 2. an L-shaped support framework; 3. a threaded through hole; 4. a first bolt; 5. a through slot; 6. a chute; 7. a slider; 8. a threaded hole; 9. a second bolt; 10. a gasket; 11. a support frame; 12. a third bolt; 13. a scaffold; 14. a T-shaped support rod; 131. a vertical rod; 132. a transverse plate; 133. a reinforcing rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a novel suspension type scaffold, L type braced frame 2 install in one side of wall body 1, and three equidistance screw through-hole 3 has been seted up to 2 riser one sides of L type braced frame, and wall body 1 passes screw through-hole 3 through first bolt 4 with 2 risers of L type braced frame and carries out the thread fastening, set up two equidistance through-groove 5 in 2 diaphragms of L type braced frame upper end, run through 5 interior both sides of groove and seted up spout 6, be equipped with slider 7 in the spout 6, slider 7 upper end center department sets up threaded hole 8, slider 7 passes gasket 10 threaded connection on screw hole 8 through second bolt 9, 7 lower extreme fixed connection support frames 11 of slider, 2 diaphragm one side lower extreme fixedly connected with scaffold 13 of L type braced frame.
The other end of the support frame 11 passes through holes formed in four corners of a vertical plate of the support frame 11 through a third bolt 12 to be fixedly connected with the wall body 1, and the support frame 11 enables the support framework 2 to be supported on the wall body 1.
The scaffold 13 comprises six vertical rods 131 and transverse cross plates 132 connected inside the vertical rods, and the scaffold 13 is provided with reinforcing rods 133, and the scaffold 13 is formed by combining the six vertical rods 131 and the transverse cross plates.
The two sides of the lower end of the scaffold 13 close to the wall 1 are fixedly connected with T-shaped support rods 14, so that the T-shaped support rods are clearly installed on the scaffold 13.
The other end of the T-shaped support rod 14 passes through a through hole formed in the four corners of the vertical plate of the T-shaped support rod 14 through a third bolt 12 to be fixedly connected with the wall 1, so that the scaffold 13 is stable on the wall 1 and is safer.
Specifically, use the utility model discloses the time, the support chassis 2 is installed in wall body 1 one side, three equidistance screw through-hole 3 is seted up to support chassis 2 riser one side, first bolt 4 makes support lamella 2 and wall body 1 carry out fixed connection through screw through-hole 3, set up and run through groove 5 on support chassis 2 diaphragm upper end, set up spout 6 in running through groove 5, and place slider 7 in spout 6, slider 7 upper end center department sets up screw hole 8 and makes second bolt 9 pass gasket 10 threaded connection on slider 7, make second bolt 9 drive gasket 10 make slider 7 obtain immovably when screw hole 8 internal rotation, slider 7 lower extreme fixed connection support frame 11, slider 7 removes drive support frame 11, make the riser of support chassis 2 and the riser of diaphragm support frame 11 carry out the triangular support to wall body 1, the other end of support frame 11 passes the hole that riser four corners department was seted up through third bolt 12 and fixes with wall body 1, support frame 2 terminal downside fixed connection scaffold 13, 13 lower extreme is connected with one side fixed T type bracing piece 14 of wall body 1, the other end of T type bracing piece 14 passes through riser 12 and sets up the riser of the safety worker's fixed connection of four corners department and the riser of guaranteeing the safety of wall body is carried out the hole and is seted up at wall body 1 through riser 12, the safety worker's fixed connection of the riser of setting up the riser of the department and is carried out the safety.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a novel suspension type scaffold, includes L type supporting framework (2), its characterized in that: install in one side of wall body (1) L type braced frame (2), three equidistance screw thread through-hole (3) have been seted up to L type braced frame (2) riser one side, wall body (1) and L type braced frame (2) riser pass screw thread through-hole (3) through first bolt (4) and carry out the thread tightening, set up two equidistance run-through groove (5) in L type braced frame (2) diaphragm upper end, run-through groove (5) interior both sides and seted up spout (6), be equipped with slider (7) in spout (6), slider (7) upper end center department sets up threaded hole (8), slider (7) pass gasket (10) threaded connection on screw hole (8) through second bolt (9), slider (7) lower extreme fixed connection support frame (11), L type braced frame (2) one side lower extreme fixedly connected with scaffold frame (13).
2. A novel suspended scaffold according to claim 1, characterized in that: equidistant through holes are formed in the four corners of the vertical plates at the other end of the support frame (11), and the vertical plates of the support frame (11) are fixedly connected with the wall body (1) through third bolts (12).
3. A novel suspended scaffold according to claim 1, characterized in that: scaffold (13) include six montants (131) and diaphragm (132), montant (131) inside transverse connection has diaphragm (132), all be equipped with stiffener (133) on scaffold (13).
4. A novel suspended scaffold according to claim 1, characterized in that: the lower end of the scaffold (13) is close to the two sides of the wall body (1) and is fixedly connected with T-shaped support rods (14).
5. A novel suspended scaffold according to claim 4 wherein: t type bracing piece (14) other end riser four corners department's through-hole, T type bracing piece (14) carry out fixed connection through third bolt (12) and wall body (1).
CN202222771481.9U 2022-10-20 2022-10-20 Novel suspension type scaffold Active CN218758629U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222771481.9U CN218758629U (en) 2022-10-20 2022-10-20 Novel suspension type scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222771481.9U CN218758629U (en) 2022-10-20 2022-10-20 Novel suspension type scaffold

Publications (1)

Publication Number Publication Date
CN218758629U true CN218758629U (en) 2023-03-28

Family

ID=85700207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222771481.9U Active CN218758629U (en) 2022-10-20 2022-10-20 Novel suspension type scaffold

Country Status (1)

Country Link
CN (1) CN218758629U (en)

Similar Documents

Publication Publication Date Title
CN101368444B (en) Novel profiled bar and wood combination type door, window shaping template and its installation method
CN210798252U (en) Assembled outer protection frame system
CN209145256U (en) The dedicated climbing frame of assembled architecture
CN218758629U (en) Novel suspension type scaffold
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN204676865U (en) A kind of building scaffold
CN208380049U (en) The dismountable triangle sets mould assembly steel overhanging support of Overhanging Outside Scaffold
CN204001702U (en) A kind of J-shaped wall plastic formwork
CN213143808U (en) Scaffold for constructional engineering
CN210798251U (en) But scaffold of automatically regulated height
CN209874185U (en) A piece together formula angle steel lattice keel bearing structure for stone material curtain
CN210195200U (en) Hanging flower basket device of encorbelmenting of high parapet
CN202672762U (en) Truss-type security channel for building construction
CN219327289U (en) Movable formwork support protection frame for outer window roof structure
CN206110643U (en) Scaffold frame perpendicular fixed knot construct
CN211229484U (en) Scaffold for building convenient to installation
CN218375102U (en) Metal roofing furred ceiling bottom plate installation device
CN210918167U (en) Triangular section steel construction device for overhanging scaffold
CN216787787U (en) Manual operation platform for tower crane dismantling
CN212613660U (en) Scaffold frame installation hanger rail structure
CN205688776U (en) The finishing scaffold that a kind of safety is high
CN211037764U (en) Hanging basket hanging mechanism for overhung eave exterior decoration
CN220848075U (en) Bearing frame for large-span lattice girder of dust-free room
CN212478617U (en) Protection system for pylon installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240920

Address after: 2101-1, Building B, CIMC Low Earth Orbit Satellite IoT Industrial Park, Keneng Road, Dongkeng Community, Fenghuang Street, Guangming District, Shenzhen City, Guangdong Province 518000

Patentee after: CSCEC Power Engineering (Shenzhen) Co.,Ltd.

Country or region after: China

Address before: No. 251, beiyangwa, Liyuan Town, Tongzhou District, Beijing

Patentee before: CHINA CONSTRUCTION SECOND ENGINEERING BUREAU Ltd.

Country or region before: China