CN110182694A - One kind being applied to console mode and self-crawling type integral construction job platform - Google Patents
One kind being applied to console mode and self-crawling type integral construction job platform Download PDFInfo
- Publication number
- CN110182694A CN110182694A CN201910483554.4A CN201910483554A CN110182694A CN 110182694 A CN110182694 A CN 110182694A CN 201910483554 A CN201910483554 A CN 201910483554A CN 110182694 A CN110182694 A CN 110182694A
- Authority
- CN
- China
- Prior art keywords
- platform
- climbing frame
- lifting column
- self
- hanging apparatus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C19/00—Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
- B66C19/02—Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries collapsible
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
Abstract
The present invention relates to one kind to be applied to console mode and self-crawling type integral construction job platform, including top operation platform, Hang vehicle orbital platform, lifting column, outer climbing frame, casting platform, external mold platform composition, standard interface is provided on outer climbing frame, outer climbing frame is detachably connected on lifting column, Hang vehicle orbital platform, casting platform, the external mold platform is even vertically detachably connected on outer climbing frame by standard interface respectively, lifting column is fixed on wall by fixed wall-attaching equipment, lifting column is fixed on ground, outer climbing frame includes upper climbing frame and lower climbing frame, upper climbing frame is connected with lower climbing frame by hydraulic cylinder.The present invention realizes the fast hoisting and precise locating function of construction material, while realizing the integration of construction outrigger and architecture storey synchronization lifting function, exempts traditional construction outrigger, have the characteristics that Fast Installation and disassembly, operating efficiency is promoted, cost of labor is reduced, shortens the duration.
Description
Technical field
The present invention relates to construction equipment technical fields, are applied to console mode more particularly, to one kind and self-crawling type is whole
Construction operation platform.
Background technique
With the continuous development growth of assembled architecture, assembly precision and assembly efficiency requirement are higher and higher in China at present,
Traditional tower crane equipment is low in the presence of promotion speed, is influenced by weather, and construction position stability is poor, precision is low, while by place
Influence can not achieve more tower cranes while construct, and cause construction surface coverage area small, the slow problem of construction speed;By assembled
The biggish limitation of prefabricated components monomer weight, ordinary tower, which slings heavy load, can not meet requirement;The assembling and disassembling expense of construction outrigger
When laborious, high altitude operation the problems such as there are biggish security risks.
Summary of the invention
In order to overcome the shortcomings in the background art, the present invention discloses a kind of applied to console mode and self-crawling type integral construction work
Industry platform is both able to satisfy fast hoisting, precise positioning, Multi-station synchronous construction, while realizing that construction layer integration is same with floor
Step lifting improves construction precision, speed, construction safety, high-efficient.
For achieving the above object, the present invention adopts the following technical scheme:
One kind being applied to console mode and self-crawling type integral construction job platform, including top operation platform, Hang vehicle orbital platform, liter
Column, outer climbing frame, casting platform, external mold platform composition are dropped, is provided with standard interface on the outer climbing frame, the outer climbing frame is detachable
Ground is connected on the lifting column, and the Hang vehicle orbital platform, the casting platform, the external mold platform even pass through standard respectively
Interface is vertically detachably connected on the outer climbing frame, the lifting column for multiple cubes of frames are bolted and
At the lifting column is fixed on wall by fixed wall-attaching equipment, and the lifting column is fixed on ground, and the outer climbing frame includes
Upper climbing frame and lower climbing frame, the upper climbing frame and the lower climbing frame are connected by hydraulic cylinder, the upper climbing frame supporting block of the upper climbing frame
It is removably connect with lifting column support rod, the lower climbing frame supporting block of the lower climbing frame removably connects with lifting column support rod
It connects.
Preferably, at least two logistics corridors are arranged in the top operation platform, are arranged above the top operation platform
First hanging apparatus further includes the second hanging apparatus being slidedly arranged below the top operation platform;
Wherein, first hanging apparatus has the locomitivity in tri- directions X/Y/Z, and second hanging apparatus has X/Z
The locomitivities of 360 rotations in the locomitivity and X/Y plane in three directions.
Preferably, first hanging apparatus is gantry crane.
Preferably, second hanging apparatus is the scissor-type lifting mechanism with pivoting support.
Preferably, it is connect above second hanging apparatus with travelling bogie, travelling bogie is in the top operation platform
On along rail running.
Preferably, the top operation platform is steel structure platform, affixed at levelling bench, covering by several steel frames
Area be greater than or equal to the house built area.
Preferably, the outer climbing frame side is welded with branch ear mount, and the branch ear mount is equipped with the vertical bolt hole of strip, described outer
The side of climbing frame and the top of the close branch ear mount are equipped with lateral connection threaded hole, and the vertical bolt hole of strip connects with lateral
Threaded hole is connect for fixing by bolt and the Hang vehicle orbital platform, the casting platform, the external mold platform.
Preferably, the fixed wall-attaching equipment includes that attached wall connects strut, attached wall connecting bracket, and two pairs of attached walls connect
It connecing bracket symmetrically to cover in lifting column periphery, and is bolted integral, the attached wall connecting bracket is welded with trunnion,
One end of the attached wall connection strut is connect by trunnion and bolt with the attached wall connecting bracket, the attached wall connection strut
The other end is fastenedly connected by the embedded board of bolt and wall.
Preferably, first hanging apparatus and second hanging apparatus and construction material use automatic pinning formula or rotation
Latch mechanism locking.
Preferably, the integral construction job platform further includes the construction elevator being arranged in lifting column.
Due to the adoption of the technical scheme as described above, the invention has the following beneficial effects:
1, the present invention is combined using the first hanging apparatus and the second hanging apparatus, and climbing frame drives a platform to synchronize and climbs, and realization is built
The fast hoisting and precise locating function of material are built, while realizing the integration of construction outrigger and architecture storey synchronization lifting function,
Exempt traditional construction outrigger, has the characteristics that Fast Installation and disassembly.
2, the present invention promotes operating efficiency to greatest extent, and artificial utilization rate and cost of labor is greatly lowered, shortens work
Phase;
3, the present invention has applied widely, improves working security, has the features such as accurate, efficient.
4, the present invention can greatly reduce artificial and scaffold use, shorten the construction period of whole building, especially suitable
It is built with novel fabricated.
5, the present invention realizes factory normalization production, combines diversity, can be customized and be produced according to different facades,
It is applied widely.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is right side structural representation of the present invention;
Fig. 3 is overlooking structure diagram of the invention;
Fig. 4 is the installation diagram of outer climbing frame and lifting column;
Fig. 5 is the connection schematic diagram of outer climbing frame and casting platform;
Fig. 6 is the structural schematic diagram of fixed wall-attaching equipment;
Appended drawing reference: at the top of 1- under operation platform, 2- Hang vehicle orbital platform, 3- lifting column, 4- outer climbing frame, the upper climbing frame of 41-, 42-
Climbing frame, 43- hydraulic cylinder, 44- lateral connection threaded hole, 5- casting platform, 6- external mold platform, the fixed wall-attaching equipment of 7-, 71- are attached
Wall connect strut, 72- attached wall connecting bracket, 73- trunnion, 8- logistics corridor, the first hanging apparatus of 9-, the second hanging apparatus of 10-,
11- travelling bogie, 12- branch ear mount, the vertical bolt hole of 121- strip, 13- bolt, 14- construction elevator, 15- construction material, 16-
Guardrail.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
In description of the invention, it should be noted that the orientation or position of the instructions such as term " on ", "lower", "horizontal"
Relationship is orientation based on the figure or positional relationship, is merely for convenience of this practical and simplified description of description, rather than
It indicates or implies that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore
It is not considered as limiting the invention.In addition, " first ", " second " are used for description purposes only, and should not be understood as instruction or
Person implies relative importance.
In description of the invention, it is also necessary to explanation, unless otherwise specific regulation and limitation, term " setting ", " peace
Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally
Connection, can be mechanical connection, is also possible to be electrically connected, can be and be directly connected to, and be also possible to be connected by intermediary, can
To be the connection inside two elements.For the ordinary skill in the art, can understand as the case may be above-mentioned
The concrete meaning of term in the present invention.
Fig. 1-4 is please referred to, one kind being applied to console mode and self-crawling type integral construction job platform, including top construction is put down
Platform 1, Hang vehicle orbital platform 2, lifting column 3, outer climbing frame 4, casting platform 5, external mold platform 6 form, and are provided on the outer climbing frame 4
Standard interface, the outer climbing frame 4 are detachably connected on the lifting column 3, the Hang vehicle orbital platform 2, it is described pour it is flat
Platform 5, the external mold platform 6 are even vertically detachably connected on the outer climbing frame 4 by standard interface respectively, the lifting
Column 3 is that multiple cubes of frames are formed by connecting by bolt 13, and the lifting column 3 is fixed on wall by fixed wall-attaching equipment 7,
The lifting column 3 is fixed on ground, and the outer climbing frame 4 includes upper climbing frame 41 and lower climbing frame 42, the upper climbing frame 41 and it is described under
Climbing frame 42 is connected by hydraulic cylinder 43, and the upper climbing frame supporting block of the upper climbing frame 41 is removably connect with 3 support rod of lifting column,
The lower climbing frame supporting block of the lower climbing frame 42 is removably connect with 3 support rod of lifting column.
Further, at least two logistics corridors 8 are arranged in the top operation platform 1, and the top operation platform 1 is set above
The first hanging apparatus 9 is set, further includes the second hanging apparatus 10 for being slidedly arranged on 1 lower section of top operation platform;
Wherein, first hanging apparatus 9 has the locomitivity in tri- directions X/Y/Z, and second hanging apparatus 10 has
The locomitivity of 360 rotations in the locomitivity and X/Y plane in tri- directions X/Z.
Further, first hanging apparatus 9 is gantry crane.Gantry crane is slidedly arranged on the operation platform 1 of top, gantry crane edge
Track on the operation platform 1 of top moved, suspension hook and trolley, trolley is arranged on gantry crane can be by Building wood
Material 15 is sling and is put down, and can carry out transverse shifting along the crossbeam on gantry crane.Gantry crane has tri- directions X/Y/Z
Locomitivity, meet the transport requirement of construction material 15.
Further, second hanging apparatus 10 is the scissor-type lifting mechanism with pivoting support.
Specifically, scissor-type lifting mechanism is driven by hydraulic cylinder, goes up and down principle: being formed by oil pump to hydraulic cylinder
Certain pressure, then passing through oil filter, throttle valve, liquid oil control valve etc. makes oil enter hydraulic cylinder lower end, makes hydraulic
The piston generation of oil cylinder acts, and achievees the purpose that lifting heavy.The stretching speed of hydraulic cylinder is determined by the flow of oil pump.
Hydraulic cylinder drive system of the invention uses commercially available hydraulic cylinder drive system.
The rise and fall of the present apparatus are all smooth motions, even if disconnected Guan Xianxiang occurs, hydraulic system does not have safe self-locking
In the case where, same descending at slow speed only wastes hydraulic oil, not will cause big injury accident.So the present apparatus is one
The lifting tool that kind probability that is fool proof, breaking down is low, maintenance expense is low.Pivoting support is driven by power device,
The 0-360 degree rotation for realizing construction material 15, construction material 15 is accurately positioned, is installed convenient for construction personnel.
The present invention uses the scissor-type lifting mechanism with pivoting support, can lift by crane construction material 15 above and below, greatly mention
High impulse stroke, and influenced by wind load smaller, it is not susceptible to swing, hoisting process is relatively more firm, construction material 15
Registration;Rotation function with 0-360 degree meets the needs of 15 any angle of construction material placement, realizes precise positioning.
The present invention improves lifting efficiency, promotes operating efficiency to greatest extent, and artificial utilization rate and cost of labor is greatly lowered.
The driving method of the power device driving of the present embodiment is motor driven, hydraulic device driving, pneumatic device driving
One of.
Further, 10 top of the second hanging apparatus is connect with travelling bogie 11, and travelling bogie 11 is flat in Hang track road
Along rail running on platform 2.
Through the above technical solutions, the second hanging apparatus 10 has 360 in the locomitivity and X/Y plane in tri- directions X/Z
The locomitivity of rotation meets the transport requirement of construction material 15.
Further, Fig. 3 is please referred to, the top operation platform 1 is steel structure platform, affixed at level by several steel frames
Platform, the area of covering are greater than or equal to the area for the house built.1 surrounding of top operation platform of the present embodiment is arranged
Guardrail 16, in order to protect the safety of construction personnel.
Specifically, top operation platform 1 is mainly used for pouring for floor, oneself will be passed through on ground by the first hanging apparatus 9
For the concrete delivery mixed to top operation platform 1, high-altitude construction, which is equipped with, pours pipeline, can be directly in top operation platform
Floor is carried out on 1 pours operation.The load that itself is subject to by top operation platform 1 is sent to lifting column 3, passes through lifting column 3
Ground is transferred loads to, the bearing capacity of top operation platform 1 is improved, has also ensured the safety of top operation platform 1
Energy.
Further, Fig. 5 is please referred to, 4 side of outer climbing frame is welded with branch ear mount 12, and the branch ear mount 12 is perpendicular equipped with strip
To bolt hole 121, the top of the side of the outer climbing frame 4 and the close branch ear mount 12 is equipped with lateral connection threaded hole 44, institute
The vertical bolt hole 121 of strip and lateral connection threaded hole 44 is stated to be used for through bolt 13 and the Hang vehicle orbital platform 2, described pour
It is fixed to build platform 5, the external mold platform 6.
Through the above technical solutions, the outer climbing frame 4 with the Hang vehicle orbital platform 2, casting platform 5, described
Threaded hole on mounting rod on external mold platform 6 is corresponding and is adjusted, and after adjusting good position, is carried out by bolt 13 tight closing
Gu so that each platform be made to be fastenedly connected with outer climbing frame 4.
Further, Fig. 6 is please referred to, the fixed wall-attaching equipment 7 includes that attached wall connects strut 71, attached wall connecting bracket
72, two pairs of attached wall connecting brackets 72 are symmetrically covered in 3 periphery of lifting column, and connected by bolt 13 it is integral, it is described
Attached wall connecting bracket 72 is welded with trunnion 73, one end of the attached wall connection strut 71 by trunnion 73 and bolt 13 with it is described attached
Wall connecting bracket 72 connects, and the other end of the attached wall connection strut 71 is fastenedly connected by bolt 13 and the embedded board of wall.
Specifically, when the height of building is when within 100m, every 5 layers of one attached wall connecting bracket 72 of setting and wall
It is fixedly connected;When the height of building is in 100m or more, an attached wall connecting bracket 72 and the fixed company of wall are set every 4 layers
It connects.
Further, first hanging apparatus 9 and second hanging apparatus 10 and construction material 15 use automatic pinning
Formula or rotation latch mechanism locking.
Further, the integral construction job platform further includes the construction elevator 14 being arranged in lifting column 3.
Specifically, outer climbing frame 4 enables top operation platform 1 to be lifted upwards with the increase of floor by hydraulic cylinder, it is whole
1 need of a top operation platform build the construction that can once complete entire building, and after first floor has been built, hydraulic cylinder makes
Outer climbing frame 43 and top operation platform 1 increase a story height upwards, prepare for pouring for next floor.
In the present embodiment, lifting column 3 is additionally provided with the directive wheel for being oriented to outer climbing frame 4, under the action of directive wheel, outside
Climbing frame 4 will not generate offset when moving up and down.
The lifting process of the present embodiment lifting column 3 is as follows:
Add 3 sequence of movement of lifting column as follows:
1, by be mounted on top operation platform 1 on the first hanging apparatus 9 will increased lifting column 3 be hung to top operation platform
Designated position on 1;
2, it will manually need increased lifting column 3 to be mounted on 3 top of lifting column, manually tighten a conjunction bolt;
It is as follows to subtract 3 sequence of movement of lifting column:
1, climbing frame is dropped into designated position;
2, between manual demolition lifting column 3 conjunction bolt and after withdrawing;
3, the lifting column 3 that the first hanging apparatus 9 will subtract is hung to lower section.
Through the above technical solutions, can easily carry out adding layer to lifting column, provide branch for climbing frame with the rising of floor
Support then improves the whole of each platform and is promoted;After having constructed, easily it can subtract layer to lifting column, it is known that all remove.
Construction material 15 in the present invention includes building inner template, building exterior sheathing, steel reinforcement cage, prefabricated components, whole kitchen
It defends.
When transporting building inner template, building inner template is provided with hanging ring, is used for and the first hanging apparatus 9 and second lifts
Device 10 is fixed temporarily.Through the above technical solutions, building inner template can securely with the first hanging apparatus 9 and second
Hanging apparatus 10 is fixed, is not easy to break off relations, safety greatly improves.
Further, the first hanging apparatus 9 and the second hanging apparatus 10 and building inner template it is fixed using automatic pinning formula or
Locking.
Through the above technical solutions, bolt locks automatically, the personnel of not needing go to insert manually, reduce security risk, improve peace
Quan Xing.
The present invention also includes the control traveling of travelling bogie 11, the first hanging apparatus 9, the second hanging apparatus 10, automatic pinning
The electrical component and system (being not drawn into figure) of upper pin and solution pin.
The present invention is combined using the first hanging apparatus and the second hanging apparatus, and climbing frame drives a platform to synchronize and climbs, and is realized
The fast hoisting and precise locating function of construction material, while realizing the integration of construction outrigger and architecture storey synchronization lifting function
Can, exempt traditional construction outrigger, has the characteristics that Fast Installation and disassembly;The present invention promotes operating efficiency to greatest extent, greatly
The artificial utilization rate of amplitude reduction and cost of labor, shorten the duration;The present invention have it is applied widely, improve construction safety
Property, have the features such as accurate, efficient;The present invention can greatly reduce artificial and scaffold use, shorten the construction of whole building
It is period, especially suitable to be built with novel fabricated;The present invention realizes factory normalization production, combines diversity, can be according to difference
Facade customizes production, applied widely.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that the process, method, article or the device that include a series of elements not only include those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do
There is also other identical elements in the process, method of element, article or device.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention.
Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one
The widest scope of cause.
Claims (10)
1. one kind be applied to console mode and self-crawling type integral construction job platform, including top operation platform, Hang vehicle orbital platform,
Lifting column, outer climbing frame, casting platform, external mold platform composition, which is characterized in that standard interface, institute are provided on the outer climbing frame
It states outer climbing frame to be detachably connected on the lifting column, the Hang vehicle orbital platform, the casting platform, the external mold platform
It is even vertically detachably connected on the outer climbing frame by standard interface respectively, the lifting column is that multiple cubes of frames are logical
It crosses and is bolted, the lifting column is fixed on wall by fixed wall-attaching equipment, and the lifting column is fixed on ground, institute
Stating outer climbing frame includes upper climbing frame and lower climbing frame, and the upper climbing frame is connected with the lower climbing frame by hydraulic cylinder, the upper climbing frame
Upper climbing frame supporting block is removably connect with lifting column support rod, the lower climbing frame supporting block of the lower climbing frame removably with lifting
The connection of column support rod.
2. according to claim 1 be applied to console mode and self-crawling type integral construction job platform, which is characterized in that described
At least two logistics corridors are arranged in top operation platform, and the first hanging apparatus is arranged above the top operation platform, further includes
The second hanging apparatus being slidedly arranged below the top operation platform;
Wherein, first hanging apparatus has the locomitivity in tri- directions X/Y/Z, and second hanging apparatus has X/Z
The locomitivities of 360 rotations in the locomitivity and X/Y plane in three directions.
3. according to claim 2 be applied to console mode and self-crawling type integral construction job platform, which is characterized in that described
First hanging apparatus is gantry crane.
4. according to claim 2 be applied to console mode and self-crawling type integral construction job platform, which is characterized in that described
Second hanging apparatus is the scissor-type lifting mechanism with pivoting support.
5. according to claim 2 be applied to console mode and self-crawling type integral construction job platform, which is characterized in that described
It is connect above second hanging apparatus with travelling bogie, travelling bogie is on the top operation platform along rail running.
6. according to claim 1 be applied to console mode and self-crawling type integral construction job platform, which is characterized in that described
Top operation platform is steel structure platform, and affixed at levelling bench by several steel frames, the area of covering is greater than or equal to institute
Build the area of house.
7. according to claim 1 be applied to console mode and self-crawling type integral construction job platform, which is characterized in that described
Outer climbing frame side is welded with branch ear mount, and the branch ear mount is equipped with the vertical bolt hole 121 of strip, the side of the outer climbing frame and close
The top of the branch ear mount is equipped with lateral connection threaded hole, and the vertical bolt hole 121 of the strip and lateral connection threaded hole are used for
It is fixed by bolt and the Hang vehicle orbital platform, the casting platform, the external mold platform.
8. according to claim 1 be applied to console mode and self-crawling type integral construction job platform, which is characterized in that described
Fixed wall-attaching equipment includes that attached wall connects strut, attached wall connecting bracket, and two pairs of attached wall connecting brackets are symmetrically covered described
Lifting column periphery, and it is bolted integral, the attached wall connecting bracket is welded with trunnion, the attached wall connection strut
One end is connect by trunnion and bolt with the attached wall connecting bracket, and the other end of the attached wall connection strut passes through bolt and wall
The embedded board of body is fastenedly connected.
9. according to claim 1 be applied to console mode and self-crawling type integral construction job platform, which is characterized in that described
First hanging apparatus and second hanging apparatus and construction material are using automatic pinning formula or rotation latch mechanism locking.
10. according to claim 1 be applied to console mode and self-crawling type integral construction job platform, which is characterized in that institute
Stating integral construction job platform further includes the construction elevator being arranged in lifting column.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910483554.4A CN110182694A (en) | 2019-06-04 | 2019-06-04 | One kind being applied to console mode and self-crawling type integral construction job platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910483554.4A CN110182694A (en) | 2019-06-04 | 2019-06-04 | One kind being applied to console mode and self-crawling type integral construction job platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110182694A true CN110182694A (en) | 2019-08-30 |
Family
ID=67720232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910483554.4A Withdrawn CN110182694A (en) | 2019-06-04 | 2019-06-04 | One kind being applied to console mode and self-crawling type integral construction job platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110182694A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110745714A (en) * | 2019-10-11 | 2020-02-04 | 贵州桥梁建设集团有限责任公司 | Self-lifting installation method of hoisting tower system |
CN112938774A (en) * | 2021-01-20 | 2021-06-11 | 东南大学 | Integral hoisting system and hoisting method for assembly type component |
WO2023070256A1 (en) * | 2021-10-25 | 2023-05-04 | 广州建筑湾区智造科技有限公司 | Construction method for fully-prefabricated assembly type multistory and high-rise concrete workshops |
-
2019
- 2019-06-04 CN CN201910483554.4A patent/CN110182694A/en not_active Withdrawn
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110745714A (en) * | 2019-10-11 | 2020-02-04 | 贵州桥梁建设集团有限责任公司 | Self-lifting installation method of hoisting tower system |
CN112938774A (en) * | 2021-01-20 | 2021-06-11 | 东南大学 | Integral hoisting system and hoisting method for assembly type component |
CN112938774B (en) * | 2021-01-20 | 2022-03-25 | 东南大学 | Integral hoisting system and hoisting method for assembly type component |
WO2023070256A1 (en) * | 2021-10-25 | 2023-05-04 | 广州建筑湾区智造科技有限公司 | Construction method for fully-prefabricated assembly type multistory and high-rise concrete workshops |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103526949B (en) | A kind of sliding and lifting construction method of attached wall vertical structure | |
CN102267664B (en) | Method for installing bridge crane using load-supporting roof beam for hoisting and usage thereof | |
CN110182694A (en) | One kind being applied to console mode and self-crawling type integral construction job platform | |
CN106744257B (en) | A kind of kiloton adjustable combined sling, assemble method and the method for lifting caisson | |
CN202144437U (en) | Standing type single-person hanging seat device | |
CN110259079A (en) | One kind being used for building machinery and construction synchronization lifting structure | |
WO2019223744A1 (en) | Construction device and construction method for prefabricated building | |
CN106948604A (en) | The irregular alien invasion glass curtain wall positioning apparatus of high-rise building and construction method | |
CN1101331C (en) | Integrated conveying and hoisting machine | |
CN103193137B (en) | High-altitude full automatic lifting and using method thereof | |
CN113090014A (en) | High-rise assembled building integral operation platform and construction method and application thereof | |
CN206562264U (en) | A kind of hanging device for transport outside high-rise building | |
CN108286332A (en) | A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method | |
CN105540446A (en) | Interior-climbing type lifting platform | |
CN205637622U (en) | Perpendicular unit glass curtain wall hoist and mount system | |
CN1833987A (en) | Integral lifting method of large bridge crane and its appts | |
CN110259152A (en) | A kind of construction material movement system and method | |
CN210366717U (en) | Be applied to console mode and from climbing formula whole construction work platform | |
CN207312994U (en) | Power station major diameter surge shaft steel lining cantilevered annular track boom hoisting | |
CN205894715U (en) | Light steel structure is semi -automatic under enclosed construction constructs from hoisting machine that climbs | |
CN109967991A (en) | A kind of Intelligent Frame Standard device | |
CN214573768U (en) | Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot | |
CN206220460U (en) | For the operating platform of tower | |
CN212832684U (en) | Self-propelled combined lifting multifunctional aerial work platform truck | |
CN210886924U (en) | Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190830 |