CN105256811B - Construction method for foundation pit supporting and protecting through sheet pile supporting structure with water stopping function - Google Patents

Construction method for foundation pit supporting and protecting through sheet pile supporting structure with water stopping function Download PDF

Info

Publication number
CN105256811B
CN105256811B CN201510638204.2A CN201510638204A CN105256811B CN 105256811 B CN105256811 B CN 105256811B CN 201510638204 A CN201510638204 A CN 201510638204A CN 105256811 B CN105256811 B CN 105256811B
Authority
CN
China
Prior art keywords
sheet pile
foundation pit
groove
concrete
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510638204.2A
Other languages
Chinese (zh)
Other versions
CN105256811A (en
Inventor
夏雄
先礼琼
刘灿明
李淋淋
毛建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ZEYU ENVIRONMENTAL ENGINEERING Co Ltd
Changzhou University
Original Assignee
JIANGSU ZEYU ENVIRONMENTAL ENGINEERING Co Ltd
Changzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZEYU ENVIRONMENTAL ENGINEERING Co Ltd, Changzhou University filed Critical JIANGSU ZEYU ENVIRONMENTAL ENGINEERING Co Ltd
Priority to CN201510638204.2A priority Critical patent/CN105256811B/en
Publication of CN105256811A publication Critical patent/CN105256811A/en
Application granted granted Critical
Publication of CN105256811B publication Critical patent/CN105256811B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明公开了一种具有止水功能的板桩支护结构及施工方法,用于基坑周壁的挡土止水,包括沿基坑支护定位线间隔排列的板桩,所述的板桩两侧面均具有凹槽,相邻板桩的凹槽之间设有用于挡土止水的砼搭板,砼搭板的两端嵌入所述凹槽内,砼搭板两端与凹槽连接处设有用于防水的橡胶止水带。本发明采用装配式施工,方便快捷,砼搭板起到挡土挡水的作用,橡胶止水带起到防水密封作用,并可适当加大板桩间距,减少插桩挤土效应,保证支护结构的整体性,有效提高支护结构的刚度,最终实现基坑工程的安全稳定,尤其适用于相对规则的中小基坑工程。

The invention discloses a sheet pile support structure with water-stop function and a construction method, which is used for retaining soil and water-stop on the surrounding wall of a foundation pit, and comprises sheet piles arranged at intervals along the positioning line of foundation pit support, and the sheet piles There are grooves on both sides, and a concrete strap for retaining soil and water is provided between the grooves of adjacent sheet piles, and the two ends of the concrete strap are embedded in the groove, and the two ends of the concrete strap are connected to the groove There is a rubber waterstop for waterproofing. The invention adopts assembled construction, which is convenient and quick. The concrete board plays the role of retaining soil and water, and the rubber waterstop plays a role of waterproof sealing. It improves the integrity of the support structure, effectively improves the rigidity of the support structure, and finally realizes the safety and stability of the foundation pit project, especially suitable for relatively regular small and medium-sized foundation pit projects.

Description

具有止水功能的板桩支护结构进行基坑支护的施工方法Construction method of sheet pile support structure with water-stop function for foundation pit support

技术领域technical field

本发明涉及建筑工程技术领域,尤其是一种具有止水功能的板桩支护结构进行基坑支护的施工方法。The invention relates to the technical field of construction engineering, in particular to a construction method for foundation pit support of a sheet pile support structure with a water-stop function.

背景技术Background technique

近年来,随着高层建筑的兴起,基坑工程的规模也越来越大。与此同时,地下交通的快速发展及地下商场和市政设施的不断兴建,简单的放坡开挖已不能够满足工程实际,随之而来的是各种各样围护结构形式的出现。基坑工程中最为核心的问题是围护体系的合理设计,该体系既要起到挡土作用,又要防止基坑外水土流失,使基坑周围地面沉降和水平位移控制在容许范围以内。目前工程中多采预制板桩进行基坑支护,由于要考虑到支护结构的挡土挡水作用,因此桩距布置较小,材料使用量大,单次吊装起重量较重,机械使用要求高。In recent years, with the rise of high-rise buildings, the scale of foundation pit engineering has also become larger and larger. At the same time, with the rapid development of underground transportation and the continuous construction of underground shopping malls and municipal facilities, simple grading and excavation can no longer meet the engineering reality, and various forms of enclosure structures have followed. The core issue in the foundation pit engineering is the rational design of the enclosure system. The system should not only play the role of retaining soil, but also prevent water and soil loss outside the foundation pit, so that the ground settlement and horizontal displacement around the foundation pit can be controlled within the allowable range. At present, prefabricated sheet piles are mostly used for foundation pit support in projects. Due to the soil and water retaining effect of the support structure, the pile spacing is small, the amount of material used is large, and the lifting capacity of a single hoisting is relatively heavy. High standard.

发明内容Contents of the invention

本发明要解决的技术问题是:克服现有技术中之不足,提供一种可充分利用支护刚度、增强基坑稳定性、防水效果好的具有止水功能的板桩支护结构及施工方法。The technical problem to be solved by the present invention is: to overcome the deficiencies in the prior art, to provide a sheet pile support structure and construction method that can make full use of the support stiffness, enhance the stability of the foundation pit, have a good waterproof effect and have a water-stop function .

本发明解决其技术问题所采用的技术方案是:一种具有止水功能的板桩支护结构,用于基坑周壁的挡土止水,包括沿基坑支护定位线间隔排列的板桩,所述的板桩两侧面均具有凹槽,相邻板桩的凹槽之间设有用于挡土止水的砼搭板,砼搭板的两端嵌入所述凹槽内,砼搭板两端与凹槽连接处设有用于防水的橡胶止水带。The technical solution adopted by the present invention to solve the technical problem is: a sheet pile support structure with water-stop function, which is used for retaining soil and water-stop on the surrounding wall of the foundation pit, including sheet piles arranged at intervals along the positioning line of the foundation pit support , the two sides of the sheet piles have grooves, and a concrete strapping board for retaining soil and water is provided between the grooves of adjacent sheet piles, and the two ends of the concrete strapping boards are embedded in the grooves, and the concrete strapping boards There are rubber waterstops for waterproofing at the connection between both ends and the groove.

优选地,所述的凹槽为方形条带状。Preferably, the grooves are in the shape of square strips.

优选地,所述的板桩伸入基坑底部土层深度为基坑深度的50%~80%。Preferably, the depth of the sheet pile extending into the soil layer at the bottom of the foundation pit is 50% to 80% of the depth of the foundation pit.

所述的橡胶止水带伸入基坑底部土层深度为基坑深度的10%。The depth of the rubber waterstop extending into the soil layer at the bottom of the foundation pit is 10% of the depth of the foundation pit.

一种使用上述具有止水功能的板桩支护结构进行基坑支护的施工方法,具有如下步骤:A construction method for foundation pit support using the above-mentioned sheet pile support structure with water-stop function has the following steps:

a、按照基坑支护设计参数,预制或购置板桩、砼搭板;a. Prefabricate or purchase sheet piles and concrete slabs according to the design parameters of foundation pit support;

b、在板桩的凹槽内嵌入橡胶止水带;b. Embed a rubber waterstop in the groove of the sheet pile;

c、沿基坑支护定位线,采用三轴搅拌桩成槽;c. Along the positioning line of foundation pit support, three-axis stirring piles are used to form grooves;

d、通过导槽定位,依次插入板桩;d. Position through the guide groove and insert sheet piles in sequence;

e、对准板桩的凹槽位置,插入砼搭板;e. Align the groove position of the sheet pile and insert the concrete lapping board;

f、重复上述b-e步骤,将板桩与砼搭板不断连接在一起,围合形成具有止水功能的板桩支护结构。f. Repeat the above b-e steps to continuously connect the sheet piles and the concrete slabs together to form a sheet pile support structure with water-stop function.

本发明的有益效果是:本发明采用装配式施工,方便快捷,具有较强的工程实用性,砼搭板起到挡土挡水的作用,橡胶止水带起到防水密封作用,并可适当加大板桩间距,充分利用支护结构的刚度,保证支护结构的整体性,有效提高基坑工程的安全稳定性,尤其适用于相对规则的中小基坑工程。The beneficial effects of the present invention are: the present invention adopts assembly construction, which is convenient and quick, and has strong engineering practicability. Increase the spacing between sheet piles, make full use of the rigidity of the support structure, ensure the integrity of the support structure, and effectively improve the safety and stability of the foundation pit project, especially suitable for relatively regular small and medium-sized foundation pit projects.

附图说明Description of drawings

下面结合附图和实施例对本发明进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

图1是本发明的施工立面结构示意图。Fig. 1 is the construction facade structure schematic diagram of the present invention.

图2本发明的平面示意图。Fig. 2 is a schematic plan view of the present invention.

图中1.板桩 2.凹槽 3.砼搭板 4.橡胶止水带 5.基坑In the figure 1. Sheet pile 2. Groove 3. Concrete board 4. Rubber waterstop 5. Foundation pit

具体实施方式detailed description

现在结合附图和优选实施例对本发明作进一步的说明。这些附图均为简化的示意图,仅以示意方式说明本发明的基本结构,因此其仅显示与本发明有关的构成。The present invention will now be further described in conjunction with the accompanying drawings and preferred embodiments. These drawings are all simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, so they only show the configurations related to the present invention.

如图1、图2所示的一种具有止水功能的板桩支护结构,用于有效深度小于等于10m的基坑5周壁的挡土止水,包括沿基坑5支护定位线间隔排列的板桩1,所述的板桩1两侧面均具有方形的条带状的凹槽2,相邻板桩1的凹槽2之间设有用于挡土止水的砼搭板3,砼搭板3的两端嵌入所述凹槽2内,砼搭板3两端与凹槽2连接处设有用于防水的橡胶止水带4。As shown in Figure 1 and Figure 2, a sheet pile support structure with water-stopping function is used for retaining and water-stopping the 5 surrounding walls of the foundation pit with an effective depth less than or equal to 10m, including the distance along the 5 support positioning lines of the foundation pit Arranged sheet piles 1, both sides of the sheet piles 1 have square strip-shaped grooves 2, and between the grooves 2 of adjacent sheet piles 1, a concrete lap 3 for retaining soil and water is provided, The two ends of the concrete board 3 are embedded in the groove 2, and a rubber waterstop 4 for waterproofing is provided at the connection between the two ends of the concrete board 3 and the groove 2.

其中板桩1伸入基坑5底部土层深度为基坑5深度的80%;橡胶止水带4伸入基坑5底部土层深度为基坑5深度的10%。Wherein the depth of sheet pile 1 extending into the bottom soil layer of foundation pit 5 is 80% of the depth of foundation pit 5;

一种采用上述具有止水功能的板桩支护结构实施基坑支护的施工方法,具有如下步骤:A construction method for implementing foundation pit support by adopting the above-mentioned sheet pile support structure with water-stopping function has the following steps:

a、按照基坑5支护设计参数,预制或购置板桩1、砼搭板3;a. According to the support design parameters of foundation pit 5, prefabricate or purchase sheet pile 1 and concrete lap slab 3;

b、沿板桩1的凹槽2内周壁嵌入橡胶止水带4;b. Embed rubber waterstop 4 along the inner peripheral wall of groove 2 of sheet pile 1;

c、沿基坑5支护定位线,采用三轴搅拌桩成槽;c. Along the 5 support positioning lines of the foundation pit, three-axis stirring piles are used to form grooves;

d、通过导槽定位,依次插入板桩1,相邻板桩1的凹槽2彼此相对;d. Position through the guide groove, insert sheet piles 1 in sequence, and the grooves 2 of adjacent sheet piles 1 are opposite to each other;

e、对准板桩1的凹槽2位置,插入砼搭板3,砼搭板3两端的顶面和两侧面分别与橡胶止水带4紧贴;e. Align the position of the groove 2 of the sheet pile 1, insert the concrete strap 3, and the top surface and both sides of the concrete strap 3 are closely attached to the rubber waterstop 4 respectively;

f、重复上述b~e步骤,将板桩1与砼搭板3不断连接在一起,最终围合形成具有止水功能的板桩支护结构。f. Repeat steps b to e above to continuously connect the sheet pile 1 and the concrete lap 3 to form a sheet pile support structure with a water-stop function.

本实施例中,板桩1采用钢筋混凝土制成,基坑5深度为10m,板桩1伸入基坑5底部土层深度为8m,橡胶止水带4伸入基坑5底部土层深度为1m。In this embodiment, the sheet pile 1 is made of reinforced concrete, the depth of the foundation pit 5 is 10m, the depth of the sheet pile 1 extending into the bottom soil layer of the foundation pit 5 is 8m, and the depth of the rubber waterstop 4 extending into the bottom soil layer of the foundation pit 5 1m.

本发明采用装配式施工,方便快捷,砼搭板3起到挡土挡水的作用,橡胶止水带4起到防水密封作用,并可适当加大板桩1间距,从而将基坑5支护形式从常规的平面模式扩展到空间模式,加强了支护结构的整体性,有效提高了支护结构的刚度,并充分利用支护结构的刚度,保证支护结构的整体性,有效提高基坑5工程的安全稳定性,尤其适用于相对规则的中小基坑5工程。The present invention adopts prefabricated construction, which is convenient and fast. The concrete board 3 plays the role of retaining soil and water, and the rubber waterstop 4 plays the role of waterproof sealing, and the distance between the sheet piles 1 can be appropriately increased, so that the foundation pit 5 The support form is extended from the conventional plane mode to the space mode, which strengthens the integrity of the support structure, effectively improves the stiffness of the support structure, and makes full use of the stiffness of the support structure to ensure the integrity of the support structure and effectively improve the foundation structure. The safety and stability of the pit 5 project is especially suitable for relatively regular small and medium-sized foundation pit 5 projects.

上述实施例只为说明本发明的技术构思及特点,其目的在于让熟悉此项技术的人士能够了解本发明的内容并加以实施,并不能以此限制本发明的保护范围,凡根据本发明精神实质所作的等效变化或修饰,都应涵盖在本发明的保护范围内。The above-mentioned embodiments are only to illustrate the technical conception and characteristics of the present invention. Substantial equivalent changes or modifications shall fall within the protection scope of the present invention.

Claims (4)

1. a kind of sheet pile supporting construction with water stopping function carries out the construction method of pattern foundation pit supporting structure, described sheet pile supporting construction Including along the spaced sheet pile (1) of foundation ditch (5) supporting position line, described sheet pile (1) two sides are respectively provided with groove (2), phase The concrete attachment strap (3) for keeping off native sealing is provided between the groove (2) of adjacent sheet pile (1), the two ends of concrete attachment strap (3) are embedded in the groove (2) in, concrete attachment strap (3) two ends are provided with the rubber fastening band (4) for waterproof with groove (2) junction;
Described construction method has following steps:
A, according to foundation ditch (5) support parameters, it is prefabricated or purchase sheet pile (1), concrete attachment strap (3);
B, the groove (2) in sheet pile (1) are embedded in rubber fastening band (4);
C, along foundation ditch (5) supporting position line, using three axes agitating pile grooving;
D, by guide groove position, be sequentially inserted into sheet pile (1);
Groove (2) position of e, alignment sheet pile (1), insertion concrete attachment strap (3);
F, the above-mentioned b~step e of repetition, sheet pile (1) is constantly linked together with concrete attachment strap (3), encloses to be formed with sealing work( The sheet pile supporting construction of energy.
2. the sheet pile supporting construction with water stopping function according to claim 1 carries out the construction method of pattern foundation pit supporting structure, its It is characterized in that:Described groove (2) is square ribbon.
3. the sheet pile supporting construction with water stopping function according to claim 1 carries out the construction method of pattern foundation pit supporting structure, its It is characterized in that:Described sheet pile (1) stretches into 50%~80% that foundation ditch (5) bottom solum depth is foundation ditch (5) depth.
4. the sheet pile supporting construction with water stopping function according to claim 3 carries out the construction method of pattern foundation pit supporting structure, its It is characterized in that:Described rubber fastening band (4) stretches into 10% that foundation ditch (5) bottom solum depth is foundation ditch (5) depth.
CN201510638204.2A 2015-09-30 2015-09-30 Construction method for foundation pit supporting and protecting through sheet pile supporting structure with water stopping function Expired - Fee Related CN105256811B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510638204.2A CN105256811B (en) 2015-09-30 2015-09-30 Construction method for foundation pit supporting and protecting through sheet pile supporting structure with water stopping function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510638204.2A CN105256811B (en) 2015-09-30 2015-09-30 Construction method for foundation pit supporting and protecting through sheet pile supporting structure with water stopping function

Publications (2)

Publication Number Publication Date
CN105256811A CN105256811A (en) 2016-01-20
CN105256811B true CN105256811B (en) 2017-04-19

Family

ID=55096727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510638204.2A Expired - Fee Related CN105256811B (en) 2015-09-30 2015-09-30 Construction method for foundation pit supporting and protecting through sheet pile supporting structure with water stopping function

Country Status (1)

Country Link
CN (1) CN105256811B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208870079U (en) * 2017-07-14 2019-05-17 吴健 Stress stake, prestressing combination supporting and piping lane
CN107687166A (en) * 2017-10-18 2018-02-13 太原理工大学 Diaphram wall is anti-to stream, water-impervious I-shaped steel joint structure and construction method
CN109056650A (en) * 2018-09-10 2018-12-21 无锡市水利设计研究院有限公司 A kind of assembled sheet pile combination shore protection and its construction method
CN113882391A (en) * 2021-10-09 2022-01-04 上海兴鸿建设工程有限公司 A foundation ditch supporting construction for building engineering
CN115522554B (en) * 2022-09-30 2025-05-27 中建八局第二建设有限公司 A water stop sheet pile support structure and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643682A (en) * 2013-11-28 2014-03-19 杭州江润科技有限公司 Pre-stressed hollow pipe pile foundation pit support structure and construction method
CN203668942U (en) * 2014-01-20 2014-06-25 北京现代金宇岩土工程有限公司 Pile protective self-hanging thin plate in supporting structure of deep foundation pit
CN104234057A (en) * 2013-10-22 2014-12-24 王磊 Polymer grouting curtain and prestressed pipe pile combined foundation pit supporting structure
CN205012352U (en) * 2015-09-30 2016-02-03 常州大学怀德学院 Sheet pile supporting construction with stagnant water function

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3051321B2 (en) * 1995-06-08 2000-06-12 運輸省港湾技術研究所長 Double sheet pile structure
JP3701280B2 (en) * 2002-12-17 2005-09-28 株式会社データ・トゥ Yamadome support

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234057A (en) * 2013-10-22 2014-12-24 王磊 Polymer grouting curtain and prestressed pipe pile combined foundation pit supporting structure
CN103643682A (en) * 2013-11-28 2014-03-19 杭州江润科技有限公司 Pre-stressed hollow pipe pile foundation pit support structure and construction method
CN203668942U (en) * 2014-01-20 2014-06-25 北京现代金宇岩土工程有限公司 Pile protective self-hanging thin plate in supporting structure of deep foundation pit
CN205012352U (en) * 2015-09-30 2016-02-03 常州大学怀德学院 Sheet pile supporting construction with stagnant water function

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
基坑支护新技术综述;吴景文等;《山西建筑》;20141031;第40卷(第30期);第74-75页 *

Also Published As

Publication number Publication date
CN105256811A (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN105256811B (en) Construction method for foundation pit supporting and protecting through sheet pile supporting structure with water stopping function
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN107542115B (en) Underground engineering waterproof structure and construction method thereof
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN206599798U (en) Advanced water-stop post-pouring belt of foundation slab structure
CN103603358A (en) Multi-platform retaining structure and construction method
CN204590038U (en) A kind of permanent foundation pit supporting construction
CN106351343A (en) Basement outer wall waterproof protection structure capable of realizing synchronous crossing construction and construction method thereof
CN205012352U (en) Sheet pile supporting construction with stagnant water function
CN107642101A (en) A kind of rocky bed steel cofferdam back cover leak stopping and guarded drainage construction method
CN110387889A (en) A kind of multi-arch type foundation pit supporting method for strip deep basal pit
CN105239584B (en) Multi-arch type sheet pile supporting construction carries out the construction technology of pattern foundation pit supporting structure
CN204959768U (en) A underground structure for airport
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN204715364U (en) A kind of foundation pit support device
CN110644538A (en) Basement side wall extra front and back pouring belt periphery protection structure
CN104047273B (en) Power station dissipation and scouring wall and construction method thereof
CN105544620A (en) Damping ditch with pressure relief device and shockproof plates and construction method for damping ditch
CN105544559B (en) The structure and method of pattern foundation pit supporting structure are carried out using prefabricated components
CN204590040U (en) Support of Foundation Pit Excavation device
CN205012351U (en) Arcading formula sheet pile supporting construction
CN106149734A (en) A kind of ground protective slope structure and construction method thereof
CN205369269U (en) Adopt prefabricated component to carry out excavation supporting's structure
CN206205166U (en) It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure
CN204959763U (en) Stake wall composite construction structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170419