CN207553116U - A kind of greening friction pile of stake top rescinded angle - Google Patents

A kind of greening friction pile of stake top rescinded angle Download PDF

Info

Publication number
CN207553116U
CN207553116U CN201720837598.9U CN201720837598U CN207553116U CN 207553116 U CN207553116 U CN 207553116U CN 201720837598 U CN201720837598 U CN 201720837598U CN 207553116 U CN207553116 U CN 207553116U
Authority
CN
China
Prior art keywords
stake top
greening
friction pile
rescinded angle
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720837598.9U
Other languages
Chinese (zh)
Inventor
陈雷
邹毅
陈永煊
孙希望
屈俊童
孟资成
李能
张蕊
石有权
赵利奎
张大可
王志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CREEC Kunming Survey Design and Research Co Ltd
Original Assignee
CREEC Kunming Survey Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CREEC Kunming Survey Design and Research Co Ltd filed Critical CREEC Kunming Survey Design and Research Co Ltd
Priority to CN201720837598.9U priority Critical patent/CN207553116U/en
Application granted granted Critical
Publication of CN207553116U publication Critical patent/CN207553116U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model is related to a kind of greening friction piles of stake top rescinded angle, belong to civil engineering field.The stake top of the friction pile at least side rescinded angle, from side, stake top side is bevel edge, and opposite side is that right-angle side or both sides are all bevel edge, and the stake top further includes horizontal plane, greening groove is additionally provided on the horizontal plane.The utility model overall structure is simple, convenient to carry out, saves quantities, and afforestation effect is good.

Description

A kind of greening friction pile of stake top rescinded angle
Technical field
The utility model is related to a kind of friction piles, and in particular to a kind of greening friction pile of stake top rescinded angle belongs to civil engineering work Journey field.
Background technology
Green Protection is the developing direction of side slope protection, and friction pile is widely applied in engineering field, but at present Friction pile is that entity pours cuboid reinforced concrete structure, and pile plate wall or retaining wall between piles etc. are concrete structure, nothing Method is afforested, and the noticeable effect of white is apparent.Friction pile as a kind of effective safeguarding technology because appearance compared with Difference, in certain places because Landscape limits it and promotes the use of.Friction pile is set for sloping area, is typically designed requirement Friction pile is arranged on the outside of road, and since friction pile cannot occupy road width, friction pile needs outer move.Outside friction pile stake position It moves, also to increase friction pile height or even stake section will also increase, and accordingly increase quantities.And friction pile height is bigger, engineering Risk is bigger.
According to friction pile force analysis, on friction pile top, particularly adjacent top surface stress very little, stake top is horizontal for a long time Section is not designed according to stressing conditions, and a friction pile using same cross-sectional, causes anti-slide pile design to exist certain Waste, pile plate wall, by optimizing appearance design, clips stake top rib as a kind of structures being chronically exposed in the public visual field Angle, stake top setting greening groove is easy for construction, without any technical difficulty and technical risk, can reach smooth-going beauty, convenient for green The purpose of change can also reduce quantities, achieve the effect that kill two birds with one stone, if with inclined inserting sheet pile wall connected applications, it can be with Reach the perfect adaptation of engineering reinforcement protection and greening.
Invention content
The purpose of this utility model is to provide a kind of greening friction pile of stake top rescinded angle, improves friction pile appearance, solution Certainly friction pile Greening problem is reduced investment outlay.
Technical solution is used by the utility model:
A kind of greening friction pile of stake top rescinded angle, it is characterised in that:The stake top of the friction pile at least side rescinded angle, from side Face is observed, and stake top side is bevel edge, and opposite side is that right-angle side or both sides are all bevel edge, and the stake top further includes horizontal plane, institute It states and greening groove is additionally provided on horizontal plane.Friction pile is for one by kinking structure, and according to friction pile force analysis, stake top part is suffered to be sheared And moment of flexure very little, stake top side rescinded angle and middle part setting greening groove do not influence anti-slide pile structure stability, i.e., friction pile are made There is no any influence with function.Friction pile reinforcing bar arranges that stake top center is plain concrete along surrounding, and top does not have to pour rescinded angle Part concrete saves quantities, and top becomes more to smooth out after friction pile rescinded angle, and view effect is more preferable.
Further, including anchor pile, several oblique cutting plates and reinforcement component, the oblique cutting plate both sides pass through reinforcement component water It is flat to be set between anchor pile.
Further, the horizontal surface area of the stake top is 2-4 square metres.
Further, the greening groove is plain concrete, and the length of greening groove is 0.8m, width 0.8-1.4m, depth It is 0.8 meter.
Further, the greening groove is set close to road side, apart from stake outer ledge for 0.2m or so, slot bottom both sides with Upper 0.2m is each to reserve a drain hole, and drain hole entrance is equipped with rubble.Planting soil or clear table soil, planting trough are filled out in greening groove Interior plantation Hanging Plants and climber, afforestation effect are good.
Further, the rescinded angle width is determined according to friction pile section, and width is 1.0m after rescinded angle, and rescinded angle height is 3.0m。
Compared with prior art, the beneficial effects of the utility model are as follows:
The top of friction pile does not have to pour rescinded angle part concrete, during construction by the upright template-setup of rescinded angle corresponding position into Oblique template, reduces top concrete and pours, and not only saves quantities, and become more to smooth out at the top of friction pile, View effect is more preferable.
It solves because stake top occupies path space, friction pile must move outward, so as to increase the cubic metre of earth and stone and land used after stake Problem, wherein general embankment friction pile is in side of banketing(On the inside of friction pile)Rescinded angle, due to rescinded angle part stake position after stake top rescinded angle Site of road is not take up, therefore stake position suitably interior can be moved, so as to reduce fill yard and land used, sloping area can effectively subtract Few antiskid pile length, so as to reduce quantities, while increases engineering safety degree.Excavation or the embankment for having landscape requirement are resisted Sliding pile, the rescinded angle on the outside of stake top eliminate stake top corner angle, are more smoothed out on the outside of stake top, can be effectively improved pile body appearance, Both reduce quantities, be also beneficial to friction pile greening.
By setting greening groove at the top of friction pile, friction pile and top slope greening are solved the problems, such as.Overall structure is simple, It is convenient to carry out, quantities is saved, afforestation effect is good.
Description of the drawings
Fig. 1 is the structure diagram of the greening friction pile of the stake top rescinded angle of the utility model;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is the structure diagram of greening friction pile of the utility model based on the stake top rescinded angle in the case of excavation;
Fig. 4 is the structure diagram of greening friction pile of the utility model based on the stake top rescinded angle in the case of embankment;
Wherein:1- friction piles, 2- stake tops inclined-plane, 3- oblique cuttings plate, 4- stake tops greening groove, 5- pavements or lawn, 6- greenings Band, 7- hillside, 8- roads.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, the technical solution in the present embodiment is carried out clear, complete Site preparation describes, it is clear that described embodiment is only a part of example rather than the example of whole to the utility model.Base Embodiment in the utility model, the institute that those of ordinary skill in the art are obtained under the premise of not making the creative labor There is other embodiment, shall fall within the protection scope of the present invention.
Embodiment 1
As shown in Figs. 1-2, the greening friction pile of the stake top rescinded angle of the present embodiment, the stake top side rescinded angle of the friction pile into For inclined-plane 2, rescinded angle width is 1.25m, and length 1.5m, rescinded angle height is 3.0m, and rescinded angle leans on road or lawn 5, is seen from side It examines, stake top side is bevel edge, and opposite side is right-angle side, and the stake top further includes horizontal plane, and the horizontal surface area of stake top is put down for 2-4 Square rice is additionally provided with greening groove 4 on horizontal plane.Greening groove 4 is plain concrete, and the length of greening groove is 0.8m, width 0.8- 1.4m, depth are 0.8 meter.4 slot bottom both sides more than 0.2m of greening groove is each to reserve a φ 80mm drain hole, and drain hole entrance Equipped with rubble.The steel bar arrangement of friction pile does not have reinforcing bar influence in friction pile surrounding, stake top setting greening groove location, and top is not With pouring rescinded angle part concrete, by the upright template-setup of rescinded angle corresponding position into oblique template during construction, friction pile pours To placement one and planting trough size cuboid of a size, the embedding pvc pipe in sluicing hole site, after concrete setting during stake top Take out embedding cuboid.Friction pile includes anchor pile 1, several oblique cutting plates 3 and reinforcement component, 3 both sides of oblique cutting plate Between being set on anchor pile 1 by reinforcement component level, the angle of inclination of oblique cutting plate 3 is identical, is greening between adjacent oblique cutting plate Band 6.
The armored concrete of the present embodiment stake top rescinded angle is 2.81 cubic metres, and stake top reserves depth 0.8m when pouring, long Degree and width are respectively the greening groove of 0.8m and 1.2m(Not casting concrete), it is 0.76 cubic metre to save concrete, single anti- Sliding pile saves 3.5 cubic metres or so of concrete altogether.
Embodiment 2
As shown in figure 3, the present embodiment is the greening friction pile of the stake top rescinded angle based on excavation, by 5 side of road(Free face one Side)Rescinded angle, the opposite side of friction pile is hillside 7.Greening groove is set close to road side, is 0.2m or so apart from stake outer ledge, Remaining is same as Example 1.
Embodiment 3
As shown in figure 4, the present embodiment is the greening friction pile of the stake top rescinded angle based on embankment, cut in the side of banketing of road 8 Angle, can also simultaneously on the outside(Face sky side)Rescinded angle so that for antiskid stake top from side, both sides are all bevel edges.
Since rescinded angle part stake position is not take up site of road after stake top rescinded angle, stake position suitably interior can be moved, so as to subtract Few fill yard and land used, sloping area can effectively reduce antiskid pile length, so as to reduce quantities, while increase engineering Degree of safety.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection domain within.

Claims (4)

1. a kind of greening friction pile of stake top rescinded angle, it is characterised in that:The stake top of the friction pile at least side rescinded angle, from side Observation, stake top side are bevel edge, and opposite side is that right-angle side or both sides are all bevel edge, and the stake top further includes horizontal plane, described Greening groove is additionally provided on horizontal plane;The horizontal surface area of the stake top is 2-4 square metres;The greening groove is set close to road side It puts, is 0.2m apart from stake outer ledge, more than 0.2m in slot bottom both sides is each to reserve a drain hole, and drain hole entrance is equipped with broken Stone.
2. the greening friction pile of stake top rescinded angle according to claim 1, it is characterised in that:Including anchor pile, several oblique cuttings Plate and reinforcement component, the oblique cutting plate both sides are set on by reinforcement component level between anchor pile.
3. the greening friction pile of stake top rescinded angle according to claim 1, it is characterised in that:The greening groove is plain coagulation Soil, the length of greening groove is 0.8m, and width 0.8-1.4m, depth is 0.8 meter.
4. the greening friction pile of stake top rescinded angle according to claim 1, it is characterised in that:Width is after friction pile rescinded angle 1.0m, rescinded angle height are 3.0m.
CN201720837598.9U 2017-07-12 2017-07-12 A kind of greening friction pile of stake top rescinded angle Active CN207553116U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720837598.9U CN207553116U (en) 2017-07-12 2017-07-12 A kind of greening friction pile of stake top rescinded angle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720837598.9U CN207553116U (en) 2017-07-12 2017-07-12 A kind of greening friction pile of stake top rescinded angle

Publications (1)

Publication Number Publication Date
CN207553116U true CN207553116U (en) 2018-06-29

Family

ID=62671936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720837598.9U Active CN207553116U (en) 2017-07-12 2017-07-12 A kind of greening friction pile of stake top rescinded angle

Country Status (1)

Country Link
CN (1) CN207553116U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403358A (en) * 2018-11-12 2019-03-01 中国十七冶集团有限公司 A kind of highway engineering friction pile outer surface greening method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403358A (en) * 2018-11-12 2019-03-01 中国十七冶集团有限公司 A kind of highway engineering friction pile outer surface greening method

Similar Documents

Publication Publication Date Title
US4521138A (en) Building blocks
CN105951712A (en) Underground diaphragm wall construction method for cutting through underground structure under ground limitation condition
CN102561370A (en) Protective structure for reinforcing high-liquid-limit soil slope
CN208183653U (en) A kind of slope protection structure
CN202509511U (en) Protective structure for reinforcing high liquid limit soil side slope
CN209555948U (en) A kind of pin-connected panel ecology retaining plate between piles construction
CN207553116U (en) A kind of greening friction pile of stake top rescinded angle
CN105256811B (en) Construction method for foundation pit supporting and protecting through sheet pile supporting structure with water stopping function
US6371700B1 (en) Retaining wall system
CN203284795U (en) Buttressed retaining wall with anchor board
CN207176627U (en) Large-scale earthing concrete block
CN208917771U (en) A kind of ecological bank protection structure
CN208701700U (en) A kind of pile foundation protective device close near deep basal pit
CN104695379A (en) Ecological river channel revetment structure
CN106012951B (en) Avoid the reservoir structure that solution cavity is built the method for reservoir and its built in In Limestone Area
CN110528540A (en) A kind of the draining anti-slide pile structure and its construction method of embedded pile
CN110055983A (en) The fast-assembling element type guard system of refuse dump side slope
CN205000346U (en) Slope frame for slope reinforcement and water drainage
CN205839695U (en) A kind of slope protection block
CN208884304U (en) A kind of intercepting ditch structure for excavation cutting top of the slope
CN207608912U (en) Side slope body supporting construction
CN104480897B (en) Flood prevention wall with small land occupation and wide application range
CN207277280U (en) A kind of prefabricated anti-arc eagle mouth structure and the wave wall equipped with anti-arc eagle mouth structure
CN208633061U (en) A kind of cylindrical fireworks formula river channel ecology bank protection structure
CN207987935U (en) A kind of highway Rock High Slope anchor pole pregroove marks safeguard structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant