CN218114849U - Curtain wall material hoisting device - Google Patents

Curtain wall material hoisting device Download PDF

Info

Publication number
CN218114849U
CN218114849U CN202121583220.3U CN202121583220U CN218114849U CN 218114849 U CN218114849 U CN 218114849U CN 202121583220 U CN202121583220 U CN 202121583220U CN 218114849 U CN218114849 U CN 218114849U
Authority
CN
China
Prior art keywords
hoisting
steel wire
plate
track
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121583220.3U
Other languages
Chinese (zh)
Inventor
江永福
何敏
张海斌
刘文军
平斌
黄飞铜
杨印南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Sanxin Technology Development Co ltd
Zhuhai Sanxin Technology Development Co ltd
Original Assignee
Shenzhen Sanxin Technology Development Co ltd
Zhuhai Sanxin Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Sanxin Technology Development Co ltd, Zhuhai Sanxin Technology Development Co ltd filed Critical Shenzhen Sanxin Technology Development Co ltd
Priority to CN202121583220.3U priority Critical patent/CN218114849U/en
Application granted granted Critical
Publication of CN218114849U publication Critical patent/CN218114849U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a curtain material hoist device, include: the track assembly comprises a plurality of bearing plates, a plurality of hoisting tracks and an electric hoist, the electric hoist is connected with the hoisting tracks and can walk on the hoisting tracks, and each bearing plate is connected with the building floor in an overhanging manner; each pulley assembly is arranged on a bearing plate and comprises at least one pulley and two steel wire ropes, and the pulleys are fixed at the end parts of the bearing plates; the hoisting device comprises a plurality of moving assemblies, wherein each bearing plate is provided with a moving assembly, the hoisting track is fixed on the moving assemblies, one end of a steel wire rope winds the pulley and is connected with one end of the moving assembly, the other end of the moving assembly is connected with another steel wire rope, and the steel wire rope can move along the bearing plates under the action of tension of the other ends of the two steel wire ropes so as to drive the hoisting track to move, so that material hoisting is realized.

Description

Curtain wall material hoisting device
Technical Field
The utility model relates to a building decoration and finishing engineering field, more specifically relates to a curtain material hoist device.
Background
Along with the increasing of the number of the inward-inclined building facades of super high-rise buildings and airport terminal buildings in recent years, the inward-inclined angle and the inward-inclined distance are large, so that the installation measures of the curtain wall are complex, the construction difficulty is high, and the danger is high. When traditional construction hoists the material, divide the multilayer to erect single track cooperation electric block or other machines and hoist usually or adopt and erect multichannel track cooperation electric block or other machines and hoists at the building top, manpower, material consumption are big, and the efficiency of construction is low, influences the time limit for a project, and dangerous higher.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a curtain material hoist device that can improve hoist and mount efficiency of construction and security is provided.
In order to solve the technical problem, the utility model provides a curtain material hoist device, it includes:
the track assembly comprises a plurality of bearing plates, a plurality of hoisting tracks and an electric hoist, the electric hoist is connected with the hoisting tracks and can walk on the hoisting tracks, and each bearing plate is connected with a building floor in an overhanging manner;
each pulley assembly is arranged on a bearing plate and comprises at least one pulley and two steel wire ropes, and the pulleys are fixed at the end parts of the bearing plates;
the hoisting device comprises a plurality of moving assemblies, wherein each bearing plate is provided with a moving assembly, the hoisting track is fixed on the moving assemblies, one end of a steel wire rope winds the pulley and is connected with one end of the moving assembly, the other end of the moving assembly is connected with another steel wire rope, and the steel wire rope can move along the bearing plates under the action of tension of the other ends of the two steel wire ropes so as to drive the hoisting track to move, so that material hoisting is realized.
The further technical scheme is as follows: the moving assembly comprises a rectangular body sleeved on the bearing plate, two lug parts connected with the steel wire ropes are arranged on the rectangular body, and at least one T-shaped track wheel is arranged at the lower end parts of two side plates in the rectangular body so as to roll along the lower end parts of the bearing plate under the tensile force action of the two steel wire ropes.
The further technical scheme is as follows: the moving assembly further comprises two balance wheels, and the two balance wheels are arranged at the upper end parts of the two side plates in the rectangular body respectively and roll along the upper end part of the bearing plate under the action of the tensile force of the two steel wire ropes.
The further technical scheme is as follows: the cuboid includes roof, two do not certainly the curb plate that roof both sides downwardly extending formed and the bottom plate of being connected with both sides board, each curb plate both ends are connected with two reinforcing plates respectively, two the ear sets up respectively on two reinforcing plates with being connected with a curb plate, and the hoist and mount track is fixed in on the bottom plate, just the reinforcing plate all is located the bottom plate.
The further technical scheme is as follows: the movable assembly further comprises two connecting parts, the connecting parts are U-shaped, the opening of each connecting part is sleeved on one ear, and the steel wire ropes are sleeved on the two connecting parts respectively.
The further technical scheme is as follows: the number of the T-shaped track wheels is four, and every two T-shaped track wheels are arranged at the lower end of one side plate in the rectangular body in parallel.
The further technical scheme is as follows: the number of the pulleys is two, the pulleys are respectively fixed on two sides of the end part of the bearing plate through a connecting plate, and the steel wire rope is connected with the moving assembly after being wound around the two pulleys.
The further technical scheme is as follows: a plurality of the loading board interval is evenly connected in building floor, and each hoist and mount track is fixed in three adjacent removal subassembly bottoms.
The further technical scheme is as follows: the bearing board is encorbelmented and is connected still to be connected with the steel sheet in the one end of building floor, two wire rope connects on the steel sheet through the rope clip respectively, and this bearing board other end is fixed on building superstructure roof beam through drawing wire rope to one side.
The further technical scheme is as follows: the bearing plate is I-shaped steel.
Compared with the prior art, the utility model discloses well loading board encorbelments and connects in building floor, and set up a removal subassembly on each loading board, remove the subassembly both ends and be connected with two wire rope's in the loose pulley assembly one end respectively, and one of them wire rope is connected with this removal subassembly after around the pulley, during user pulling two wire rope's the other end, can make the removal subassembly remove along the loading board, reciprocate in order to drive hoist and mount track, electric block is connected with hoist and mount track and can follow hoist and mount track walking in order to transport article, thereby realize material hoist and mount, can know, through loose pulley assembly, the orbital removal installation of hoist and mount can be realized to loading board and removal subassembly's cooperation, can realize the hoist and mount of material through the orbital electric block of hoist and mount, the manpower and materials that need consume are less, the efficiency of construction is higher, and wire rope's the other end can set up indoors, then the hoist and mount process can be accomplished at indoor operation, the job site is safer, the security is higher.
Drawings
Fig. 1 is a schematic plan view of a specific embodiment of the curtain wall material hoisting device of the present invention.
Fig. 2 is a sectional view of a specific embodiment of the curtain wall material hoisting device of the utility model.
Fig. 3 is a schematic plan view of the moving assembly in the curtain wall material lifting device.
Fig. 4 is the side view schematic diagram of the moving assembly in the curtain wall material hoisting device.
Figure 5 is the utility model discloses remove the section node schematic diagram of subassembly among the curtain material hoist device.
Fig. 6 is an enlarged schematic view of a portion a of fig. 1.
Fig. 7 is a schematic sectional view of a portion a in fig. 1.
Detailed Description
To make the objects, technical solutions and advantages of the present invention more clearly understood by those skilled in the art, the present invention will be further described with reference to the accompanying drawings and examples.
Referring to fig. 1 to 7, fig. 1 to 7 show a specific embodiment of the curtain wall material lifting device 1 of the present invention. In order to facilitate the display of the internal structure of the moving assembly 30, the top plate 3011 is removed from the top views of fig. 1 and fig. 3, in the embodiment shown in the drawings, the curtain wall material hoisting device 1 includes a rail assembly 10, a plurality of pulley assemblies 20, and a plurality of moving assemblies 30, wherein the rail assembly 10 includes a plurality of bearing plates 101, a plurality of hoisting rails 102, and an electric hoist 103, the electric hoist 103 is connected to the hoisting rails 102 and can move on the hoisting rails 102, and each bearing plate 101 is cantilevered to the building floor 40; each pulley assembly 20 is disposed on a bearing plate 101, the pulley assembly 20 includes at least one pulley 201 and two steel cables 202, the pulley 201 is fixed at an end of the bearing plate 101, in this embodiment, the number of the pulleys 201 is two, and the two pulleys 201 are respectively fixed at two sides of the end of the bearing plate 101 through a connection plate 203; each bearing plate 101 is provided with a moving assembly 30, the hoisting track 102 is fixed on the moving assembly 30, one end of a steel wire rope 202 is connected with one end of the moving assembly 30 after winding around the two pulleys 201, the other end of the moving assembly 30 is connected with the other steel wire rope 202, and the steel wire rope can move along the bearing plate 101 under the action of the pulling force of the other ends of the two steel wire ropes 202 so as to drive the hoisting track 102 to move, thereby realizing material hoisting.
Based on the above design, when a user pulls the other end of the two steel wire ropes 202, the moving assembly 30 can be made to move along the bearing plate 101, understandably, when one steel wire rope 202 is pulled, the other steel wire rope 202 is loosened, the moving assembly 30 can move along the bearing plate 101 to drive the hoisting track 102 to move up and down, the electric hoist 103 is connected with the hoisting track 102 and can walk along the hoisting track 102 to transport objects, thereby realizing material hoisting, and knowing that the moving installation of the hoisting track 102 can be realized through the cooperation of the pulley assembly 20, the bearing plate 101 and the moving assembly 30, and the hoisting of the materials can be realized through the electric hoist 103 of the hoisting track 102, thereby effectively solving the problems of large resource consumption and low installation efficiency caused by erecting multiple tracks or single track at the top in the prior art, and the other end of the steel wire rope 202 can be arranged indoors, so that the hoisting process can be completed indoors, the construction site is safer, and higher in safety.
In some embodiments, the moving assembly 30 includes a rectangular body 301 sleeved on the supporting plate 101, two ears 3017 disposed on the rectangular body 301, and two connecting portions 302, the connecting portions 302 are U-shaped, an opening of each connecting portion 302 is sleeved on one ear 3017, and the two steel cables 202 are respectively sleeved on the two connecting portions 302. Specifically, in this embodiment, the rectangular body 301 includes a top plate 3011, two side plates 3012 respectively formed by extending downward from two sides of the top plate 3011, and a bottom plate 3013 connected to the two side plates 3012, and the length of the bottom plate 3013 is greater than the length of the top plate 3011, two ends of each side plate 3012 are respectively connected to two reinforcing plates 3016, two ear portions 3017 are respectively disposed on two reinforcing plates 3016 connected to the same side plate 3012, the hoisting track 102 is fixed to the bottom plate 3013 through a connecting bolt 70, and the reinforcing plates 3016 are all located on the bottom plate 3013.
In some embodiments, the supporting plate 101 may be an i-shaped steel to be more easily matched with the moving assembly 30, and referring to fig. 3 to 7, four T-shaped track wheels 3014 are disposed in the rectangular body 301, and each two T-shaped track wheels 3014 are respectively fixed to the lower end of a side plate 3012 in the rectangular body 301 in parallel by a screw 80 to roll along the lower flange plate 1012 of the supporting plate 101 under the pulling force of two steel cables 202. Further, the moving assembly 30 further includes two balance wheels 3015, the two balance wheels 3015 are respectively disposed at the upper ends of the two side plates 3012 in the rectangular body 301, so as to roll along the flange plate 1011 on the bearing plate 101 under the pulling force of the two steel cables 202; in this embodiment, each balance wheel 3015 is fixed on the top board 3011 and the side board 3012 through a mounting board 303, and the mounting board 303 is substantially U-shaped. Understandably, the utility model discloses in, T type rail wheel 3014 is the unilateral rail wheel of tapered T type, cuboid 301, stabilizer 3015 and T type rail wheel 3014's size is confirmed with the size of loading board 101.
With reference to fig. 1 and fig. 2, in the embodiment shown in the drawings, a plurality of the bearing plates 101 are uniformly connected to the building floor 40 at intervals, each hoisting track 102 is fixed to the bottom of three adjacent mobile components 30, one end of each bearing plate 101 is connected to the building floor 40 in a hoop manner through round steel so as to be cantilevered to the building floor 40, and the other end is further connected to a steel plate 205, two steel cables 202 are respectively connected to the steel plates 205 through cable clamps 204, after a user pulls the steel cables 202 to a desired position of the rectangular body 301 as required, the steel cables 202 are fixed around the cable clamps 204 to fix the position of the mobile components 30, and the other end of each bearing plate 101 is fixed to the upper structural beam 50 of the building through a cable-stayed steel cable 60, specifically, a connecting lug plate 1013 is provided at the other end of each bearing plate 101, one end of the cable-stayed steel cable 60 is connected to the connecting lug plate 1013 through a stainless steel ring turn-round screw 90, and the other end is fixed to the embedded connector 501 of the upper structural beam 50 of the building through a cable clamp.
Understandably, when the curtain wall material hoisting device 1 of the utility model is used and installed, firstly the rectangular body 301 is sleeved on the bearing plate 101, one steel wire rope 202 is sleeved on one connecting part 302 of the rectangular body 301 after winding two pulleys 201, then the other steel wire rope 202 is sleeved on the other connecting part 302 of the rectangular body 301, then one end of all the bearing plates 101 is fixed on the building floor 40 by round steel in a hoop form, the hoop round steel is locked, the inclined pull steel wire rope 60 is installed (the embedded connecting piece 501 is installed on the upper structure beam 50 in advance, and the connecting ear plate 1013 is installed at the other end of the bearing plate 101), then the pulley component 20 on each bearing plate 101 is operated, namely the steel wire rope 202 wound through the pulley 201 is loosened, draw and drag another wire rope 202, draw the cuboid 301 to from the nearest easy operation position of floor 40, lock wire rope 202, and guarantee that cuboid 301 on all loading boards 101 is located a straight line, at this moment, install hoisting track 102 on the bottom plate 3013 of cuboid 301 through connecting bolt 70, the workman can stand and tighten connecting bolt 70 at floor 40 limit portion, install electric block 103 again on hoisting track 102, loosen the wire rope 202 that does not detour pulley 201, draw and draw wire rope 202 that detour pulley 201, draw predetermined design position with hoisting track 102, lock wire rope 202, tighten and draw wire rope 60 to one side, the utility model discloses a curtain material hoist device 1 accomplishes the installation, can carry out material hoist and mount.
To sum up, the utility model discloses curtain material hoist device can realize hoisting orbital removal installation through loose pulley assembly, loading board and the cooperation of removal subassembly, can realize the hoist and mount of material through hoisting orbital electric block, and the required manpower and materials that consume are less, and the efficiency of construction is higher, and wire rope's the other end can set up indoor, and then the hoist and mount process can be accomplished at indoor operation, and the job site is safer, and the security is higher.
The foregoing is considered as illustrative of the preferred embodiments of the invention and is not intended to limit the invention in any way. Various equivalent changes and modifications can be made on the embodiments by those skilled in the art, and all equivalent changes and modifications within the scope of the claims should be within the protection scope of the present invention.

Claims (10)

1. The utility model provides a curtain material hoist device which characterized in that, curtain material hoist device includes:
the track assembly comprises a plurality of bearing plates, a plurality of hoisting tracks and an electric hoist, the electric hoist is connected with the hoisting tracks and can walk on the hoisting tracks, and each bearing plate is connected with the building floor in an overhanging manner;
each pulley assembly is arranged on a bearing plate and comprises at least one pulley and two steel wire ropes, and the pulleys are fixed at the end parts of the bearing plates;
the hoisting device comprises a plurality of moving assemblies, wherein each bearing plate is provided with a moving assembly, the hoisting track is fixed on the moving assemblies, one end of a steel wire rope winds the pulley and is connected with one end of the moving assembly, the other end of the moving assembly is connected with another steel wire rope, and the steel wire rope can move along the bearing plates under the action of tension of the other ends of the two steel wire ropes so as to drive the hoisting track to move, so that material hoisting is realized.
2. The curtain wall material lifting device of claim 1, characterized in that: the moving assembly comprises a rectangular body sleeved on the bearing plate, two lug parts connected with the steel wire ropes are arranged on the rectangular body, and at least one T-shaped track wheel is arranged at the lower end parts of two side plates in the rectangular body so as to roll along the lower end parts of the bearing plate under the tensile force action of the two steel wire ropes.
3. The curtain wall material lifting device of claim 2, characterized in that: the moving assembly further comprises two balance wheels, and the two balance wheels are arranged at the upper end parts of the two side plates in the rectangular body respectively and roll along the upper end part of the bearing plate under the action of the tensile force of the two steel wire ropes.
4. The curtain wall material hoisting device of claim 2, characterized in that: the cuboid includes roof, two do not certainly the curb plate that roof both sides downwardly extending formed and the bottom plate of being connected with both sides board, each curb plate both ends are connected with two reinforcing plates respectively, two the ear sets up respectively on two reinforcing plates with being connected with a curb plate, and the hoist and mount track is fixed in on the bottom plate, just the reinforcing plate all is located the bottom plate.
5. The curtain wall material lifting device of claim 4, characterized in that: the movable assembly further comprises two connecting parts, the connecting parts are U-shaped, the opening of each connecting part is sleeved on one ear, and the steel wire ropes are sleeved on the two connecting parts respectively.
6. The curtain wall material lifting device of claim 2, characterized in that: the number of the T-shaped track wheels is four, and every two T-shaped track wheels are arranged at the lower end part of one side plate in the rectangular body in parallel.
7. The curtain wall material lifting device of claim 1, characterized in that: the number of the pulleys is two, the pulleys are respectively fixed on two sides of the end part of the bearing plate through a connecting plate, and the steel wire rope is connected with the moving assembly after being wound around the two pulleys.
8. The curtain wall material lifting device of claim 1, characterized in that: a plurality of the loading board interval is evenly connected in building floor, and each hoist and mount track is fixed in three adjacent removal subassembly bottoms.
9. The curtain wall material lifting device of claim 1, characterized in that: the bearing board is encorbelmented and is connected still to be connected with the steel sheet in the one end of building floor, two wire rope connects on the steel sheet through the rope clip respectively, and this bearing board other end is fixed on building superstructure roof beam through drawing wire rope to one side.
10. The curtain wall material lifting device of claim 1, characterized in that: the bearing plate is I-shaped steel.
CN202121583220.3U 2021-07-12 2021-07-12 Curtain wall material hoisting device Active CN218114849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121583220.3U CN218114849U (en) 2021-07-12 2021-07-12 Curtain wall material hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121583220.3U CN218114849U (en) 2021-07-12 2021-07-12 Curtain wall material hoisting device

Publications (1)

Publication Number Publication Date
CN218114849U true CN218114849U (en) 2022-12-23

Family

ID=84493221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121583220.3U Active CN218114849U (en) 2021-07-12 2021-07-12 Curtain wall material hoisting device

Country Status (1)

Country Link
CN (1) CN218114849U (en)

Similar Documents

Publication Publication Date Title
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN112072560B (en) Method for vertically laying super high-rise shaft cable in air through relay lifting
CN110562868A (en) Hoisting construction method for unit type glass curtain wall of super high-rise building
CN216235734U (en) Vertical transportation hoisting structure for curtain wall unit plate
CN110469102A (en) A kind of high-altitude combined steel beam installs the operating platform and its construction method
CN108675170A (en) Roofing monorail crane and its construction method
CN218114849U (en) Curtain wall material hoisting device
CN112252741A (en) Full-rail crane for super high-rise unit curtain wall and installation and use method thereof
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
CN216196742U (en) A wallboard installation device for position is striden to height
CN115162184A (en) Suspension bridge steel truss erecting system and method
CN113501440A (en) Curtain wall material hoisting device
CN211035118U (en) Construction material and instrument hoisting device for electric power iron tower
CN114934441A (en) Anti-slip temporary sling cable clamp structure
CN211283445U (en) Cable carries loop wheel machine installation mechanism
CN210885048U (en) Large-scale equipment hoisting system
CN210827120U (en) Tensioning operation platform supported by temporary anchoring platform based on prefabricated section box girder
CN209779465U (en) main tower erects cable-stay bridge's string cable construction system that changes
CN207896560U (en) A kind of skyscraper cable-laying gear
CN201686458U (en) Movable operating platform used for quickly processing welding seam at end opening of steel box girder
CN211081059U (en) Hoisting device for unit plate of curtain wall with curved outer vertical surface
CN216235766U (en) High-rise building steel vestibule hoisting device
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN218114945U (en) Synchronous lifting control cable wind rope system