CN217998995U - Novel prefabricated mixed connecting piece - Google Patents
Novel prefabricated mixed connecting piece Download PDFInfo
- Publication number
- CN217998995U CN217998995U CN202221676740.3U CN202221676740U CN217998995U CN 217998995 U CN217998995 U CN 217998995U CN 202221676740 U CN202221676740 U CN 202221676740U CN 217998995 U CN217998995 U CN 217998995U
- Authority
- CN
- China
- Prior art keywords
- suspension
- column
- novel prefabricated
- hybrid connection
- screw thread
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a novel prefabricated hybrid connection spare, including the hybrid connection spare body, the hybrid connection spare body includes that two coupling mechanism, two first mechanisms that hang, spliced pole, two second hang mechanism and screw post, and the equal fixed mounting in both sides on spliced pole top has coupling mechanism, the utility model relates to a novel prefabricated hybrid connection spare hangs the mechanism through setting up first mechanism and the second of hanging, and the staff rotates equipment post or hangs the frame according to actual need, adjusts first mechanism and the second of hanging respectively and hangs the mounted position of mechanism on the screw post, and the lifting hook of hoist passes rings or hangs the hole and lifts by crane to the screw post, and indirect concrete piece outside the screw post lifts by crane carries, and the connecting piece assembles together with the hoist through rotating, and the assemble time is short, has improved the construction progress of assembly type construction, and the hoist multilayer lifts by crane, improves the stability of being connected between concrete member and the hoist.
Description
Technical Field
The utility model relates to a building technical field specifically is a novel prefabricated hybrid connecting piece.
Background
The connecting piece is a small component which plays a role in connecting components as the name implies, along with the vigorous development of the assembly type concrete construction technology on building industrialization and industrialization, intensive standardized production and assembly type construction are combined, the house construction speed and safety are effectively improved, the assembly type concrete component is widely used, people assemble semi-finished products or finished products before the assembly type concrete component construction with a crane through the connecting piece, and the assembly is completed through the carrying of the crane, however, the traditional connecting piece is unstable at the joint between the concrete component and the crane, the structure of the connecting piece is complex, the assembly time of the connecting piece and the crane is prolonged, and the construction progress of the assembly type construction is reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel prefabricated hybrid connection spare to the junction of traditional connecting piece to between concrete member and the hoist that proposes in solving above-mentioned background is unstable, and the structure of connecting piece is complicated, has increased the time of connecting piece with the hoist equipment, has reduced the problem of the construction progress of assembled construction.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a novel prefabricated hybrid connection spare, includes the hybrid connection spare body, the hybrid connection spare body includes that two coupling mechanism, two first suspension mechanism, spliced pole, two second hang mechanism and screw thread post, the equal fixed mounting in both sides on spliced pole top has coupling mechanism, the inside threaded connection of spliced pole has the screw thread post, the equal threaded connection in both ends of screw thread post has first suspension mechanism, the surface threaded connection of screw thread post has two second suspension mechanism, two coupling mechanism all includes reference column, antiskid sheets and a plurality of spring, the inside of reference column is equipped with two antiskid sheets, equal fixed mounting has a plurality of spring between the both sides of reference column inner wall and two adjacent one sides of antiskid sheets, in the jack rod on the hoist inserts the reference column, the ground jack pole extrudees the antiskid sheets to both sides, and the antiskid sheets extrudes the spring from one side, and the spring has elasticity, and elastic deformation takes place to cushion the extrusion force for the spring.
Preferably, two the bottom of reference column all with spliced pole fixed connection, coupling mechanism passes through the reference column and installs on the spliced pole.
Preferably, the two first suspension mechanisms respectively comprise an assembly column and a suspension plate, the suspension plate is fixedly mounted on one side of the assembly column, a plurality of suspension holes are formed in the surface of the suspension plate, the lifting hook of the crane penetrates through the suspension holes, and the crane lifts the concrete member through the suspension plate.
Preferably, the middle part of one side of the assembly column, which is far away from the suspension plate, is in threaded connection with the threaded column, a worker rotates the assembly column, threads on the inner wall of the assembly column are matched with threads on the surface of the threaded column, and therefore the first suspension mechanism is installed on the threaded column by rotating the assembly column.
Preferably, two the second hangs the mechanism and all includes hanging frame, direction ring and rings, the middle part of hanging the frame is rotated and is connected with the direction ring, the top fixed mounting of direction ring has rings, and the staff rotates the direction ring, adjusts the direction of direction ring on hanging the frame for rings and the lifting hook contact on the hoist, the lifting hook passes rings, and the hoist of being convenient for lifts concrete member.
Preferably, two hang the inside of frame all with screw thread post threaded connection, the staff rotates and hangs the frame, hangs the screw thread on frame inner wall and the screw thread on screw thread post surface and matches each other, so the staff hangs the frame through rotating and adjusts the position that the second hung the mechanism and installed on the screw thread post for hang the frame and slide to the crane hook under.
Preferably, the friction strips are fixedly mounted on the surface of the connecting column, the friction coefficient of the surface of each friction strip is high, the friction strips are made of rubber materials, the friction coefficient of the surface of the connecting column is increased due to the mounting of the friction strips, and the static friction between the connecting column and a concrete piece when the connecting column penetrates through the concrete piece is increased.
Compared with the prior art, the beneficial effects of the utility model are that: through setting up first mechanism and the second mechanism that hangs, the staff rotates equipment post or hangs the frame according to actual need, adjust first mechanism and the second that hangs the mounted position of mechanism on the screw post respectively, the lifting hook of hoist passes rings or hangs the hole and lifts by crane to the screw post, the indirect transport of lifting by crane to the concrete spare outside the screw post, the connecting piece is assembled together with the hoist through rotating, the assemble duration is short, the construction progress of assembly type construction has been improved, the hoist is lifted by crane the multilayer, improve the stability of being connected between concrete member and the hoist.
Drawings
Fig. 1 is a side view of the present invention;
fig. 2 is a perspective view of the present invention;
fig. 3 is a side view of a second suspension mechanism of the present invention;
fig. 4 is a side view of the first suspension mechanism of the present invention;
fig. 5 is an internal schematic view of the connection mechanism of the present invention.
In the figure: 1. a hybrid connector body; 2. a connecting mechanism; 21. a positioning column; 22. anti-slip sheets; 23. a spring; 3. a first suspension mechanism; 31. assembling the column; 32. a suspension plate; 33. a hanging hole; 4. connecting columns; 5. a second suspension mechanism; 51. a hanging frame; 52. a directional ring; 53. a hoisting ring; 6. a threaded post; 7. and (4) rubbing the strips.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Please refer to fig. 1-5, the utility model provides a novel prefabricated mixed connecting piece, including mixed connecting piece body 1, mixed connecting piece body 1 includes two coupling mechanism 2, two first mechanisms 3 that hang, spliced pole 4, two second hang mechanism 5 and screw post 6, the equal fixed mounting in both sides on spliced pole 4 top has coupling mechanism 2, the inside threaded connection of spliced pole 4 has screw post 6, the equal threaded connection in both ends of screw post 6 has first mechanism 3 that hangs, the surface threaded connection of screw post 6 has two second to hang mechanism 5, two coupling mechanism 2 all include reference column 21, antiskid sheet 22 and a plurality of spring 23, the inside of reference column 21 is equipped with two antiskid sheet 22, equal fixed mounting has a plurality of spring 23 between the both sides of reference column 21 inner wall and the adjacent one side of two antiskid sheet 22, the jack rod on the hoist crane inserts in the reference column 21, the jack rod extrudees antiskid sheet 22 to both sides, antiskid sheet 22 extrudees spring 23 from one side, spring 23 has elasticity, spring 23 takes place elastic deformation and cushions the extrusion force.
The bottom of two reference column 21 all with spliced pole 4 fixed connection, coupling mechanism 2 passes through reference column 21 to be installed on spliced pole 4.
The two first suspension mechanisms 3 respectively comprise an assembly column 31 and a suspension plate 32, the suspension plate 32 is fixedly mounted on one side of the assembly column 31, a plurality of suspension holes 33 are formed in the surface of the suspension plate 32, a hook of the crane penetrates through the suspension holes 33, and the crane lifts the concrete member through the suspension plate 32.
The middle part of two erection columns 31 on one side of keeping away from hang board 32 all with screw thread post 6 threaded connection, the staff rotates erection column 31, and the screw thread of erection column 31 inner wall matches each other with the screw thread on screw thread post 6 surface, so rotate erection column 31 and install first mechanism 3 that hangs on screw thread post 6.
The two second suspension mechanisms 5 respectively comprise a suspension frame 51, a direction ring 52 and a hanging ring 53, the direction ring 52 is rotatably connected to the middle of the suspension frame 51, the hanging ring 53 is fixedly mounted at the top end of the direction ring 52, a worker rotates the direction ring 52 to adjust the direction of the direction ring 52 on the suspension frame 51, so that the hanging ring 53 is in contact with a lifting hook on the crane, and the lifting hook penetrates through the hanging ring 53 to facilitate the crane to lift the concrete component.
The inside of two suspension frames 51 all matches with the screw thread on 6 surfaces of screw thread post with 6 threaded connection of screw thread post, staff rotate suspension frame 51, and the screw thread of suspension frame 51 inner wall matches each other with the screw thread on 6 surfaces of screw thread post, so the staff adjusts the position of second suspension mechanism 5 installation on screw thread post 6 through rotating suspension frame 51 for suspension frame 51 slides to crane hook under.
The friction strips 7 are fixedly arranged on the surface of the connecting column 4, the friction coefficient of the surface of each friction strip 7 is high, the friction strips 7 are made of rubber materials, the friction coefficient of the surface of the connecting column 4 is increased by the aid of the friction strips 7, and the static friction between the connecting column 4 and a concrete piece when the connecting column 4 penetrates through the concrete piece is increased.
When the embodiment of the application is used: workers use the connecting column 4 to penetrate through a concrete component, the friction coefficient of the surface of the friction strip 7 is high, the friction strip 7 is made of rubber materials, the friction coefficient of the surface of the connecting column 4 is increased by installing the friction strip 7, the static friction force between the connecting column 4 and a concrete part when the connecting column 4 penetrates through the concrete part is increased, the connecting column 4 is fixed, the workers rotate the threaded column 6, threads on the surface of the threaded column 6 are matched with threads on the inner wall of the connecting column 4, so the workers rotate the threaded column 6, the position of the threaded column 6 on the connecting column 4 is adjusted, the workers rotate the suspension frame 51, the threads on the inner wall of the suspension frame 51 are matched with threads on the surface of the threaded column 6, the workers adjust the position of the second suspension mechanism 5 on the threaded column 6 by rotating the suspension frame 51, the suspension frame 51 slides to be right below a crane hook, the workers rotate the direction ring 52, the direction of the direction ring 52 is adjusted on the suspension frame 51, the workers make the suspension ring 53 be in contact with the crane hook on the crane, the hook passes through the lifting ring 53, the concrete component is convenient for lifting of the crane, the worker rotates the assembly column 31, the lifting ring 31 is matched with the threads on the inner wall of the threaded column 6, the lifting ring 31, the lifting ring 32 is installed on the surface of the suspension column 6, and the suspension mechanism, and the lifting ring 33 of the suspension column 3 passes through the suspension plate 33 of the suspension mechanism.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.
Claims (7)
1. A novel prefabricated hybrid connection piece, includes hybrid connection piece body (1), its characterized in that: mix connecting piece body (1) and include two coupling mechanism (2), two first suspension mechanism (3), spliced pole (4), two second suspension mechanism (5) and screw thread post (6), the equal fixed mounting in both sides on spliced pole (4) top has coupling mechanism (2), the inside threaded connection of spliced pole (4) has screw thread post (6), the equal threaded connection in both ends of screw thread post (6) has first suspension mechanism (3), the surface threaded connection of screw thread post (6) has two second suspension mechanism (5), two coupling mechanism (2) all include reference column (21), antiskid sheets (22) and a plurality of spring (23), the inside of reference column (21) is equipped with two antiskid sheets (22), equal fixed mounting has a plurality of spring (23) between the both sides of reference column (21) inner wall and the adjacent one side of two antiskid sheets (22).
2. A novel prefabricated hybrid connection according to claim 1, characterized in that: the bottom ends of the two positioning columns (21) are fixedly connected with the connecting column (4).
3. A novel prefabricated hybrid connection according to claim 1, characterized in that: the two first suspension mechanisms (3) respectively comprise an assembly column (31) and a suspension plate (32), the suspension plate (32) is fixedly mounted on one side of the assembly column (31), and a plurality of suspension holes (33) are formed in the surface of the suspension plate (32).
4. A novel prefabricated hybrid connection according to claim 3, characterized in that: the middle parts of the two assembling columns (31) far away from one side of the suspension plate (32) are in threaded connection with the threaded columns (6).
5. A novel prefabricated hybrid connection according to claim 1, characterized in that: two second suspension mechanism (5) all include suspension frame (51), direction ring (52) and rings (53), the middle part of suspension frame (51) is rotated and is connected with direction ring (52), the top fixed mounting of direction ring (52) has rings (53).
6. A novel prefabricated hybrid connection according to claim 5, characterized in that: the insides of the two hanging frames (51) are in threaded connection with the threaded columns (6).
7. A novel prefabricated hybrid connection according to claim 1, characterized in that: and a plurality of friction strips (7) are fixedly arranged on the surface of the connecting column (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221676740.3U CN217998995U (en) | 2022-07-01 | 2022-07-01 | Novel prefabricated mixed connecting piece |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221676740.3U CN217998995U (en) | 2022-07-01 | 2022-07-01 | Novel prefabricated mixed connecting piece |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217998995U true CN217998995U (en) | 2022-12-09 |
Family
ID=84311977
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221676740.3U Active CN217998995U (en) | 2022-07-01 | 2022-07-01 | Novel prefabricated mixed connecting piece |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217998995U (en) |
-
2022
- 2022-07-01 CN CN202221676740.3U patent/CN217998995U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112340599B (en) | Freely-adjustable assembly type hoisting device for building wallboard | |
CN107673185B (en) | Hoisting device and hoisting method for prefabricated assembled concrete external wall panel | |
WO2020052291A1 (en) | Construction elevator wall-attaching frame mounting platform attached to steel platform formwork and method therefor | |
CN111980391A (en) | Integral hoisting platform and building method of building outer facade construction platform | |
CN114261882A (en) | Assembled building wallboard hoist device | |
CN105253828A (en) | Small lifting equipment for building operations | |
CN217998995U (en) | Novel prefabricated mixed connecting piece | |
CN112376698A (en) | Corridor construction method | |
CN215254463U (en) | Self-lifting type external climbing frame for high-rise building | |
CN101660660B (en) | Novel installing method of gas cabinet | |
CN112343302B (en) | Installation method of aluminum alloy doors and windows of high-rise building group | |
CN106121259A (en) | The hanging apparatus of embedded integrated outer wall plate and hanging method thereof | |
CN206255738U (en) | Flat step stair and building constructions | |
CN212151488U (en) | High-efficient electrical panel cabinet lifts by crane installation device | |
CN211687924U (en) | Assembled wall body hoist and mount auxiliary device | |
CN112320633A (en) | Plate hoisting device for building construction | |
CN109052205B (en) | Stable high altitude hangs thing device when heavy object promotes | |
CN205935718U (en) | Hoist device of embedded integral side fascia | |
CN207497867U (en) | A kind of building machinery lifts machine support | |
CN216196744U (en) | Architectural decoration curtain installation adjusting device | |
CN219033752U (en) | Light steel assembled keel frame | |
CN219117014U (en) | Synchronous electric hoist lifting device for internal climbing type tower crane | |
CN210558874U (en) | Steel construction hoist device based on BIM | |
CN217975297U (en) | Lift for building engineering construction | |
CN216360881U (en) | Supporting platform for mounting steel structure industrial factory building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |