CN218371437U - Portable metal pipeline hoists hoisting device - Google Patents

Portable metal pipeline hoists hoisting device Download PDF

Info

Publication number
CN218371437U
CN218371437U CN202222714397.3U CN202222714397U CN218371437U CN 218371437 U CN218371437 U CN 218371437U CN 202222714397 U CN202222714397 U CN 202222714397U CN 218371437 U CN218371437 U CN 218371437U
Authority
CN
China
Prior art keywords
rope
metal pipeline
hoisting
hook
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222714397.3U
Other languages
Chinese (zh)
Inventor
滕堃
于飞
葛小明
沙胜男
陆云新
赵家辉
田云翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Sijian Construction Group Co Ltd
Original Assignee
Nantong Sijian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Sijian Construction Group Co Ltd filed Critical Nantong Sijian Construction Group Co Ltd
Priority to CN202222714397.3U priority Critical patent/CN218371437U/en
Application granted granted Critical
Publication of CN218371437U publication Critical patent/CN218371437U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a portable metal pipeline hoist and mount hoisting device relates to building engineering construction technical field, effectively utilizes reserving the riser entrance to a cave in the floor main part engineering, has solved among the prior art metal pipeline's hoist and mount and has promoted the technical problem that influences the efficiency of construction. The device includes electric hoist, the lifting rope, the rope fastening, the shaped steel base, lifting hook and fag end, electric hoist installs on the shaped steel base, the highest floor department of building on required installation metal pipeline is placed to the shaped steel base, every floor on the building all is provided with the reservation riser entrance to a cave on same axis position, electric hoist equipment is located directly over the reservation riser entrance to a cave, electric hoist can drive the lifting rope winding on the reel, the lifting rope can pass all reservation riser entrances on same axis position, other district's section except free end on free end that the free end passed lifting hook and lifting rope of lifting rope is connected through the rope fastening, the fag end is used for the cover on metal pipeline and the lifting hook can hook the fag end.

Description

Portable metal pipeline hoists hoisting device
Technical Field
The utility model belongs to the technical field of the building engineering construction technique and specifically relates to a portable metal pipeline hoists hoisting device is related to.
Background
In the construction process of constructional engineering, a large number of metal pipelines need to be hoisted and carried across floors. Normally, the metal pipeline hoisting is carried out by utilizing a pipeline well or an erected outdoor personnel goods elevator, a tower crane and the like, if the construction area of an engineering single layer is too large, a large number of metal pipelines need to be installed, the metal pipelines are still hoisted to an appointed floor from the pipeline well and then carried for the second time, the construction efficiency is greatly influenced, materials are transported among various specialties, and the coordination difficulty is large.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a portable metal pipeline hoists hoisting device to the hoist and mount of solving among the prior art metal pipeline promotes the technical problem who influences the efficiency of construction. The utility model provides a plurality of technical effects that preferred technical scheme among a great deal of technical scheme can produce see the explanation below in detail.
In order to achieve the above purpose, the utility model provides a following technical scheme:
the utility model provides a pair of portable metal pipeline hoists hoisting device, including electric hoist engine, lifting rope, cable loop, shaped steel base, lifting hook and fag end, wherein, electric hoist engine is installed on the shaped steel base, the highest floor department of building on required installation metal pipeline is placed to the shaped steel base, every floor on the building all is provided with on same axis position and reserves the riser through-hole, electric hoist engine is located directly over reserving the riser entrance to a cave, the one end of lifting rope is connected just on the last reel of electric hoist engine can drive the lifting rope winding is in on the reel, the lifting rope can pass on same axis position all reserve the riser entrance to a cave, the free end of lifting rope with pass the lifting hook just the free end with other district's section on the lifting rope except the free end passes through the cable loop is connected, the fag end is used for the cover just on the metal pipeline the lifting hook the cable loop, the lifting rope can drive the metal pipeline passes the riser entrance to a cave.
Optionally, the rope buckle comprises a U-shaped rod, a fixing portion and a nut, wherein two ends of the U-shaped rod penetrate through the fixing portion, the nut is in threaded connection with the end portion of the U-shaped rod, and the U-shaped rod and the fixing portion form a closed fastening opening.
Optionally, two through holes are arranged on the fixing part; and the end part of the U-shaped rod is provided with a thread.
Optionally, the profile steel base is connected with the electric winch through a bolt.
Optionally, the electric winch further comprises an operation controller electrically connected with the electric winch.
Optionally, an auxiliary tool is included, which can hook the free end of the metal pipe.
Optionally, the auxiliary tool comprises a handle, a connecting rod and a connecting hook, and the handle and the connecting hook are respectively and fixedly connected with two ends of the connecting rod.
Optionally, the lifting rope is a steel wire rope.
The utility model provides a pair of portable metal pipeline hoists hoisting device places electric hoist and shaped steel base directly over the reservation riser entrance to a cave in the required installation metal pipeline of the highest floor of building earlier, twines the lifting rope on the reel in electric hoist simultaneously, and electric hoist starts the back, carries out lifting rope promotion and descending operation. The lifting rope falls down and sequentially passes through all reserved vertical pipe holes in the same axial line position, and finally enters a metal pipeline stacking floor, the metal pipelines are stacked according to system numbers, and the stacking position is close to the corresponding reserved vertical pipe holes. At the moment, only one side end of the metal pipeline needs to be tightly sleeved through the rope sleeve, the rope sleeve is hooked by the lifting hook, then the electric winch is started, the lifting rope is lifted, meanwhile, the metal pipeline is driven to lift, and the metal pipeline smoothly penetrates through the reserved vertical pipe hole to reach the appointed floor. After the materials of the pipeline systems of all floors are transported to the appointed installation area, the installation construction of the main trunk pipe of the metal vertical pipe is carried out, and the time of secondary transportation is saved. When the next metal pipeline is lifted, the lifting rope, the rope buckle, the lifting hook and the rope sleeve need to penetrate through the installed metal pipeline, and then the lifting rope, the rope buckle, the lifting hook and the rope sleeve are sleeved on the next metal pipeline to be lifted, so that the construction process is good in recycling effect, the construction efficiency is improved, and the technical problem that the lifting of the metal pipeline influences the construction efficiency in the prior art is solved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a portable metal pipeline hoisting device provided by an embodiment of the present invention;
fig. 2 is a schematic structural diagram of connection of a lifting rope, a rope buckle, a lifting hook, a rope loop and a metal pipeline of the portable metal pipeline lifting device provided by the embodiment of the invention;
fig. 3 is a schematic structural view of a rope buckle of the portable metal pipeline hoisting device provided by the embodiment of the invention;
fig. 4 is a schematic structural diagram of an auxiliary tool of the portable metal pipeline hoisting device provided by the embodiment of the present invention;
in the figure 1, an electric winch;
2. a lifting rope;
3. a rope buckle; 31. a U-shaped rod; 32. a fixed part; 33. a nut;
4. a section steel base;
5. a floor; 51. reserving a vertical pipe opening;
6. a hook;
7. a metal pipe;
8. an auxiliary tool; 81. a handle; 82. a connecting rod; 83. a connecting hook;
9. operating the controller;
10. and (4) rope sleeving.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the technical solutions of the present invention will be described in detail below. It is to be understood that the disclosed embodiments are merely exemplary of the invention, and are not intended to limit the invention to the precise embodiments disclosed. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
In the description of the present invention, it is to be noted that "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like are used in an orientation or positional relationship indicated based on the orientation or positional relationship shown in the drawings for convenience of description and simplicity of description, and do not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "connected" and "connected" are to be construed broadly, e.g., as being fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood as the case may be, by those of ordinary skill in the art.
Example 1:
the utility model provides a portable metal pipeline hoists hoisting device, including electric hoist engine 1, lifting rope 2, 3 and the shaped steel base 4 of cable loop, wherein, electric hoist engine 1 installs on shaped steel base 4, the highest floor 5 department of building on required installation metal pipeline 7 is placed to shaped steel base 4, every floor 5 on the building all is provided with reservation riser entrance to a cave 51 on same axis position, electric hoist engine 1 is located and reserves riser entrance to a cave directly over 51, the one end of lifting rope 2 is connected on the reel on electric hoist engine 1 and electric hoist engine 1 can drive lifting rope 2 winding on the reel, when electric hoist engine 1 drive reel rolls, make the lifting rope 2 can wind on the reel, or lifting rope 2 breaks away from the reel, lifting rope 2 can pass all reservation riser entrance to a cave 51 on same axis position, the free end of lifting rope 2 with pass 6 and other district's section except that the free end on lifting rope 2 of lifting rope 2 be connected through cable loop 3, rope 10 is used for the cover on metal pipeline 7 and 6 can hook the hole aperture of lifting rope, lifting rope 2 is greater than the lifting rope loop 51 of lifting rope, lifting rope is greater than the metal pipeline 51. The utility model provides a pair of metal pipeline hoist and mount hoisting device places electric hoist engine 1 and shaped steel base 4 directly over reservation riser entrance to a cave 51 in 5 required installation metal pipeline 7 of the highest floor of building earlier, twines lifting rope 2 on the reel in electric hoist engine 1 simultaneously, and electric hoist engine 1 starts the back, carries out lifting rope 2 and promotes and descend the operation. The lifting rope 2 firstly falls down and sequentially passes through all reserved riser holes 51 on the same axial line position, and finally enters a stacking floor 5 of the metal pipelines 7, the metal pipelines 7 are respectively stacked according to the system number, and the stacking position is close to the corresponding reserved riser hole 51. At this time, the end of the metal pipeline 7 is tightly sleeved by the rope loop 10, the rope loop is hooked by the lifting hook 6, and then the electric hoist 1 is started, so that the lifting rope 2 rises, and meanwhile, the metal pipeline 7 is driven to rise and smoothly passes through the reserved vertical pipe opening 51 to reach the appointed floor 5. After the materials of the pipeline systems of each floor 5 are transported to the appointed installation area, the installation construction of the main trunk pipe of the metal vertical pipe 7 is carried out, and the time of secondary transportation is saved. When promoting next metal pipeline 7 later, need pass the metal pipeline 7 that has installed with lifting rope 2, cable loop 3, lifting hook 6 and fag end 10, overlap the next metal pipeline 7 again and promote, construction process reuse effect is good, has solved among the prior art metal pipeline's hoist and mount promotion and has influenced the technical problem of efficiency of construction.
Example 2:
the difference between the present embodiment 2 and embodiment 1 is that the rope buckle 3 includes a U-shaped rod 31, a fixing portion 32 and a nut 33, two ends of the U-shaped rod 31 pass through the fixing portion 32 and the nut 33 is screwed with the end of the U-shaped rod 31, the U-shaped rod 31 and the fixing portion 32 form a closed fastening opening, the free end of the lifting rope 2 and other sections of the lifting rope 2 except the free end pass through the fastening opening, and the size of the opening is changed by changing the elongation of the U-shaped rod 31 passing through the fixing portion 32, so that the lifting rope 2 can be fastened on the rope buckle 3. The number of the rope buckles 3 is a plurality of, and the installation number of the rope buckles 3 can be supplemented according to the specification of the required hoisting metal pipeline 7.
As an alternative embodiment, the fixing portion 32 is provided with two through holes through which the two end portions of the U-shaped rod 3 pass respectively; the end of the U-shaped rod 31 is provided with threads which are in threaded connection with two nuts 33, and the number of the nuts 33 is two.
As an alternative embodiment, the steel section base 4 is connected with the electric winch 1 through bolts.
As an optional embodiment, an operation controller 9 is further included, the operation controller 9 is electrically connected to the electric hoist 1, and the operation controller 9 may control the electric hoist 1 to rotate forward, backward, or stop. The operating controller 9 is located at a reserved riser opening 51 in the next floor 5 where the electric winch 1 is located. When the metal pipeline 7 is hoisted, the mobile phone is used for communication, and the metal pipeline 7 is effectively ensured to be vertically transported to the appointed floor 5 through operating a manual control button on the controller 9, so that the operation is convenient and fast.
As an alternative embodiment, an auxiliary tool 8 is also included, the auxiliary tool 8 being able to hook the free end of the metal pipe 7. When the lifting rope 2 just begins to lift the metal pipeline 7, in order to avoid scratches on the floor at the free end of the metal pipeline 7, a worker can hold the auxiliary tool 8 to hook the free end of the metal pipeline 7, so that the free end of the metal pipeline 7 is lifted, the free end of the metal pipeline 7 is separated from the floor, and scratches on the floor can be avoided.
As an alternative embodiment, the auxiliary tool 8 includes a handle 81, a connecting rod 82 and a connecting hook 83, the handle 81 and the connecting hook 83 are respectively fixedly connected to two ends of the connecting rod 82, the worker can hold the handle 81, the connecting hook 83 can extend into the metal pipe 7, and the connecting hook 83 is closely held with the other end of the metal pipe 7.
As an alternative embodiment, the hoist rope 2 may be a wire rope. According to the maximum specification and material of the metal pipeline 7 to be hoisted and the total height of the hoisting floor, the specification and the number of the steel wire ropes are matched with each other according to the corresponding reserved vertical pipe opening 51, so that the hoisting load safety requirement is met. The rope containing amount of the winding drum should reach the maximum value of the working length of the steel wire rope allowed to be contained. The diameter of the actually used steel wire rope is consistent with the diameter marked on the nameplate of the electric winch 1.
The above description is only for the specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art can easily think of the changes or substitutions within the technical scope of the present invention, and all should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (8)

1. A portable metal pipeline hoisting device is characterized by comprising an electric winch (1), a lifting rope (2), a rope buckle (3), a profile steel base (4), a lifting hook (6) and a rope sleeve (10), wherein,
the electric hoisting machine (1) is installed on the section steel base (4), the section steel base (4) is placed at the highest floor (5) of a building on a metal pipeline (7) to be installed, a reserved vertical pipe hole (51) is formed in each floor (5) of the building on the same axis position, the electric hoisting machine (1) is located right above the reserved vertical pipe hole (51), one end of the hoisting rope (2) is connected to a winding drum on the electric hoisting machine (1), the electric hoisting machine (1) can drive the hoisting rope (2) to be wound on the winding drum, the hoisting rope (2) can penetrate through all the reserved vertical pipe holes (51) in the same axis position, the free end of the hoisting rope (2) penetrates through the lifting hook (6), the free end of the hoisting rope (2) is connected with other sections of the hoisting rope (2) except the free end through the rope buckle (3), and the rope sleeve (10) is used for being sleeved on the metal pipeline (7), and the hoisting rope (6) can hook the vertical pipe (2), and the hoisting rope sleeve (2) can penetrate through the movable rope sleeve (51).
2. The portable metal pipeline hoisting device according to claim 1, wherein the rope buckle (3) comprises a U-shaped rod (31), a fixing portion (32) and a nut (33), two ends of the U-shaped rod (31) pass through the fixing portion (32) and the nut (33) is in threaded connection with the end of the U-shaped rod (31), and the U-shaped rod (31) and the fixing portion (32) form a closed fastening port.
3. The portable metal pipeline hoisting device according to claim 2, wherein the fixing portion (32) is provided with two through holes; and the end part of the U-shaped rod (31) is provided with a thread.
4. The portable metal pipeline hoisting device of claim 1, wherein the steel base (4) is connected with the electric hoist (1) through bolts.
5. The portable metal pipeline hoisting device according to claim 1, further comprising an operation controller (9), wherein the operation controller (9) is electrically connected with the electric winch (1).
6. The portable metal pipeline hoisting device according to claim 1, further comprising an auxiliary tool (8), wherein the auxiliary tool (8) can hook the free end of the metal pipeline (7).
7. The portable metal pipeline hoisting device according to claim 6, wherein the auxiliary tool (8) comprises a handle (81), a connecting rod (82) and a connecting hook (83), and the handle (81) and the connecting hook (83) are respectively fixedly connected with two ends of the connecting rod (82).
8. The portable metal pipeline hoisting device of claim 1, wherein the lifting rope (2) is a steel wire rope.
CN202222714397.3U 2022-10-14 2022-10-14 Portable metal pipeline hoists hoisting device Active CN218371437U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222714397.3U CN218371437U (en) 2022-10-14 2022-10-14 Portable metal pipeline hoists hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222714397.3U CN218371437U (en) 2022-10-14 2022-10-14 Portable metal pipeline hoists hoisting device

Publications (1)

Publication Number Publication Date
CN218371437U true CN218371437U (en) 2023-01-24

Family

ID=84929946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222714397.3U Active CN218371437U (en) 2022-10-14 2022-10-14 Portable metal pipeline hoists hoisting device

Country Status (1)

Country Link
CN (1) CN218371437U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116290766A (en) * 2023-02-15 2023-06-23 中国十九冶集团有限公司 Method for transporting building materials

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116290766A (en) * 2023-02-15 2023-06-23 中国十九冶集团有限公司 Method for transporting building materials

Similar Documents

Publication Publication Date Title
CN218371437U (en) Portable metal pipeline hoists hoisting device
CN201040150Y (en) High building emergency escaping rescue device
CN112072560B (en) Method for vertically laying super high-rise shaft cable in air through relay lifting
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN111764629A (en) Method for mounting and dismounting inclined roof hanging basket without counterweight
CN211004312U (en) Steel wire rope reel locking device for tower crane
CN110294427B (en) Method for replacing steel wire rope of main hoisting system of large tower crane
CN111422759A (en) Method for dismantling tower crane in narrow space
CN111689417B (en) Anti-falling elevator for building
CN111411624B (en) Hoisting method for reinforcement cage of underground continuous wall in height-limited area
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
CN210885048U (en) Large-scale equipment hoisting system
CN209853625U (en) Manual hole digging pile winch with height limiter
CN210029781U (en) Anti-shaking device for hoisting
CN114165061A (en) Construction method of vertical transportation system
CN111196566A (en) Construction structure and construction method of super high-rise inner climbing tower crane
CN2042492U (en) Dual-purpose vertical lift platform for fixing and load-lifting
CN217417980U (en) Simple cantilever hoisting equipment
CN211998555U (en) Construction structure of super high-rise inner climbing tower crane
CN218434615U (en) Hoisting cableway device with adjustable tightness
CN212076223U (en) Pull rod hoist system convenient to dismantle
CN115207837A (en) Overhead cable laying method and safety protection auxiliary device thereof
CN221587805U (en) Wallboard lifting machine
CN214272878U (en) Attached lifting scaffold
CN219449103U (en) Secondary beam lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant