CN218521633U - Spraying maintenance device for variable-diameter bridge high pier - Google Patents

Spraying maintenance device for variable-diameter bridge high pier Download PDF

Info

Publication number
CN218521633U
CN218521633U CN202222484970.6U CN202222484970U CN218521633U CN 218521633 U CN218521633 U CN 218521633U CN 202222484970 U CN202222484970 U CN 202222484970U CN 218521633 U CN218521633 U CN 218521633U
Authority
CN
China
Prior art keywords
bridge high
sides
high pier
frame
groups
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222484970.6U
Other languages
Chinese (zh)
Inventor
卜崇财
武新春
安玉国
刘华云
李晓东
刘建龙
连立永
郭兴忠
贺倩
毛文景
舒仁轩
党积荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN202222484970.6U priority Critical patent/CN218521633U/en
Application granted granted Critical
Publication of CN218521633U publication Critical patent/CN218521633U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a spray maintenance device of a variable-diameter bridge high pier, which comprises a main body frame, a bridge high pier body and a fixed frame, wherein the fixed frame is connected to the top end of the bridge high pier body, and the main body frame is arranged at the front end of the bridge high pier body; two sides of the rear end of the main body frame respectively extend to two sides of the bridge high pier body; the main body frame is connected with the fixing frame through the hanging rings at the two ends of the top of the main body frame and the hanging ropes at the two sides of the fixing frame. Two groups of spray pipes of the device are sleeved on two sides of the bridge high pier body in a staggered manner, so that the bridge high pier body is completely surrounded, and the bridge high pier body is subjected to spray maintenance without dead angles; the two-way lead screw of reducing motor drive rotates, and two-way lead screw can drive the movable block opposite direction of its outside both sides simultaneously and remove, and the movable block drives mounting bracket opposite direction and removes, makes the shower opposite direction removal of cover in bridge high mound body both sides, can change like this between two sets of showers apart from realizing the reducing, conveniently sprays the maintenance to the bridge high mound body of different specifications.

Description

Spraying maintenance device for variable-diameter bridge high pier
Technical Field
The utility model relates to a high mound maintenance technical field of bridge, concretely relates to spray curing means of high mound of reducing bridge.
Background
The bridge high pier is a main structure for supporting a bridge span, not only bears all loads transmitted by the bridge span structure, but also directly bears various loads such as soil pressure, water flow impact force, ice pressure, ship impact force and the like, so that a bridge pier body has enough strength, rigidity and stability, the maintenance of bridge pier concrete is particularly important for the concrete bridge pier body except the quality and construction auxiliary measures of the concrete, the quality of concrete maintenance directly determines whether the concrete can meet the designed strength requirement, and can meet the requirements of functions and time limits of use, and the existing spray maintenance device for the bridge high pier has dead corners for the spray maintenance of the bridge high pier and cannot meet the use requirement; the spraying maintenance of the bridge high piers with different specifications is inconvenient, and the use limitation is large; automatic and stable lifting spraying is inconvenient, and comprehensive spraying maintenance is inconvenient for the high bridge pier; the spraying maintenance device of the variable-diameter bridge high pier is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The not enough to prior art, the utility model aims at providing a spray curing means of high mound of reducing bridge.
In order to achieve the above object, the utility model provides a following technical scheme:
a spraying maintenance device of a variable-diameter type bridge high pier comprises a main body frame 1, a bridge high pier body 2 and a fixing frame 9, wherein the fixing frame 9 is fixedly connected to the top end of the bridge high pier body 2, and the main body frame 1 is arranged at the front end of the bridge high pier body 2; two sides of the rear end of the main body frame 1 respectively extend to two sides of the bridge high pier body 2; two ends of the tops of two sides of the main body frame 1 are respectively and fixedly connected with a hanging ring 18, and the hanging rings 18 connect the main body frame 1 with the fixed frame 9 through the hanging ropes 8 on two sides of the fixed frame 9; a water tank 3 is arranged on one side of the bottom end of the bridge high pier body 2, a water pump 4 is connected to the top end of the water tank 3, and two groups of water delivery hoses 5 are connected to the output end of the water pump 4; two groups of mounting frames 12 are connected to two sides of the rear end of the main body frame 1 in a sliding manner, the top ends of the two groups of mounting frames 12 are fixedly connected with supporting frames 7 respectively, one sides of the two groups of supporting frames 7 are fixedly connected with spraying pipes 11 respectively, and a plurality of groups of water spraying nozzles 15 are uniformly arranged on the inner side walls of the two groups of spraying pipes 11; the top ends of the two groups of water delivery hoses 5 are respectively fixedly connected with the bottoms of the two groups of spraying pipes 11, and the two groups of spraying pipes 11 are arranged in a staggered manner.
Further, the spray pipes 11 are U-shaped, and the U-shaped spray pipes 11 are respectively sleeved on two sides of the bridge high pier body 2.
Further, the inside swing joint of main part frame 1 has two-way lead screw 14, the outside both sides of two-way lead screw 14 threaded connection has movable block 13 respectively, the rear end and the mounting bracket 12 fixed connection of movable block 13, movable block 13 drives mounting bracket 12 opposite directions and removes, one side fixedly connected with reducing motor 6 of main part frame 1.
Further, the output end of the reducing motor 6 is fixedly connected with one side of a bidirectional screw 14, and moving blocks 13 on two outer sides of the bidirectional screw 14 are symmetrically arranged.
Furthermore, the inside of mount 9 both sides is provided with fluting 16 respectively, the inside swing joint of fluting 16 has winding up roller 10, lifting rope 8 has been convoluteed to the outside of winding up roller 10, the both sides of mount 9 are fixedly connected with elevator motor 17 respectively, elevator motor 17's output and one side fixed connection of winding up roller 10.
Compared with the prior art, the utility model discloses possess following beneficial effect:
this variable diameter formula bridge height mound's curing means that sprays can realize spraying the maintenance to the no dead angle of bridge height mound, still conveniently sprays the maintenance to the bridge height mound of different specifications, and the limitation of using is less, and automatic steady lift spraying system is convenient for carry out comprehensive maintenance that sprays to bridge height mound, specifically is:
(1) By arranging the water tank, the water pump, the water delivery hoses, the support frame, the spray pipes and the water spray nozzles, when the water tank is used, the water pump is started, water in the water tank is pumped out by the water pump, and then the water is respectively delivered to the two groups of spray pipes positioned on the two sides of the bridge high pier body through the two groups of water delivery hoses, the water is uniformly sprayed out by the water spray nozzles, the two groups of spray pipes are arranged in a staggered mode, and the two groups of spray pipes are respectively sleeved on the two sides of the bridge high pier body, so that the bridge high pier body can be completely surrounded, no dead angle exists in spray maintenance of the bridge high pier body, and the use requirement can be met;
(2) By arranging the reducing motor, the mounting frame, the moving blocks and the bidirectional screw rod, when the bridge high pier is used, the reducing motor is started, the reducing motor drives the bidirectional screw rod to rotate, the bidirectional screw rod can simultaneously drive the moving blocks on two sides of the outer portion of the bidirectional screw rod to move oppositely, the moving blocks can drive the mounting frame to move oppositely, so that the spraying pipes sleeved on two sides of the bridge high pier body move oppositely, the distance between the two groups of spraying pipes can be changed, reducing is achieved, and spraying maintenance of bridge high pier bodies of different specifications is facilitated;
(3) Through setting up lifting rope, winding up roller, fluting, elevator motor and rings, when using, start elevator motor, elevator motor drive winding up roller receive and releases the lifting rope to the messenger suspends in midair in the automatic steady lift of main part frame of lifting rope bottom, can drive the shower like this and freely goes up and down, thereby carries out comprehensive maintenance of spraying to the lateral wall of the high mound body of bridge voluntarily, and it is very convenient to use.
Drawings
FIG. 1 is a schematic view of the front cross-sectional structure of the present invention;
FIG. 2 is an enlarged front view of a partial section of the main frame of the present invention;
FIG. 3 is a schematic top view of the shower pipe of the present invention;
FIG. 4 is a schematic view of the front view of the fixing frame of the present invention showing an enlarged partial section;
fig. 5 is a schematic view of the top view structure of the main body frame of the present invention.
In the figure: 1. a main body frame; 2. a bridge high pier body; 3. a water tank; 4. a water pump; 5. a water delivery hose; 6. a variable diameter motor; 7. a support frame; 8. a lifting rope; 9. a fixed mount; 10. a winding roller; 11. a spray pipe; 12. a mounting frame; 13. a moving block; 14. a bidirectional screw; 15. a water spray nozzle; 16. grooving; 17. a lifting motor; 18. a lifting ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
In the description of the present invention, the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
Example 1
Referring to the attached drawings 1-5, the spray maintenance device for the variable-diameter bridge high pier of the present invention comprises a main body frame 1, a bridge high pier body 2 and a fixing frame 9, wherein the fixing frame 9 is fixedly connected to the top end of the bridge high pier body 2, and the main body frame 1 is arranged at the front end of the bridge high pier body 2; two sides of the rear end of the main body frame 1 respectively extend to two sides of the bridge high pier body 2; two ends of the top parts of two sides of the main body frame 1 are respectively and fixedly connected with a hanging ring 18, and the hanging rings 18 connect the main body frame 1 with the fixed frame 9 through the hanging ropes 8 on two sides of the fixed frame 9; a water tank 3 is arranged on one side of the bottom end of the bridge high pier body 2, a water pump 4 is connected to the top end of the water tank 3, and two groups of water delivery hoses 5 are connected to the output end of the water pump 4; two groups of mounting frames 12 are slidably connected to two sides of the rear end of the main body frame 1, the top ends of the two groups of mounting frames 12 are respectively and fixedly connected with a support frame 7, one side of each group of support frames 7 is respectively and fixedly connected with a spray pipe 11, and a plurality of groups of water spray nozzles 15 are uniformly arranged on the inner side walls of the two groups of spray pipes 11; the top ends of the two groups of water delivery hoses 5 are respectively and fixedly connected with the bottoms of the two groups of spray pipes 11, and the two groups of spray pipes 11 are arranged in a staggered manner.
Optimally, the spray pipes 11 are U-shaped, and the U-shaped spray pipes 11 are respectively sleeved on two sides of the bridge high pier body 2.
Optimally, the inside of the main body frame 1 is movably connected with a bidirectional screw rod 14, two sides of the outside of the bidirectional screw rod 14 are respectively in threaded connection with a moving block 13, the rear end of the moving block 13 is fixedly connected with an installation frame 12, the moving block 13 drives the installation frame 12 to move oppositely, and one side of the main body frame 1 is fixedly connected with a reducing motor 6.
Optimally, the output end of the reducing motor 6 is fixedly connected with one side of the bidirectional screw 14, and the moving blocks 13 on the two outer sides of the bidirectional screw 14 are symmetrically arranged.
Optimally, the insides of two sides of the fixing frame 9 are respectively provided with a slot 16, the inside of the slot 16 is movably connected with a winding roller 10, the outside of the winding roller 10 is wound with a lifting rope 8, two sides of the fixing frame 9 are respectively fixedly connected with a lifting motor 17, and the output end of the lifting motor 17 is fixedly connected with one side of the winding roller 10.
Example 2
Based on embodiment 1, as shown in fig. 1-5, when the utility model is used, firstly, the water pump 4 is started, the water pump 4 pumps out the water in the water tank 3, and then the water is respectively delivered to the two groups of spray pipes 11 positioned at the two sides of the bridge high pier body 2 through the two groups of water delivery hoses 5, the water spray nozzle 15 uniformly sprays out the water, because the two groups of spray pipes 11 are arranged in a staggered manner, and the two groups of spray pipes 11 are respectively sleeved at the two sides of the bridge high pier body 2, the bridge high pier body 2 can be completely surrounded, so that no dead angle exists in the spray maintenance of the outer side wall of the bridge high pier body 2; secondly, starting the lifting motor 17, driving the winding roller 10 by the lifting motor 17 to wind and unwind the lifting rope 8, so that the main body frame 1 suspended at the bottom of the lifting rope 8 automatically and stably ascends and descends, and then driving the spray pipe 11 to freely ascend and descend, thereby automatically and comprehensively spray and maintain the outer side wall of the bridge high pier body 2; finally, start reducing motor 6, reducing motor 6 drives two-way lead screw 14 and rotates, and two-way lead screw 14 can drive the movable block 13 opposite direction of its outside both sides simultaneously, and movable block 13 drives mounting bracket 12 opposite direction and moves to make the cover at the 11 opposite direction movements of shower in 2 both sides of bridge high mound body, can change the distance between two sets of shower 11 like this, thereby realize the reducing, the convenient bridge high mound body 2 to different specifications sprays the maintenance.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a variable diameter formula bridge height pier spray curing means, includes main part frame (1), bridge height pier body (2) and mount (9), its characterized in that: the fixing frame (9) is fixedly connected to the top end of the bridge high pier body (2), and the main body frame (1) is arranged at the front end of the bridge high pier body (2); two sides of the rear end of the main body frame (1) respectively extend to two sides of the bridge high pier body (2); the two ends of the tops of the two sides of the main body frame (1) are respectively and fixedly connected with a hanging ring (18), and the hanging rings (18) connect the main body frame (1) with the fixing frame (9) through the hanging ropes (8) on the two sides of the fixing frame (9); a water tank (3) is arranged on one side of the bottom end of the bridge high pier body (2), a water pump (4) is connected to the top end of the water tank (3), and two groups of water delivery hoses (5) are connected to the output end of the water pump (4); two groups of mounting frames (12) are slidably connected to two sides of the rear end of the main body frame (1), the top ends of the two groups of mounting frames (12) are respectively and fixedly connected with a supporting frame (7), one side of each group of supporting frames (7) is respectively and fixedly connected with a spray pipe (11), and a plurality of groups of water spray nozzles (15) are uniformly arranged on the inner side walls of the two groups of spray pipes (11); the top ends of the two groups of water delivery hoses (5) are respectively fixedly connected with the bottoms of the two groups of spray pipes (11), and the two groups of spray pipes (11) are arranged in a staggered manner.
2. The spray maintenance device of variable-diameter bridge high pier according to claim 1, characterized in that: the spraying pipes (11) are U-shaped, and the U-shaped spraying pipes (11) are respectively sleeved on two sides of the bridge high pier body (2).
3. The spray maintenance device of variable-diameter bridge high pier according to claim 1, characterized in that: the inside swing joint of main part frame (1) has two-way lead screw (14), the outside both sides of two-way lead screw (14) threaded connection respectively has movable block (13), the rear end and mounting bracket (12) fixed connection of movable block (13), movable block (13) drive mounting bracket (12) antiport, one side fixedly connected with reducing motor (6) of main part frame (1).
4. The spraying maintenance device for the variable-diameter type bridge high pier according to claim 3, characterized in that: the output end of the reducing motor (6) is fixedly connected with one side of the bidirectional lead screw (14), and the moving blocks (13) on the two outer sides of the bidirectional lead screw (14) are symmetrically arranged.
5. The spraying maintenance device for the variable-diameter type bridge high pier as claimed in claim 1, wherein: the inside of mount (9) both sides is provided with fluting (16) respectively, the inside swing joint of fluting (16) has winding up roller (10), lifting rope (8) have been convoluteed to the outside of winding up roller (10), fixedly connected with elevator motor (17) respectively in the both sides of mount (9), one side fixed connection of the output of elevator motor (17) and winding up roller (10).
CN202222484970.6U 2022-09-20 2022-09-20 Spraying maintenance device for variable-diameter bridge high pier Active CN218521633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222484970.6U CN218521633U (en) 2022-09-20 2022-09-20 Spraying maintenance device for variable-diameter bridge high pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222484970.6U CN218521633U (en) 2022-09-20 2022-09-20 Spraying maintenance device for variable-diameter bridge high pier

Publications (1)

Publication Number Publication Date
CN218521633U true CN218521633U (en) 2023-02-24

Family

ID=85245972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222484970.6U Active CN218521633U (en) 2022-09-20 2022-09-20 Spraying maintenance device for variable-diameter bridge high pier

Country Status (1)

Country Link
CN (1) CN218521633U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117802912A (en) * 2024-02-29 2024-04-02 山西路桥第六工程有限公司 Bridge sprays maintenance equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117802912A (en) * 2024-02-29 2024-04-02 山西路桥第六工程有限公司 Bridge sprays maintenance equipment
CN117802912B (en) * 2024-02-29 2024-05-03 山西路桥第六工程有限公司 Bridge sprays maintenance equipment

Similar Documents

Publication Publication Date Title
CN218521633U (en) Spraying maintenance device for variable-diameter bridge high pier
CN103948357B (en) External wall cleaning equipment
CN206635699U (en) A kind of bridge guard rail high-efficiency washing device
CN213062878U (en) Construction lifting operation protection platform
CN207974504U (en) Climbing type hanging basket system for tilting decoration of exterior wall construction
CN212897417U (en) Outer wall spraying device
CN205083400U (en) Drag and draw washing of formula wall, polishing, spraying all -in -one
CN105231963A (en) Dragged type wall cleaning, polishing and painting integrated machine
CN110182694A (en) One kind being applied to console mode and self-crawling type integral construction job platform
CN220376298U (en) Hanging basket lifting device
CN219968346U (en) Bridge pouring construction device
CN111877728A (en) Lifting type movable operation platform for steel structure overhanging construction
CN110654472A (en) Self-adaptive flexible holding climbing platform of wind power tower cylinder frame type
CN214531835U (en) External hanging type operation device for large storage tank
CN214459726U (en) Hanging-filling beam spraying maintenance equipment
CN112440374B (en) Concrete curing water injection system
CN210713714U (en) Remote outer wall waterproofing agent spraying device
CN210886924U (en) Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area
CN210239083U (en) Be used for construction machinery and construction synchronous elevation structure
CN208934392U (en) Construction mould bases
CN2547274Y (en) Automatic washing machine capable of washing multi-kinds of plane wall
CN213330052U (en) Cement wall surface spraying device
CN211036711U (en) Stride empty case roof beam construction structures
CN110862023A (en) Construction method of mechanical hoisting device
CN217840830U (en) Hang rail installation work platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant