CN105484421A - Ring beam formwork bricks and building secondary structure filler wall ring beam construction method - Google Patents

Ring beam formwork bricks and building secondary structure filler wall ring beam construction method Download PDF

Info

Publication number
CN105484421A
CN105484421A CN201510921844.4A CN201510921844A CN105484421A CN 105484421 A CN105484421 A CN 105484421A CN 201510921844 A CN201510921844 A CN 201510921844A CN 105484421 A CN105484421 A CN 105484421A
Authority
CN
China
Prior art keywords
ring beam
brick
template
construction
template brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510921844.4A
Other languages
Chinese (zh)
Inventor
王跃强
周琪琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP
Original Assignee
1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP filed Critical 1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP
Priority to CN201510921844.4A priority Critical patent/CN105484421A/en
Publication of CN105484421A publication Critical patent/CN105484421A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C1/00Building elements of block or other shape for the construction of parts of buildings
    • E04C1/39Building elements of block or other shape for the construction of parts of buildings characterised by special adaptations, e.g. serving for locating conduits, for forming soffits, cornices, or shelves, for fixing wall-plates or door-frames, for claustra
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • E04C3/22Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members built-up by elements jointed in line

Abstract

The invention discloses a building secondary structure filler wall ring beam construction method. The method comprises the following steps that a lower wall is built to reach the design height; formwork bricks are built on the top of the lower wall, and a groove penetrating through a beam formwork brick body is formed in the middle of each formwork brick body; the cross section of the formwork brick bodies is in a U shape; the opening end of each formwork brick faces upwards, and a ring beam steel reinforcing bar is arranged inside each annular groove; ring beam concrete is poured into the annular groove. According to the building secondary structure filler wall ring beam construction method, construction is easy and convenient, and no damage is caused to the wall below a ring beam during construction; materials are saved, the construction cost is lowered, waste of formworks and wood beams is avoided, the lease or purchase cost of a formwork clamp is lowered, and the ring beam formwork assembly and disassembly labor cost is lowered; no potential quality hazard is caused during construction, quality defects such as ring beam concrete formwork expansion are avoided, the construction progress is improved, and continuous construction can be performed on the upper and lower walls of the ring beam.

Description

Ring beam template brick and building secondary structure infilled wall collar tie beam construction method
Technical field
The present invention relates to a kind of construction techniques, specifically, relate to a kind of building secondary structure infilled wall collar tie beam construction method.
Background technology
When building secondary structure infilled wall is built by laying bricks or stones, building wall is constructed a certain height, according to job specfication and designing requirement, need arrange collar tie beam, to increase overall performance and the anti-seismic performance of body of wall.Collar tie beam construction traditionally, needs to install ring beam template separately at collar tie beam position, follow-up concreting, complete and after reaching design strength until collar tie beam concreting, by its form removable, can then carry out the building construction of collar tie beam top residue body of wall.
Traditional circle beam forms construction method, during model sheetinstallat, because needs use template clamping, conventional jig is " step fastener ", when jig is installed, often damages collar tie beam lower wall body because of hammering jig.During collar tie beam concreting, probably because jig is fixing loosely, there is the defect such as mould, race mould that rises in structure.The construction of collar tie beam upper wall body, needs can carry out after ring beam template is removed, there is certain influence like this to the construction period.Traditional circle beam forms is constructed, and also will drop into manpower and material resources greatly, waste resource.
Summary of the invention
For above-mentioned deficiency of the prior art, the invention provides a kind of rational in infrastructure, ring beam template brick that safety factor is high, easy to operate.
The technical solution used in the present invention is:
A kind of ring beam template brick, comprises template brick body, is provided with the groove of through beam template brick body in the middle part of described template brick body; Described template brick body cross-section is U-shaped.
The bottom of described groove is arc surface.
Described template brick body is rectangular, and described groove is arranged along template brick body length direction.
Described template brick body is L-type.
Described template brick body is circular arc type.
A kind of building secondary structure infilled wall collar tie beam construction method, comprises the steps:
Build lower wall body by laying bricks or stones, build lower wall body by laying bricks or stones design height;
Build template brick by laying bricks or stones at lower wall body top, in the middle part of described template brick body, be provided with the groove of through beam template brick body; Described template brick body cross-section is U-shaped;
Upwards, described groove is arranged along body of wall length direction in described template brick openend; Described adjacent forms brick end face is bonded to each other;
Described template brick is at the top looping groove of lower wall body;
In annular groove, ring beam reinforcing steel bar is set;
Collar tie beam concreting is carried out in annular groove;
Concreting is complete, after concrete setting, can proceed the building construction of collar tie beam upper wall body.
The beneficial effect of hinge structure of the present invention:
Building secondary structure infilled wall collar tie beam construction method of the present invention, easy construction, can not damage the following body of wall of collar tie beam during construction; Save material and reduce construction cost, avoiding the waste of template, flitch, reducing lease or the buying expenses of template clamping, reducing ring beam template and install and the labour cost of removing; Construction, without hidden danger of quality, there will not be collar tie beam concrete to rise the mass defects such as mould, and raising construction speed, collar tie beam top and the bottom body of wall can sequential production.
Accompanying drawing explanation
Fig. 1 is that perspective view put by ring beam template brick of the present invention;
Fig. 2 is the ring beam template brick constructing structure schematic diagram of secondary structure infilled wall collar tie beam construction method of the present invention.
Critical piece symbol description in accompanying drawing:
In figure:
1, template brick body 2, groove
3, ring beam reinforcing steel bar 4, lower wall body.
Detailed description of the invention
Referring to drawings and Examples, the present invention will be described in detail:
Accompanying drawing 1-2 is known, a kind of ring beam template brick, comprises template brick body 1, is provided with the groove 2 of through beam template brick body in the middle part of described template brick body 1; Described template brick body cross-section is U-shaped.
The bottom of described groove 2 is arc surface.
Described template brick body 1 is rectangular, and described groove 2 is arranged along template brick body length direction.
Described template brick body 1 is in L-type.
Described template brick body 1 is in circular arc type.
A kind of building secondary structure infilled wall collar tie beam construction method, comprises the steps:
Build lower wall body 4 by laying bricks or stones, build lower wall body 4 by laying bricks or stones design height;
Build template brick by laying bricks or stones at lower wall body 4 top, in the middle part of described template brick body, be provided with the groove of through beam template brick body; Described template brick body cross-section is U-shaped;
Upwards, described groove is arranged along body of wall length direction in described template brick openend; Described adjacent forms brick end face is bonded to each other;
Described template brick is at the top looping groove of lower wall body;
Ring beam reinforcing steel bar 3 is set in annular groove;
Collar tie beam concreting is carried out in annular groove;
Concreting is complete, after concrete setting, can proceed the building construction of collar tie beam upper wall body.
Building secondary structure infilled wall collar tie beam construction method of the present invention, easy construction, can not damage the following body of wall of collar tie beam during construction; Save material and reduce construction cost, avoiding the waste of template, flitch, reducing lease or the buying expenses of template clamping, reducing ring beam template and install and the labour cost of removing; Construction, without hidden danger of quality, there will not be collar tie beam concrete to rise the mass defects such as mould, and raising construction speed, collar tie beam top and the bottom body of wall can sequential production.
Secondary structure infilled wall collar tie beam construction method Specific construction process of the present invention is as follows:
One, the specification of ring beam template brick is selected
According to the specific requirement of secondary structure building wall engineering, select the sizing brick identical with masonry panel width, and according to the feature of body of wall and mechanical requirements, the depth of groove, the brick wall that calculate brick of determining to shape are thick.
Two, processing customization brick template
The shaping type ring beam template brick size gone out designed by requiring according to mechanics and other, selects to make shaping type template brick with masonry panel same material, according to engineering construction consumption, and can be mass customized.
Three, the building construction of typified form brick
Building by laying bricks or stones of ring beam template brick, identical with general secondary structure building wall construction method, shaping type template brick is built by laying bricks or stones at collar tie beam level locations, template frog is unified upwards, ring beam reinforcing steel bar is arranged in template frog after building by laying bricks or stones, after ring beam reinforcing steel bar acceptance(check), carry out collar tie beam concreting, after solidifying after concreting, just can proceed the building construction of collar tie beam upper wall body.

Claims (6)

1. a ring beam template brick, is characterized in that: comprise template brick body, is provided with the groove of through beam template brick body in the middle part of described template brick body; Described template brick body cross-section is U-shaped.
2. ring beam template brick according to claim 1, is characterized in that: the bottom of described groove is arc surface.
3. ring beam template brick according to claim 1, it is characterized in that: described template brick body is rectangular, described groove is arranged along template brick body length direction.
4. ring beam template brick according to claim 1, is characterized in that: described template brick body is L-type.
5. ring beam template brick according to claim 1, is characterized in that: described template brick body is circular arc type.
6. a building secondary structure infilled wall collar tie beam construction method, is characterized in that: comprise the steps:
Build lower wall body by laying bricks or stones, build lower wall body by laying bricks or stones design height;
Build template brick by laying bricks or stones at lower wall body top, in the middle part of described template brick body, be provided with the groove of through beam template brick body; Described template brick body cross-section is U-shaped;
Upwards, described groove is arranged along body of wall length direction in described template brick openend; Described adjacent forms brick end face is bonded to each other;
Described template brick is at the top looping groove of lower wall body;
In annular groove, ring beam reinforcing steel bar is set;
Collar tie beam concreting is carried out in annular groove;
Concreting is complete, after concrete setting, can proceed the building construction of collar tie beam upper wall body.
CN201510921844.4A 2015-12-14 2015-12-14 Ring beam formwork bricks and building secondary structure filler wall ring beam construction method Pending CN105484421A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510921844.4A CN105484421A (en) 2015-12-14 2015-12-14 Ring beam formwork bricks and building secondary structure filler wall ring beam construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510921844.4A CN105484421A (en) 2015-12-14 2015-12-14 Ring beam formwork bricks and building secondary structure filler wall ring beam construction method

Publications (1)

Publication Number Publication Date
CN105484421A true CN105484421A (en) 2016-04-13

Family

ID=55671669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510921844.4A Pending CN105484421A (en) 2015-12-14 2015-12-14 Ring beam formwork bricks and building secondary structure filler wall ring beam construction method

Country Status (1)

Country Link
CN (1) CN105484421A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049751A (en) * 2016-06-28 2016-10-26 中天建设集团有限公司 Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip
CN107327019A (en) * 2017-07-05 2017-11-07 宁波二十冶建设有限公司 One kind exempts from template cast-in-situ steel reinforced concrete collar tie beam structure and its construction method
CN110541520A (en) * 2019-09-02 2019-12-06 威海建设集团股份有限公司 construction method of horizontal component of secondary structure of building engineering wall
CN111075101A (en) * 2019-12-12 2020-04-28 中国建筑第五工程局有限公司 BM interlocking building block U-shaped block lintel, ring beam and horizontal tie beam and construction method thereof
CN112962863A (en) * 2021-02-08 2021-06-15 江西科技学院 Construction method of semi-prefabricated ring beam and semi-prefabricated ring beam structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007128082A1 (en) * 2006-05-10 2007-11-15 Benex Technologies Pty Ltd Improvements relating to a concrete masonry hollow block
CN103122672A (en) * 2013-01-10 2013-05-29 梁振东 Ring beam brick
CN203213379U (en) * 2013-01-22 2013-09-25 山东农业大学 Heat-preserving and heat-insulating type concrete ring beam template building block
CN204040301U (en) * 2014-09-03 2014-12-24 中国建筑第四工程局有限公司 The building block of a kind of loop beam forms

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007128082A1 (en) * 2006-05-10 2007-11-15 Benex Technologies Pty Ltd Improvements relating to a concrete masonry hollow block
CN103122672A (en) * 2013-01-10 2013-05-29 梁振东 Ring beam brick
CN203213379U (en) * 2013-01-22 2013-09-25 山东农业大学 Heat-preserving and heat-insulating type concrete ring beam template building block
CN204040301U (en) * 2014-09-03 2014-12-24 中国建筑第四工程局有限公司 The building block of a kind of loop beam forms

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049751A (en) * 2016-06-28 2016-10-26 中天建设集团有限公司 Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip
CN107327019A (en) * 2017-07-05 2017-11-07 宁波二十冶建设有限公司 One kind exempts from template cast-in-situ steel reinforced concrete collar tie beam structure and its construction method
CN110541520A (en) * 2019-09-02 2019-12-06 威海建设集团股份有限公司 construction method of horizontal component of secondary structure of building engineering wall
CN110541520B (en) * 2019-09-02 2021-06-01 威海建设集团股份有限公司 Construction method of horizontal component of secondary structure of building engineering wall
CN111075101A (en) * 2019-12-12 2020-04-28 中国建筑第五工程局有限公司 BM interlocking building block U-shaped block lintel, ring beam and horizontal tie beam and construction method thereof
CN112962863A (en) * 2021-02-08 2021-06-15 江西科技学院 Construction method of semi-prefabricated ring beam and semi-prefabricated ring beam structure

Similar Documents

Publication Publication Date Title
CN105484421A (en) Ring beam formwork bricks and building secondary structure filler wall ring beam construction method
CN103669562A (en) Cantilever bay window board concrete overall pouring structure and construction method thereof
CN106245821B (en) A kind of lightweight steel construction lightweight concrete prefabrication and assembly construction wall and its construction method
CN105952148A (en) Easy-to-demount inner aluminum form support system for narrow deformation joint and construction method
CN110107080A (en) A kind of basement unilateral side shear wall formwork reinforcement means
CN103306463B (en) Metal liner concrete air channel construction method
CN103556819A (en) Construction method for reserving constructional column holes in beam plate
CN112726878A (en) Formwork-erecting-free construction method for masonry filler wall constructional column, prefabricated module and mould
CN106285002A (en) Cast-in-place walls difference of height tool-type hoisting die construction method
CN107905424A (en) Full prefabricated band splicing groove unidirectional harden structure, making and assembly method
CN108571166A (en) A kind of deformation joint formwork construction method
CN202483061U (en) Post-cast strip supporting formwork
CN113898102A (en) Ribbed concrete laminated slab
CN102409848A (en) Construction molding methods for light-weight ribbed floorslab and light-weight ribbed floor
CN103696437B (en) A kind of construction method of cutting lattice column
CN205712565U (en) A kind of prefabricated two-sided wall
CN105064500A (en) Balcony beam slab inner side filling wall body and main body structure integral casting construction method
CN102605988B (en) Synchronous construction method for chimney lining external concrete
CN204311649U (en) Prefabrication and assembly construction boxlike reinforcement side fascia with ribbing and exterior wall
CN107042575A (en) A kind of umbrella skeleton support assembled core and prefabricated component manufacture method
CN107882243B (en) A kind of cassette ceiling and construction method of concrete-filled rectangular steel tube waffle beam structure
CN207469596U (en) A kind of beam column outer rim is exempted to tear concrete mold open
CN107939094B (en) Conical concrete funnel construction method
CN106320662B (en) Decorating outer wall of building ultra-wide concrete wire construction method
CN205875714U (en) A consolidate fixture for retainer plate beam mold board

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160413