- Prior art keywords
- groove
- preformed bricks
- bricks
- steel
- strip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Moulds, Cores, Or Mandrels (AREA)
Abstract
The utility model discloses a kind of collar tie beam of aerated blocks or strip, it is characterized in that building preformed bricks with groove on aerated blocks by laying bricks or stones, preformed bricks groove port is upward, after the completion of building by laying bricks or stones, each preformed bricks form the groove of an insertion, arrange steel bar stress in the groove of insertion, and in the groove of insertion casting concrete so as to forming collar tie beam or the strip of aerated blocks.Also disclose special precast brick.This utility model without the need for formwork and waits concrete curing in the construction of collar tie beam and strip, does not affect collar tie beam and strip superstructure to continue construction, effectively shortens the construction period.Simultaneously preformed bricks constructing operation is flexibly simple, is greatly improved engineering construction efficiency, reduces cost, and safe and reliable.
Description
Technical field
The present invention relates to a kind of technical field of engineering construction, the specifically collar tie beam of aerated blocks or strip and preformed bricks
Technology.
Background technology
Aerating block concrete is a kind of light porous, insulation, fire protecting performance is good, can follow closely, can saw, can dig and have
The New Building Materials of certain shock resistance, are therefore used widely.Often need in the collar tie beam of aerated blocks and strip construction
Want formwork, lay reinforcing bar and casting concrete, after concrete curing reaches design requirement, form removal proceed collar tie beam or plate
Construction with above section.The maintenance of the formwork and concrete of this construction method Girth or strip is undoubtedly built to projects
If bring, in the case where energy-efficient green building construction background is currently advocated, conventional construction method is obvious
Have much room for improvement.
Content of the invention
The present invention is to overcome the deficiencies in the prior art, there is provided a kind of collar tie beam of aerated blocks or strip, the strip or collar tie beam
In construction, without the need for formwork and wait maintenance, preformed bricks constructing operation is flexibly simple, can effectively improve engineering construction efficiency.
The technical scheme that the present invention takes:
A kind of collar tie beam of aerated blocks or strip, it is characterised in that the collar tie beam of the aerated blocks or strip include building by laying bricks or stones in aerating
Preformed bricks with groove on block, upward, after the completion of building by laying bricks or stones, each preformed bricks form the groove of an insertion to the preformed bricks groove port,
It is disposed with steel bar stress in the groove of insertion, and casting concrete in the groove of insertion.
After the completion of the groove inner concrete of insertion is poured, formed collar tie beam or strip upper strata aerated blocks build by laying bricks or stones in
In the preformed bricks with groove.
The preformed bricks with groove are made by preformed bricks processing mold, and the preformed bricks processing mold, using spelling
Block makes:Combined by the steel side form and the beneath steel internal model with handle of two sideband spikes, wherein the steel of two sideband spikes
Side form is respectively left steel side form and right steel side form, and the steel internal model with handle is placed between left steel side form and right steel side form, steel internal model
The preformed bricks of molding are made to form the groove.
Present invention also offers a kind of preformed bricks, simple structure, make simple, low cost.
A kind of preformed bricks, it is characterised in that the preformed bricks are used for the strip of aerated blocks or the construction of collar tie beam, the preformed bricks
Being provided with groove, groove is used for arranging steel bar stress and casting concrete.
The prefabricated brick masonry is on aerated blocks, and groove port is upward, and each preformed bricks form the recessed of insertion after completing to build by laying bricks or stones
The steel bar stress of groove, collar tie beam or strip is arranged in by design requirement in the groove of the insertion, and is poured in the groove of insertion
Concrete.
The preformed bricks are formed by preformed bricks processing mold is prefabricated, the preformed bricks processing mold, are made using piece:By
The steel side form of two sideband spikes and the beneath steel internal model with handle are combined, and the steel side form of wherein two sideband spikes is respectively
Left steel side form and right steel side form, the steel internal model with handle are placed between left steel side form and right steel side form, and steel internal model makes the pre- of molding
Brickmaking forms the groove.
The preformed bricks are a kind of concrete prefabricated bricks with groove.
The strip of aerated blocks of the present invention or collar tie beam, by placing steel bar stress and casting concrete on the groove of preformed bricks
Form collar tie beam or strip.The aerated blocks on upper strata can be propped in the preformed bricks two ends, can continue after arrangement reinforcing bar and casting concrete
Carry out the construction on collar tie beam or strip upper strata.The present invention without the need for formwork and waits concrete curing in the construction of collar tie beam or strip,
And constructing operation is simple, can effectively improve engineering integral construction efficiency and reduces cost.
Description of the drawings
The processing mold transverse cross-sectional view of Fig. 1 preformed bricks of the present invention;
The processing mold longitudinal sectional drawing of Fig. 2 preformed bricks of the present invention;
The structural representation of Fig. 3 preformed bricks of the present invention;
The practical application figure of the preformed bricks in Fig. 4 present invention.
As Figure 1-Figure 4,1 be cross form spike, 2 be steel internal model handle, 3 be steel internal model, 4 be concrete slab band pre-
Brickmaking, 5 be horizontal steel side form, 6 be vertical framework spike, 7 for longitudinal steel side form, 8 be middle part cut-off template, 9 be aerated blocks, 10
For masonry mortar, 11 be reinforcing bar, 12 be casting concrete.
Specific embodiment
The present invention is to build preformed bricks with groove on aerated blocks by laying bricks or stones, and preformed bricks groove port is upward, each pre- after the completion of building by laying bricks or stones
Brickmaking forms the groove of an insertion, arranges steel bar stress in the groove of insertion, and in the groove of insertion casting concrete from
And form collar tie beam or the strip of aerated blocks.After the completion of the groove inner concrete of insertion is poured, in the collar tie beam or strip for being formed
The aerated blocks on upper strata are built by laying bricks or stones in the preformed bricks with groove.
Preformed bricks with groove are made by preformed bricks processing mold, and the preformed bricks processing mold, using piece system
Make:Combined by the steel side form and the beneath steel internal model with handle of two sideband spikes, wherein the steel side form of two sideband spikes
Respectively left steel side form and right steel side form, the steel internal model with handle are placed between left steel side form and right steel side form, and steel internal model makes into
The preformed bricks of type form the groove.
Present invention also offers a kind of special preformed bricks, simple structure, make simple, low cost:The preformed bricks are used for
The strip of aerated blocks or the construction of collar tie beam, the preformed bricks are provided with groove, in groove for arrange steel bar stress with pour mixed
Solidifying soil.Prefabricated brick masonry is on aerated blocks, and groove port is upward, and each preformed bricks form the groove of insertion, collar tie beam after completing to build by laying bricks or stones
Or the steel bar stress of strip is arranged in by design requirement in the groove of the insertion, and casting concrete in the groove of insertion.
Preformed bricks are formed by preformed bricks processing mold is prefabricated, the preformed bricks processing mold, are made using piece:By two sideband spikes
Steel side form and the beneath steel internal model with handle are combined, and wherein the steel side form of two sideband spikes is respectively left steel side form with the right side
Steel side form, the steel internal model with handle are placed between left steel side form and right steel side form, and it is described that steel internal model forms the preformed bricks of molding
Groove.The preformed bricks are a kind of concrete prefabricated bricks with groove.
Preformed bricks of the present invention are a kind of concrete prefabricated bricks with groove, build by laying bricks or stones on aerated blocks, and pass through pre-
Steel bar stress is placed in the groove of brickmaking and casting concrete forms collar tie beam or strip, simultaneously because the preformed bricks two ends can be propped
The construction of the aerated blocks on upper strata, collar tie beam and strip without the need for formwork and waits concrete curing, does not affect the upper strata of collar tie beam and strip
Structure continues construction, effectively shortens the construction period.This preformed bricks constructing operation is flexibly simple simultaneously, and engineering construction effect is greatly improved
Rate, reduces cost, and safe and reliable.
Control accompanying drawing, illustrates.
Preformed bricks processing mold in the present invention, including left side mould, right side mould and internal model, left side mould, right side mould are relative to be set
Put, between left side mould and right side mould, be provided with spacing distance, internal model is located between left side mould and right side mould, between internal model and left side mould
Spacing distance is provided with, spacing distance between internal model and right side mould, is provided with, it is fluted that internal model forms the preformed bricks of molding.Left side mould
Spike is carried with right side mould, and left side mould is vertical by respective spike support fixation with right side mould to be erected, the internal model upper band
There is handle.Left side mould is left steel side form, and right side mould is right steel side form, and the spike that left steel side form is respectively come with right steel side form is referred to as
Cross form spike 1, internal model are steel internal model 3, and handle thereon is steel internal model handle 2.The left steel side form with right steel side form is
Aforementioned lateral steel side form 5, respectively a bar shaped side plate, left steel side form and its spike are welded to connect on a base, right steel side form
And its spike is welded to connect on a base, left steel side form is provided with the i.e. longitudinal steel of end steel side form with the both ends of right steel side form
Side form 7, end steel side form with spike and are welded to connect on a base, along the length direction of left steel side form and right steel side form
Interval setting dividing plate, as middle part cut-off template 8, the spike that end steel side form is carried are vertical framework spike 6.
Such as Fig. 4, in strip or the construction of collar tie beam of aerated blocks, the size of outer length and width of the concrete slab with preformed bricks 4 can root
Determine according to collar tie beam or plate design requirement;The prefabricated brick masonry is on aerated blocks, and groove port is upward;Preformed bricks complete to build by laying bricks or stones
Afterwards, the steel bar stress of collar tie beam or strip is arranged in the groove of the insertion that each preformed bricks are formed by design requirement;And in insertion
Casting concrete in groove;As the groove two side of preformed bricks is supporting, so after the completion of groove concreting, collar tie beam
Or the aerated blocks on strip upper strata can be built by laying bricks or stones in preformed bricks at once.
Claims (6)
1. a kind of collar tie beam of aerated blocks or strip, it is characterised in that the collar tie beam of the aerated blocks or strip include building by laying bricks or stones in aerated blocks
On preformed bricks with groove, upward, after the completion of building by laying bricks or stones, each preformed bricks form the recessed of an insertion to the groove port of the preformed bricks
Groove, is disposed with steel bar stress in the groove of insertion, and casting concrete in the groove of insertion.
2. the collar tie beam of aerated blocks or strip according to claim 1, it is characterised in that the preformed bricks with groove are by prefabricated
Brick processing mold is made, the preformed bricks processing mold, is made using piece, including the steel side form of two sideband spikes
And the beneath steel internal model with handle, the wherein steel side form of two sideband spikes is respectively left steel side form and right steel side form, with handle
Steel internal model be placed between left steel side form and right steel side form, the steel internal model with handle makes the preformed bricks of molding form the groove.
3. a kind of preformed bricks, it is characterised in that the preformed bricks are used for the strip of aerated blocks or the construction of collar tie beam, in the preformed bricks
Being provided with groove, groove is used for arranging steel bar stress and casting concrete.
4. preformed bricks according to claim 3, it is characterised in that the prefabricated brick masonry is on aerated blocks, and groove port court
On, each preformed bricks form the groove of insertion after completing to build by laying bricks or stones, the steel bar stress of collar tie beam or strip is arranged in described by design requirement
In the groove of insertion, and casting concrete in the groove of insertion.
5. preformed bricks according to claim 3, it is characterised in that the preformed bricks are formed by preformed bricks processing mold is prefabricated, institute
Preformed bricks processing mold is stated, is made using piece:By die combination in the steel side form and the beneath steel with handle of two sideband spikes
Form, wherein the steel side form of two sideband spikes is respectively left steel side form and right steel side form, the steel internal model with handle is placed in left steel side
Between mould and right steel side form, the steel internal model with handle makes the preformed bricks of molding form the groove.
6. preformed bricks according to claim 5, it is characterised in that the preformed bricks are concrete prefabricated brick.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620681069.XU CN206016054U (en) | 2016-06-28 | 2016-06-28 | A kind of collar tie beam of aerated blocks or strip and preformed bricks |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620681069.XU CN206016054U (en) | 2016-06-28 | 2016-06-28 | A kind of collar tie beam of aerated blocks or strip and preformed bricks |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206016054U true CN206016054U (en) | 2017-03-15 |
Family
ID=58243332
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620681069.XU Expired - Fee Related CN206016054U (en) | 2016-06-28 | 2016-06-28 | A kind of collar tie beam of aerated blocks or strip and preformed bricks |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206016054U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049751A (en) * | 2016-06-28 | 2016-10-26 | 中天建设集团有限公司 | Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip |
-
2016
- 2016-06-28 CN CN201620681069.XU patent/CN206016054U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049751A (en) * | 2016-06-28 | 2016-10-26 | 中天建设集团有限公司 | Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104532985B (en) | Shear wall cast with tenon-and-mortise precast concrete blocks replacing formworks and construction method thereof | |
CN110439137A (en) | Prefabricated panel, wall and prefabricated panel production method, precast wall body construction method | |
CN103046465B (en) | Reinforcing construction method for foam core die precast hollow plate beam | |
CN105464382A (en) | Building block and constructional column integrated construction method and constructional column formwork building block | |
CN110761441B (en) | Construction method of prefabricated serrated racking concrete module of constructional column | |
CN206174120U (en) | Prefabricated constructional column and structure thereof | |
CN104612300A (en) | Hollow composite floor slab and construction method thereof | |
CN112726878A (en) | Formwork-erecting-free construction method for masonry filler wall constructional column, prefabricated module and mould | |
CN114482344A (en) | Cast-in-place concrete sandwich outer wall construction method capable of improving construction efficiency | |
CN113898102A (en) | Ribbed concrete laminated slab | |
CN206016054U (en) | A kind of collar tie beam of aerated blocks or strip and preformed bricks | |
CN105946099B (en) | Fill the method for construction of core assembly concrete beam | |
CN208618661U (en) | Pillar structure based on hollow masonry | |
CN205617419U (en) | Novel combination formula reinforced earth retaining wall structure | |
CN111561103A (en) | BM interlocking building block constructional column, tie beam structure and construction method thereof | |
CN106401276A (en) | Construction method for wall column binding bars of frame type building block enclosing wall | |
CN207525938U (en) | A kind of assembled frame-shear structure column splitlevel connection structure | |
CN207189929U (en) | Roofing assembled concrete blast cap prefabricated mould | |
CN106049751A (en) | Manufacturing method of ring beam or plate strip of aerated block and special prefabricated brick of ring beam or plate strip | |
CN206011405U (en) | A kind of aerated blocks strip preformed bricks processing mold | |
CN112832546B (en) | Transformation method of existing structure replacement concrete system | |
CN106013568B (en) | Based on detachable positioning controller cast-in-situ floorslab structure and construction method | |
CN211774796U (en) | Cross wall connection department constructional column exempts from formwork structure | |
CN211736048U (en) | Infilled wall brickwork ring roof beam construction structures | |
CN104110131A (en) | Hollow concrete shuttering of constructional wall column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170315 Termination date: 20180628 |
|