CN217896771U - Assembled multifunctional heat-preservation fixing part - Google Patents

Assembled multifunctional heat-preservation fixing part Download PDF

Info

Publication number
CN217896771U
CN217896771U CN202221987016.2U CN202221987016U CN217896771U CN 217896771 U CN217896771 U CN 217896771U CN 202221987016 U CN202221987016 U CN 202221987016U CN 217896771 U CN217896771 U CN 217896771U
Authority
CN
China
Prior art keywords
construction
tray
bridge
shaped adjusting
upright post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221987016.2U
Other languages
Chinese (zh)
Inventor
李振荣
刘彦
严海艳
宋高云
赵晓红
吴疆
孟俊林
李飞
孟宇霆
张宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Second Construction Group Co Ltd
Original Assignee
Shanxi Second Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Second Construction Group Co Ltd filed Critical Shanxi Second Construction Group Co Ltd
Priority to CN202221987016.2U priority Critical patent/CN217896771U/en
Application granted granted Critical
Publication of CN217896771U publication Critical patent/CN217896771U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

An assembled multifunctional heat-preservation fixing piece belongs to the field of buildings and comprises a T-shaped adjusting upright post and a screw rod, and is characterized in that the T-shaped adjusting upright post is provided with two annular reinforcing steel bar supporting hooks, and one end of the T-shaped adjusting upright post is fixed with a template; the other end of the T-shaped adjusting upright post is connected with one end of a screw rod, and the other end of the screw rod penetrates into the main keel and tightly clamps and fixes the main keel on the ceiling screw rod through two nuts. The utility model discloses it is easy and simple to handle, the installation is swift, and three processes of traditional reinforcement back-up, heat preservation shop paste, furred ceiling installation drilling effectively combine together and reduce the construction process to reduce the construction degree of difficulty, promoted the efficiency of construction, accelerated the construction progress, eliminated the heat preservation risk of droing, avoided the circuit problem of reprocessing, avoided building rubbish's production, practiced thrift construction cost.

Description

Assembled multifunctional heat-preservation fixing part
Technical Field
The utility model belongs to concrete building construction field, the construction of mainly used cast-in-place concrete structure and assembled concrete structure cast-in-place floor, cast-in-place wall body or prefabricated wall body, prefabricated floor heat preservation, concretely relates to multi-functional heat preservation mounting of assembled.
Background
At present, in concrete building engineering actual construction, a mode that a building main body structure is constructed and then a floor slab and a wall body are subjected to heat preservation construction or a prefabricated wall body is produced, and the outer blade plate is connected by adopting glass fiber ribs and penetrates through a heat preservation layer to be anchored into the wall body is adopted for processing. The construction modes are as follows: for the heat preservation construction of the top of a cast-in-place structural floor slab or a prefabricated floor slab, the operation can be carried out after the main body structure construction is finished, the construction process has less interpenetration, when the heat preservation construction and the ceiling construction of the floor slab are carried out in the later period, a hole is formed in the top plate, the pre-buried wire pipe of the floor slab is easy to penetrate through, the wire cannot penetrate through the wire pipe or penetrate through the wire, the circuit cannot be normally used, and the circuit is newly laid; for the heat preservation construction of the cast-in-place wall body, the hanging basket is hung externally after the construction of the main body structure is finished, the construction quality control is difficult, and the heat preservation layer falls off to hurt people sometimes; for the construction mode that the glass fiber reinforced plastic connecting piece is inserted after the outer blade plate concrete is poured during the production of the prefabricated wall body, the rear insertion time is strictly controlled, once the concrete begins to be initially set and loses fluidity, a gap is formed between the inserted connecting piece and the concrete, the outer blade plate falling phenomenon is very easy to occur when the prefabricated wall body is demolded and lifted, or the risk that the outer blade plate falls is easy to occur in the later-stage building in the using process.
The above-mentioned several kinds of construction methods processes integrate the degree lower, and the rework is reprocessed the phenomenon comparatively frequently, and the quality risk is comparatively outstanding, and solid construction waste discharges the quantity and increases relatively to cause the construction process loaded down with trivial details, the construction degree of difficulty is big, construction cost increases, the efficiency of construction reduces, construction period extension scheduling problem.
Disclosure of Invention
In order to avoid cast-in-place concrete structure and prefabricated concrete structure, when cast-in-place wall body, cast-in-place floor, prefabricated floor heat preservation construction, the process integrates the degree lowly, rework and repair the phenomenon, the heat preservation drops the phenomenon in the later stage use, building rubbish increases the phenomenon to and the outer acanthus leaf of prefabricated wall drops the risk problem, the loaded down with trivial details problem that the construction degree of difficulty is big of the construction process, the problem that construction cost increases the problem, the efficiency of construction reduces, the problem that construction period delays, the utility model provides a multi-functional heat preservation mounting of assembled.
An assembled multifunctional heat-preservation fixing piece comprises a T-shaped adjusting upright post and a screw rod, and is characterized in that the T-shaped adjusting upright post is provided with two annular reinforcing steel bar support hooks, and a bridge-cut tray at one end of the T-shaped adjusting upright post is fixed with a template through an iron nail; the bridge cut-off tray is connected with one end of the screw rod, and the other end of the screw rod penetrates into the main keel and tightly clamps and fixes the main keel on the ceiling screw rod through two nuts.
The T-shaped adjusting upright column is composed of a threaded rod and a bridge-cut tray at one end of the threaded rod, and the threaded rod and the bridge-cut tray are connected into a whole.
Annular reinforcing bar holds in palm colludes and comprises L shape hook and ring, and L shape hook and ring are connected as an organic wholely, and the ring is equipped with the threaded rod complex screw hole with T type regulation stand.
The bridge cut-off tray is a circular tray and comprises a connector and a plastic shell, the plastic shell is poured on the periphery of the connector, and the connector is provided with a threaded hole.
The utility model discloses it is easy and simple to handle, the installation is swift, and three processes of traditional reinforcement back-up, heat preservation shop paste, furred ceiling installation drilling effectively combine together and reduce the construction process to reduce the construction degree of difficulty, promoted the efficiency of construction, accelerated the construction progress, eliminated the heat preservation risk of droing, avoided the circuit problem of reprocessing, avoided building rubbish's production, practiced thrift construction cost.
Drawings
Fig. 1 is a front view of the utility model.
Fig. 2 is a plan view of the present invention.
Fig. 3 is a left side view of the utility model.
Fig. 4 isbase:Sub>A cross-sectional view taken alongbase:Sub>A-base:Sub>A of fig. 2.
In the drawing, 1, a main keel, 2, an auxiliary keel, 3, a bridge-cut tray, 4, a T-shaped adjusting upright post, 5, an annular steel bar support hook, 6, a screw rod, 7, a nut, 8, an iron nail, 3-1, a connector and 3-2 of a plastic shell.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
Fig. 1, fig. 2, fig. 3, fig. 4 show that the assembly type multifunctional heat preservation fixing part comprises a T-shaped adjusting upright post 4 and a screw rod 6, and is characterized in that the T-shaped adjusting upright post 4 is provided with two annular steel bar support hooks 5,T, one end of the adjusting upright post 4 is connected with a bridge cut-off tray 3, and the bridge cut-off tray 3 is fixed with a template (the template is a building construction facility) through an iron nail 8; the bridge cut-off tray 3 is connected with one end of a screw rod 6 through threads, the other end of the screw rod 6 penetrates into a main keel 1, the main keel 1 is clamped and fixed on the screw rod 6 through two nuts 7, and the main keel 1 is connected with an auxiliary keel 2.
The T-shaped adjusting upright post 4 consists of a threaded rod and a bridge-cut tray 3 at one end of the threaded rod, and the threaded rod and the bridge-cut tray 3 are connected into a whole.
The bridge cut-off tray is a circular tray and consists of a connector 3-1 and a plastic shell 3-2, the plastic shell 3-2 is poured on the periphery of the connector 3-1, and the connector 3-1 is provided with a threaded hole.
Annular reinforcing bar holds in palm colludes 5 and comprises L shape hook and ring, and L shape hook and ring are connected as an organic wholely, and the ring is equipped with the threaded rod complex screw hole with T type regulation stand.
The utility model discloses a use method: fixing a bridge cutoff tray on an installed template or a trolley for component production, and connecting the auxiliary keel with the suspended ceiling; the annular steel bar support hook positioned below rotates to the bottom of the designed position of the steel bar at the bottom of the plate to support the steel bar at the bottom of the longitudinal and transverse plates, and the function of a steel bar cushion block is achieved; the annular reinforcing steel bar support hook positioned on the upper surface rotates to the bottom of the design position of the plate reinforcing steel bar to support the longitudinal and transverse plate reinforcing steel bar, so that the stirrup reinforcing steel bar is played, the floor slab gluten is supported, and the accurate position of the floor plate reinforcing steel bar is ensured; carrying out floor slab concrete pouring according to the requirement of the designed concrete strength grade of the floor slab; and when the strength of the floor slab concrete reaches the form removal requirement, removing the floor slab supporting template, and cutting the iron nails.

Claims (4)

1. The utility model provides a multi-functional heat preservation mounting of assembled, includes T type regulation stand, lead screw, and characterized by T type regulation stand sets up two annular reinforcing bar holds in the palm and colludes, and T type regulation stand one end sets up the bridge cut-off tray, and lead screw one end is connected to the bridge cut-off tray, and the lead screw other end penetrates in the main joist and presss from both sides tightly the fixing on the furred ceiling lead screw through two nuts with the main joist.
2. The assembly type multifunctional heat-insulating fixing part as claimed in claim 1, wherein the T-shaped adjusting upright post is composed of a threaded rod and a bridge-cut tray at one end of the threaded rod, and the threaded rod and the bridge-cut tray are connected into a whole.
3. The assembly type multifunctional heat-preservation fixing piece as claimed in claim 1 or 2, wherein the bridge-cut tray is a circular tray and is composed of a connector and a plastic shell, the plastic shell is poured on the periphery of the connector, and the connector is provided with a threaded hole matched with the screw rod.
4. The assembly type multifunctional heat-preservation fixing part as claimed in claim 1, wherein the annular steel bar support hook is composed of an L-shaped hook and an annular ring, the L-shaped hook and the annular ring are connected into a whole, and the annular ring is provided with a threaded hole matched with a threaded rod of the T-shaped adjusting upright column.
CN202221987016.2U 2022-07-29 2022-07-29 Assembled multifunctional heat-preservation fixing part Active CN217896771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221987016.2U CN217896771U (en) 2022-07-29 2022-07-29 Assembled multifunctional heat-preservation fixing part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221987016.2U CN217896771U (en) 2022-07-29 2022-07-29 Assembled multifunctional heat-preservation fixing part

Publications (1)

Publication Number Publication Date
CN217896771U true CN217896771U (en) 2022-11-25

Family

ID=84139338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221987016.2U Active CN217896771U (en) 2022-07-29 2022-07-29 Assembled multifunctional heat-preservation fixing part

Country Status (1)

Country Link
CN (1) CN217896771U (en)

Similar Documents

Publication Publication Date Title
CN106320691B (en) Aluminum wood template construction method
CN105971272B (en) Assembled aluminum template masonry shearwalls reinforced concrete structural column and construction method
CN206616862U (en) Formwork root bracing means
CN105464216B (en) Construction method based on integral lifting formwork-strengthening system superelevation super-section batter post
CN103206089A (en) Fabricated aluminum alloy formwork system construction method
CN207863507U (en) A kind of vertical member displacement apparatus for skyscraper floor
CN106368430A (en) Aluminum formwork installation process
CN102619331A (en) Once molding construction method of beam-type conversion layer of high-rise building by steel pipe supporting and laminated pouring
CN201738250U (en) Arch culvert and arch ring steel die trolley
CN103556819A (en) Construction method for reserving constructional column holes in beam plate
CN105484421A (en) Ring beam formwork bricks and building secondary structure filler wall ring beam construction method
CN217896771U (en) Assembled multifunctional heat-preservation fixing part
CN109457814A (en) Towering and major diameter building top cover construction method based on Bailey bracket structure
CN211873837U (en) One-step forming supporting and reinforcing system for reversed ridge of kitchen and bathroom
CN206397136U (en) Assembled aluminum template masonry shearwalls reinforced concrete structural column
CN113494182A (en) One-step forming supporting and reinforcing system for reversed ridges of kitchens and bathrooms and construction method thereof
CN110409320A (en) A kind of the concrete cast-in-situ bracket and its construction method of adjustable slope
CN110043060A (en) A method of landing frame column is changed to beam post structures
CN105370027A (en) Construction method for integrally lifted and supported steel platform structure in high-rise suspended structure
CN106320662B (en) Decorating outer wall of building ultra-wide concrete wire construction method
CN105625708B (en) A kind of aluminum wood composite shuttering system for building
CN108193874A (en) A kind of stairway steel formwork for building
CN105735630A (en) Fixing method for steel beam
CN110230399B (en) Construction method for preventing displacement of shear wall reinforcing steel bars
CN206034950U (en) A early tear support open for building templates