CN218234050U - Building parapet node structure - Google Patents
Building parapet node structure Download PDFInfo
- Publication number
- CN218234050U CN218234050U CN202220952666.7U CN202220952666U CN218234050U CN 218234050 U CN218234050 U CN 218234050U CN 202220952666 U CN202220952666 U CN 202220952666U CN 218234050 U CN218234050 U CN 218234050U
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- bar pole
- parapet
- node structure
- brick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Fencing (AREA)
Abstract
The utility model provides a building parapet node structure, including parapet node structure and roofing, parapet node structure includes first support column, and first support column total is a plurality of, and is the equidistance along the marginal length of roofing and arranges, the bottom of first support column is equipped with logical groove; the roofing includes the reinforcing bar pole, the first support post of reinforcing bar pole perpendicular to, and the reinforcing bar pole total a plurality of and with first support post one-to-one, the one end of reinforcing bar pole runs through logical groove and welds, the fragment of brick has all been laid along the length direction of reinforcing bar pole to reinforcing bar pole top and bottom, and the fragment of brick covers whole reinforcing bar pole, is equipped with equal bolt hole on the fragment of brick. The utility model discloses when using, carry out the content formula through the inside first support column that sets up reinforcing bar pole and parapet at the roofing and be connected to and the support effect of support bar to first support column, strengthen the support intensity of the node of whole parapet, effectively avoid the parapet to take place the condition emergence of collapsing of turning on one's side.
Description
Technical Field
The utility model belongs to the technical field of the parapet, especially, indicate a building parapet node structure.
Background
At present, the parapet is constructed by adopting separation nets and supporting columns on roofs of most of residential or commercial buildings, so that the view field of residents or people is overlooked, but the parapet has certain potential safety hazards, and is very likely to be loosened and collapsed due to insufficient supporting strength at the nodes of the parapet. Therefore, a building parapet node structure is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
For solving the defects of the prior art, the utility model provides a building parapet node structure.
The technical scheme of the utility model is realized like this: a building parapet node structure comprises a parapet node structure and a roof, wherein the parapet node structure comprises a plurality of first support columns which are arranged at equal intervals along the edge length of the roof, and the bottoms of the first support columns are provided with through grooves;
the roofing includes the reinforcing bar pole, the first support post of reinforcing bar pole perpendicular to, and the reinforcing bar pole total a plurality of and with first support post one-to-one, the one end of reinforcing bar pole runs through logical groove and welds, the fragment of brick has all been laid along the length direction of reinforcing bar pole to reinforcing bar pole top and bottom, and the fragment of brick covers whole reinforcing bar pole, is equipped with equal bolt hole on the fragment of brick, and the fragment of brick passes through the bolt fastening who corresponds with the bolt hole on the reinforcing bar pole, the space between fragment of brick and the reinforcing bar pole has all been watered the concrete, and the top that leads to the groove is all walked through to the concrete.
Preferably, every the edge of fragment of brick all installs the connecting plate, and the connecting plate between two adjacent fragments of brick is all set up mutually in a staggered way, and hugs closely each other.
Preferably, a reinforcing mesh is arranged between two adjacent reinforcing rods.
Preferably, every the top of first support column all is equipped with the second support column of crooked setting, and all connects through the connecting rod between two adjacent first support columns.
Preferably, every one side that the second support column direction of buckling was kept away from to first support column is equipped with the bracing piece, the base is installed to the bottom of bracing piece, and the base passes through the bolt fastening on the fragment of brick, the sleeve is installed at the top of bracing piece, and the sleeve cup joints on first support column and through the bolt fastening.
Preferably, parapet node structure's top is equipped with the oblique top, and the crooked direction downward sloping of second support column is followed to the oblique top, junction between oblique top and the roofing is equipped with the chute, and is equipped with the water trough that a plurality of equidistance were arranged along the direction of arranging of first support column on the top surface of roofing, and the water trough is connected with the chute.
Compared with the prior art, the utility model discloses when using, carry out the content formula through the inside first support column that sets up reinforcing bar pole and parapet at the roofing and be connected to and the support effect of support bar to first support column, strengthen the support intensity of the node of whole parapet, effectively avoid the parapet to take place to turn on one's side the condition of collapsing and take place.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic cross-sectional structural view of a joint structure of a parapet wall of a building provided by the present invention;
fig. 2 is a connection diagram of the through groove and the reinforcing steel bar of the node structure of the parapet wall of the building provided by the utility model;
fig. 3 is a schematic diagram of a brick structure of a node structure of a parapet wall of the present invention;
fig. 4 is the utility model provides an overall structure schematic diagram of building parapet node structure.
In the figure: 1. a first support column; 2. a through groove; 3. a reinforcing bar rod; 4. bricks; 5. bolt holes; 6. a second support column; 7. a connecting rod; 8. a base; 9. a support bar; 10. a sleeve; 11. a reinforcing mesh; 12. a connecting plate; 13. obliquely ejecting; 14. a roof; 15. A chute; 16. a water trough.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a building parapet node structure comprises a parapet node structure and a roof 14, wherein the parapet node structure comprises a plurality of first supporting columns 1, the first supporting columns 1 are arranged at equal intervals along the edge length of the roof 14, and the bottoms of the first supporting columns 1 are provided with through grooves 2;
Specifically, through set up the logical groove 2 of reinforcing bar 3 through first support column 1 bottom of parapet in roofing 14 inside, carry out the mode of content formula connection to both, strengthen the support intensity of the node of whole parapet, effectively avoid the parapet to take place the condition emergence of collapsing of turning on one's side
Further say, every connecting plate 12 is all installed to the edge of fragment of brick 4, and 12 homogeneous phases of connecting plate between two adjacent fragment of brick 4 are wrong to be set up, and hug closely each other, through the wrong formula connection between the fragment of brick 4, the cover and the packing of cooperation concrete have strengthened the whole support intensity of roofing 14 promptly, have improved the fixed stay effect of reinforcing bar pole 3 to first support column 1 again.
Furthermore, a reinforcing mesh 11 is arranged between two adjacent reinforcing rods 3, and the gripping force of the concrete between the upper layer of bricks 4 and the lower layer of bricks 4 is enhanced through the reinforcing mesh 11, so that the action strength of the concrete on the bricks 4 is enhanced.
Further say, every the top of first support column 1 all is equipped with the second support column 6 of crooked setting, and all connects through connecting rod 7 between two adjacent first support columns 1, and through the second support column 6 of crooked setting, the effectual possibility of avoiding the people to overturn from the parapet, carries out safety protection to the people of climbing on roofing 14.
Further say, every one side that second support column 6 direction of buckling was kept away from to first support column 1 is equipped with bracing piece 9, base 8 is installed to the bottom of bracing piece 9, and base 8 passes through the bolt fastening on fragment of brick 4, sleeve 10 is installed at the top of bracing piece 9, and sleeve 10 cup joints on first support column 1 and through the bolt fastening, through the supporting role of bracing piece 9 to first support column 1, further strengthens first support column 1's support.
Further say, parapet node structure's top is equipped with pushes up 13 to one side, pushes up 13 to one side along the crooked direction downward sloping of second support column 6, the junction between 13 and the roofing 14 is equipped with chute 15 to one side, and is equipped with the water trough 16 that a plurality of equidistance were arranged along the direction of arranging of first support column 1 on the top surface of roofing 14, and water trough 16 is connected with chute 15, through pushing up 13 and water trough 16 to one side, dredges the emission to rainwater etc. that fall on roof 14, avoids the rainwater to assemble at parapet node, soaks inside, causes the condition such as corruption to take place.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a building parapet node structure which characterized in that: the parapet node structure comprises a parapet node structure and a roof (14), wherein the parapet node structure comprises a plurality of first supporting columns (1), the first supporting columns (1) are arranged at equal intervals along the edge length of the roof (14), and the bottoms of the first supporting columns (1) are provided with through grooves (2);
roofing (14) include reinforcing bar pole (3), the first support column of reinforcing bar pole (3) perpendicular to (1), and reinforcing bar pole (3) total a plurality of and with first support column (1) one-to-one, the one end of reinforcing bar pole (3) runs through logical groove (2) and welds, fragment of brick (4) have all been laid along the length direction of reinforcing bar pole (3) in reinforcing bar pole (3) top and bottom, and fragment of brick (4) cover whole reinforcing bar pole (3), are equipped with on fragment of brick (4) equal bolt hole (5), and fragment of brick (4) through the bolt fastening who corresponds with bolt hole (5) on reinforcing bar pole (3), the space between fragment of brick (4) and reinforcing bar pole (3) all waters the concrete, and the concrete all crosses the top that leads to groove (2).
2. The structure of a building parapet node according to claim 1, wherein connecting plates (12) are installed at the edges of each brick (4), and the connecting plates (12) between two adjacent bricks (4) are staggered and tightly attached to each other.
3. A construction parapet node structure according to claim 1, characterized in that a reinforcing mesh (11) is provided between two adjacent reinforcing rods (3).
4. A building parapet node structure according to claim 1, characterized in that the top of each first supporting column (1) is provided with a second supporting column (6) which is arranged in a bent manner, and two adjacent first supporting columns (1) are connected through a connecting rod (7).
5. The building parapet node structure of claim 1, wherein a supporting rod (9) is arranged on one side, away from the bending direction of the second supporting column (6), of each first supporting column (1), a base (8) is installed at the bottom of the supporting rod (9), the base (8) is fixed on a brick (4) through a bolt, a sleeve (10) is installed at the top of the supporting rod (9), and the sleeve (10) is sleeved on the first supporting column (1) and fixed through the bolt.
6. The parapet node structure of a building as claimed in claim 1, wherein a slanted top (13) is provided at the top of the parapet node structure, the slanted top (13) is inclined downward along the bending direction of the second support column (6), a chute (15) is provided at the joint between the slanted top (13) and the roof (14), and a plurality of water passing grooves (16) are provided on the top surface of the roof (14) along the arrangement direction of the first support columns (1), the water passing grooves (16) being connected to the chute (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220952666.7U CN218234050U (en) | 2022-04-22 | 2022-04-22 | Building parapet node structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220952666.7U CN218234050U (en) | 2022-04-22 | 2022-04-22 | Building parapet node structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218234050U true CN218234050U (en) | 2023-01-06 |
Family
ID=84662162
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220952666.7U Active CN218234050U (en) | 2022-04-22 | 2022-04-22 | Building parapet node structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218234050U (en) |
-
2022
- 2022-04-22 CN CN202220952666.7U patent/CN218234050U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100902642B1 (en) | Arbor | |
CN104389349B (en) | The novel house can quickly remove, assembled and assemble method | |
KR101615614B1 (en) | A construction method of a structure with modular retaining wall and double wall | |
CN105008633A (en) | Waterproofing and drainage device for rooftop of building | |
CN218234050U (en) | Building parapet node structure | |
KR102029231B1 (en) | Tile-shaped roof structure for soundproof tunnels | |
CN116591368A (en) | Structure slope finding overhead permeable roof with sport field and construction method | |
CN217353235U (en) | Building group | |
CN210530149U (en) | Inclined roof ceramic tile dry hanging structure | |
CN114718250A (en) | Archaizing building group | |
CN205134785U (en) | Prevent structure that cornices that ftractures | |
CN217353231U (en) | Commercial archaizing building based on reinforced concrete | |
CN217150946U (en) | Archaizing slope roof | |
CN220225972U (en) | Steel construction building tile roofing cornice drainage structures | |
CN205531042U (en) | Upright lock stitches steel tile roofing system | |
CN212427821U (en) | Green drainage roofing in sponge city | |
CN217232961U (en) | Archaize watchtower | |
CN215330420U (en) | Roof structure, roof and wall stand column connecting structure, house framework and house | |
CN218952624U (en) | Wood structure wave-shaped roof | |
CN210342217U (en) | Assembly integral type building inclined roof component | |
CN211421141U (en) | Geotechnical engineering excavation supporting enclosure wall | |
CN219196502U (en) | Building roof structure based on archaizing tile | |
CN215330424U (en) | GSY external wall panel and ring beam connecting structure higher than outdoor water surface | |
CN217326665U (en) | Archaizing building with two or more layers | |
CN212153933U (en) | Planting roofing parapet structure |