CN218756845U - Solvent-free polyurethane runway - Google Patents
Solvent-free polyurethane runway Download PDFInfo
- Publication number
- CN218756845U CN218756845U CN202222968410.8U CN202222968410U CN218756845U CN 218756845 U CN218756845 U CN 218756845U CN 202222968410 U CN202222968410 U CN 202222968410U CN 218756845 U CN218756845 U CN 218756845U
- Authority
- CN
- China
- Prior art keywords
- layer
- runway
- solvent
- basic unit
- buffer block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a solvent-free polyurethane runway, relates to runway technical field, aims at solving the problem that the basic unit is insecure, the metalling is easy to be loose, trample the position and easily sink, is used for outdoor exercises, the utility model discloses a set up outlet, water drainage, water inlet and upper portion cross-section and be the basic unit of triangle-shaped, when rainwater permeates to basic unit top, can flow to the left and right sides along the slope, and flow into the water drainage through the water inlet, finally discharge through the outlet, and the water drainage only sets up the left and right sides at the basic unit, has greatly reduced the hollow position of basic unit inside, makes the basic unit more firm; the support rods are arranged, so that the gravel layer can be reinforced, the gravel layer is prevented from being loosened, and the stability of the whole runway is facilitated; through setting up the buffer block, can cushion the shock attenuation to the runway, laminate each other between the buffer block simultaneously, can effectively utilize the space, trample the in-process of runway at the user, trample the position wholly all can be supported by the buffer block, be difficult for collapsing.
Description
Technical Field
The utility model relates to a runway technical field specifically is a solvent-free polyurethane runway.
Background
Can contain TDI, benzene, toluene, poisonous volatile solvent such as xylol usually in the material that common plastic course adopted in the market, still contain harmful additives such as plasticizer and heavy metal, not only can cause the harm to user's healthy, also can produce great destruction to the environment, it is great to use the degree of difficulty simultaneously, the adhesion is low, lay the inefficiency, the solidification speed is slow, it is higher to the construction requirement, and there is the peculiar smell in the laying process, influence the normal teaching activity of school and the normal life of resident on every side easily, lay the back of accomplishing, the travelling comfort of whole runway, intensity and drainage effect are also relatively poor, therefore, it is imperative to design a plastic course of solvent-free safety ring guarantor.
The polyurethane runway is the most typical type of plastic runways, is also called as an elastic floor, a sports floor, a track and field ground terrace, a track and field runway and the like, and can be used as a track and field ground or a runway; at the same time, such runways also have the following characteristics: moderate elasticity, flatness, durability, all weather, permeability, easy maintenance, low maintenance cost and simple construction, and can be used after rain.
Chinese patent CN202021330986.6 discloses a solvent-free environment-friendly plastic track, which adopts the technical scheme that the solvent-free environment-friendly plastic track comprises a reinforced concrete pipeline, wherein the upper end of the reinforced concrete pipeline is internally provided with a water seepage hole, the upper end surface of the reinforced concrete pipeline is paved with a large gravel sublayer, the upper end surface of the large gravel sublayer is paved with a small gravel sublayer, the upper end surface of the small gravel sublayer is paved with a quartz sand layer, the upper end surface of the quartz sand layer is paved with a cement layer, the upper end of the cement layer is provided with an environment-friendly solvent-free plastic layer, an installation cavity is reserved between the cement layer and the environment-friendly solvent-free plastic layer, and the interior of the installation cavity is fixedly connected with a buffer column and a buffer spring; the problems in the technical scheme are as follows: the reinforced concrete pipeline is arranged as a foundation, and although the reinforced concrete pipeline has a drainage function, the hollow position in the reinforced concrete pipeline is too much, the whole reinforced concrete pipeline is not firm enough, and the reinforced concrete pipeline is not suitable for being used as a supporting part of the whole runway; the large gravel sublayer, the small gravel sublayer and the quartz sand layer are arranged in the runway, but the layered structures are loose, so that the layered structures are looser due to long-time vibration in the use process of the runway, and the stability of the whole runway is not facilitated; set up a plurality of buffering post cooperation buffer spring in the runway and wholly cushion the shock attenuation to the runway, but between the buffering post and the space between the buffer spring is too much, and the unable effectively utilized space tramples the in-process of runway at the user, and most space can't play buffering absorbing effect, uses the back for a long time, sinks easily.
SUMMERY OF THE UTILITY MODEL
In view of the problems in the prior art, the utility model discloses a solvent-free polyurethane runway, which adopts the technical proposal that the runway comprises a polyurethane layer used as the outer surface of the runway, and also comprises a base layer, a water outlet, a water drainage channel, a water inlet, a filter screen, a support rod, a gravel layer, a cement layer, a lower glue layer, a buffer block and an upper glue layer, wherein the cross section of the upper part of the base layer is triangular, after rainwater permeates into the top of the base layer, the water can flow towards two sides under the action of the triangular cross section, the cross section of the lower part is rectangular and is used for supporting and fixing the whole runway, the water drainage channel is arranged at the left side and the right side inside and is used for draining water, the gravel layer and a plurality of support rods are arranged at the top, the gravel layer can play the roles of diffusing stress and draining, and can accelerate the consolidation and sedimentation of the lower coating layer at the same time, and the support rods can reinforce the gravel layer, prevent its random loose removal, the water inlet that has the filter screen is connected at the drain passage top, and the water that flows down through triangle-shaped cross section can stay to water inlet department, finally gets into in the drain passage, the filter screen not only can prevent rubble in the rubble layer from getting into in the drain passage, can also filter the water that passes through the water inlet, the outside is connected a plurality of the outlet, here can directly communicate devices such as sewer or connection suction pump, and then discharge the water in the drain passage, cement layer bottom is connected the bracing piece with the rubble layer for it is fixed to connect, the top is connected the lower glue film, be used for connecting fixedly, can play the effect of buffering shock attenuation to a certain extent simultaneously, go up the glue film bottom and be trapezoidal through a plurality of cross sections the buffer block is connected the lower glue film, lower glue film is used for connecting fixedly, can play the absorbing effect of buffering to a certain extent simultaneously, the buffer block can play the primary role in buffering the shock attenuation, and the top is connected the polyurethane layer for connect fixedly.
As an optimized technical scheme of the utility model, asphalt concrete is chooseed for use to the material of basic unit, and closely knit, stable, roughness is suitable, durable, can effectively separate soil and other lamellar structure, and thickness is 50-100mm, avoids too thick extravagant resource, or too thin leads to damaging easily.
As the utility model discloses a preferred technical scheme, metal rubber is chooseed for use to the material of filter screen, is applicable to environment such as high low temperature, big difference in temperature, high pressure, high vacuum, strong radiation, violent vibration and corruption, and is corrosion-resistant, intensity is big, shock resistance simultaneously.
As a preferred technical scheme of the utility model, it is adjacent about the setting of misplacing around the bracing piece, can more effectual reinforcement the metalling, and prevent the rubble in the metalling removes at will.
As an optimal technical scheme of the utility model, the size of rubble in the rubble layer all is greater than the size of mesh in the filter screen can prevent rubble in the rubble layer passes through the water inlet gets into in the water drainage.
As the utility model discloses an optimal technical scheme, polyurethane layer top is equipped with runway micelle and white PU lacquer and rules, runway micelle compressive strength is high, and hardness elasticity is moderate, and physical properties is stable, can increase frictional force simultaneously, can effectively reduce the rate of tumbling and tumble injury, white PU lacquer is rule safety ring more, durable, and is simultaneously more striking.
As a preferred technical scheme of the utility model, be equipped with the hole of permeating water of a plurality of vertical settings in the buffer block, make water such as rainwater pass through the polyurethane layer go up behind this layer of glue film infiltration, can continue the infiltration of flowing downwards more fast smoothly, prevent that the rainwater from gathering unable discharge in the runway.
The utility model has the advantages that: the utility model has the advantages that the drainage outlet, the drainage channel, the water inlet and the base layer with the triangular upper section are arranged, when rainwater permeates to the upper part of the base layer, the rainwater can flow to the left and right sides along the slope, flows into the drainage channel through the water inlet and is finally discharged through the drainage outlet, and the drainage channel is only arranged on the left and right sides of the base layer, so that the hollow position inside the base layer is greatly reduced, the base layer is firmer and can be used as a supporting part of the whole runway; the support rods are arranged, so that the gravel layer can be reinforced, the gravel in the gravel layer is effectively prevented from being loosened, and the stability of the whole runway is facilitated; through setting up the buffer block, can cushion the shock attenuation to the runway, laminate each other between the buffer block simultaneously, can effectively utilize the space, trample the in-process of runway at the user, trample the position wholly all can be supported by the buffer block, even after using for a long time, also be difficult for collapsing.
Drawings
Fig. 1 is a schematic structural view of a front view of the present invention;
FIG. 2 is a schematic structural diagram of a side view of a base layer of the present invention;
fig. 3 is a schematic structural diagram of a top view of the buffer block of the present invention.
In the figure: 1. a base layer; 2. a water discharge port; 3. a water drain channel; 4. a water inlet; 5. a filter screen; 6. a support bar; 7. a crushed stone layer; 8. a cement layer; 9. a glue layer is arranged; 10. a buffer block; 11. coating an adhesive layer; 12. a polyurethane layer; 13. and (5) water permeable holes.
Detailed Description
Example 1
As shown in fig. 1 to 3, the present invention discloses a solvent-free polyurethane track, which is a polyurethane track and is certainly made of polyurethane, so the polyurethane layer 12 is disposed in the present embodiment, and can be used as the outer surface of the track for students and other people.
The runway usually comprises a plurality of lamellar structures, it is impossible to set up only one deck, especially for the polyurethane runway, because its top material is softer, if polyurethane layer 12 bottom direct contact soil, then polyurethane layer 12 receives when using power, just transmit to the soil very easily, just collapse after long-time use very easily, the wet degree of soil also can directly influence the use experience of runway simultaneously, so set up basic unit 1 in this embodiment, can separate polyurethane layer 12 and soil, support fixedly through basic unit 1 to the runway is whole.
In order to form a complete runway, the embodiment is further provided with a rubble layer 7, a cement layer 8, a lower adhesive layer 9 and an upper adhesive layer 11, the upper end and the lower end of the rubble layer 7 are respectively connected with the cement layer 8 and the base layer 1, the top of the cement layer 8 is connected with the lower adhesive layer 9, and the bottom of the polyurethane layer 12 is connected with the upper adhesive layer 11.
The biggest characteristic of the plastic track is that the plastic track has certain elasticity, and in order to strengthen the function, a plurality of buffer blocks 10 are arranged between the lower rubber layer 9 and the upper rubber layer 11 in the embodiment, so that the effect of buffering and shock absorption can be achieved, and meanwhile, the cross sections of the buffer blocks 10 are trapezoidal, so that the elasticity of the buffer blocks 10 can be more effectively exerted.
Although the rubble layer 7 can the diffusion stress, closely adjacent inadequately between the rubble, it is easy loose when receiving vibrations, in order to consolidate the rubble layer 7, has set up a plurality of bracing pieces 6 at basic unit 1 top in this embodiment, can prevent effectively that the rubble in the rubble layer 7 is not hard up.
Polyurethane runway is in the use, and its drainage function is also very important, and in order to avoid the rainwater to stay there being the inside use to crowds such as students of runway and cause the influence, set up outlet 2, drain 3, water inlet 4 on basic unit 1 in this embodiment, during rainwater infiltration basic unit 1 top, can get into drain 3 through water inlet 4, discharge through outlet 2 again at last.
In order to make the rainwater get into drain 3 more fast, set up the cross-section on basic unit 1 upper portion into triangle-shaped in this embodiment, can make the rainwater flow to water inlet 4 departments along its inclined plane fast, be favorable to the quick seepage of rainwater.
Because the water inlet 4 top is exactly the rubble layer 7, in order to avoid the rubble in the rubble layer 7 to pass through water inlet 4 entering water drainage 3, set up filter screen 5 in this embodiment, not only can block the rubble in the rubble layer 7, can also filter the water that flows into in the water drainage 3.
In order to make the base layer 1 more firm and durable, the material of the base layer is asphalt concrete, so that the base layer is compact, stable, appropriate in roughness and durable, and can effectively separate soil from other layered structures;
in order to avoid wasting resources by making the base layer 1 too thick or easily breaking by making it too thin, the thickness is set to 75mm in this embodiment.
In order to make the filter screen 5 more durable, select its material for use in this embodiment to be metal rubber, be applicable to environment such as high low temperature, big difference in temperature, high pressure, high vacuum, strong radiation, violent vibration and corruption, simultaneously corrosion-resistant, intensity is big, shock resistance.
In order to strengthen the rubble in the rubble layer 7 better, dislocation set about adjacent bracing piece 6 in this embodiment, can more effectual reinforcement rubble layer 7 to prevent that the rubble in the rubble layer 7 from removing at will.
In order to prevent the crushed stones in the crushed stone layer 7 from entering the water drain 3 through the water inlet 4, the sizes of the crushed stones in the crushed stone layer 7 are all larger than the sizes of the meshes in the filter screen 5 in the embodiment.
In order to use the runway better, set up runway micelle and white PU lacquer marking off at polyurethane layer 12 top in this embodiment, runway micelle compressive strength is high, and hardness elasticity is moderate, and physical properties is stable, can increase frictional force simultaneously, can effectively reduce the rate of slipping and falling injury, and white PU lacquer marking off is safer environmental protection, durable more, simultaneously more striking.
In order to make the interior rainwater of runway discharge more fast, set up the hole 13 of permeating water of a plurality of vertical settings in buffer block 10 in this embodiment, make water such as rainwater pass through polyurethane layer 12, go up the glue bed 11 and permeate this layer after, can more fast smoothly continue downward flow infiltration, prevent that the rainwater from gathering unable discharge in the runway.
The utility model discloses a theory of operation: in the laying process, from up laying basic unit 1 down in proper order, metalling 7, cement layer 8, glue film 9 down, buffer block 10, go up glue film 11, polyurethane layer 12, set up permeable hole 13 in buffer block 10, make hydroenergy in the runway permeate down fast enough, a plurality of bracing pieces 6 have been set up between basic unit 1 and cement layer 8, can consolidate metalling 7, when rainwater permeates to basic unit 1 top, because 1 upper portion cross-section of basic unit is triangle-shaped, therefore the rainwater can flow to both sides, and in 4 entering water drainage channels 3 of water inlet, at last through outlet 2, filter screen 5 sets up in water inlet 4 department, not only can prevent that the rubble in the metalling 7 from falling to water drainage channels 3, can also filter the water through 4 departments of water inlet.
The mechanical connection according to the present invention is a conventional means used by those skilled in the art, and can be suggested by limited tests, which is common knowledge.
Components not described in detail herein are prior art.
Although the present invention has been described in detail with reference to the specific embodiments, the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge range of those skilled in the art, and modifications or variations without creative efforts are still within the scope of the present invention.
Claims (7)
1. A solvent-free polyurethane track comprising a polyurethane layer (12), characterized in that: still include basic unit (1), outlet (2), drain (3), water inlet (4), filter screen (5), bracing piece (6), metalling (7), cement layer (8), lower rubber layer (9), buffer block (10), go up rubber coating (11), basic unit (1) upper portion cross-section is triangle-shaped, and the lower part cross-section is the rectangle, and the inside left and right sides all is equipped with drain (3), top are equipped with metalling (7) and a plurality of bracing piece (6), drain (3) top is connected and is had filter screen (5) water inlet (4), the outside is connected a plurality of outlet (2), cement layer (8) bottom is connected bracing piece (6) with metalling (7), the top is connected glue film (9) down, it is trapezoidal through a plurality of cross-sections to go up rubber coating (11) bottom buffer block (10) are connected glue film (9) down, the top is connected polyurethane layer (12).
2. A solvent-free polyurethane runway according to claim 1, characterized by: the base layer (1) is made of asphalt concrete and has the thickness of 50-100mm.
3. A solvent-free polyurethane runway according to claim 1, characterized by: the filter screen (5) is made of metal rubber.
4. A solvent-free polyurethane runway according to claim 1, characterized by: the left and right adjacent support rods (6) are arranged in a staggered manner from front to back.
5. A solvent-free polyurethane runway according to claim 1, characterized by: the size of the broken stones in the broken stone layer (7) is larger than that of the meshes in the filter screen (5).
6. A solvent-free polyurethane runway according to claim 1, characterized by: the top of the polyurethane layer (12) is provided with runway rubber particles and a white PU paint line.
7. A solvent-free polyurethane runway according to claim 1, characterized by: a plurality of vertically arranged permeable holes (13) are arranged in the buffer block (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222968410.8U CN218756845U (en) | 2022-11-08 | 2022-11-08 | Solvent-free polyurethane runway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222968410.8U CN218756845U (en) | 2022-11-08 | 2022-11-08 | Solvent-free polyurethane runway |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218756845U true CN218756845U (en) | 2023-03-28 |
Family
ID=85646236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222968410.8U Active CN218756845U (en) | 2022-11-08 | 2022-11-08 | Solvent-free polyurethane runway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218756845U (en) |
-
2022
- 2022-11-08 CN CN202222968410.8U patent/CN218756845U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202945619U (en) | Basement wall and baseplate waterproof and drainage structure | |
CN208685396U (en) | Permeable plastic cement race track | |
CN213740419U (en) | Light road structure of permeating water | |
CN218756845U (en) | Solvent-free polyurethane runway | |
CN204608556U (en) | A kind of water permeable pavement | |
KR20120047400A (en) | Drain block | |
CN104594604A (en) | Embedded and bonded composite type elastic rubber floor tile and laying and replacing method thereof | |
CN211815297U (en) | Permeable asphalt pavement | |
CN209923727U (en) | Plastic track with water seepage function | |
CN204608544U (en) | A kind of water conservation layer of water permeable pavement | |
CN209162571U (en) | A kind of sponge-type permeable pavement structure | |
KR20090129292A (en) | The water run-through-base combine armature mat with invisible water punctured pipe and its construction process | |
CN207582229U (en) | Compound plastic cement race track | |
CN206385415U (en) | A kind of permeable road structure in environmentally friendly gardens | |
CN210395013U (en) | Light type road structure of permeating water | |
CN205529756U (en) | Novel asphalt concrete road surface structure | |
KR102285538B1 (en) | Granite sidewalk block with water drain | |
CN205012183U (en) | Brick permeates water with function fast seeps water | |
CN210658404U (en) | High-strength assembly type drainage blind ditch structure | |
CN203411895U (en) | Drainage facility for highway bridge floor | |
CN108824126B (en) | Environment-friendly permeable slow runway | |
CN220564988U (en) | Acrylic acid court ground structure | |
KR100722239B1 (en) | Elastic paving material mixed small pipe and constructing method thereof | |
CN213233022U (en) | Ventilative type plastic course with drainage function | |
CN217579605U (en) | Synthetic rubber runway structure with permeability |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |