Prior art keywords
wall
underground
underground structure
deeply
lead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610377884.1A
Other languages
Chinese (zh)
Inventor
王博
王一博
朱炎兵
雷崇
赵星
董俊
张波
陈辉
王鹏
周华海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201610377884.1A priority Critical patent/CN105951712A/en
Publication of CN105951712A publication Critical patent/CN105951712A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • E02D5/187Bulkheads or similar walls made solely of concrete in situ the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints

Abstract

The invention discloses an underground diaphragm wall construction method for cutting through an underground structure under the ground limitation condition. The underground diaphragm wall construction method for cutting through the underground structure under the ground limitation condition comprises the steps of building deep guide walls at two sides of an proposed underground diaphragm wall in the underground structure in a fitting way, and building brackets on gaps between the outer sides of the deep guide walls and a base plate; carrying out step-slope excavation on soil mass above a top plate within the range of the proposed underground diaphragm wall, cutting and breaking the top plate within the range of the proposed underground diaphragm wall, and alternatively arranging horizontal supports in an upper cutting groove formed by the top plate; carrying out precipitation construction on the underground structure, and cutting and breaking the base plate between the deep guide walls to form a lower cutting groove; backfilling cemented soil, and constructing inverted L-shaped guide walls. According to the underground diaphragm wall construction method for cutting through the underground structure under the ground limitation condition, on the premise of ensuring the safety of the existing underground structure and surrounding building structures, the underground diaphragm wall is ensured to successfully cut through the underground structure, and the traffic above the underground structure is ensured to be normal.

Description

The construction method of underground continuous wall of underground structure is passed through under the confined condition of a kind of place
Technical field
The present invention relates to the deep basal pit works such as track traffic, underground space development, building construction Journey field, in particular to the underground passing through existing underground structure under the confined condition of a kind of place Continuous wall construction method.
Background technology
Diaphram wall, as a kind of common foundation pit enclosure structure pattern, is widely used in In Metro station excavation engineering.Along with the development of subway construction cause, subway erect-position can not Avoid with city below the underground such as built underground people's air defense cave depot, market place builet below the ground, underground garage There is conflict situations such as intersecting, overlapping in structure.This kind of situation, it is common practice that put slope and break Remove the underground structure affecting continuous wall trench underground region, after element earthen backfill is compacted this region Carry out normal construction of diaphragm wall again, when site condition is by limited time, do not possess Put slope excavation and abolish the condition of underground structure, abolish impact residue underground knot the most on a large scale The stability in the large of structure, still needs and takes the protection residue underground structure peace of measure targetedly Entirely, it is ensured that road traffic normal pass above construction period residue underground structure.How to exist Under the confined condition of place, it is ensured that diaphram wall can pass through the same of existing underground structure smoothly Time ensure that underground structure self and safety of surrounding environment are to need in engineering to solve in work progress Important Problems certainly.
Summary of the invention
Present invention aim to solve the deficiency of above-mentioned background technology, it is provided that a kind of place The construction method of underground continuous wall of underground structure is passed through, it is ensured that existing underground is tied under confined condition On the premise of structure self and periphery construction of structures safety, it is ensured that diaphram wall can be worn smoothly More underground structure, it is ensured that traffic normal pass above underground structure.
The technical scheme is that the ground passing through underground structure under the confined condition of a kind of place Lower continuous wall construction method, it is characterised in that step is:
A. in existing underground structure, the diaphram wall both sides planned to build of laminating build and deeply lead wall, Deeply lead wall to be connected with top board, the base plate of underground structure, described deeply lead outside wall and between base plate between Every building bracket;
B. the soil body in the range of the diaphram wall planned to build, above top board is put slope excavation, Cutting is abolished top board and is deeply led top board between wall two and form cutting groove, is spaced in upper cutting groove Arrange horizontal support;
C. underground structure is carried out dewatering construction, after level of ground water is reduced to below base plate, Cutting is abolished base plate and is deeply led between wall base plate two and form incision and cut groove;
D. soil cement is backfilled above top board at excavation, at soil cement edge, the ground planned to build of laminating Lower diaphragm wall both sides construction inverted L shape leads wall, leads pouring diaphram wall between wall two.
Preferably, in step d, first lower cutting groove, two deeply lead between wall, on cutting groove even Backfill element soil in the logical space formed;Soil cement is backfilled at excavation, at soil cement above top board The diaphram wall both sides construction inverted L shape that edge, laminating are planned to build leads wall;Treat to the design duration Time lead two again and between wall, pour diaphram wall.
Preferably, deeply leading wall in step a is the armored concrete using water-proof concrete cast Structure.
Preferably, step a is led deeply wall upper and lower side respectively with top board, the base plate of underground structure Bar planting connects.
Preferably, light well point of first constructing in step c, well point arranges outside wall along deeply leading, After making level of ground water be reduced to below base plate by well point, cutting is abolished base plate and is deeply led wall two Between base plate formed incision cut groove.
Preferably, step d is led wall bottom to be connected with top board bar planting.
Wall of leading in the present invention is that in prior art, inverted L shape leads wall, and galianconism is positioned horizontally in earth's surface, Long-armed vertically stretching into underground, it act as: provides to chute forming machine grooving and guides;Store mud Cave in preventing notch.
The invention have the benefit that
1. the present invention is by rebuilding underground structural support system, it is ensured that diaphram wall is executed Underground structure inherently safe between the duration.The present invention solves diaphram wall in prior art and needs Pass through the technical problem of constructional difficulties under existing underground structure, place confined condition, it is ensured that Construction period underground structure self and the safety of surrounding enviroment, for safe construction, control Risk has good effect.
2. the present invention be applicable to diaphram wall need to pass through earth's surface site condition limited, cannot Put slope excavation abolish, abolish on a large scale impact residue underground structure stability in the large existingly Lower structure situation, the most built underground people's air defense cave depot of existing underground structure, market place builet below the ground, Underground Garage.It is particularly suited under the conditions of site condition is limited, road can not break, working as subway The construction of foundation pit enclosure structure diaphram wall when station scope exists built underground structure.
Construction method the most of the present invention reduces construction risk, it is ensured that construction quality, accelerates Construction speed, method is simple, economical rationality, technology maturation, have a extensive future, benefit Well.
Accompanying drawing explanation
Fig. 1 is that the present invention constructs schematic diagram
Wherein: 1. diaphram wall 2. underground structure 3. is deeply led wall 4. bracket 5. and put slope line 6. Horizontal support 7. well point 8. native 9. soil cements 10. of element lead wall 2.1 top board 2.2 base plate 2.3 2.4 times cutting grooves of upper cutting groove.
Detailed description of the invention
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
As it is shown in figure 1, the present invention provides passes through underground structure under the confined condition of a kind of place Construction method of underground continuous wall, existing underground structure 2 includes top board 2.1, the base plate 2.2 (end Plate includes concrete layer and lower section bed course), construction method concretely comprises the following steps:
A. in underground structure 2, diaphram wall 1 both sides planned to build of laminating build and deeply lead wall 3, Deeply lead wall 3 to be connected, by structure again with top board 2.1, base plate 2.2 bar planting of underground structure 2 Build underground structural support system, it is ensured that diaphram wall 1 construction period underground structure self is pacified Entirely.Deeply leading wall 3 is the reinforced concrete structure using water-proof concrete cast, seepage-resistant grade P8, it is ensured that diaphram wall 1 slurry coat method (or cast concrete) not spillage.Deeply lead wall Build bracket 4 along deeply leading wall 3 length direction interval outside 3 and between base plate 2.2.
B. in the range of the diaphram wall 1 planned to build, above top board 2.1, the soil body puts slope Excavation, both sides are formed and put slope line 5, put bottom slope line 5 until the diaphram wall 1 planned to build Scope both sides, cutting is abolished top board 2.1 and is deeply led (the diaphram wall planned to build between wall 3 two In the range of 1) the upper cutting groove 2.3 of top board 2.1 formation, in upper cutting groove 2.3, water is arranged at interval Flat support 6, the lateral Water And Earth Pressures that opposing both sides pass over, it is ensured that construction period foundation ditch The phenomenons such as periphery construction of structures is not ftractureed, sidesway, sedimentation.
C. underground structure 2 being carried out dewatering construction, the dewatering construction of the present embodiment is light for construction Type well point 7, well point 7, along deeply leading layout outside wall 3, makes subsoil water potential drop by well point 7 As little as base plate less than 2.2 0.5m, then cutting abolishes base plate 2.2 and deeply leads between wall 3 two and (intend In the range of the diaphram wall 1 built) the lower cutting groove 2.4 of base plate 2.2 formation, it is ensured that do not occur Retention of excessive fluid, gush the dangerous situations such as sand.
It is not to connect under construction ground immediately after a lot of work progress abolish existing underground structure Continuous wall, therefore after abolishing existing underground structure, can select to construct or treat suitable work immediately Phase constructs diaphram wall again.
Abolish existing underground structure construct immediately diaphram wall time, step d is:
D. above top board 2.1, backfill soil cement 9 is to putting slope line 5, and soil cement 9 is close to for outside Putting the triangle stack of slope line 5, wherein concordant with horizontal earth's surface, inner side is the most somewhat Towards tilted hypotenuse, horizontal sides and inner side construction inverted L shape at soil cement 9 lead wall 10, Lead diaphram wall 1 both sides that wall 10 laminating is planned to build, lead wall 10 bottom and plant with top board 2.1 Muscle connects, it is ensured that notch is stable, leads pouring diaphram wall 1 between wall 10 two.
When the suitable durations such as abolishing existing underground structure constructs diaphram wall 1 again, step D is:
D. wall 3 edge, upper cutting groove 2.3 both sides of the edge, lower cutting groove 2.4 is deeply led due to two Both sides of the edge are all corresponding with diaphram wall 1 both sides planned to build, therefore descend cutting groove 2.4, Two deeply lead between wall 3, the most through in space that upper cutting groove 2.3 connection is formed, Back-filling in layers element soil 8 in this space, to top board 2.1 upper surface, then executes immediately with above-mentioned Equally backfill soil cement 9 during work diaphram wall, construction inverted L shape leads wall 10, leads wall 10 Bottom is connected with top board 2.1 bar planting.Treat to the suitable duration to lead two again and pour underground between wall 10 Diaphragm wall 1.

Claims (6)

1. under the confined condition of place, pass through a construction method of underground continuous wall for underground structure, It is characterized in that, step is:
A. in existing underground structure (2), diaphram wall (1) both sides planned to build of fitting Build and deeply lead wall (3), deeply lead wall (3) and the top board (2.1) of underground structure (2), the end Plate (2.2) connect, described deeply lead wall (3) outside with base plate (2.2) between be spaced build cattle Lower limb (4);
B. in the range of the diaphram wall (1) planned to build, top board (2.1) top the soil body enter Row puts slope excavation, and cutting is abolished top board (2.1) and deeply led top board (2.1) between wall (3) two Cutting groove (2.3) in formation, in upper cutting groove (2.3), horizontal support (6) is arranged at interval;
C. underground structure (2) is carried out dewatering construction, treat that level of ground water is reduced to base plate (2.2) After below, cutting is abolished base plate (2.2) and is deeply led base plate (2.2) formation between wall (3) two Lower cutting groove (2.4);
D. soil cement (9) is backfilled, on soil cement (9) limit at the excavation of top board (2.1) top Diaphram wall (1) the both sides construction inverted L shape that edge, laminating are planned to build leads wall (10), two Lead and between wall (10), pour diaphram wall (1).
2. construction method as claimed in claim 1, it is characterised in that in step d, first Lower cutting groove (2.4), two deeply lead between wall (3), upper cutting groove (2.3) connection is formed Space in backfill element soil (8);Soil cement (9) is backfilled at the excavation of top board (2.1) top, At soil cement (9) edge, laminating plan to build diaphram wall (1) both sides construction inverted L shape Lead wall (10);Lead two again when to the design duration and pour diaphram wall between wall (10) (1)。
3. construction method as claimed in claim 1, it is characterised in that deeply lead in step a Wall (3) is the reinforced concrete structure using water-proof concrete cast.
4. construction method as claimed in claim 1, it is characterised in that deeply lead in step a Wall (3) upper and lower side top board (2.1), base plate (2.2) with underground structure (2) respectively is planted Muscle connects.
5. construction method as claimed in claim 1, it is characterised in that first execute in step c Work light well point (7), well point (7) are arranged, by well point (7) along deeply leading wall (3) outside Make level of ground water be reduced to base plate (2.2) below after, cutting abolish base plate (2.2) two Deeply lead base plate (2.2) between wall (3) and form lower cutting groove (2.4).
6. construction method as claimed in claim 1, it is characterised in that lead wall in step d (10) bottom is connected with top board (2.1) bar planting.
CN201610377884.1A 2016-05-31 2016-05-31 Underground diaphragm wall construction method for cutting through underground structure under ground limitation condition Pending CN105951712A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610377884.1A CN105951712A (en) 2016-05-31 2016-05-31 Underground diaphragm wall construction method for cutting through underground structure under ground limitation condition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610377884.1A CN105951712A (en) 2016-05-31 2016-05-31 Underground diaphragm wall construction method for cutting through underground structure under ground limitation condition

Publications (1)

Publication Number Publication Date
CN105951712A true CN105951712A (en) 2016-09-21

Family

ID=56908394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610377884.1A Pending CN105951712A (en) 2016-05-31 2016-05-31 Underground diaphragm wall construction method for cutting through underground structure under ground limitation condition

Country Status (1)

Country Link
CN (1) CN105951712A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869110A (en) * 2016-12-29 2017-06-20 上海市基础工程集团有限公司 The construction method of underground continuous wall of existing underground structure
CN108018865A (en) * 2017-12-01 2018-05-11 姚燕明 The grooving technology of wall is led by the use of existing underpass as construction of diaphragm wall
CN108775009A (en) * 2018-06-28 2018-11-09 中国建筑第四工程局有限公司 A kind of measure method preventing grooving spillage and leak
CN109706915A (en) * 2018-12-11 2019-05-03 北京建工土木工程有限公司 The construction method of guide wall of underground continuous wall in a kind of tunnel
CN110387887A (en) * 2019-06-28 2019-10-29 同济大学建筑设计研究院(集团)有限公司 It is oriented to the construction method of partition wall and its construction method and foundation pit enclosure structure
CN110924428A (en) * 2019-11-08 2020-03-27 中天建设集团有限公司 Pile-forming construction method for cast-in-place pile to penetrate existing basement structure
CN112593546A (en) * 2020-12-03 2021-04-02 中铁广州工程局集团有限公司 Construction method for underground diaphragm wall to penetrate through underground structure

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5530039A (en) * 1978-08-23 1980-03-03 Kajima Corp Method for constructing underground structures
CN102561361A (en) * 2012-03-05 2012-07-11 中交第四航务工程局有限公司 Ultra-deep T-shaped trench-wall pile in soft-toped hard-bottomed soil layer and trench forming method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5530039A (en) * 1978-08-23 1980-03-03 Kajima Corp Method for constructing underground structures
CN102561361A (en) * 2012-03-05 2012-07-11 中交第四航务工程局有限公司 Ultra-deep T-shaped trench-wall pile in soft-toped hard-bottomed soil layer and trench forming method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
贺小强: ""地下连续墙直穿既有地下人防工程施工"", 《山西建筑》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869110A (en) * 2016-12-29 2017-06-20 上海市基础工程集团有限公司 The construction method of underground continuous wall of existing underground structure
CN108018865A (en) * 2017-12-01 2018-05-11 姚燕明 The grooving technology of wall is led by the use of existing underpass as construction of diaphragm wall
CN108775009A (en) * 2018-06-28 2018-11-09 中国建筑第四工程局有限公司 A kind of measure method preventing grooving spillage and leak
CN109706915A (en) * 2018-12-11 2019-05-03 北京建工土木工程有限公司 The construction method of guide wall of underground continuous wall in a kind of tunnel
CN110387887A (en) * 2019-06-28 2019-10-29 同济大学建筑设计研究院(集团)有限公司 It is oriented to the construction method of partition wall and its construction method and foundation pit enclosure structure
CN110924428A (en) * 2019-11-08 2020-03-27 中天建设集团有限公司 Pile-forming construction method for cast-in-place pile to penetrate existing basement structure
CN112593546A (en) * 2020-12-03 2021-04-02 中铁广州工程局集团有限公司 Construction method for underground diaphragm wall to penetrate through underground structure

Similar Documents

Publication Publication Date Title
CN105951712A (en) Underground diaphragm wall construction method for cutting through underground structure under ground limitation condition
CN107119691A (en) One kind is applied to the square deep basal pit of the high pressure-bearing of rich water sand gravel layer and its excavation method
CN105569064B (en) A kind of setting formula construction of Open Caisson Foundation method suitable for deep water drift net
CN111485901B (en) Method for building side-span non-filling type long and narrow shallow bottom karst cave section tunnel
CN206636602U (en) Vault song wall tunnel structure
CN102296572B (en) Earth and rockfill dam body seepage monitoring structure provided with abandoned dreg site behind dam and construction method thereof
CN105239578B (en) Water-rich sand layer deep foundation pit underwater construction method
CN104878719B (en) Mutual embedding reinforcement formula Ecological Retaining Wall construction method
CN104404974A (en) High-pressure-bearing water and thick sand and pebble formation deep foundation pit grouting bottom-sealing structure and construction technology thereof
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN106088126A (en) A kind of open caisson deviation rectification construction method
CN110206039A (en) Complex geological condition cheats Larsen steel sheet pile construction method in hole
CN106050239A (en) Construction method for retaining structure of deep and large vertical shaft in water-abundant upper-soft lower-hard stratum
CN106120822B (en) A kind of method for protecting support and device that prevent mud stone from coming down
CN105155421B (en) Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water
CN204570652U (en) A kind of karst strata rock-steady structure
CN104947689A (en) Hole collapse preventive trenching construction method of underground diaphragm wall
CN107700434A (en) A kind of dome grating formula armored concrete mud-rock flow blocking dam and its construction process
CN204252148U (en) High artesian thick sand-pebble layer deep foundation ditch slip casting back cover structure
CN208152063U (en) A kind of superelevation infiltration coefficient sand ovum stratum Groundwater Control system
CN206829167U (en) A kind of cast-in-place box beam bracket raft foundation with discharge orifice
CN109826201A (en) A kind of weak soil foundation pit step method for protecting support
CN207211176U (en) A kind of big open caisson of superelevation
CN105350544A (en) Waterproof curtain used for stone-contained area and construction method thereof
CN104674780A (en) Karst stratum stabilization structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160921