CN106049751A - Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip - Google Patents
Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip Download PDFInfo
- Publication number
- CN106049751A CN106049751A CN201610508370.5A CN201610508370A CN106049751A CN 106049751 A CN106049751 A CN 106049751A CN 201610508370 A CN201610508370 A CN 201610508370A CN 106049751 A CN106049751 A CN 106049751A
- Authority
- CN
- China
- Prior art keywords
- groove
- steel
- preformed bricks
- bricks
- side form
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0002—Auxiliary parts or elements of the mould
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0002—Auxiliary parts or elements of the mould
- B28B7/0014—Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/16—Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
- B28B7/162—Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes for building blocks or similar block-shaped articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/28—Cores; Mandrels
Abstract
The invention discloses a manufacturing method of a ring beam or plate strip of an aerated block. The manufacturing method is characterized by comprising the following steps: constructing prefabricated bricks with grooves on aerated blocks, wherein the groove openings of the prefabricated bricks face upwards; after the construction is completed, forming a through groove in each prefabricated brick; arraigning stressed reinforced ribs inside the through grooves, and casting concrete into the through grooves, thereby forming the ring beam or plate strip of the aerated block. The invention further discloses a special prefabricated brick. In construction of the ring beam or the plate strip, no support mold or concrete maintenance is needed, continuous construction of an upper-layer structure of the ring beam or the plate strip is not affected, and the construction cycle can be effectively shortened. Meanwhile, the prefabricated brick is flexible and simple to operate, the construction efficiency of engineering is greatly improved, the cost can be lowered, and the construction is safe and reliable.
Description
Technical field
The present invention relates to the technical field of a kind of engineering construction, specifically the collar tie beam of aerated blocks or the manufacturer of strip
Method and the technology of special precast brick thereof.
Background technology
Aerated blocks concrete is that one is light porous, insulation, fire protecting performance good, can follow closely, can saw, can dig and have
The New Building Materials of certain shock resistance, are therefore used widely.The collar tie beam and strip construction of aerated blocks often need
Want formwork, lay reinforcing bar and casting concrete, arrive form removal proceed collar tie beam or plate after design requires until concrete curing
Construction with above section.The maintenance of this construction method Girth or the formwork of strip and concrete is built to projects undoubtedly
If bringing certain delay and delayed, advocating under energy-efficient green building construction background current, conventional construction method is obvious
Have much room for improvement.
Summary of the invention
The present invention is for overcoming the deficiencies in the prior art, it is provided that the collar tie beam of a kind of aerated blocks or the manufacture method of strip, i.e. exists
In the construction of strip or collar tie beam, it is not necessary to formwork and wait maintenance, preformed bricks constructing operation is simple flexibly, can be effectively improved engineering and execute
Work efficiency rate.
The technical scheme that the present invention takes:
The collar tie beam of a kind of aerated blocks or the manufacture method of strip, it is characterised in that on aerated blocks, build preformed bricks with groove by laying bricks or stones,
Upward, after having built by laying bricks or stones, each preformed bricks forms a through groove to preformed bricks groove port, arranges stress steel in through groove
Muscle, and in through groove casting concrete thus form collar tie beam or the strip of aerated blocks.
After through groove inner concrete has poured, the aerated blocks on upper strata at the collar tie beam formed or strip build by laying bricks or stones in
In described preformed bricks with groove.
Described preformed bricks with groove is made by preformed bricks processing mold, described preformed bricks processing mold, uses and spells
Block makes: formed by die combination in the steel side form of two sideband spikes and the steel of beneath band handle, the wherein steel of two sideband spikes
Side form is respectively left steel side form and right steel side form, and in the steel of band handle, mould is placed between left steel side form and right steel side form, mould in steel
The preformed bricks making molding forms described groove.
The invention provides a kind of special preformed bricks, simple in construction, make simple, low cost.
A kind of preformed bricks, it is characterised in that this preformed bricks is used for strip or the construction of collar tie beam, the described preformed bricks of aerated blocks
It is provided with groove, is used in groove arranging steel bar stress and casting concrete.
Described preformed bricks is built by laying bricks or stones on aerated blocks, and groove port is upward, and each preformed bricks is formed through recessed after completing to build by laying bricks or stones
The steel bar stress of groove, collar tie beam or strip is arranged in described through groove by design requirement, and pours in through groove
Concrete.
Described preformed bricks is formed by preformed bricks processing mold is prefabricated, described preformed bricks processing mold, uses piece to make: by
In the steel side form of two sideband spikes and the steel of beneath band handle, die combination forms, and wherein the steel side form of two sideband spikes is respectively
Left steel side form and right steel side form, in the steel of band handle, mould is placed between left steel side form and right steel side form, and in steel, mould makes the pre-of molding
Brickmaking forms described groove.
Described preformed bricks is a kind of concrete prefabricated brick with groove.
The present invention is applied to the strip of aerated blocks or the construction of collar tie beam, by placing steel bar stress on the groove of preformed bricks
Collar tie beam or strip is formed with casting concrete.The aerated blocks on upper strata can be propped in these preformed bricks two ends, is arranging reinforcing bar and is pouring mixed
Collar tie beam or the construction on strip upper strata can be proceeded after solidifying soil.The present invention in the construction of collar tie beam or strip without formwork and wait
Concrete curing, and constructing operation is simple, can be effectively improved engineering integral construction efficiency and reduce cost.
Accompanying drawing explanation
The processing mold transverse cross-sectional view of Fig. 1 preformed bricks of the present invention;
The processing mold longitudinal sectional drawing of Fig. 2 preformed bricks of the present invention;
Preformed bricks structural representation in Fig. 3 present invention;
The actual application drawing of the preformed bricks in Fig. 4 present invention.
As Figure 1-Figure 4,1 be cross form spike, 2 be mould handle in steel, 3 be mould in steel, 4 pre-for concrete strip
Brickmaking, 5 be horizontal steel side form, 6 for vertical framework spike, 7 be longitudinal steel side form, 8 be middle part partition template, 9 be aerated blocks, 10
For masonry mortar, 11 be reinforcing bar, 12 for casting concrete.
Detailed description of the invention
The collar tie beam of aerated blocks of the present invention or the manufacture method of strip, build preformed bricks with groove on aerated blocks by laying bricks or stones, prefabricated
Upward, after having built by laying bricks or stones, each preformed bricks forms a through groove to frog mouth, arranges steel bar stress in through groove, and
Casting concrete in through groove thus form collar tie beam or the strip of aerated blocks.Pour at through groove inner concrete
Cheng Hou, the aerated blocks at the collar tie beam formed or the upper strata of strip is built by laying bricks or stones in described preformed bricks with groove.
Preformed bricks with groove is made by preformed bricks processing mold, described preformed bricks processing mold, uses piece system
Make: formed by die combination in the steel side form of two sideband spikes and the steel of beneath band handle, the wherein steel side form of two sideband spikes
Being respectively left steel side form and right steel side form, in the steel of band handle, mould is placed between left steel side form and right steel side form, and in steel, mould makes into
The preformed bricks of type forms described groove.
Present invention also offers a kind of special preformed bricks, simple in construction, make simple, low cost: this preformed bricks is used for
The strip of aerated blocks or the construction of collar tie beam, described preformed bricks is provided with groove, be used for arranging steel bar stress in groove with pour mixed
Solidifying soil.Preformed bricks is built by laying bricks or stones on aerated blocks, and groove port is upward, and each preformed bricks forms through groove, collar tie beam after completing to build by laying bricks or stones
Or the steel bar stress of strip is arranged in described through groove by design requirement, and casting concrete in through groove.
Preformed bricks is formed by preformed bricks processing mold is prefabricated, described preformed bricks processing mold, uses piece to make: by two sideband spikes
In the steel of steel side form and beneath band handle, die combination forms, and wherein the steel side form of two sideband spikes is respectively left steel side form with right
Steel side form, in the steel of band handle, mould is placed between left steel side form and right steel side form, and in steel, to make the preformed bricks of molding be formed described for mould
Groove.This preformed bricks is a kind of concrete prefabricated brick with groove.
Preformed bricks of the present invention is a kind of concrete prefabricated brick with groove, builds by laying bricks or stones on aerated blocks, and by advance
Place steel bar stress in the groove of brickmaking and casting concrete forms collar tie beam or strip, simultaneously because these preformed bricks two ends can be propped
The construction of the aerated blocks on upper strata, collar tie beam and strip is without formwork and waits concrete curing, does not affect the upper strata of collar tie beam and strip
Structure continues construction, effectively shortens the construction period.This preformed bricks constructing operation is simple flexibly simultaneously, and engineering construction effect is greatly improved
Rate, reduces cost, and safe and reliable.
Comparison accompanying drawing, illustrates.
Preformed bricks processing mold in the present invention, including left side mould, right side mould and Nei Mo, left side mould, right side mould set relatively
Putting, be provided with spacing distance between left side mould and right side mould, interior mould is located between left side mould and right side mould, between Nei Mo and left side mould
Being provided with spacing distance, be provided with spacing distance between Nei Mo and right side mould, interior mould makes the preformed bricks of molding be formed with groove.Left side mould
With right side mould all with spike, left side mould and right side mould are supported fixing by respective spike and vertical erect, and described interior mould carries
There is handle.Left side mould is left steel side form, and right side mould is right steel side form, left steel side form and right steel side form each with spike be referred to as
Cross form spike 1, interior mould is mould 3 in steel, and handle thereon is mould handle 2 in steel.Described left steel side form with right steel side form is
Aforementioned lateral steel side form 5, respectively one bar shaped side plate, left steel side form and spike thereof be welded to connect on a base, right steel side form
And spike is welded to connect on a base, left steel side form and the both ends of right steel side form are provided with the most longitudinal steel of end steel side form
Side form 7, end steel side form is with spike and is welded to connect on a base, along the length direction of left steel side form Yu right steel side form
Interval dividing plate is set, be middle part cut off template 8, end steel side form with spike be vertical framework spike 6.
Such as Fig. 4, in strip or the construction of collar tie beam of aerated blocks, the size of the outer length and width of concrete strip preformed bricks 4 can root
Design requirement according to collar tie beam or plate to determine;Described preformed bricks is built by laying bricks or stones on aerated blocks, and groove port is upward;Preformed bricks completes to build by laying bricks or stones
After, the steel bar stress of collar tie beam or strip is arranged in the through groove that each preformed bricks is formed by design requirement;And through
Casting concrete in groove;Owing to the groove two side of preformed bricks is supporting, so after groove concreting completes, collar tie beam
Or the aerated blocks on strip upper strata can build by laying bricks or stones in preformed bricks at once.
Claims (7)
1. the collar tie beam of an aerated blocks or the manufacture method of strip, it is characterised in that build by laying bricks or stones with groove prefabricated on aerated blocks
Brick, upward, after having built by laying bricks or stones, each preformed bricks is collectively forming a through groove, in the groove that this is through to each preformed bricks groove port
Arrange steel bar stress, and in the groove that this is through casting concrete thus form collar tie beam or the strip of aerated blocks.
The collar tie beam of aerated blocks or the manufacture method of strip the most according to claim 1, it is characterised in that described through recessed
After groove inner concrete has poured, the aerated blocks at the described collar tie beam formed or the upper strata of strip is built by laying bricks or stones in described with groove pre-
In brickmaking.
The collar tie beam of aerated blocks or the manufacture method of strip the most according to claim 1, it is characterised in that described with groove pre-
Brickmaking is made by preformed bricks processing mold, described preformed bricks processing mold, uses piece to make: by the steel of two sideband spikes
In the steel of side form and band handle, die combination forms, and wherein the steel side form of two sideband spikes is respectively left steel side form and right steel side
Mould, in the steel of band handle, mould is placed between left steel side form and right steel side form, and in the steel of band handle, mould makes the preformed bricks of molding be formed
Described groove.
4. a preformed bricks, it is characterised in that this preformed bricks is used for strip or the construction of collar tie beam of aerated blocks, to form aerated blocks
Collar tie beam or strip, described preformed bricks is provided with groove, is used for arranging steel bar stress and casting concrete in groove.
Preformed bricks the most according to claim 4, it is characterised in that described preformed bricks is built by laying bricks or stones on aerated blocks, and groove port court
On, each preformed bricks forms the steel bar stress of through groove, collar tie beam or strip and is arranged in described by design requirement after completing to build by laying bricks or stones
In through groove, and casting concrete in through groove.
Preformed bricks the most according to claim 4, it is characterised in that described preformed bricks is formed by preformed bricks processing mold is prefabricated, institute
State preformed bricks processing mold, use piece to make: by die combination in the steel side form of two sideband spikes and the steel of beneath band handle
Forming, wherein the steel side form of two sideband spikes is respectively left steel side form and right steel side form, and in the steel of band handle, mould is placed in left steel side
Between mould and right steel side form, in the steel of band handle, mould makes the preformed bricks of molding form described groove.
Preformed bricks the most according to claim 6, it is characterised in that described preformed bricks is concrete prefabricated brick.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610508370.5A CN106049751A (en) | 2016-06-28 | 2016-06-28 | Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610508370.5A CN106049751A (en) | 2016-06-28 | 2016-06-28 | Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106049751A true CN106049751A (en) | 2016-10-26 |
Family
ID=57200582
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610508370.5A Pending CN106049751A (en) | 2016-06-28 | 2016-06-28 | Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106049751A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110142852A (en) * | 2019-06-27 | 2019-08-20 | 中核华辰建筑工程有限公司 | A kind of c-type concrete stock mould production equipment and its use technique |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2239997Y (en) * | 1995-08-28 | 1996-11-13 | 周长春 | Ring beam capable of making prefabricated floor slab monolithic pure at the support |
WO2004009925A1 (en) * | 1999-12-21 | 2004-01-29 | Dial Ted C Jr | Block system |
CN204748883U (en) * | 2015-06-30 | 2015-11-11 | 郑州远东耐火材料有限公司 | Founding zirconium corundum silo brick die utensil |
CN105484421A (en) * | 2015-12-14 | 2016-04-13 | 二十二冶集团第一建设有限公司 | Ring beam formwork bricks and building secondary structure filler wall ring beam construction method |
CN206016054U (en) * | 2016-06-28 | 2017-03-15 | 中天建设集团有限公司 | A kind of collar tie beam of aerated blocks or strip and preformed bricks |
-
2016
- 2016-06-28 CN CN201610508370.5A patent/CN106049751A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2239997Y (en) * | 1995-08-28 | 1996-11-13 | 周长春 | Ring beam capable of making prefabricated floor slab monolithic pure at the support |
WO2004009925A1 (en) * | 1999-12-21 | 2004-01-29 | Dial Ted C Jr | Block system |
CN204748883U (en) * | 2015-06-30 | 2015-11-11 | 郑州远东耐火材料有限公司 | Founding zirconium corundum silo brick die utensil |
CN105484421A (en) * | 2015-12-14 | 2016-04-13 | 二十二冶集团第一建设有限公司 | Ring beam formwork bricks and building secondary structure filler wall ring beam construction method |
CN206016054U (en) * | 2016-06-28 | 2017-03-15 | 中天建设集团有限公司 | A kind of collar tie beam of aerated blocks or strip and preformed bricks |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110142852A (en) * | 2019-06-27 | 2019-08-20 | 中核华辰建筑工程有限公司 | A kind of c-type concrete stock mould production equipment and its use technique |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013531B (en) | The concrete shear wall structure based on 3D printing with concave convex texture | |
US9518388B1 (en) | Construction method for producing beam and slab made of compound concrete containing demolished concrete | |
CN104532985B (en) | Shear wall cast with tenon-and-mortise precast concrete blocks replacing formworks and construction method thereof | |
CN110439137A (en) | Prefabricated panel, wall and prefabricated panel production method, precast wall body construction method | |
CN103410317A (en) | Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part | |
CN105464382A (en) | Building block and constructional column integrated construction method and constructional column formwork building block | |
CN105064548A (en) | Wall structure of dismounting-free constructional column formwork and construction method of wall structure | |
CN206681202U (en) | For filling the prefabricated steel wire net rack integrated board self-heat conserving structure of wall | |
CN105113706A (en) | Reinforced truss gypsum plate with insulation layer, novel dismantling-free formwork and their construction method | |
CN101220617A (en) | Heat preserving wall foaming in place and construction method | |
CN208618661U (en) | Pillar structure based on hollow masonry | |
CN106049751A (en) | Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip | |
CN206016054U (en) | A kind of collar tie beam of aerated blocks or strip and preformed bricks | |
CN108343234B (en) | Modification module capable of being used as cast-in-situ ring beam template of hollow block masonry and application thereof | |
CN106703278A (en) | Combined hollow block brickwork wall body and construction method thereof | |
CN209669686U (en) | A kind of box beam head assembled plugging structure | |
KR20110050898A (en) | Vertical joint frame for improving monolithic concrete | |
CN108756016A (en) | A kind of construction method for making secondary structure beam form with U-shaped building block | |
CN201068619Y (en) | Dedicated collar beam, trim joist building blocks with heat-insulating layer | |
CN206011405U (en) | A kind of aerated blocks strip preformed bricks processing mold | |
CN210797967U (en) | Novel precast concrete module formwork constructional column structure | |
CN202689278U (en) | Superimposed hollow slab | |
CN108843016B (en) | Shear wall template internal stay and tie bar combined type component and method | |
CN205444666U (en) | Prefabricated thermal insulation wall component | |
CN212153437U (en) | Steel bar connection structure for large-volume concrete bearing platform post-cast strip construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161026 |
|
WD01 | Invention patent application deemed withdrawn after publication |