CN216552972U - A lifting tool for construction of exterior walls with overhanging eaves structure - Google Patents

A lifting tool for construction of exterior walls with overhanging eaves structure Download PDF

Info

Publication number
CN216552972U
CN216552972U CN202120762655.8U CN202120762655U CN216552972U CN 216552972 U CN216552972 U CN 216552972U CN 202120762655 U CN202120762655 U CN 202120762655U CN 216552972 U CN216552972 U CN 216552972U
Authority
CN
China
Prior art keywords
assembly
fixedly connected
side wall
lifting
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120762655.8U
Other languages
Chinese (zh)
Inventor
郭龙岳
张楚宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Construction Group Corp Ltd
Original Assignee
Hebei Construction Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Construction Group Corp Ltd filed Critical Hebei Construction Group Corp Ltd
Priority to CN202120762655.8U priority Critical patent/CN216552972U/en
Application granted granted Critical
Publication of CN216552972U publication Critical patent/CN216552972U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a lifting tool for construction of an outer wall with an outer overhanging eave structure, which comprises a lifting main body, wherein a guide mechanism is arranged on the side wall of the lifting main body; the guide mechanism comprises a first assembly, an oblique beam, a second assembly and a back suspension beam, wherein the first assembly is fixedly connected with the side wall of the oblique beam, one end of the oblique beam, which is far away from the first assembly, is fixedly connected with the side wall of the second assembly, and one end of the second assembly, which is far away from the oblique beam, is fixedly connected with the back suspension beam; the lift main part includes fore-stock, after-poppet, balancing weight, and fore-stock fixed mounting is on the building roof, and the activity is provided with first dead lever on the inside lateral wall of fore-stock, and the inside fixed mounting of fore-stock has first hydraulic stem, compares in traditional elevating system can combine the distance that job site adjustment hanging flower basket platform is close to the wall according to the molding structure who cornices, and simple structure is convenient for assemble, compares and saves a large amount of manpowers and cost in putting up the scaffold.

Description

一种用于具有外挑檐结构外墙施工的升降工具A lifting tool used for the construction of an outer wall with an overhanging eaves structure

技术领域technical field

本实用新型涉及建筑施工技术领域,尤其涉及一种用于具有外挑檐结构外墙施工的升降工具。The utility model relates to the technical field of building construction, in particular to a lifting tool used for the construction of an outer wall with an overhanging eaves structure.

背景技术Background technique

目前,在建筑现场施工脚手架拆除后的后期高层建筑外墙维修工作中,大多采用重新搭设脚手架或利用传统升降工具进行施工。但是对于高层建筑搭设外脚手架所需施工成本太高、施工效率太低。At present, most of the repair work on the exterior walls of high-rise buildings after the dismantling of the construction scaffolding on the construction site is carried out by re-installing the scaffolding or using traditional lifting tools for construction. However, for high-rise buildings, the construction cost is too high and the construction efficiency is too low.

传统的施工升降装置对具有外挑檐结构的外墙不便于施工。因为挑檐外侧距墙体有一定的距离,传统升降装置无法接近外墙。本实用新型是根据挑檐的造型结构结合施工现场常用的传统升降工具,自制的一种和挑檐结构相匹配的可变型施工升降工具。从而降低现场施工成本、提高工作效率。The traditional construction lifting device is inconvenient for the construction of the outer wall with the outer overhang structure. Because the outer side of the overhang is at a certain distance from the wall, the traditional lifting device cannot approach the outer wall. The utility model is a self-made variable construction lifting tool matched with the overhang structure according to the shape structure of the overhang and the traditional lifting tools commonly used in the construction site. Thereby reducing on-site construction costs and improving work efficiency.

实用新型内容Utility model content

本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种用于具有外挑檐结构外墙施工的升降工具。The purpose of the utility model is to solve the shortcomings of the prior art, and proposes a lifting tool for the construction of an outer wall with an overhanging eaves structure.

为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme:

一种用于具有外挑檐结构外墙施工的升降工具,包括升降主体,所述升降主体的侧壁上设置有导向机构;A lifting tool used for construction of an outer wall with an overhanging eaves structure, comprising a lifting main body, a guide mechanism is arranged on the side wall of the lifting main body;

所述导向机构包括第一组合件、斜梁、第二组合件、回悬梁,所述第一组合件与斜梁的侧壁固定连接,所述斜梁远离第一组合件的一端与第二组合件的侧壁固定连接,所述第二组合件远离斜梁的一端与回悬梁固定连接;The guiding mechanism includes a first assembly, an inclined beam, a second assembly, and a cantilever beam. The first assembly is fixedly connected to the sidewall of the inclined beam, and one end of the inclined beam away from the first assembly is connected to the second assembly. The side walls of the assembly are fixedly connected, and one end of the second assembly away from the inclined beam is fixedly connected to the suspension beam;

所述升降主体包括前支架、后支架、配重块,所述前支架固定安装在建筑物楼顶,所述前支架的内部侧壁上活动设置有第一固定杆,所述前支架的内部固定安装有第一液压杆,所述第一液压杆的输出端与第一固定杆的侧壁固定连接,所述第一固定杆由前支架的内部贯穿至前支架的外部,所述第一固定杆的侧壁上设置有第一套管,所述第一固定杆的顶端固定连接有钢丝绳固定环,所述后支架的内部固定连接有第二液压杆,所述第二液压杆的输出端固定连接有第二固定杆,所述第二固定杆由后支架的内部贯穿后支架的外部,所述配重块固定安装在后支架的底端侧壁上。The lifting main body includes a front bracket, a rear bracket, and a counterweight block. The front bracket is fixedly installed on the roof of the building. A first fixing rod is movably arranged on the inner side wall of the front bracket. A first hydraulic rod is fixedly installed, the output end of the first hydraulic rod is fixedly connected with the side wall of the first fixing rod, the first fixing rod penetrates from the inside of the front bracket to the outside of the front bracket, the first The side wall of the fixing rod is provided with a first sleeve, the top of the first fixing rod is fixedly connected with a wire rope fixing ring, and the interior of the rear bracket is fixedly connected with a second hydraulic rod, and the output of the second hydraulic rod is The end is fixedly connected with a second fixing rod, the second fixing rod penetrates through the outside of the rear bracket from the inside of the rear bracket, and the counterweight block is fixedly installed on the bottom end side wall of the rear bracket.

优选地,所述第一套管的内部设置有横梁,所述横梁的侧壁上设置有第二套管,所述第二固定杆远离后支架的一端与第二套管的侧壁固定连接。Preferably, a cross beam is arranged inside the first sleeve, a second sleeve is disposed on the side wall of the cross beam, and one end of the second fixing rod away from the rear bracket is fixedly connected to the side wall of the second sleeve .

优选地,所述横梁远离第二套管的一端与所述第一组合件的侧壁固定连接。Preferably, one end of the beam away from the second sleeve is fixedly connected to the side wall of the first assembly.

优选地,所述回悬梁的端部上设置有升降机构,所述升降机构包括驱动电机和吊篮平台,所述驱动电机设置在回悬梁的端部,所述驱动电机通过吊绳与吊篮平台固定连接。Preferably, a lifting mechanism is provided on the end of the suspension beam, the lifting mechanism includes a drive motor and a gondola platform, the drive motor is arranged at the end of the suspension beam, and the drive motor is connected to the gondola through a suspension rope. Platform fixed connection.

优选地,所述第二套管的侧壁上固定连接有加强钢丝绳,所述钢丝绳固定环与加强钢丝绳相卡紧,所述加强钢丝绳远离钢丝绳固定环的一端与第二组合件的侧壁固定连接。Preferably, a reinforced wire rope is fixedly connected to the side wall of the second sleeve, the wire rope fixing ring is clamped with the reinforced wire rope, and the end of the reinforced wire rope away from the wire rope fixing ring is fixed to the side wall of the second assembly connect.

相比现有技术,本实用新型的有益效果为:Compared with the prior art, the beneficial effects of the present utility model are:

本实用新型通过第一组合件、斜梁、第二组合件、回悬梁的配合使用可以实现对升降部分的导向,从而使得吊篮平台能够贴近建筑物的墙壁,由于第一液压杆与第二液压杆可以分别对第一固定杆与第二固定杆的高度进行调整,相较于传统的升降机构能够根据挑檐的造型结构结合施工现场调整吊篮平台靠近墙壁的距离,结构简单,便于进行组装,相较于搭建脚手架节省大量的人力与成本。The utility model can realize the guidance of the lifting part through the coordinated use of the first assembly, the inclined beam, the second assembly and the return suspension beam, so that the hanging basket platform can be close to the wall of the building. The hydraulic rod can adjust the height of the first fixed rod and the second fixed rod respectively. Compared with the traditional lifting mechanism, the distance between the hanging basket platform and the wall can be adjusted according to the shape of the overhang and the construction site. The structure is simple and easy to carry out. Assembly, saves a lot of manpower and cost compared to building scaffolding.

附图说明Description of drawings

图1为本实用新型提出的一种用于具有外挑檐结构外墙施工的升降工具的结构示意图;Fig. 1 is the structural representation of a kind of lifting tool for the construction of the outer wall with the outer overhang structure proposed by the utility model;

图2为本实用新型的A部分放大图;Fig. 2 is the enlarged view of A part of the present utility model;

图3为本实用新型的B部分放大图。Figure 3 is an enlarged view of part B of the utility model.

图中:1前支架、2后支架、3配重块、4横梁、5钢丝绳紧绳器、 6加强钢丝绳、7第一组合件、8斜梁、9第二组合件、10回悬梁、 11吊篮平台、12驱动电机、13钢丝绳固定环、14第一套管、15第二套管、16第一固定杆、17第二固定杆、18第一液压杆、19第二液压杆。In the figure: 1 front bracket, 2 rear bracket, 3 counterweight, 4 beam, 5 wire rope tightener, 6 reinforced wire rope, 7 first assembly, 8 inclined beam, 9 second assembly, 10 cantilever beam, 11 Gondola platform, 12 drive motor, 13 steel wire rope fixing ring, 14 first sleeve, 15 second sleeve, 16 first fixed rod, 17 second fixed rod, 18 first hydraulic rod, 19 second hydraulic rod.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example.

参照图1-3,一种用于具有外挑檐结构外墙施工的升降工具,包括升降主体,升降主体的侧壁上设置有导向机构;Referring to Figures 1-3, a lifting tool for the construction of an outer wall with an overhanging eaves structure includes a lifting body, and a guide mechanism is provided on the side wall of the lifting body;

导向机构包括第一组合件7、斜梁8、第二组合件9、回悬梁10,第一组合件7与斜梁8的侧壁固定连接,斜梁8远离第一组合件7的一端与第二组合件9的侧壁固定连接,第二组合件9远离斜梁8的一端与回悬梁10固定连接,第一组合件7和第二组合件9都可以进行自身角度的调节,从而能够调整回悬梁10与墙壁之间的距离,结构简单,便于进行组装,相较于搭建脚手架节省大量的人力与成本;The guiding mechanism includes a first assembly 7, an inclined beam 8, a second assembly 9, and a cantilever beam 10. The first assembly 7 is fixedly connected to the side wall of the inclined beam 8, and the end of the inclined beam 8 away from the first assembly 7 is connected to the side wall. The side walls of the second assembly 9 are fixedly connected, and one end of the second assembly 9 away from the inclined beam 8 is fixedly connected to the suspension beam 10 . Both the first assembly 7 and the second assembly 9 can adjust their own angles, so that the Adjusting the distance between the cantilever beam 10 and the wall, the structure is simple, easy to assemble, and saves a lot of manpower and cost compared to building scaffolding;

升降主体包括前支架1、后支架2、配重块3,前支架1固定安装在建筑物楼顶,前支架1的内部侧壁上活动设置有第一固定杆16,前支架1的内部固定安装有第一液压杆18,第一液压杆18的输出端与第一固定杆16的侧壁固定连接,第一固定杆16由前支架1的内部贯穿至前支架1的外部,第一固定杆16的侧壁上设置有第一套管14,第一固定杆16的顶端固定连接有钢丝绳固定环13,后支架2的内部固定连接有第二液压杆19,第二液压杆19的输出端固定连接有第二固定杆17,第二固定杆17由后支架2的内部贯穿后支架2的外部,配重块3固定安装在后支架2的底端侧壁上,第一套管14的内部设置有横梁4,横梁4的侧壁上设置有第二套管15,第二固定杆17远离后支架2的一端与第二套管15的侧壁固定连接,横梁4远离第二套管15的一端与第一组合件7的侧壁固定连接,回悬梁10的端部上设置有升降机构,升降机构包括驱动电机12和吊篮平台11,驱动电机12设置在回悬梁10的端部,驱动电机12通过吊绳与吊篮平台11 固定连接,第二套管15的侧壁上固定连接有加强钢丝绳6,钢丝绳固定环13与加强钢丝绳6相卡紧,加强钢丝绳6远离钢丝绳固定环13的一端与第二组合件9的侧壁固定连接。The lifting main body includes a front bracket 1, a rear bracket 2 and a counterweight 3. The front bracket 1 is fixedly installed on the roof of the building. A first fixing rod 16 is movably arranged on the inner side wall of the front bracket 1, and the interior of the front bracket 1 is fixed. A first hydraulic rod 18 is installed, the output end of the first hydraulic rod 18 is fixedly connected to the side wall of the first fixing rod 16, the first fixing rod 16 penetrates from the inside of the front bracket 1 to the outside of the front bracket 1, and the first fixing rod 16 is fixed. The side wall of the rod 16 is provided with a first sleeve 14 , the top end of the first fixing rod 16 is fixedly connected with a wire rope fixing ring 13 , and the interior of the rear bracket 2 is fixedly connected with a second hydraulic rod 19 , and the output of the second hydraulic rod 19 The end is fixedly connected with a second fixing rod 17 , the second fixing rod 17 penetrates the outside of the rear bracket 2 from the inside of the rear bracket 2 , the counterweight 3 is fixedly installed on the bottom end side wall of the rear bracket 2 , the first sleeve 14 There is a cross beam 4 inside, the side wall of the cross beam 4 is provided with a second sleeve 15, the end of the second fixing rod 17 away from the rear bracket 2 is fixedly connected with the side wall of the second sleeve 15, and the cross beam 4 is away from the second sleeve. One end of the tube 15 is fixedly connected to the side wall of the first assembly 7, and a lifting mechanism is provided on the end of the suspension beam 10. The lifting mechanism includes a drive motor 12 and a gondola platform 11, and the drive motor 12 is arranged at the end of the suspension beam 10. The driving motor 12 is fixedly connected to the hanging basket platform 11 through the hanging rope, the side wall of the second casing 15 is fixedly connected with a reinforcing wire rope 6, the wire rope fixing ring 13 is clamped with the reinforcing wire rope 6, and the reinforcing wire rope 6 is fixed away from the wire rope. One end of the ring 13 is fixedly connected to the side wall of the second assembly 9 .

本实用新型中,使用时,先将前支架1固定安装在楼顶,再启动第一液压杆18对第一固定杆16的高度进行调整,第一固定杆16带动第一套管14进行移动,由于横梁4可以在第一套管14的内部进行移动,当横梁4移动到合适的位置时,通过螺丝对第一套管14与横梁4进行固定,再对第二套管15的位置进行调整,安装在后支架2 底部的配重块3能够避免装置在使用过程中发生倾倒;In the utility model, when in use, the front support 1 is first fixed on the roof, and then the first hydraulic rod 18 is activated to adjust the height of the first fixed rod 16, and the first fixed rod 16 drives the first sleeve 14 to move , since the beam 4 can move inside the first sleeve 14 , when the beam 4 moves to an appropriate position, the first sleeve 14 and the beam 4 are fixed by screws, and then the position of the second sleeve 15 is fixed. Adjustment, the counterweight 3 installed at the bottom of the rear bracket 2 can prevent the device from tipping over during use;

在对第一固定杆16进行移动的过程中,通过第一套管14对第一组合件7进行移动,从而能够调整吊篮平台11与墙壁之间的间距,再通过使用钢丝绳紧绳器5实现对加强钢丝绳6的拉紧,进而降低第二组合件9在工作过程中竖直向下的作用力,增加了装置的安全性与使用寿命。In the process of moving the first fixing rod 16, the first assembly 7 is moved through the first sleeve 14, so that the distance between the gondola platform 11 and the wall can be adjusted, and then the wire rope tightening device 5 can be used to adjust the distance between the platform 11 and the wall. The tightening of the reinforcing steel wire rope 6 is realized, thereby reducing the vertical downward force of the second assembly 9 during the working process, and increasing the safety and service life of the device.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. Equivalent replacement or modification of the new technical solution and its utility model concept shall be included within the protection scope of the present utility model.

Claims (5)

1. A lifting tool for construction of an outer wall with an outer overhanging eave structure is characterized by comprising a lifting main body, wherein a guide mechanism is arranged on the side wall of the lifting main body;
the guide mechanism comprises a first assembly (7), an oblique beam (8), a second assembly (9) and a back suspension beam (10), the first assembly (7) is fixedly connected with the side wall of the oblique beam (8), one end, far away from the first assembly (7), of the oblique beam (8) is fixedly connected with the side wall of the second assembly (9), and one end, far away from the oblique beam (8), of the second assembly (9) is fixedly connected with the back suspension beam (10);
the lifting main body comprises a front support (1), a rear support (2) and a balancing weight (3), the front support (1) is fixedly installed on the roof of a building, a first fixing rod (16) is movably arranged on the inner side wall of the front support (1), a first hydraulic rod (18) is fixedly installed inside the front support (1), the output end of the first hydraulic rod (18) is fixedly connected with the side wall of the first fixing rod (16), the first fixing rod (16) penetrates through the front support (1) from the inside to the outside of the front support (1), a first sleeve (14) is arranged on the side wall of the first fixing rod (16), a steel wire rope fixing ring (13) is fixedly connected to the top end of the first fixing rod (16), a second hydraulic rod (19) is fixedly connected to the inside of the rear support (2), and a second fixing rod (17) is fixedly connected to the output end of the second hydraulic rod (19), the second fixed rod (17) penetrates through the outer part of the rear support (2) from the inner part of the rear support (2), and the balancing weight (3) is fixedly installed on the side wall of the bottom end of the rear support (2).
2. The lifting tool for the construction of the external wall with the external overhanging eave structure is characterized in that a cross beam (4) is arranged inside the first sleeve (14), a second sleeve (15) is arranged on the side wall of the cross beam (4), and one end, far away from the rear bracket (2), of the second fixing rod (17) is fixedly connected with the side wall of the second sleeve (15).
3. The lifting tool for exterior wall construction with an exterior overhang structure according to claim 2, wherein one end of the cross beam (4) remote from the second sleeve (15) is fixedly connected with the side wall of the first assembly (7).
4. A lifting tool for construction of an external wall with an external overhanging eave structure according to claim 3, wherein a lifting mechanism is arranged on the end of the cantilever beam (10), the lifting mechanism comprises a driving motor (12) and a hanging basket platform (11), the driving motor (12) is arranged on the end of the cantilever beam (10), and the driving motor (12) is fixedly connected with the hanging basket platform (11) through a lifting rope.
5. The lifting tool for the construction of the outer wall with the outer overhanging eave structure is characterized in that a reinforcing steel wire rope (6) is fixedly connected to the side wall of the second sleeve (15), the steel wire rope fixing ring (13) is clamped with the reinforcing steel wire rope (6), and one end, away from the steel wire rope fixing ring (13), of the reinforcing steel wire rope (6) is fixedly connected with the side wall of the second assembly (9).
CN202120762655.8U 2021-04-14 2021-04-14 A lifting tool for construction of exterior walls with overhanging eaves structure Expired - Fee Related CN216552972U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120762655.8U CN216552972U (en) 2021-04-14 2021-04-14 A lifting tool for construction of exterior walls with overhanging eaves structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120762655.8U CN216552972U (en) 2021-04-14 2021-04-14 A lifting tool for construction of exterior walls with overhanging eaves structure

Publications (1)

Publication Number Publication Date
CN216552972U true CN216552972U (en) 2022-05-17

Family

ID=81537162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120762655.8U Expired - Fee Related CN216552972U (en) 2021-04-14 2021-04-14 A lifting tool for construction of exterior walls with overhanging eaves structure

Country Status (1)

Country Link
CN (1) CN216552972U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370119A (en) * 2022-09-30 2022-11-22 河南省工建集团有限责任公司 Long cantilever concrete cornice is construction platform for furred ceiling

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370119A (en) * 2022-09-30 2022-11-22 河南省工建集团有限责任公司 Long cantilever concrete cornice is construction platform for furred ceiling
CN115370119B (en) * 2022-09-30 2023-12-19 河南省工建集团有限责任公司 Construction platform for long cantilever concrete cornice

Similar Documents

Publication Publication Date Title
CN216552972U (en) A lifting tool for construction of exterior walls with overhanging eaves structure
CN113955636A (en) Hoisting equipment for assembly type building construction
CN212832530U (en) Electric plate wall erecting vehicle
CN110577162A (en) A method and device for flipping a climbing beam of an internal climbing tower crane
CN111910934A (en) Lifting appliance for mounting color steel plates on outer wall surfaces of single-layer industrial factory buildings and construction method
CN105776092A (en) Stretching type basket device and construction method thereof
CN211569862U (en) Prefabricated hoist and mount piece of building convenient to dismouting
CN219031629U (en) Lifting equipment for indoor plate installation
CN219217279U (en) Assembled building wallboard hoist device
CN214570286U (en) Convenient type slat wall installation assists utensil
CN215711332U (en) Wall panel hoisting frame
CN210944595U (en) Movable self-lifting pipeline hoisting device
CN212687285U (en) A special elevator for construction and installation engineering
CN212613611U (en) Construction platform special for steel structure
CN210655932U (en) Novel pipeline hoist and mount device
CN108915237A (en) A kind of scouring platform for building construction exterior wall glass
CN217578150U (en) Flue lifting device
CN211037771U (en) Hanging basket device for outer slope construction
CN209507462U (en) A scissor climbing overall hoisting machine for adding elevators to existing buildings
CN223239633U (en) A construction hanger for building construction
CN218438187U (en) A novel system for cornicing construction hanging basket hoist installation
CN214422208U (en) Worker is high altitude protection hanging flower basket for civil engineering
CN220487501U (en) A safety base device for rock steep slope support anchor drilling
CN220814888U (en) Hydraulic die lifting device for special-shaped chimney
CN206502575U (en) Portable building external wall operation lowering equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220517