CN217975328U CN202222140249.5U CN202222140249U CN217975328U CN 217975328 U CN217975328 U CN 217975328U CN 202222140249 U CN202222140249 U CN 202222140249U CN 217975328 U CN217975328 U CN 217975328U
Authority
CN
China
Prior art keywords
point truss
pole setting
hoisting point
wall
pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222140249.5U
Other languages
Chinese (zh)
Inventor
运明博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Jiusheng Engineering Technology Co ltd
Original Assignee
Tianjin Jiusheng Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Jiusheng Engineering Technology Co ltd filed Critical Tianjin Jiusheng Engineering Technology Co ltd
Priority to CN202222140249.5U priority Critical patent/CN217975328U/en
Application granted granted Critical
Publication of CN217975328U publication Critical patent/CN217975328U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a hoisting point truss subassembly about climbing frame of pole setting is assisted in mountable belongs to building tool technical field, this pole setting is assisted in mountable climb frame hoisting point truss subassembly about frame, climb a atress balanced structure including major structure and assistance. The major structure includes pole setting and hoisting point truss, and the pole setting lateral wall is connected with hoisting point truss one end, and supplementary frame atress balanced structure of climbing includes supplementary pole setting, and supplementary pole setting includes two diagonal web members and dead lever, two diagonal web member both ends respectively with hoisting point truss outer wall and pole setting lateral wall fixed connection, and the dead lever lateral wall is connected with the hoisting point truss other end, in this application, aims at improving the problem that the atress is unbalanced when climbing the frame promotion, and life is short.

Description

Climbing frame upper and lower hoisting point truss assembly capable of being provided with auxiliary vertical rod
Technical Field
The utility model particularly relates to a pole setting is assisted in mountable climbs upper and lower hoisting point truss subassembly of frame belongs to building tool technical field.
Background
The climbing frame, also called a lifting frame, can be classified into hydraulic, electric, manual, etc. according to its power source. The scaffold is a novel scaffold system developed in recent years and is mainly applied to high-rise shear wall type floors. It can ascend or descend along the building. This system makes the scaffold technology completely changed: firstly, the frame does not need to be turned over; and secondly, the scaffold is free from the dismounting and mounting procedures (the scaffold is used until the construction is finished after one-time assembly), and is not limited by the height of a building, so that the manpower and the materials are greatly saved. And also has a great improvement on the traditional scaffold in the safety angle. Has great development advantages in high-rise buildings.
The climbing frame upper and lower hoisting point truss device used in the current industry is convenient to install, for example, the lower hoisting point truss structure (China, 20210105 is published every day for the authorized bulletin) of the climbing frame with the publication number of CN212295594U, the scheme comprises an inner vertical rod of the climbing frame lower hoisting point truss, a plurality of climbing frame lower hoisting point truss cross rods are arranged on one side of the inner vertical rod of the climbing frame lower hoisting point truss, one end of each climbing frame lower hoisting point truss cross rod is connected with an outer vertical rod of the climbing frame lower hoisting point truss, and a lower hoisting point is installed on the outer vertical rod of the climbing frame lower hoisting point truss. The utility model discloses simple structure, safe light, the assembly use the degree of difficulty lower, and manufacturing process is simple, and application scope is wide, and circulated use both can realize the safe handling of guarantee attached lift scaffold, can also save a large amount of manual works, improve the efficiency of construction simultaneously effectively. However, the above scheme still has certain defects, and the inventor finds that the stress is unbalanced when the climbing frame is lifted, so that the service life of the climbing frame is short.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art's weak point, provide a pole setting is assisted in mountable climb frame upper and lower hoisting point truss subassembly, it is unbalanced to aim at improving the atress when climbing the frame and promoting, and the short problem of life.
The utility model discloses a realize like this:
the utility model provides a pole setting is assisted in mountable climbs upper and lower hoisting point truss subassembly of frame, climb the balanced structure of frame atress including major structure and supplementary.
The major structure includes pole setting and hoisting point truss, the pole setting lateral wall with hoisting point truss one end is connected, supplementary frame atress balanced structure of climbing includes supplementary pole setting, supplementary pole setting includes two diagonal web members and dead lever, two diagonal web member both ends respectively with hoisting point truss outer wall with pole setting lateral wall fixed connection, the dead lever lateral wall with the other end of hoisting point truss is connected.
The utility model discloses an in one embodiment, the hoisting point truss includes two horizontal poles and restriction levers, two the horizontal pole both ends respectively with the pole setting with dead lever lateral wall fixed connection, the restriction lever both ends respectively with two horizontal pole opposite face fixed connection.
In an embodiment of the present invention, the cross rod and the limiting rod have through holes on their surfaces, and the inner walls of the through holes are further provided with internal threads.
The utility model discloses an in one embodiment, the major structure still includes four supplementary fixed parts, four supplementary fixed part both ends respectively with the horizontal pole with pole setting outer wall fixed connection.
The utility model discloses an in the embodiment, supplementary fixed part includes set-square and two fixing bolt I, set-square outer wall both ends respectively with the horizontal pole outer wall with the laminating of pole setting lateral wall, two fixing bolt I runs through the set-square respectively with the horizontal pole outer wall with pole setting lateral wall bolted connection.
In an embodiment of the present invention, the main body structure further includes a lifting point portion, and the lifting point portion is fixedly connected to the cross rod and the outer wall of the limiting rod.
The utility model discloses an in one embodiment, hoisting point portion includes alloy steel plate, two connecting plates and three fixing bolt II, alloy steel plate bottom with the horizontal pole with the laminating of restriction pole outer wall is three fixing bolt II runs through alloy steel plate respectively with the horizontal pole with the through hole that restriction pole surface was seted up is connected, two connecting plate bottom respectively with alloy steel plate surface both sides fixed connection, just the connecting hole has still been seted up to the connecting plate lateral wall.
The utility model discloses an in one embodiment, the major structure still includes the guide rail pole setting, the guide rail pole setting with pole setting lateral wall fixed connection.
The beneficial effects of the utility model are that, through two diagonal web member one ends and hoisting point truss outer wall welding, the other end and the welding of pole setting lateral wall, reach the purpose of supporting the hoisting point truss, the hoisting point truss can be stretched simultaneously, through dead lever lateral wall and the welding of the other end of hoisting point truss, the stability that assurance hoisting point truss and two diagonal web members that can be better and pole setting are connected, so effectual solved among the above-mentioned scheme, the unbalanced problem of atress when climbing the frame and promoting, the problem of climbing frame life weak point has been solved simultaneously.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic structural view of an upper and lower suspension point truss assembly of a climbing frame, on which an auxiliary vertical rod can be mounted according to an embodiment of the present invention;
fig. 2 is a schematic view of a lifting point part structure provided by the embodiment of the present invention;
fig. 3 is a schematic structural view of an auxiliary fixing part according to an embodiment of the present invention;
fig. 4 is an enlarged schematic structural diagram of a point a in fig. 1 according to an embodiment of the present invention.
In the figure: 10-a body structure; 110-upright stanchion; 120-hoisting point truss; 130-an auxiliary fixing part; 140-a hoisting point section; 150-guide rail upright stanchions; 20-auxiliary climbing frame stress balancing structure; 210-auxiliary vertical rods; 211-diagonal web member; 212-a fixing bar; 121-a cross bar; 122-a restraining bar; 131-a triangular plate; 132-fixing bolt I; 141-alloy steel plate; 142-a connecting plate; 143-fixing bolt ii.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Examples
Referring to fig. 1, the present application provides an upper and lower suspension point truss assembly of a climbing frame capable of installing an auxiliary vertical rod, which includes a main structure 10 and an auxiliary climbing frame stress balancing structure 20.
The main structure 10 is used for fixing the lifting point truss 120, and the auxiliary climbing frame stress balancing structure 20 is used for balancing the stress of the lifting climbing frame and increasing the service life of the climbing frame.
Referring to fig. 1, 2, 3 and 4, the main structure 10 includes an upright 110 and a suspension point truss 120, wherein a sidewall of the upright 110 is connected to one end of the suspension point truss 120, and the sidewall of the upright 110 is welded to one end of the suspension point truss 120 to fix the suspension point truss 120.
The utility model discloses an in one embodiment, hoisting point truss 120 includes two horizontal poles 121 and restriction pole 122, two horizontal poles 121 both ends respectively with pole setting 110 and dead lever 212 lateral wall fixed connection, restriction pole 122 both ends respectively with two horizontal poles 121 opposite face fixed connection, wherein, through two horizontal poles 121 one end and pole setting 110 lateral wall welding, the other end and the welding of dead lever 212 lateral wall, dead lever 212 and pole setting 110 can be connected, through restriction pole 122 both ends respectively with two horizontal poles 121 opposite face welding, reach the purpose of supporting and fixed horizontal pole 121.
In an embodiment of the present invention, through holes are opened on the surfaces of the cross rod 121 and the limiting rod 122, and inner walls of the through holes are further provided with internal threads, wherein the purpose of fixing the hanging point part 140 is achieved by opening the through holes on the surfaces of the cross rod 121 and the limiting rod 122, and the inner walls of the through holes are further provided with internal threads.
The utility model discloses an in one embodiment, major structure 10 still includes four supplementary fixed parts 130, four supplementary fixed part 130 both ends respectively with horizontal pole 121 and pole setting 110 outer wall fixed connection, wherein, through supplementary fixed part 130 both ends respectively with horizontal pole 121 and pole setting 110 outer wall bolted connection, reach supplementary fixed horizontal pole 121's purpose.
The utility model discloses an in an embodiment, supplementary fixed part 130 includes set square 131 and two fixing bolt I132, set square 131 outer wall both ends laminate with horizontal pole 121 outer wall and pole setting 110 lateral wall respectively, two fixing bolt I132 run through set square 131 respectively with horizontal pole 121 outer wall and pole setting 110 lateral wall bolted connection, wherein, laminate with horizontal pole 121 outer wall and pole setting 110 lateral wall respectively through set square 131 outer wall both ends, can assist the stability that increases horizontal pole 121, run through set square 131 respectively with horizontal pole 121 outer wall and pole setting 110 lateral wall bolted connection through two fixing bolt I132, can the not equidimension set square 131 of effectual change, increase the connectivity of horizontal pole 121 and pole setting 110 simultaneously.
In an embodiment of the present invention, the main body structure 10 further includes a hanging point portion 140, the hanging point portion 140 is fixedly connected to the outer walls of the cross rod 121 and the limiting rod 122, wherein the bottom of the hanging point portion 140 is bolted to the outer walls of the cross rod 121 and the limiting rod 122, so as to fix the hanging point portion 140.
In an embodiment of the utility model, hoisting point portion 140 includes alloy steel plate 141, two connecting plates 142 and three fixing bolt II 143, alloy steel plate 141 bottom and laminating of horizontal pole 121 and restriction pole 122 outer wall, three fixing bolt II 143 runs through alloy steel plate 141 and is connected with the through-hole that horizontal pole 121 and restriction pole 122 surface were seted up respectively, two connecting plates 142 bottom respectively with alloy steel plate 141 surface both sides fixed connection, and the connecting plate 142 lateral wall has still seted up the connecting hole, wherein, through laminating of alloy steel plate 141 bottom and horizontal pole 121 and restriction pole 122 outer wall, run through the through-hole bolted connection that alloy steel plate 141 was seted up respectively with horizontal pole 121 and restriction pole 122 surface through three fixing bolt II 143, reach the purpose of fixed alloy steel plate 141, through two connecting plates 142 bottom respectively with alloy steel plate 141 surface both sides welding, and two connecting plates 142 lateral walls have still seted up the connecting hole, reach the purpose of fixed external horizontal truss.
The utility model discloses an in one embodiment, major structure 10 still includes guide rail pole setting 150, guide rail pole setting 150 and pole setting 110 lateral wall fixed connection, wherein, guide rail pole setting 150 lateral walls and pole setting 110 lateral wall bolted connection reach the removal and climb the purpose of a lower hoisting point truss 120 on the frame.
Referring to fig. 1, the auxiliary climbing frame stress balancing structure 20 includes an auxiliary vertical rod 210, the auxiliary vertical rod 210 includes two diagonal web members 211 and a fixing rod 212, two ends of the two diagonal web members 211 are respectively and fixedly connected to the outer wall of the lifting point truss 120 and the side wall of the vertical rod 110, and the side wall of the fixing rod 212 is connected to the other end of the lifting point truss 120, wherein one end of each of the two diagonal web members 211 is welded to the outer wall of the lifting point truss 120, and the other end of each of the two diagonal web members 211 is welded to the side wall of the vertical rod 110, so as to support the lifting point truss 120, and at the same time, the lifting point truss 120 can be stretched, and the other end of the lifting point truss 120 is welded to the side wall of the fixing rod 212, so that the stability of the connection between the lifting point truss 120 and the two diagonal web members 211 and the vertical rod 110 can be better ensured.
This mountable is supplementary pole setting climb the operating principle of hanging spot truss subassembly on frame: when the climbing frame is used, the side wall of the vertical rod 110 is welded with the side wall of the hoisting point truss 120, the hoisting point truss 120 can be fixedly connected, the guide rail vertical rod 150 is in bolted connection with the side wall of the vertical rod 110, the purpose of moving the whole climbing frame to hoist the hoisting point truss 120 is achieved, two ends of the limiting rod 122 are respectively welded with opposite surfaces of the two cross rods 121, the purpose of supporting or fixing the cross rods 121 is achieved, the two fixing bolts I132 penetrate through the triangular plate 131 and are respectively in bolted connection with the outer walls of the cross rods 121 and the side wall of the vertical rod 110, the connectivity of the cross rods 121 and the vertical rod 110 can be effectively improved, the three fixing bolts II 143 penetrate through the alloy steel plate 141 and are in bolted connection with the through holes formed in the surfaces of the cross rods 121 and the limiting rod 122, the alloy steel plate 141 can be fixed, the bottoms of the two connecting plates 142 are welded with two ends of the surface of the alloy steel plate 141, the connecting plates 142 are further provided with connecting holes to achieve the purpose of external horizontal truss, two ends of the two diagonal web rods 211 are respectively welded with the side walls of the vertical rod 110 and the cross rods 121, the side walls of the fixing rods 212 are welded with the side walls of the two cross rods 121, and the problem of uneven stress during lifting frame can be solved.
It should be noted that the specific model specifications of the alloy steel plate 141 and the triangular plate 131 need to be determined by model selection according to the actual specification of the device, and the specific model selection calculation method adopts the prior art, so detailed description is omitted.
The above is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and various modifications and changes will occur to those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. A climbing frame upper and lower lifting point truss component capable of being provided with auxiliary vertical rods is characterized by comprising
The main structure (10) comprises a vertical rod (110) and a hoisting point truss (120), wherein the side wall of the vertical rod (110) is connected with one end of the hoisting point truss (120);
supplementary frame atress balanced structure (20) of climbing, supplementary frame atress balanced structure (20) of climbing includes supplementary pole setting (210), supplementary pole setting (210) include two oblique web members (211) and dead lever (212), two oblique web member (211) both ends respectively with hoisting point truss (120) outer wall with pole setting (110) lateral wall fixed connection, dead lever (212) lateral wall with hoisting point truss (120) other end is connected.
2. The climbing frame upper and lower lifting point truss assembly capable of being provided with the auxiliary vertical rod as claimed in claim 1, wherein: the hoisting point truss (120) comprises two cross rods (121) and limiting rods (122), two ends of each cross rod (121) are fixedly connected with the vertical rods (110) and the side walls of the fixing rods (212), and two ends of each limiting rod (122) are fixedly connected with opposite surfaces of the two cross rods (121).
3. The truss assembly of upper and lower suspension points of a creeper capable of mounting an auxiliary vertical pole as claimed in claim 2, wherein: through holes are formed in the surfaces of the cross rod (121) and the limiting rod (122), and inner threads are further arranged on the inner walls of the through holes.
4. The climbing frame upper and lower lifting point truss assembly capable of being provided with the auxiliary vertical rod as claimed in claim 3, wherein: the main body structure (10) further comprises four auxiliary fixing parts (130), and two ends of the four auxiliary fixing parts (130) are fixedly connected with the cross rod (121) and the outer wall of the vertical rod (110) respectively.
5. The truss assembly of upper and lower suspension points of a creeper capable of mounting an auxiliary vertical pole as claimed in claim 4, wherein: supplementary fixed part (130) include set-square (131) and two fixing bolt I (132), set-square (131) outer wall both ends respectively with horizontal pole (121) outer wall with pole setting (110) lateral wall laminating, two fixing bolt I (132) run through set-square (131) respectively with horizontal pole (121) outer wall with pole setting (110) lateral wall bolted connection.
6. The truss assembly of upper and lower suspension points of a creeper capable of mounting an auxiliary vertical pole as claimed in claim 5, wherein: the main body structure (10) further comprises a lifting point part (140), and the lifting point part (140) is fixedly connected with the outer walls of the cross rod (121) and the limiting rod (122).
7. The climbing frame upper and lower suspension point truss assembly with the auxiliary vertical rods mountable thereon of claim 6, wherein: hoisting point portion (140) include alloy steel sheet (141), two connecting plates (142) and three fixing bolt II (143), alloy steel sheet (141) bottom with horizontal pole (121) with the laminating of restriction lever (122) outer wall is three fixing bolt II (143) run through alloy steel sheet (141) respectively with horizontal pole (121) with the through hole that restriction lever (122) surface was seted up is connected, two connecting plate (142) bottom respectively with alloy steel sheet (141) surface both sides fixed connection, just connecting plate (142) lateral wall has still seted up the connecting hole.
8. The creeper upper and lower suspension point truss assembly with the auxiliary vertical poles mountable of claim 7, wherein: the main structure (10) further comprises a guide rail vertical rod (150), and the guide rail vertical rod (150) is fixedly connected with the side wall of the vertical rod (110).
CN202222140249.5U 2022-08-15 2022-08-15 Climbing frame upper and lower hoisting point truss assembly capable of being provided with auxiliary vertical rod Active CN217975328U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222140249.5U CN217975328U (en) 2022-08-15 2022-08-15 Climbing frame upper and lower hoisting point truss assembly capable of being provided with auxiliary vertical rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222140249.5U CN217975328U (en) 2022-08-15 2022-08-15 Climbing frame upper and lower hoisting point truss assembly capable of being provided with auxiliary vertical rod

Publications (1)

Publication Number Publication Date
CN217975328U true CN217975328U (en) 2022-12-06

Family

ID=84258500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222140249.5U Active CN217975328U (en) 2022-08-15 2022-08-15 Climbing frame upper and lower hoisting point truss assembly capable of being provided with auxiliary vertical rod

Country Status (1)

Country Link
CN (1) CN217975328U (en)

Similar Documents

Publication Publication Date Title
CN105201195B (en) One kind can lift supporting leg type elevator hoistway construction platform and construction method
CN204899274U (en) Prefabricated concrete structure goes along with sb. to guard him frame outward
CN113090014A (en) High-rise assembled building integral operation platform and construction method and application thereof
CN213836318U (en) Bridge floor wet joint hangs mould structure
CN113062584A (en) Multipoint elevator shaft construction lifting platform and construction method
CN217975328U (en) Climbing frame upper and lower hoisting point truss assembly capable of being provided with auxiliary vertical rod
CN211368423U (en) Stay cable tower top lifting traction operation platform
CN208732495U (en) A kind of small gun carriage
CN109371848A (en) The longitudinal temporary connecting structure and method of suspension bridge concrete stiffening girder installation
CN210316599U (en) A curtain ring rail for roofing truss beam position
CN102259794B (en) Method for installing overall combined type crane beam
CN204357138U (en) Simple steel structure lifting upending frame
CN212295594U (en) Lower hoisting point truss structure of climbing frame
CN201649667U (en) Reinforcement cage immersion guide frame
CN212773380U (en) Lower hanger structure for scaffold
CN211396549U (en) Telescopic folding elevator shaft construction operation platform
CN218434602U (en) Novel aerial working platform
CN221093443U (en) Equipment assembly arranged on frame beam for hoisting secondary beam
CN217518280U (en) Large-span steel beam installation hoisting system
CN219826107U (en) Quick easy-to-install and-remove elevator shaft operation frame and template
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN219194178U (en) Lifting appliance for lifting steel plate superposed beam
CN210049568U (en) Fixed guide pulley lower bearing beam structure of inserted lift scaffold
CN215925683U (en) Cable tower main reinforcement hoisting bracket
CN219239011U (en) Hoisting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant