CN208685396U - Permeable plastic cement race track - Google Patents

Permeable plastic cement race track Download PDF

Info

Publication number
CN208685396U
CN208685396U CN201821212726.1U CN201821212726U CN208685396U CN 208685396 U CN208685396 U CN 208685396U CN 201821212726 U CN201821212726 U CN 201821212726U CN 208685396 U CN208685396 U CN 208685396U
Authority
CN
China
Prior art keywords
plastic cement
race track
cement race
drainage
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821212726.1U
Other languages
Chinese (zh)
Inventor
马玉萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Changzhou Construction Engineering Co Ltd
Original Assignee
Qingdao Changzhou Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Changzhou Construction Engineering Co Ltd filed Critical Qingdao Changzhou Construction Engineering Co Ltd
Priority to CN201821212726.1U priority Critical patent/CN208685396U/en
Application granted granted Critical
Publication of CN208685396U publication Critical patent/CN208685396U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of permeable plastic cement race tracks, are related to accommodation at the stadium technical field, its key points of the technical solution are that including concrete layer, buffer layer, drainage blanket, pervious bed, glue-line and the stratum granulosum being successively layed in above base soil layer from the bottom to top;The drainage blanket includes the bottom plate being fixedly connected with buffer layer, is integrally formed with multiple top plates disposed in parallel in plate upper surface, and drainage cavity is formed between top plate and bottom plate, and top plate is equipped with multiple permeable holes being connected to drainage cavity;Glue-line is stitched equipped with multiple drainings.The utility model solves the problems, such as that existing plastic cement race track sleet sky is easy ponding and influences to use, and can quickly drain ponding and be easy to use.

Description

Permeable plastic cement race track
Technical field
The utility model relates to accommodation at the stadium technical fields, more specifically, it is related to a kind of permeable plastic cement race track.
Background technique
Plastic cement race track is also known as round-the-clock athletics tracks, is sports equipment widely used at present.Plastic cement race track has Flatness is good, compression strength is high, elastic appropriate, stable physical property the characteristic of hardness, with certain anti-uv-ray and Ageing-resistant ability is conducive to the performance of sportsman's speed and technology, effectively improves sports achievement, reduces tumble injury rate.
Authorization Notice No. is that the Chinese utility model patent of CN207633159U discloses a kind of novel environment friendly plastic cement runway, Including plastic layer, the poroelasticity stratum granulosum of releasable negative oxygen ion is arranged in the top of the plastic layer;Under the plastic layer Portion sets gradually waterproof layer, bubble concrete layer and basal layer.The utility model has the disadvantage that effectively prevent surface layer Water is leaked to basal layer, is laid with waterproof layer below plastic layer, this causes water when rain and snow weather on plastic cement race track to be not easy to seep downwards Leakage, ponding is easy to produce on plastic cement race track, influences the use of plastic cement race track.
Utility model content
In view of the deficienciess of the prior art, leading to the purpose of this utility model is to provide a kind of permeable plastic cement race track It crosses in laid inside drainage blanket, so that the rainwater on runway is discharged from drainage blanket in time, convenient for timely using after the rainy day.
To achieve the above object, the utility model provides following technical solution: a kind of permeable plastic cement race track, including by Under the supreme concrete layer being successively layed in above base soil layer, buffer layer, drainage blanket, pervious bed, glue-line and stratum granulosum;The row Water layer includes the bottom plate being fixedly connected with buffer layer, is integrally formed with multiple top plates disposed in parallel in plate upper surface, top plate with Drainage cavity is formed between bottom plate, top plate is equipped with multiple permeable holes being connected to drainage cavity;Glue-line is stitched equipped with multiple drainings.
By using above-mentioned technical proposal, after rain and snow weather, the ponding on plastic cement race track is penetrated into down by draining seam In the pervious bed of side, then water penetrates into drainage blanket position by pervious bed, water from open-work water penetration to drainage cavity in, drainage cavity In water collect after be discharged to the outside.It is not easy to retain ponding on plastic cement race track, can quickly come into operation.
The utility model is further arranged to: the buffer layer includes multiple arranged side by side and is fixed on concrete layer Elastic pipeline, bottom plate are fixedly connected by rivet with elastic pipeline.
By using above-mentioned technical proposal, buffer layer makes plastic cement race track have certain damping effect, and people are in plastic cement Mitigate anti-brisance when running on runway, runs comfortable.It is convenient that bottom plate is fixedly mounted by rivet.
The utility model is further arranged to: the elastic pipeline is fixed by multiple U-shaped card hoops with concrete layer, multiple U-shaped card hoop is uniformly distributed along the length direction of elastic pipeline.
By using above-mentioned technical proposal, elastic pipeline prevents the later period to be laid with drainage blanket or make by clip defined position It is subjected to displacement with process being hit by a bullet property pipeline, improves the stability of entire plastic cement race track.Yoke configurations are simple, facilitate elastic pipeline Installation.
The utility model is further arranged to: the elastic pipeline is rubber tube or plastic tube.
By using above-mentioned technical proposal, rubber tube and plastic tube are existing common tubing, and raw material is taken conveniently, save modeling The laying cost of glue runway.
The utility model is further arranged to: the pervious bed is that 5-15mm is thick, pervious bed by 5-10mm rubber granule with PU glue mixes.
By using above-mentioned technical proposal, pervious bed is formed using rubber granule and PU glue sticking, there is seam between rubber granule Gap is conducive to permeable, while rubber granule has elasticity, and certain thickness pervious bed can also play damping effect.
The utility model is further arranged to: the plastic cement race track further includes the drainage ditch for being set to drainage blanket side, row It is equipped with water channel in water channel, the flow inlet for drainage cavity to be connected to water channel is offered on drainage ditch.
By using above-mentioned technical proposal, the water of drainage blanket convergence enters in drainage ditch from flow inlet, and such rainwater can be held Continuous discharge, so that the anti-rain ability of plastic cement race track increases.
The utility model is further arranged to: being located above water channel on the drainage ditch and is equipped with grate.
By using above-mentioned technical proposal, grate can prevent from foreign from entering water channel resulting in blockage.In addition, working as rainfall Larger, when rainwater has little time to stitch lower seep from draining, rainwater can be flowed to directly from grate in drainage ditch 8, improve drainage efficiency.
The utility model is further arranged to: the top plate cross section is in convex arc or inverted U-shaped or M shape.
By using above-mentioned technical proposal, on the one hand top plate can increase the intensity of drainage blanket, another aspect top plate and thoroughly The contact area of water layer greatly increases, and improves permeable effect.
In conclusion the utility model has the advantages that compared with the prior art
1. after rain and snow weather, the water energy on plastic cement race track is enough quickly through the lower infiltration of draining seam, and is discharged by drainage blanket, subtract The possibility of ponding on small plastic cement race track;
2. most of rainwater can be flowed to directly in drainage ditch from grate when rainfall is larger, plastic cement race track is improved Drainage efficiency enhances anti-rain ability;
3. buffer layer and pervious bed are flexible, so that plastic cement race track has shock-absorbing effect to the active force of top, people is improved Comfort level of walking or run on plastic cement race track.
Detailed description of the invention
Fig. 1 is the integrally-built schematic diagram of plastic cement race track;
Fig. 2 be highlight drainage blanket and buffer layer structure in Fig. 1 A-A to cross-sectional view;
Fig. 3 is the enlarged drawing for highlighting draining hole site portion B in Fig. 2 on drainage blanket.
Appended drawing reference: 1, base soil layer;2, concrete layer;3, buffer layer;31, clip;4, drainage blanket;41, bottom plate;411, Rivet;42, drainage cavity;43, top plate;431, permeable hole;5, pervious bed;6, glue-line;61, draining seam;7, stratum granulosum;8, it drains Canal;81, water channel;82, flow inlet;9, grate.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing.
Wherein identical components are presented with like reference characters.It should be noted that word used in the following description Language "front", "rear", "left", "right", "up" and "down" refer to the direction in attached drawing, word " bottom surface " and " top surface ", "inner" and "outside" refers respectively to the direction towards or away from geometric center of specific component.
Embodiment: a kind of permeable plastic cement race track, as depicted in figs. 1 and 2, including the base soil layer set gradually from the bottom to top 1, concrete layer 2, buffer layer 3, drainage blanket 4, pervious bed 5, glue-line 6 and stratum granulosum 7, building in the side of runway has drainage ditch 8, Drainage blanket 4 is connected to drainage ditch 8.After rain and snow weather, the rainwater of runway surface is penetrated into downwards in drainage blanket 4 by pervious bed 5, Then rainwater is converged in drainage blanket 4 and is flowed in drainage ditch 8, and rainwater is facilitated to be discharged, and is conducive to use plastic cement race track as early as possible.
With reference to Fig. 1, concrete layer 2 can be formed using C20 concreting, and intensity with higher avoids plastic cement from running Sink in road use process.
With reference to Fig. 1 and Fig. 2, buffer layer 3 can be more rubber tubes or plastic tube arranged side by side, have centainly strong Degree and elasticity absorb vibration energy so that flexible deformation can occur while playing a supporting role, play damping effect.Often Root rubber tube or plastic tube are fixed on concrete layer 2 by U-shaped card hoop 31, and the both ends of clip 31 pass through bolt and concrete layer 2 connections.Cavity is formed between two neighboring rubber tube or plastic tube, as needed, can filling sponge in the cavities, sponge energy It is enough that insulation effect is played to rubber tube or plastic tube, so that possibility of cracks subtracts under low temperature environment in winter for rubber tube or plastic tube It is small.
Pervious bed 5 can use partial size to mix for 5-10mm rubber grain with PU glue and be laid with, and deposit between rubber grain There is more gap, so that the moisture of top is smoothly flowed down through gap.
Glue-line 6 can use PU glue broken-up laying, and thickness can be 3-5mm, and draining seam is formed between adjacent two sections of glue-lines 6 61.Stratum granulosum 7 is the rubber granule of partial size 5-8mm, has certain flexibility, and such people, which walks or run on runway, to feel counter and shake Effect is low, and if people fall down when being contacted with plastic cement race track, a possibility that scratch, reduces.
Drainage ditch 8 can be piled up using common brick, be fixed between common brick with cement mortar.Water is formed in drainage ditch 8 The position in road 81, the corresponding drainage blanket 4 of drainage ditch 8 offers multiple flow inlets 82, and the bottom side of flow inlet 82 is tilted towards to water channel 81 Lower setting, so that the water of drainage blanket 4 smoothly flows into water channel 81 and collects.
The foreign matter of top falls into water channel 81 and results in blockage in order to prevent, and grate 9 is placed at the top of drainage ditch 8, so that modeling Rainwater a part of glue runway top surface can be directly flowed into drainage ditch 8 by grate 9, and external sundries is stopped by grate 9.
Referring to figs. 2 and 3, drainage blanket 4 can be made of hard PVC, and drainage blanket 4 includes that bottom plate 41 and one are solid Due to multiple top plates 43 of 41 upper surface of bottom plate, the spaced and parallel setting of multiple top plates 43, the bottom plate between two neighboring top plate 43 41 positions are fixed on the rubber tube or plastic tube of lower section by rivet 411.Top plate 43 can be in convex arc, as needed Top plate 43 is also possible to inverted V-shaped or M shape.Drainage cavity 42 is formed between top plate 43 and bottom plate 41.It is densely covered on top plate 43 more A permeable hole 431, the diameter of permeable hole 431 are 3-5mm, are penetrated into from permeable hole 431 so that the water energy flowed down in pervious bed 5 is enough Into drainage cavity 42.Since top plate 43 is arc-shaped, the contact area between top plate 43 and pervious bed 5 increases, and improves permeable effect.
The laying method of the permeable plastic cement race track is as follows:
Foundation pit is excavated according to the design size of plastic cement race track on the ground, and tamps leveling base soil layer 1, then in foundation pit Drainage ditch 8 is piled up with common brick in side, and flow inlet 82 is reserved in side of the drainage ditch 8 in the middle part of foundation pit.
Then on base soil layer 1 casting concrete 10-20cm thickness concrete, concrete layer is formed after concrete hardening 2.Then the middle part of laying rubber tube or plastic tube on concrete layer 2, rubber tube or plastic tube is fixed on multiple clips 31 Buffer layer 3 is formed on concrete layer 2.Drainage blanket 4 is laid on buffer layer 3, so that drainage cavity 42 and drainage ditch on drainage blanket 4 8 flow inlet 82 is aligned, and with rivet 411 that drainage blanket 4 and buffer layer 3 is fixed.
It is laid with the dry rubber substance grain for first spreading 1-2cm thickness above drainage blanket 4, then repaves the rubber granule and PU glue of 3-12cm thickness Mixture, dry rubber substance grain can prevent PU glue to be directly glued to block permeable hole 431 on drainage blanket 4.It is mixed to rubber granule and PU glue After object hardening, the PU glue of broken-up laying 3-5mm, and rubber granule is sprinkled upon formation stratum granulosum 7 on PU glue.
Finally grate 9 is placed on drainage ditch 8.
The above is only the preferred embodiment of the utility model, and the protection scope of the utility model is not limited merely to Above-described embodiment, technical solution belonging to the idea of the present invention belong to the protection scope of the utility model.It should refer to Out, for those skilled in the art, it is without departing from the principle of the utility model it is several improvement and Retouching, these improvements and modifications also should be regarded as the protection scope of the utility model.

Claims (9)

1. a kind of permeable plastic cement race track, it is characterised in that: including the coagulation being successively layed in above base soil layer (1) from the bottom to top Soil layer (2), buffer layer (3), drainage blanket (4), pervious bed (5), glue-line (6) and stratum granulosum (7);The drainage blanket (4) includes The bottom plate (41) being fixedly connected with buffer layer (3) is integrally formed with multiple top plates disposed in parallel (43) in bottom plate (41) upper surface, Between top plate (43) and bottom plate (41) formed drainage cavity (42), top plate (43) be equipped with it is multiple be connected to drainage cavity (42) it is permeable Hole (431);Glue-line (6) is equipped with multiple drainings seam (61).
2. permeable plastic cement race track according to claim 1, it is characterised in that: the buffer layer (3) include it is multiple side by side The elastic pipeline for being arranged and being fixed on concrete layer (2), bottom plate (41) are fixedly connected by rivet (411) with elastic pipeline.
3. permeable plastic cement race track according to claim 2, it is characterised in that: the elastic pipeline passes through multiple U-shaped cards It binds round (31) and concrete layer (2) to fix, multiple U-shaped card hoops (31) are uniformly distributed along the length direction of elastic pipeline.
4. permeable plastic cement race track according to claim 3, it is characterised in that: the elastic pipeline is rubber tube or plastics Pipe.
5. permeable plastic cement race track according to claim 1, it is characterised in that: the pervious bed (5) is 5-15mm thick, thoroughly Water layer (5) is mixed by the rubber granule of 5-10mm with PU glue.
6. permeable plastic cement race track according to claim 1, it is characterised in that: the plastic cement race track further includes the row of being set to The drainage ditch (8) of water layer (4) side is equipped with water channel (81) in drainage ditch (8), is offered on drainage ditch (8) for by drainage cavity (42) flow inlet (82) being connected to water channel (81).
7. permeable plastic cement race track according to claim 6, it is characterised in that: the flow inlet (82) is from drainage cavity (42) It is tilted obliquely to water channel (81) direction.
8. permeable plastic cement race track according to claim 6, it is characterised in that: be located at water channel on the drainage ditch (8) (81) top is equipped with grate (9).
9. permeable plastic cement race track according to claim 1, it is characterised in that: top plate (43) cross section is in convex Arc or inverted U-shaped or M shape.
CN201821212726.1U 2018-07-28 2018-07-28 Permeable plastic cement race track Expired - Fee Related CN208685396U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821212726.1U CN208685396U (en) 2018-07-28 2018-07-28 Permeable plastic cement race track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821212726.1U CN208685396U (en) 2018-07-28 2018-07-28 Permeable plastic cement race track

Publications (1)

Publication Number Publication Date
CN208685396U true CN208685396U (en) 2019-04-02

Family

ID=65882746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821212726.1U Expired - Fee Related CN208685396U (en) 2018-07-28 2018-07-28 Permeable plastic cement race track

Country Status (1)

Country Link
CN (1) CN208685396U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396896A (en) * 2019-07-05 2019-11-01 杭州宝力体育设施工程有限公司 A kind of environmental protection breathable type plastic cement race track and its construction method
CN110499694A (en) * 2019-09-03 2019-11-26 李泽君 A kind of runway of the permeable cooling of block-proof type
CN110820477A (en) * 2019-11-29 2020-02-21 杭州宝力体育设施工程有限公司 Plastic course that gas permeability is good
CN112681060A (en) * 2020-12-24 2021-04-20 北京泛华新兴体育产业股份有限公司 Novel composite plastic track and construction process thereof
CN115627675A (en) * 2022-10-25 2023-01-20 中建八局第二建设有限公司 Structure of sports ground and construction method of plastic track and lawn thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396896A (en) * 2019-07-05 2019-11-01 杭州宝力体育设施工程有限公司 A kind of environmental protection breathable type plastic cement race track and its construction method
CN110396896B (en) * 2019-07-05 2021-08-10 杭州宝力体育设施工程有限公司 Environment-friendly breathable plastic track and construction method thereof
CN110499694A (en) * 2019-09-03 2019-11-26 李泽君 A kind of runway of the permeable cooling of block-proof type
CN110499694B (en) * 2019-09-03 2021-06-22 李泽君 Anti-blocking type water-permeable cooling runway
CN110820477A (en) * 2019-11-29 2020-02-21 杭州宝力体育设施工程有限公司 Plastic course that gas permeability is good
CN112681060A (en) * 2020-12-24 2021-04-20 北京泛华新兴体育产业股份有限公司 Novel composite plastic track and construction process thereof
CN115627675A (en) * 2022-10-25 2023-01-20 中建八局第二建设有限公司 Structure of sports ground and construction method of plastic track and lawn thereof

Similar Documents

Publication Publication Date Title
CN208685396U (en) Permeable plastic cement race track
CN209039905U (en) A kind of asphalt paving convenient for construction
CN207739090U (en) A kind of novel road laying structure
CN101067313A (en) Draining method and draining and irrigating tube thereof
ES2767374T3 (en) Method for cooling a sports field
CN208685390U (en) Sponge city paved road structure
CN206545257U (en) A kind of novel greening band water storage structure
CN107794822A (en) A kind of porous pavement based on sponge the idea of the city
CN209482090U (en) A kind of tunnel drainage pavement structure
CN207582229U (en) Compound plastic cement race track
CN207793792U (en) A kind of road surface permeable pavement structure
CN208472506U (en) A kind of permeable breathable plastic sports ground
JPH05508204A (en) Infrastructure structures particularly suitable for tennis courts, tennis courts and tennis court construction methods
CN209923727U (en) Plastic track with water seepage function
CN214656073U (en) Natural permeable quarrying paving structure for sponge city
CN108611948A (en) A kind of urban road permeable pavement structure
CN212834837U (en) Town road with drainage function
CN211815322U (en) Water-permeable anti-cracking sports field
CN209162572U (en) A kind of sponge-type garden line structure based on historic Landscapes ecotechnology
CN207828733U (en) A kind of novel water permeable concrete road
CN207793797U (en) A kind of football pitch chinampa with plumbing function
CN217579605U (en) Synthetic rubber runway structure with permeability
CN205636875U (en) Rainwater incremental system
CN110499693A (en) A kind of permeable road structure of municipal administration and its construction method
CN220564988U (en) Acrylic acid court ground structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190402

Termination date: 20200728

CF01 Termination of patent right due to non-payment of annual fee