CN106049751A - Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip - Google Patents

Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip Download PDF

Info

Publication number
CN106049751A
CN106049751A CN201610508370.5A CN201610508370A CN106049751A CN 106049751 A CN106049751 A CN 106049751A CN 201610508370 A CN201610508370 A CN 201610508370A CN 106049751 A CN106049751 A CN 106049751A
Authority
CN
China
Prior art keywords
groove
steel
preformed bricks
bricks
side form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610508370.5A
Other languages
Chinese (zh)
Inventor
吴少平
邓志峰
彭建良
彭亮
关天定
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201610508370.5A priority Critical patent/CN106049751A/en
Publication of CN106049751A publication Critical patent/CN106049751A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • B28B7/0014Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/16Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
    • B28B7/162Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes for building blocks or similar block-shaped articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/28Cores; Mandrels

Abstract

The invention discloses a manufacturing method of a ring beam or plate strip of an aerated block. The manufacturing method is characterized by comprising the following steps: constructing prefabricated bricks with grooves on aerated blocks, wherein the groove openings of the prefabricated bricks face upwards; after the construction is completed, forming a through groove in each prefabricated brick; arraigning stressed reinforced ribs inside the through grooves, and casting concrete into the through grooves, thereby forming the ring beam or plate strip of the aerated block. The invention further discloses a special prefabricated brick. In construction of the ring beam or the plate strip, no support mold or concrete maintenance is needed, continuous construction of an upper-layer structure of the ring beam or the plate strip is not affected, and the construction cycle can be effectively shortened. Meanwhile, the prefabricated brick is flexible and simple to operate, the construction efficiency of engineering is greatly improved, the cost can be lowered, and the construction is safe and reliable.

Description

The collar tie beam of a kind of aerated blocks or the manufacture method of strip and special precast brick thereof
Technical field
The present invention relates to the technical field of a kind of engineering construction, specifically the collar tie beam of aerated blocks or the manufacturer of strip Method and the technology of special precast brick thereof.
Background technology
Aerated blocks concrete is that one is light porous, insulation, fire protecting performance good, can follow closely, can saw, can dig and have The New Building Materials of certain shock resistance, are therefore used widely.The collar tie beam and strip construction of aerated blocks often need Want formwork, lay reinforcing bar and casting concrete, arrive form removal proceed collar tie beam or plate after design requires until concrete curing Construction with above section.The maintenance of this construction method Girth or the formwork of strip and concrete is built to projects undoubtedly If bringing certain delay and delayed, advocating under energy-efficient green building construction background current, conventional construction method is obvious Have much room for improvement.
Summary of the invention
The present invention is for overcoming the deficiencies in the prior art, it is provided that the collar tie beam of a kind of aerated blocks or the manufacture method of strip, i.e. exists In the construction of strip or collar tie beam, it is not necessary to formwork and wait maintenance, preformed bricks constructing operation is simple flexibly, can be effectively improved engineering and execute Work efficiency rate.
The technical scheme that the present invention takes:
The collar tie beam of a kind of aerated blocks or the manufacture method of strip, it is characterised in that on aerated blocks, build preformed bricks with groove by laying bricks or stones, Upward, after having built by laying bricks or stones, each preformed bricks forms a through groove to preformed bricks groove port, arranges stress steel in through groove Muscle, and in through groove casting concrete thus form collar tie beam or the strip of aerated blocks.
After through groove inner concrete has poured, the aerated blocks on upper strata at the collar tie beam formed or strip build by laying bricks or stones in In described preformed bricks with groove.
Described preformed bricks with groove is made by preformed bricks processing mold, described preformed bricks processing mold, uses and spells Block makes: formed by die combination in the steel side form of two sideband spikes and the steel of beneath band handle, the wherein steel of two sideband spikes Side form is respectively left steel side form and right steel side form, and in the steel of band handle, mould is placed between left steel side form and right steel side form, mould in steel The preformed bricks making molding forms described groove.
The invention provides a kind of special preformed bricks, simple in construction, make simple, low cost.
A kind of preformed bricks, it is characterised in that this preformed bricks is used for strip or the construction of collar tie beam, the described preformed bricks of aerated blocks It is provided with groove, is used in groove arranging steel bar stress and casting concrete.
Described preformed bricks is built by laying bricks or stones on aerated blocks, and groove port is upward, and each preformed bricks is formed through recessed after completing to build by laying bricks or stones The steel bar stress of groove, collar tie beam or strip is arranged in described through groove by design requirement, and pours in through groove Concrete.
Described preformed bricks is formed by preformed bricks processing mold is prefabricated, described preformed bricks processing mold, uses piece to make: by In the steel side form of two sideband spikes and the steel of beneath band handle, die combination forms, and wherein the steel side form of two sideband spikes is respectively Left steel side form and right steel side form, in the steel of band handle, mould is placed between left steel side form and right steel side form, and in steel, mould makes the pre-of molding Brickmaking forms described groove.
Described preformed bricks is a kind of concrete prefabricated brick with groove.
The present invention is applied to the strip of aerated blocks or the construction of collar tie beam, by placing steel bar stress on the groove of preformed bricks Collar tie beam or strip is formed with casting concrete.The aerated blocks on upper strata can be propped in these preformed bricks two ends, is arranging reinforcing bar and is pouring mixed Collar tie beam or the construction on strip upper strata can be proceeded after solidifying soil.The present invention in the construction of collar tie beam or strip without formwork and wait Concrete curing, and constructing operation is simple, can be effectively improved engineering integral construction efficiency and reduce cost.
Accompanying drawing explanation
The processing mold transverse cross-sectional view of Fig. 1 preformed bricks of the present invention;
The processing mold longitudinal sectional drawing of Fig. 2 preformed bricks of the present invention;
Preformed bricks structural representation in Fig. 3 present invention;
The actual application drawing of the preformed bricks in Fig. 4 present invention.
As Figure 1-Figure 4,1 be cross form spike, 2 be mould handle in steel, 3 be mould in steel, 4 pre-for concrete strip Brickmaking, 5 be horizontal steel side form, 6 for vertical framework spike, 7 be longitudinal steel side form, 8 be middle part partition template, 9 be aerated blocks, 10 For masonry mortar, 11 be reinforcing bar, 12 for casting concrete.
Detailed description of the invention
The collar tie beam of aerated blocks of the present invention or the manufacture method of strip, build preformed bricks with groove on aerated blocks by laying bricks or stones, prefabricated Upward, after having built by laying bricks or stones, each preformed bricks forms a through groove to frog mouth, arranges steel bar stress in through groove, and Casting concrete in through groove thus form collar tie beam or the strip of aerated blocks.Pour at through groove inner concrete Cheng Hou, the aerated blocks at the collar tie beam formed or the upper strata of strip is built by laying bricks or stones in described preformed bricks with groove.
Preformed bricks with groove is made by preformed bricks processing mold, described preformed bricks processing mold, uses piece system Make: formed by die combination in the steel side form of two sideband spikes and the steel of beneath band handle, the wherein steel side form of two sideband spikes Being respectively left steel side form and right steel side form, in the steel of band handle, mould is placed between left steel side form and right steel side form, and in steel, mould makes into The preformed bricks of type forms described groove.
Present invention also offers a kind of special preformed bricks, simple in construction, make simple, low cost: this preformed bricks is used for The strip of aerated blocks or the construction of collar tie beam, described preformed bricks is provided with groove, be used for arranging steel bar stress in groove with pour mixed Solidifying soil.Preformed bricks is built by laying bricks or stones on aerated blocks, and groove port is upward, and each preformed bricks forms through groove, collar tie beam after completing to build by laying bricks or stones Or the steel bar stress of strip is arranged in described through groove by design requirement, and casting concrete in through groove. Preformed bricks is formed by preformed bricks processing mold is prefabricated, described preformed bricks processing mold, uses piece to make: by two sideband spikes In the steel of steel side form and beneath band handle, die combination forms, and wherein the steel side form of two sideband spikes is respectively left steel side form with right Steel side form, in the steel of band handle, mould is placed between left steel side form and right steel side form, and in steel, to make the preformed bricks of molding be formed described for mould Groove.This preformed bricks is a kind of concrete prefabricated brick with groove.
Preformed bricks of the present invention is a kind of concrete prefabricated brick with groove, builds by laying bricks or stones on aerated blocks, and by advance Place steel bar stress in the groove of brickmaking and casting concrete forms collar tie beam or strip, simultaneously because these preformed bricks two ends can be propped The construction of the aerated blocks on upper strata, collar tie beam and strip is without formwork and waits concrete curing, does not affect the upper strata of collar tie beam and strip Structure continues construction, effectively shortens the construction period.This preformed bricks constructing operation is simple flexibly simultaneously, and engineering construction effect is greatly improved Rate, reduces cost, and safe and reliable.
Comparison accompanying drawing, illustrates.
Preformed bricks processing mold in the present invention, including left side mould, right side mould and Nei Mo, left side mould, right side mould set relatively Putting, be provided with spacing distance between left side mould and right side mould, interior mould is located between left side mould and right side mould, between Nei Mo and left side mould Being provided with spacing distance, be provided with spacing distance between Nei Mo and right side mould, interior mould makes the preformed bricks of molding be formed with groove.Left side mould With right side mould all with spike, left side mould and right side mould are supported fixing by respective spike and vertical erect, and described interior mould carries There is handle.Left side mould is left steel side form, and right side mould is right steel side form, left steel side form and right steel side form each with spike be referred to as Cross form spike 1, interior mould is mould 3 in steel, and handle thereon is mould handle 2 in steel.Described left steel side form with right steel side form is Aforementioned lateral steel side form 5, respectively one bar shaped side plate, left steel side form and spike thereof be welded to connect on a base, right steel side form And spike is welded to connect on a base, left steel side form and the both ends of right steel side form are provided with the most longitudinal steel of end steel side form Side form 7, end steel side form is with spike and is welded to connect on a base, along the length direction of left steel side form Yu right steel side form Interval dividing plate is set, be middle part cut off template 8, end steel side form with spike be vertical framework spike 6.
Such as Fig. 4, in strip or the construction of collar tie beam of aerated blocks, the size of the outer length and width of concrete strip preformed bricks 4 can root Design requirement according to collar tie beam or plate to determine;Described preformed bricks is built by laying bricks or stones on aerated blocks, and groove port is upward;Preformed bricks completes to build by laying bricks or stones After, the steel bar stress of collar tie beam or strip is arranged in the through groove that each preformed bricks is formed by design requirement;And through Casting concrete in groove;Owing to the groove two side of preformed bricks is supporting, so after groove concreting completes, collar tie beam Or the aerated blocks on strip upper strata can build by laying bricks or stones in preformed bricks at once.

Claims (7)

1. the collar tie beam of an aerated blocks or the manufacture method of strip, it is characterised in that build by laying bricks or stones with groove prefabricated on aerated blocks Brick, upward, after having built by laying bricks or stones, each preformed bricks is collectively forming a through groove, in the groove that this is through to each preformed bricks groove port Arrange steel bar stress, and in the groove that this is through casting concrete thus form collar tie beam or the strip of aerated blocks.
The collar tie beam of aerated blocks or the manufacture method of strip the most according to claim 1, it is characterised in that described through recessed After groove inner concrete has poured, the aerated blocks at the described collar tie beam formed or the upper strata of strip is built by laying bricks or stones in described with groove pre- In brickmaking.
The collar tie beam of aerated blocks or the manufacture method of strip the most according to claim 1, it is characterised in that described with groove pre- Brickmaking is made by preformed bricks processing mold, described preformed bricks processing mold, uses piece to make: by the steel of two sideband spikes In the steel of side form and band handle, die combination forms, and wherein the steel side form of two sideband spikes is respectively left steel side form and right steel side Mould, in the steel of band handle, mould is placed between left steel side form and right steel side form, and in the steel of band handle, mould makes the preformed bricks of molding be formed Described groove.
4. a preformed bricks, it is characterised in that this preformed bricks is used for strip or the construction of collar tie beam of aerated blocks, to form aerated blocks Collar tie beam or strip, described preformed bricks is provided with groove, is used for arranging steel bar stress and casting concrete in groove.
Preformed bricks the most according to claim 4, it is characterised in that described preformed bricks is built by laying bricks or stones on aerated blocks, and groove port court On, each preformed bricks forms the steel bar stress of through groove, collar tie beam or strip and is arranged in described by design requirement after completing to build by laying bricks or stones In through groove, and casting concrete in through groove.
Preformed bricks the most according to claim 4, it is characterised in that described preformed bricks is formed by preformed bricks processing mold is prefabricated, institute State preformed bricks processing mold, use piece to make: by die combination in the steel side form of two sideband spikes and the steel of beneath band handle Forming, wherein the steel side form of two sideband spikes is respectively left steel side form and right steel side form, and in the steel of band handle, mould is placed in left steel side Between mould and right steel side form, in the steel of band handle, mould makes the preformed bricks of molding form described groove.
Preformed bricks the most according to claim 6, it is characterised in that described preformed bricks is concrete prefabricated brick.
CN201610508370.5A 2016-06-28 2016-06-28 Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip Pending CN106049751A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610508370.5A CN106049751A (en) 2016-06-28 2016-06-28 Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610508370.5A CN106049751A (en) 2016-06-28 2016-06-28 Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip

Publications (1)

Publication Number Publication Date
CN106049751A true CN106049751A (en) 2016-10-26

Family

ID=57200582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610508370.5A Pending CN106049751A (en) 2016-06-28 2016-06-28 Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip

Country Status (1)

Country Link
CN (1) CN106049751A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110142852A (en) * 2019-06-27 2019-08-20 中核华辰建筑工程有限公司 A kind of c-type concrete stock mould production equipment and its use technique

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2239997Y (en) * 1995-08-28 1996-11-13 周长春 Ring beam capable of making prefabricated floor slab monolithic pure at the support
WO2004009925A1 (en) * 1999-12-21 2004-01-29 Dial Ted C Jr Block system
CN204748883U (en) * 2015-06-30 2015-11-11 郑州远东耐火材料有限公司 Founding zirconium corundum silo brick die utensil
CN105484421A (en) * 2015-12-14 2016-04-13 二十二冶集团第一建设有限公司 Ring beam formwork bricks and building secondary structure filler wall ring beam construction method
CN206016054U (en) * 2016-06-28 2017-03-15 中天建设集团有限公司 A kind of collar tie beam of aerated blocks or strip and preformed bricks

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2239997Y (en) * 1995-08-28 1996-11-13 周长春 Ring beam capable of making prefabricated floor slab monolithic pure at the support
WO2004009925A1 (en) * 1999-12-21 2004-01-29 Dial Ted C Jr Block system
CN204748883U (en) * 2015-06-30 2015-11-11 郑州远东耐火材料有限公司 Founding zirconium corundum silo brick die utensil
CN105484421A (en) * 2015-12-14 2016-04-13 二十二冶集团第一建设有限公司 Ring beam formwork bricks and building secondary structure filler wall ring beam construction method
CN206016054U (en) * 2016-06-28 2017-03-15 中天建设集团有限公司 A kind of collar tie beam of aerated blocks or strip and preformed bricks

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110142852A (en) * 2019-06-27 2019-08-20 中核华辰建筑工程有限公司 A kind of c-type concrete stock mould production equipment and its use technique

Similar Documents

Publication Publication Date Title
CN106013531B (en) The concrete shear wall structure based on 3D printing with concave convex texture
US9518388B1 (en) Construction method for producing beam and slab made of compound concrete containing demolished concrete
CN104532985B (en) Shear wall cast with tenon-and-mortise precast concrete blocks replacing formworks and construction method thereof
CN110439137A (en) Prefabricated panel, wall and prefabricated panel production method, precast wall body construction method
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN105464382A (en) Building block and constructional column integrated construction method and constructional column formwork building block
CN105064548A (en) Wall structure of dismounting-free constructional column formwork and construction method of wall structure
CN206681202U (en) For filling the prefabricated steel wire net rack integrated board self-heat conserving structure of wall
CN105113706A (en) Reinforced truss gypsum plate with insulation layer, novel dismantling-free formwork and their construction method
CN101220617A (en) Heat preserving wall foaming in place and construction method
CN208618661U (en) Pillar structure based on hollow masonry
CN106049751A (en) Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip
CN206016054U (en) A kind of collar tie beam of aerated blocks or strip and preformed bricks
CN108343234B (en) Modification module capable of being used as cast-in-situ ring beam template of hollow block masonry and application thereof
CN106703278A (en) Combined hollow block brickwork wall body and construction method thereof
CN209669686U (en) A kind of box beam head assembled plugging structure
KR20110050898A (en) Vertical joint frame for improving monolithic concrete
CN108756016A (en) A kind of construction method for making secondary structure beam form with U-shaped building block
CN201068619Y (en) Dedicated collar beam, trim joist building blocks with heat-insulating layer
CN206011405U (en) A kind of aerated blocks strip preformed bricks processing mold
CN210797967U (en) Novel precast concrete module formwork constructional column structure
CN202689278U (en) Superimposed hollow slab
CN108843016B (en) Shear wall template internal stay and tie bar combined type component and method
CN205444666U (en) Prefabricated thermal insulation wall component
CN212153437U (en) Steel bar connection structure for large-volume concrete bearing platform post-cast strip construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161026

WD01 Invention patent application deemed withdrawn after publication