CN218083482U - Drilling equipment is used in building engineering construction - Google Patents

Drilling equipment is used in building engineering construction Download PDF

Info

Publication number
CN218083482U
CN218083482U CN202221968951.4U CN202221968951U CN218083482U CN 218083482 U CN218083482 U CN 218083482U CN 202221968951 U CN202221968951 U CN 202221968951U CN 218083482 U CN218083482 U CN 218083482U
Authority
CN
China
Prior art keywords
fixedly connected
building engineering
drilling equipment
construction
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221968951.4U
Other languages
Chinese (zh)
Inventor
刘剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Huachuan Foundation Construction Group Co ltd
Original Assignee
Sichuan Huachuan Foundation Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Huachuan Foundation Construction Group Co ltd filed Critical Sichuan Huachuan Foundation Construction Group Co ltd
Priority to CN202221968951.4U priority Critical patent/CN218083482U/en
Application granted granted Critical
Publication of CN218083482U publication Critical patent/CN218083482U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)
  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The utility model discloses a drilling equipment is used in building engineering construction, comprising a base plate, upper surface one side fixedly connected with fixed column of bottom plate, the first motor of upper surface middle part fixedly connected with of fixed column, the output of first motor extends to the inside of fixed column, and the fixedly connected with threaded rod, the outer wall threaded connection of threaded rod has the thread piece, the right side fixedly connected with fixed plate of thread piece, the upper surface left side fixedly connected with electric telescopic handle of fixed plate, electric telescopic handle's output fixedly connected with slider, the fixed sleeve that has cup jointed in the middle part of slider, telescopic upper surface middle part fixedly connected with second motor, the output of second motor extends to telescopic inside, and fixedly connected with drilling rod, upper surface one side fixedly connected with box of bottom plate. Through above-mentioned structure, can collect and handle the dust and the dust in the drilling process, and make things convenient for drilling work.

Description

Drilling equipment is used in building engineering construction
Technical Field
The utility model relates to a building engineering construction technical field, in particular to drilling equipment is used in building engineering construction.
Background
The construction of the building engineering comprises earthwork, foundation and foundation engineering, masonry engineering, reinforced concrete engineering, prestressed concrete engineering, structural hoisting engineering, steel structure engineering, waterproof engineering, decoration engineering, winter and rainy period construction and the like.
The applicant is applying the utility model discloses the time, through the retrieval, discover that chinese patent discloses "drilling equipment for building engineering construction", its application number is "202020196181.0", this patent mainly passes through the pneumatic cylinder, the guide bar, the cooperation of sliding plate, can make servo motor and drill bit creep into the underground or by in the drilling thing along the guide bar, and be convenient for make the drill bit withdraw from control, through the cooperation between stand, the round bar, the connecting block, the handle, the guide bar, can adjust the angle of guide bar, thereby adjust the angle of drill bit drilling, the functionality of this equipment has been improved, but the device is in drilling process, can produce a large amount of dust and dust, influence user's health, so need a drilling equipment for building engineering construction that can solve above problem now.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to solve one of the technical problem that exists among the prior art at least, provide a drilling equipment for building engineering construction, can collect and handle the dust in the drilling process, and make things convenient for drilling work.
In order to achieve the purpose, the drilling equipment for the construction of the building engineering comprises a bottom plate, wherein a fixed column is fixedly connected to one side of the upper surface of the bottom plate, a first motor is fixedly connected to the middle of the upper surface of the fixed column, the output end of the first motor extends into the fixed column and is fixedly connected with a threaded rod, a threaded block is in threaded connection with the outer wall of the threaded rod, a fixed plate is fixedly connected to the right side of the threaded block, an electric telescopic rod is fixedly connected to the left side of the upper surface of the fixed plate, a sliding block is fixedly connected to the output end of the electric telescopic rod, a sleeve is fixedly sleeved in the middle of the sliding block, a second motor is fixedly connected to the middle of the upper surface of the sleeve, and the output end of the second motor extends into the sleeve and is fixedly connected with a drill rod;
the improved air-suction box is characterized in that a box body is fixedly connected to one side of the upper surface of the bottom plate, a filter screen is fixedly connected to the inner wall of the box body, an air suction pipe penetrates through the upper surface of the box body, an air suction pump is arranged at the upper end of the air suction pipe, a connecting hose penetrates through the side wall of the box body, and one end, away from the box body, of the connecting hose is communicated with the side wall of the sleeve.
According to the drilling equipment for the construction of the building engineering, a notch is formed in the middle of the fixing plate, and the sleeve penetrates through the notch. Play the removal limiting displacement to the sleeve.
According to the drilling equipment for the construction engineering, the sliding block is connected with the fixing plate in a sliding mode. Movement of the sleeve is achieved.
According to the drilling equipment for the construction of the constructional engineering, a drill bit is arranged at the bottom end of the drill rod. For drilling.
According to the drilling equipment for the construction of the building engineering, the inner bottom wall of the box body is provided with a balancing weight. The stability of the whole is improved, and the inclination is avoided.
According to a drilling equipment for building engineering construction, the inner wall of box just is located the below fixedly connected with swash plate of filter screen, the left side wall of box runs through and is provided with the dust exhaust pipe. The filtered dust and dirt can be discharged.
According to the drilling equipment for the construction of the building engineering, four corners of the bottom end of the bottom plate are provided with universal wheels. For movement.
According to the drilling equipment for the construction of the constructional engineering, the four corners of the upper surface of the bottom plate are provided with fixing screws in a threaded penetrating manner. For the fixation of the soleplate.
The utility model discloses following beneficial effect has:
1. compared with the prior art, this drilling equipment for building engineering construction is provided with fixed column, first motor, threaded rod, thread piece, fixed plate and electric telescopic handle, and first motor drives the threaded rod and rotates, and then realizes that the thread piece drives the fixed plate and carries out altitude mixture control for drilling, second electric telescopic handle drive sleeve and carry out the translation, can realize the adjustment to the drilling position, and under the condition of not drilling, withdraws the sleeve, reduces occuping of space.
2. Compared with the prior art, this drilling equipment for building engineering construction is provided with box, filter screen, aspiration pump and coupling hose, and coupling hose keeps away from the one end and the sleeve intercommunication of box, can collect and filter the discharge to the dust and the dust that produce in the drilling process, protection user's health.
Additional aspects and advantages of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.
Drawings
The present invention will be further described with reference to the accompanying drawings and examples;
fig. 1 is a schematic view of the overall structure of the drilling equipment for construction of the building engineering of the present invention;
fig. 2 is an enlarged schematic view of the structure of the drilling equipment for construction of the building engineering of the utility model at a position A in fig. 1;
FIG. 3 is a partial perspective view of the drilling equipment for construction of building engineering of the present invention;
fig. 4 is the utility model relates to a drilling equipment's for building engineering construction front view.
Illustration of the drawings:
1. a base plate; 2. fixing a column; 3. a first motor; 4. a threaded rod; 5. a thread block; 6. a fixing plate; 7. an electric telescopic rod; 8. a slider; 9. a sleeve; 10. a second motor; 11. drilling a rod; 12. a counterweight block; 13. a sloping plate; 14. a filter screen; 15. an air exhaust pipe; 16. an air pump; 17. a connecting hose; 18. a dust exhaust pipe; 19. a universal wheel; 20. a set screw; 21. and (4) a box body.
Detailed Description
This section will describe in detail the embodiments of the present invention, preferred embodiments of the present invention are shown in the attached drawings, which are used to supplement the description of the text part of the specification with figures, so that one can intuitively and vividly understand each technical feature and the whole technical solution of the present invention, but they cannot be understood as the limitation of the protection scope of the present invention.
Referring to fig. 1-4, the embodiment of the utility model provides a drilling equipment is used in building engineering construction, it includes bottom plate 1, upper surface one side fixedly connected with fixed column 2 of bottom plate 1, the first motor 3 of upper surface middle part fixedly connected with of fixed column 2, the output of first motor 3 extends to the inside of fixed column 2, and fixedly connected with threaded rod 4, the outer wall threaded connection of threaded rod 4 has threaded block 5, threaded block 5's right side fixedly connected with fixed plate 6, through first motor 3's drive effect, it rotates to drive threaded rod 4, and then realize that threaded block 5 drives fixed plate 6 and carries out height control.
Upper surface left side fixedly connected with electric telescopic handle 7 of fixed plate 6, electric telescopic handle 7's output fixedly connected with slider 8, slider 8 and 6 sliding connection of fixed plate, sleeve 9 has been cup jointed to slider 8's middle part is fixed, the breach has been seted up at the middle part of fixed plate 6, sleeve 9 runs through this breach, play the removal limiting displacement to sleeve 9, electric telescopic handle 7 is used for adjusting sleeve 9's horizontal position, sleeve 9's upper surface middle part fixedly connected with second motor 10, the output of second motor 10 extends to sleeve 9's inside, and fixedly connected with drilling rod 11, the bottom of drilling rod 11 is provided with the drill bit, second motor 10 drives drilling rod 11 and rotates, and then carry out drilling work through the drill bit.
Upper surface one side fixedly connected with box 21 of bottom plate 1, the inner diapire of box 21 is provided with balancing weight 12, improve holistic stability, avoid the slope, the inner wall fixedly connected with filter screen 14 of box 21, can filter dust and dust, the upper surface of box 21 runs through and is provided with exhaust tube 15, the upper end of exhaust tube 15 is provided with aspiration pump 16, be used for the air extraction effect, the lateral wall of box 21 runs through and is provided with coupling hose 17, coupling hose 17 keeps away from the one end of box 21 and sleeve 9's lateral wall intercommunication, aspiration pump 16 is with drilling process, dust and dust suction box 21 in the sleeve 9, the inner wall of box 21 just is located filter screen 14's below fixedly connected with swash plate 13, the left side wall of box 21 runs through and is provided with dust exhaust pipe 18, can discharge dust and dust under filtering.
The bottom four corners of bottom plate 1 all is provided with universal wheel 19 for remove, and the equal screw thread in upper surface four corners of bottom plate 1 runs through and is provided with set screw 20 for fixed to bottom plate 1.
The working principle is as follows: this a drilling equipment is used in building engineering construction, during the use, remove bottom plate 1 to the assigned position, rotate set screw 20, go into the underground, fix bottom plate 1, open the switch of first motor 3 and electric telescopic handle 7, can realize the regulation of 6 height of fixed plate and the regulation of sleeve 9 horizontal position, the switch of second motor 10 is opened in the deuterogamy, drive the rotation of drilling rod 11 and drill bit, can carry out drilling work, secondly, at drilling in-process, sleeve 9 bottom can produce a large amount of dust and dust, at this moment, open the switch of aspiration pump 16, can be with in this dust and dust suction box 21, filter, clean air is discharged from exhaust tube 15, dust and the dust granule that filters are from dust exhaust tube 18.
The embodiments of the present invention have been described in detail with reference to the drawings, but the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art.

Claims (8)

1. The drilling equipment for the construction of the building engineering is characterized by comprising a bottom plate (1), wherein one side of the upper surface of the bottom plate (1) is fixedly connected with a fixed column (2), the middle part of the upper surface of the fixed column (2) is fixedly connected with a first motor (3), the output end of the first motor (3) extends into the fixed column (2) and is fixedly connected with a threaded rod (4), the outer wall of the threaded rod (4) is in threaded connection with a threaded block (5), the right side of the threaded block (5) is fixedly connected with a fixed plate (6), the left side of the upper surface of the fixed plate (6) is fixedly connected with an electric telescopic rod (7), the output end of the electric telescopic rod (7) is fixedly connected with a sliding block (8), the middle part of the sliding block (8) is fixedly sleeved with a sleeve (9), the middle part of the upper surface of the sleeve (9) is fixedly connected with a second motor (10), and the output end of the second motor (10) extends into the sleeve (9) and is fixedly connected with a drill rod (11);
the utility model discloses a portable air conditioner, including bottom plate (1), upper surface one side fixedly connected with box (21) of bottom plate (1), the inner wall fixedly connected with filter screen (14) of box (21), the upper surface of box (21) runs through and is provided with exhaust tube (15), the upper end of exhaust tube (15) is provided with aspiration pump (16), the lateral wall of box (21) runs through and is provided with coupling hose (17), coupling hose (17) keep away from the one end of box (21) and the lateral wall intercommunication of sleeve (9).
2. The drilling equipment for the construction of the building engineering as claimed in claim 1, characterized in that the middle of the fixing plate (6) is provided with a notch through which the sleeve (9) passes.
3. Drilling equipment for the construction of building engineering according to claim 1, characterized in that the slide (8) is connected slidingly to the fixed plate (6).
4. A drilling device for constructional engineering as claimed in claim 1 wherein the drill rod (11) is provided at its lower end with a drill bit.
5. The drilling equipment for the construction of building engineering according to claim 1, characterized in that the inner bottom wall of the box body (21) is provided with a counterweight (12).
6. The drilling equipment for the building engineering construction according to claim 1, wherein an inclined plate (13) is fixedly connected to the inner wall of the box body (21) and below the filter screen (14), and a dust exhaust pipe (18) penetrates through the left side wall of the box body (21).
7. The drilling equipment for building engineering construction according to claim 1, wherein universal wheels (19) are arranged at four corners of the bottom end of the bottom plate (1).
8. The drilling equipment for the construction of the building engineering as claimed in claim 1, characterized in that four corners of the upper surface of the bottom plate (1) are provided with fixing screws (20) in a threaded penetrating manner.
CN202221968951.4U 2022-07-28 2022-07-28 Drilling equipment is used in building engineering construction Active CN218083482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221968951.4U CN218083482U (en) 2022-07-28 2022-07-28 Drilling equipment is used in building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221968951.4U CN218083482U (en) 2022-07-28 2022-07-28 Drilling equipment is used in building engineering construction

Publications (1)

Publication Number Publication Date
CN218083482U true CN218083482U (en) 2022-12-20

Family

ID=84484522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221968951.4U Active CN218083482U (en) 2022-07-28 2022-07-28 Drilling equipment is used in building engineering construction

Country Status (1)

Country Link
CN (1) CN218083482U (en)

Similar Documents

Publication Publication Date Title
CN105583783B (en) One kind can dust suction electric hammer
CN112431550A (en) Drilling dust-settling device and process for highway construction
CN112326328A (en) Highway sampling device that building engineering used
CN218083482U (en) Drilling equipment is used in building engineering construction
CN211286502U (en) Plastering device for building construction
CN219359865U (en) Building outer wall surface perforating device
CN204621156U (en) A kind of arm extending type percussion drill
CN113187205B (en) Auxiliary wood floor laying device
CN113749579B (en) Water storage equipment and ground cleaning equipment applying same
CN212807685U (en) Geotechnical investigation sampling device that architectural design used
CN112854174A (en) Geological detection device for bridge design
CN215227279U (en) Wall cleaning device for building engineering
CN220167849U (en) Window dirt shielding device easy to install
CN217872640U (en) Drilling machine device with multidirectional drilling construction and drilling dust prevention
CN217484319U (en) Device for detecting grouting reinforcement effect of weathered and broken water-rich surrounding rock of coal mine
CN217304441U (en) Portable coring machine device
CN216031712U (en) Civil engineering wall body drilling equipment
CN111896313B (en) Soil sampling device is used in mine environment restoration
CN105583785B (en) One kind exempts from hand held electric hammer
CN216197829U (en) Artificial intelligence bores equipment of digging
CN108331525A (en) It is a kind of to soak mine device on the spot
CN215823888U (en) Cement dust removing mechanism
CN220203836U (en) Drilling device for preventing dust from splashing by upper wall and lower pile in stratum
CN216329223U (en) Drilling device for building construction
CN220100803U (en) Steel structure supporting frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant