CN217923603U - Multi-pile combined driving type pile wall supporting structure system - Google Patents
Multi-pile combined driving type pile wall supporting structure system Download PDFInfo
- Publication number
- CN217923603U CN217923603U CN202220985775.9U CN202220985775U CN217923603U CN 217923603 U CN217923603 U CN 217923603U CN 202220985775 U CN202220985775 U CN 202220985775U CN 217923603 U CN217923603 U CN 217923603U
- Authority
- CN
- China
- Prior art keywords
- wall
- pile
- reinforcement cage
- supporting
- row
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model discloses a formula stake wall supporting construction system is beaten in antithetical couplet to many piles, include along a plurality of wall grooves of the peripheral continuous closed setting of foundation ditch a plurality of row's stake steel reinforcement cage (or precast tubular pile, piling bar etc.) has been placed in the wall groove, each interval arrangement between row's stake steel reinforcement cage (or precast pile, piling bar etc.), it is full of plain concrete to pour in the wall groove, plain concrete with row's stake steel reinforcement cage (or precast tubular pile, piling bar etc.) combines the atress structure that forms the foundation ditch supporting system. The utility model discloses a wall formula grooving and place row's stake steel reinforcement cage (or precast tubular pile, piling bar etc.) in the wall inslot, both absorbed whole width of cloth finished wall of underground continuous wall, the contact surface is small in quantity, and the stagnant water is effectual, and advantages such as straightness easy control hang down have absorbed row's stake steel reinforcement cage (or precast tubular pile, piling bar etc.) simultaneously and have arranged nimble, hoist and mount conveniently, synthesize with advantages such as the steel volume is few, specially adapted some complicated deep basal pit supporting engineering.
Description
Technical Field
The utility model relates to a foundation ditch engineering field, concretely relates to formula stake wall supporting construction system is beaten in many antithetical couplets.
Background
With the development of underground space becoming more and more powerful, the application of foundation pit support in engineering becomes more and more extensive. Due to the complexity of geotechnical engineering itself, and often with complex surrounding environments: underground pipelines, peripheral roads, buildings and the like sometimes occur in accidents related to foundation pit support safety, and negative influence and economic loss are caused to the society. Through statistical analysis, the underground water causes the foundation pit engineering dangerous case to account for a larger proportion of the accidents.
In deep foundation pit supporting engineering, the more common supporting forms mainly comprise three forms, namely a row pile and a waterproof curtain supporting form, the supporting effect mainly depends on whether the waterproof curtain meets the design requirement, and the pile forming effect is limited by factors such as geology, construction level and the like, so that the foundation pit water leakage phenomenon often occurs, and even safety accidents are caused; secondly, the interlocking row pile supporting form adopts the mutual interlocking of meat and vegetable piles, so that the problem of unstable pile forming quality of mixing piles, high-pressure jet grouting piles and the like is solved, the water stopping effect is improved, but the contact surface between piles is more, the pile forming verticality requirement is higher, and the problem of water leakage caused by insufficient lap joint length between piles due to the problem of water leakage of the contact surface is easy to occur or the problem of water leakage caused by insufficient lap joint length between piles due to the verticality is solved; and thirdly, the underground continuous wall is in a supporting mode, the whole wall is formed, the number of the contact surfaces of the wall and the wall is small, the quality is easy to control, the underground continuous wall is widely applied to ultra-deep foundation pits or complex foundation pits, and the comprehensive cost is high. How to save the engineering cost and ensure the safety of the foundation pit under the condition of ensuring the water stopping effect is worthy of being explored by engineering personnel.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a formula stake wall supporting construction system is beaten in many stake antithetical couplet, its structure is firm reliable, and the stagnant water is effectual, and construction convenience synthesizes and uses the steel volume few, can solve some complicated deep basal pit support problems.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a formula stake wall supporting construction system is beaten to many stake antithetical couplets which characterized in that: the foundation pit supporting structure comprises a plurality of wall grooves which are continuously and hermetically arranged along the periphery of a foundation pit, a plurality of supporting members are placed in the wall grooves and are arranged at intervals, plain concrete is poured in the wall grooves and is filled in the wall grooves, and the plain concrete and the supporting members are combined to form a stressed structure of a foundation pit supporting system.
Preferably, the high-pressure jet grouting piles are arranged at the joints of the two adjacent wall grooves, and water stopping at the joints of the wall grooves and the wall grooves can be enhanced through the high-pressure jet grouting piles.
Preferably, the supporting member is a member with similar functions such as a row pile reinforcement cage or a precast pile or a steel pile.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model discloses a wall formula grooving and place the supporting member in the wall inslot, both absorbed whole width of cloth finished wall of underground continuous wall, the contact surface is small in quantity, and the stagnant water is effectual, and advantages such as straightness easy control that hangs down have absorbed the supporting member simultaneously, for example arrange pile steel reinforcement cage or precast pile or piling bar etc. arrange in a flexible way, hoist and mount conveniently, synthesize with advantages such as the steel volume is few, the engineering is strutted to some complicated deep basal pits of specially adapted.
Drawings
Fig. 1 is the structure schematic diagram of the multi-pile combined driving type pile-wall supporting structure system of the utility model.
In the figure: 1-wall slot, 2-row pile reinforcement cage, 3-concrete and 4-high-pressure jet grouting pile.
Detailed Description
The technical solutions of the present invention will be described in detail below with reference to the accompanying drawings and examples so that those skilled in the art can better understand and implement the technical solutions of the present invention.
The utility model provides a formula stake wall supporting construction system is beaten in many antithetical couplet, include along the peripheral wall groove 1 that sets up in succession of foundation ditch, set up at the wall inslot strut member and pour the plain concrete 3 at the wall inslot.
The supporting member in this embodiment is the row pile reinforcement cage 2, and in actual construction, other members with similar functions, such as prefabricated columns, steel columns and the like, can be selected as the supporting member.
As shown in fig. 1, the wall slots 1 are continuously arranged along the periphery of the foundation pit, six rows of pile cages 2 (or precast piles, steel piles, etc.) are placed in each wall slot 1, and the pile cages 2 (or precast piles, steel piles, etc.) are arranged at certain intervals; and plain concrete 3 is poured to fill the wall groove 1 and is combined with the pile arrangement reinforcement cage 2 (or precast piles, steel piles and the like) to form a stressed structure of a foundation pit supporting system.
The utility model discloses still set up high pressure jet grouting pile 4 at seam crossing between adjacent wall groove 1 and the wall groove 1, can effectively strengthen the stagnant water of wall groove 1 and 1 seam crossing in wall groove through high pressure jet grouting pile 4.
The utility model discloses compare prior art, beneficial effect lies in adopting wall formula grooving and placing campshed steel reinforcement cage 2 (or precast pile, piling bar etc.) in wall groove 1, has both absorbed the whole wall of underground continuous wall, and the contact surface is small in quantity, and the stagnant water is effectual, and straightness advantage such as easily control hangs down has absorbed campshed steel reinforcement cage 2 (or precast pile, piling bar etc.) simultaneously and has arranged in a flexible way, hoist and mount conveniently, synthesizes with advantages such as the steel volume is few, the engineering is strutted to some complicated deep basal pits of specially adapted.
The above-mentioned embodiment is only the preferred embodiment of the present invention, but can not be regarded as the restriction to the utility model, any change and improvement based on the inventive concept should fall into the protection scope of the present invention, and the specific protection scope is based on the claims.
Claims (3)
1. The utility model provides a formula stake wall supporting construction system is beaten to many stake antithetical couplet which characterized in that: the foundation pit supporting structure comprises a plurality of wall grooves which are continuously and hermetically arranged along the periphery of a foundation pit, a plurality of supporting members are placed in the wall grooves and are arranged at intervals, plain concrete is poured in the wall grooves and is filled in the wall grooves, and the plain concrete and the supporting members are combined to form a stressed structure of a foundation pit supporting system.
2. The multi-pile co-driving type pile-wall supporting structure system according to claim 1, wherein: and high-pressure jet grouting piles are arranged at the joints of two adjacent wall grooves for water stop reinforcement.
3. The multi-pile co-driving type pile-wall supporting structure system according to claim 1, wherein: the supporting member is a row pile reinforcement cage or a precast pile or a steel pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220985775.9U CN217923603U (en) | 2022-04-27 | 2022-04-27 | Multi-pile combined driving type pile wall supporting structure system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220985775.9U CN217923603U (en) | 2022-04-27 | 2022-04-27 | Multi-pile combined driving type pile wall supporting structure system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217923603U true CN217923603U (en) | 2022-11-29 |
Family
ID=84175696
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220985775.9U Active CN217923603U (en) | 2022-04-27 | 2022-04-27 | Multi-pile combined driving type pile wall supporting structure system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217923603U (en) |
-
2022
- 2022-04-27 CN CN202220985775.9U patent/CN217923603U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109750660B (en) | Underground diaphragm wall with seepage-proof joint and construction method thereof | |
CN107268636A (en) | The diaphragm wall foundation ditch that the steel cylinder or steel sheet pile of a kind of seal groove and occlusion structure are constituted is with going along with sb. to guard him and construction method | |
CN204510230U (en) | Rich groundwater and the bad deep pit digging supporting and protection structure of geology | |
CN109440778B (en) | Active bidirectional inclined row pile foundation pit supporting method | |
CN212641473U (en) | Foundation pit supporting structure adjacent to existing building | |
CN206706772U (en) | A kind of double steel sheet pile supporting construction | |
CN107217676A (en) | A kind of steel cylinder with seal groove and occlusion structure or steel sheet pile and steel construction diaphragm wall | |
CN112502133A (en) | Construction process of building underground continuous wall based on steel grating | |
CN107059856A (en) | The ecology stake of pretensioning prestressed concrete porous hollow and its construction method | |
CN109440779B (en) | Active type X-shaped double-row pile foundation pit supporting method | |
CN108118689B (en) | Prefabricated underground diaphragm wall capable of being partially recycled, lifting appliance and construction method | |
CN105256811B (en) | Construction method for foundation pit supporting and protecting through sheet pile supporting structure with water stopping function | |
CN213897154U (en) | Soft soil foundation pit bottom curing structure | |
CN217923603U (en) | Multi-pile combined driving type pile wall supporting structure system | |
CN211646245U (en) | High-pile wharf and breakwater structure | |
CN112609705A (en) | Steel sheet pile supporting system and method suitable for shallow soft soil foundation pit | |
CN210288408U (en) | Foundation pit supporting structure | |
JP2005290869A (en) | Reinforcing structure of structure on water | |
CN111877365A (en) | H-shaped steel combined steel sheet pile continuous wall combined supporting system and construction method thereof | |
CN108411934B (en) | Floating tubular pile, dam retaining structure and construction method thereof | |
CN108221955B (en) | Prefabricated underground diaphragm wall capable of being recycled integrally, lifting appliance and construction method | |
JP4958064B2 (en) | Seismic reinforcement structure of quay | |
CN216739655U (en) | Foundation pit support meeting underground structure | |
CN206928281U (en) | Pretensioning prestressed concrete porous hollow ecology stake | |
CN108221954B (en) | Easy-to-detach prefabricated underground diaphragm wall, lifting appliance and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |