CN218668433U - Operating platform for building construction of anti-video wall of house - Google Patents

Operating platform for building construction of anti-video wall of house Download PDF

Info

Publication number
CN218668433U
CN218668433U CN202223078220.5U CN202223078220U CN218668433U CN 218668433 U CN218668433 U CN 218668433U CN 202223078220 U CN202223078220 U CN 202223078220U CN 218668433 U CN218668433 U CN 218668433U
Authority
CN
China
Prior art keywords
rod
window
fixedly connected
platform
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223078220.5U
Other languages
Chinese (zh)
Inventor
宋有前
李智
王家翠
王亚坤
杜晓鹏
李新星
李翔宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202223078220.5U priority Critical patent/CN218668433U/en
Application granted granted Critical
Publication of CN218668433U publication Critical patent/CN218668433U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides an operation platform that is used for house to prevent building construction by laying bricks or stones to the video wall belongs to construction technical field, has effectively solved residential buildings's the inconvenient problem of construction to the video wall. The technical scheme comprises a fixing mechanism arranged in a floor and a supporting mechanism arranged on the outer side of the floor, wherein the fixing mechanism and the supporting mechanism are in hanging connection and matching. The utility model has the advantages that: the operating platform for the building construction of the sight-seeing preventing wall of the house is convenient to use, stable in structure and free of damage to the wall body of a floor.

Description

Operating platform for building construction of anti-video wall of house
Technical Field
The utility model relates to a construction technical field especially relates to an operation platform that is used for house to prevent building construction to video wall.
Background
In the residential design, a sight-proof wall (with a fire-proof function) is generally arranged between two households on the north side. The anti-sight wall is arranged in a concave corridor of the building, when the main body construction is finished, the climbing frame is dismantled, and the building and the external decoration construction do not have a working surface. The method commonly adopted at present is to set up a scaffold again, and the method has the following defects: the construction period for building the scaffold is long and the cost is high; the frame body is erected to influence the backfilling and garden construction of the position; when the monomer exceeds 50 meters, an overhanging scaffold needs to be erected, and holes need to be reserved at the joint of an overhanging component and a structure or external decoration construction is influenced on a stay bolt.
Therefore, how to solve the above technical problems becomes a problem faced by the present invention.
SUMMERY OF THE UTILITY MODEL
In order to solve the defects of the prior art, the utility model provides a convenient to use, stable in structure and can not cause the operation platform that is used for house to prevent building construction to visual wall of damage to the floor wall body.
The utility model provides a technical scheme that its technical problem adopted is: the utility model provides an operation platform that is used for house to prevent building construction by laying bricks or stones to wall, including set up in intraformational fixed establishment of floor with set up in the supporting mechanism in the floor outside, fixed establishment with articulate the cooperation between the supporting mechanism.
The fixing mechanism comprises a vertical rod vertically arranged close to the window, the upper end and the lower end of the vertical rod are in threaded connection with first jacking supports, and the other first jacking supports are respectively in press fit with the bottom surface of the upper floor slab and the top surface of the lower floor slab;
the vertical rod is connected with a connecting rod which is perpendicular to the vertical rod through a first fastener and extends to the outer side of the window, the part, located between the window and the vertical rod, of the connecting rod is connected with the center of a horizontal rod which is horizontally arranged through a second fastener, the vertical rod is perpendicular to the horizontal rod, the second fastener is connected with a supporting rod which is vertically arranged downwards, the bottom of the supporting rod is in threaded connection with a second jacking which is in compression fit with the lower floor slab, two ends of the horizontal rod are connected with stabilizing rods which are vertically arranged downwards through third fasteners, and the bottoms of the two stabilizing rods are both in threaded connection with third jacking which is in compression fit with the lower floor slab;
the connecting rod is located the one end fixedly connected with vertical adapter sleeve that sets up of window outside, the adapter sleeve with supporting mechanism articulates the cooperation.
The supporting mechanism comprises a screw rod which is vertically arranged close to the outer side of the window, the top of the screw rod is fixedly connected with a hook which is bent downwards, the hook is in hooking fit with the inner side of the connecting sleeve, and the bottom of the screw rod is fixedly connected with the inner side edge of the platform plate which is rectangular and horizontally arranged;
loop bars are symmetrically and fixedly connected to two ends of the outer side of the platform plate, and first steel wire ropes are fixedly connected between the hook and the two loop bars respectively;
the landing slab is kept away from the vertical guard plate that sets up of window one side edge fixedly connected with, the landing slab both sides are provided with stabilizing part.
The stabilizing component comprises rubber pads which are arranged on one side of the platform plate close to the wall body at equal intervals and precession bolts which are arranged on one side of the cantilever beam close to the wall body to be built at equal intervals.
The guard plate is even has seted up a plurality of holes, guard plate top bilateral symmetry threaded connection has the vertical guard bar that sets up, two by a plurality of second wire rope that are parallel to each other and the level setting of supreme even fixedly connected with between the guard bar.
The platform plate is of a foldable structure, a connecting hole is formed in the platform plate corresponding to the screw rod, the screw rod penetrates below the connecting hole, and a fixing nut is connected to the screw rod below the connecting hole in a threaded mode;
the platform board is kept away from window one side with be beta structure between the guard plate bottom.
The utility model discloses during the in-service use: fixing mechanism is fixed in the window inboard, the pole setting is tight with top floor and below floor top through rotatory first top support, second top support and third top support are also the outrigger in the below floor, in putting into the connecting sleeve through hanging the hook, the screw rod bottom is worn to establish the connecting hole and is fixed through fixation nut simultaneously, first wire rope hangs and establishes to accomplish supporting mechanism and fixing mechanism's being connected on the loop bar of both sides promptly, rotatory precession bolt is its tight wall body in top again, and make the rubber pad top tight cantilever beam of one side in addition, guard bar and guard plate threaded connection, the construction of building by laying bricks or stones to the sight wall is carried out in the integral erection of accomplishing operation platform, the platform board is used with the turnover behind the collapsible of guard plate.
The beneficial effects of the utility model are that:
1. the utility model is connected with the main structure by extrusion and fixation, which is harmless to the structure;
2. the platform plate and the protection plate of the utility model are foldable, convenient to install and disassemble and can be recycled;
3. the utility model discloses structural design is simple, takes and tears the convenience open.
Drawings
FIG. 1 is a schematic view of a three-dimensional structure of the utility model in a use state;
FIG. 2 is a schematic view of a first angle perspective structure of the present invention;
FIG. 3 is an enlarged schematic view of area A of FIG. 2;
FIG. 4 is a schematic view of a second angle of the present invention;
FIG. 5 is a schematic view of the three-dimensional structure of the platform plate and the protection plate of the present invention in use;
figure 6 is the utility model discloses platform board fold condition spatial structure schematic diagram.
Wherein the reference numerals are: 1. a floor; 101. a window; 102. an upper floor slab; 103. a lower floor slab; 104. a wall body; 105. a cantilever beam; 2. a fixing mechanism; 201. erecting a rod; 202. a first jacking; 203. a first fastener; 204. a connecting rod; 205. a second fastener; 206. a horizontal bar; 207. a support bar; 208. a second jacking; 209. a third fastener; 210. a stabilizer bar; 211. a third jacking; 212. connecting sleeves; 3. a support mechanism; 301. a screw; 302. hooking; 303. a loop bar; 304. a first wire rope; 305. a protection plate; 306. a rubber pad; 307. screwing in the bolt; 308. a guard bar; 309. a second wire rope; 310. connecting holes; 311. fixing a nut; 312. a platform plate.
Detailed Description
In order to clearly illustrate the technical features of the present solution, the present solution is explained below by way of specific embodiments.
Referring to fig. 1 to 6, the utility model relates to an operation platform for building construction to video wall is prevented to house, including setting up the fixed establishment 2 in floor 1 and setting up in the supporting mechanism 3 in the floor 1 outside, articulate the cooperation between fixed establishment 2 and the supporting mechanism 3. The fixing mechanism 2 comprises a vertical rod 201 vertically arranged close to the window 101, the upper end and the lower end of the vertical rod 201 are in threaded connection with first jacking supports 202, the other first jacking supports 202 are in press fit with the bottom surface of the upper floor 102 and the top surface of the lower floor 103 respectively, the vertical rod 201 is connected with a connecting rod 204 which is perpendicular to each other and extends to the outer side of the window 101 through a first fastener 203, the connecting rod 204 is positioned between the window 101 and the vertical rod 201 and is connected with the central part of a horizontal rod 206 horizontally arranged through a second fastener 205, the vertical rod 201 is perpendicular to the horizontal rod 206, the second fastener 205 is connected with a supporting rod 207 vertically arranged downwards, the bottom of the supporting rod 207 is in threaded connection with a second jacking support 208 in press fit with the lower floor 103, the two ends of the horizontal rod 206 are connected with stabilizer bars 210 vertically arranged downwards through third fasteners 209, the bottoms of the two stabilizer bars 210 are in threaded connection with third jacking supports 211 in press fit with the lower floor 103, one end of the connecting rod 204 positioned outside the window 101 is fixedly connected with a vertically arranged connecting sleeve 212, and is in hanging fit with the supporting mechanism 3. Supporting mechanism 3 includes the screw rod 301 that is close to the vertical setting in window 101 outside, screw rod 301 top fixedly connected with downwarping couple 302, couple 302 articulates the cooperation with adapter sleeve 212 inboard, screw rod 301 bottom and rectangle form and the inboard marginal fixed connection of the landing slab 312 of level setting, landing slab 312 outside both ends symmetry fixedly connected with loop bar 303, respectively the first wire rope 304 of fixedly connected with between couple 302 and two loop bars 303, landing slab 312 keeps away from window 101 a side marginal fixedly connected with vertical guard plate 305 that sets up, landing slab 312 both sides are provided with stabilizing part. The stabilizing members include rubber pads 306 positioned equidistantly on the side of the deck 312 adjacent the wall 104 and threaded bolts 307 positioned equidistantly on the side of the cantilever beam 105 adjacent the wall to be constructed. A plurality of holes have been seted up to guard plate 305 is even, and the bilateral symmetry threaded connection in guard plate 305 top has vertical guard bar 308 that sets up, by a plurality of second wire rope 309 that are parallel to each other and the level sets up of lower supreme even fixedly connected with between two guard bars 308. Platform board 312 is beta structure, and platform board 312 corresponds screw rod 301 and has seted up connecting hole 310, and screw rod 301 runs through to connecting hole 310 below, and screw rod 301 threaded connection who is located the connecting hole 310 below has fixation nut 311, and platform board 312 keeps away from between window 101 one side and the guard plate 305 bottom be beta structure.
In actual use: fixing mechanism 2 inside window 101, pole 201 through rotatory first top support 202 with the top floor 102 and below floor 103 tight, second top support 208 and third top support 211 also stably support on below floor 103, in hanging into adapter sleeve 212 through couple 302, screw 301 bottom is worn to establish connecting hole 310 and is fixed through fixation nut 311 simultaneously, first wire rope 304 hangs to establish to the loop bar 303 of both sides promptly accomplish supporting mechanism 3 and the connection of fixing mechanism 2, again rotatory precession bolt 307 is its tight wall 104 of top, and make the rubber pad 306 of another side tightly push up cantilever beam 105, guard bar 308 and the threaded connection of guard plate 305, accomplish the integral erection of operation platform and carry out the construction of looking at the wall, platform board 312 and guard plate 305 can be used by week after folding.
The technical features that the utility model has not been described can be realized through or adopt prior art, and no longer give unnecessary details here, and of course, the above-mentioned explanation is not right the utility model discloses a restriction, the utility model discloses also not only be limited to the above-mentioned example, ordinary skilled person in this technical field is in the utility model discloses a change, modification, interpolation or replacement made in the essential scope also should belong to the utility model discloses a protection scope.

Claims (6)

1. The operating platform for the building construction of the anti-video wall of the house is characterized by comprising a fixing mechanism (2) arranged in a floor (1) and a supporting mechanism (3) arranged on the outer side of the floor (1), wherein the fixing mechanism (2) is in hanging connection with the supporting mechanism (3) in a matching manner.
2. The operating platform for the building construction of the anti-sight wall of the house according to claim 1, wherein the fixing mechanism (2) comprises an upright rod (201) which is vertically arranged close to the window (101), the upper end and the lower end of the upright rod (201) are both in threaded connection with a first jacking (202), and the other first jacking (202) is respectively in press fit with the bottom surface of the upper floor (102) and the top surface of the lower floor (103);
the vertical rod (201) is connected with a connecting rod (204) which is perpendicular to the vertical rod (201) through a first fastener (203) and extends to the outer side of the window (101), the connecting rod (204) is located between the window (101) and the vertical rod (201) and is connected with the central part of a horizontal rod (206) which is horizontally arranged through a second fastener (205), the vertical rod (201) is perpendicular to the horizontal rod (206), the second fastener (205) is connected with a support rod (207) which is vertically arranged downwards, the bottom of the support rod (207) is in threaded connection with a second top support (208) which is in compression fit with the lower floor slab (103), two ends of the horizontal rod (206) are connected with stabilizer bars (210) which are vertically arranged downwards through a third fastener (209), and the bottoms of the two stabilizer bars (210) are in threaded connection with third top supports (211) which are in compression fit with the lower floor slab (103);
the connecting rod (204) is located one end fixedly connected with the vertically arranged connecting sleeve (212) outside the window (101), and the connecting sleeve (212) is in hanging connection with the supporting mechanism (3) in a matching manner.
3. The operating platform for building construction of the anti-sight wall of the house according to claim 2, wherein the supporting mechanism (3) comprises a screw rod (301) vertically arranged close to the outer side of the window (101), a hook (302) bent downwards is fixedly connected to the top of the screw rod (301), the hook (302) is in hooking fit with the inner side of the connecting sleeve (212), and the bottom of the screw rod (301) is fixedly connected with the inner side edge of a platform plate (312) which is rectangular and horizontally arranged;
two ends of the outer side of the platform plate (312) are symmetrically and fixedly connected with loop bars (303), and a first steel wire rope (304) is fixedly connected between the hook (302) and the two loop bars (303) respectively;
keep away from landing slab (312) vertical guard plate (305) that set up of window (101) one side edge fixedly connected with, landing slab (312) both sides are provided with stabilizing means.
4. Operating platform for building construction of residential anti-sight walls according to claim 3, characterized in that said stabilizing means comprise rubber pads (306) equally spaced on the side of said platform plate (312) close to the wall (104) and precession bolts (307) equally spaced on the side of the cantilever beam (105) close to the wall to be built.
5. The operating platform for the masonry construction of the residential anti-eye walls according to claim 3, wherein a plurality of holes are uniformly formed in the protection plate (305), protection rods (308) which are vertically arranged upwards are symmetrically and threadedly connected to two sides of the top of the protection plate (305) in a threaded manner, and a plurality of second steel wire ropes (309) which are parallel to each other and horizontally arranged are uniformly and fixedly connected between the two protection rods (308) from bottom to top.
6. The operating platform for the building construction of the anti-sight wall of the house according to claim 3, wherein the platform plate (312) is of a foldable structure, a connecting hole (310) is formed in the platform plate (312) corresponding to the screw rod (301), the screw rod (301) penetrates to the position below the connecting hole (310), and a fixing nut (311) is connected to the screw rod (301) below the connecting hole (310) in a threaded mode;
the platform plate (312) is far away from the window (101) and is of a folding structure between the bottom of the protection plate (305).
CN202223078220.5U 2022-11-21 2022-11-21 Operating platform for building construction of anti-video wall of house Active CN218668433U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223078220.5U CN218668433U (en) 2022-11-21 2022-11-21 Operating platform for building construction of anti-video wall of house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223078220.5U CN218668433U (en) 2022-11-21 2022-11-21 Operating platform for building construction of anti-video wall of house

Publications (1)

Publication Number Publication Date
CN218668433U true CN218668433U (en) 2023-03-21

Family

ID=85539028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223078220.5U Active CN218668433U (en) 2022-11-21 2022-11-21 Operating platform for building construction of anti-video wall of house

Country Status (1)

Country Link
CN (1) CN218668433U (en)

Similar Documents

Publication Publication Date Title
CN102168484B (en) External hanging scaffold and application method thereof
CN215803108U (en) Attached beam type hanging basket
CN215253499U (en) Scaffold device
CN218668433U (en) Operating platform for building construction of anti-video wall of house
CN212246007U (en) Be used for tower crane bracket welded portable platform
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
CN107035037B (en) Tower top curtain wall frame and mounting method thereof
CN210798251U (en) But scaffold of automatically regulated height
CN212053667U (en) Building outer wall construction scaffold convenient to installation
CN211736294U (en) Double-row scaffold triangular point attached fixed outer high-altitude overhanging erection platform
CN211257761U (en) Lifting type elevator shaft operating platform
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method
CN218507425U (en) Hoisting device suitable for hoisting large-size curtain wall plate/glass
CN210918167U (en) Triangular section steel construction device for overhanging scaffold
CN218815124U (en) Hanging basket device for erecting on high-rise building slope roof
CN110821133B (en) Externally-hung operation steel platform and construction method thereof
CN111704058A (en) Hoisting device
CN211622697U (en) Anti-falling device for building construction
CN214462389U (en) Scaffold for building engineering
CN216787787U (en) Manual operation platform for tower crane dismantling
CN216810887U (en) Suspension operation platform and hydraulic climbing formwork system
CN216516907U (en) High-altitude convenient cantilever frame
CN212333249U (en) Steel pipe storage frame for building site
CN214302864U (en) Well operation combination steel platform
CN219100689U (en) Attachment structure suitable for super high floor attached lifting scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant