CN111075101A - BM interlocking building block U-shaped block lintel, ring beam and horizontal tie beam and construction method thereof - Google Patents
BM interlocking building block U-shaped block lintel, ring beam and horizontal tie beam and construction method thereof Download PDFInfo
- Publication number
- CN111075101A CN111075101A CN201911275565.XA CN201911275565A CN111075101A CN 111075101 A CN111075101 A CN 111075101A CN 201911275565 A CN201911275565 A CN 201911275565A CN 111075101 A CN111075101 A CN 111075101A
- Authority
- CN
- China
- Prior art keywords
- block
- interlocking
- shaped
- lintel
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C1/00—Building elements of block or other shape for the construction of parts of buildings
- E04C1/24—Elements for building-up floors, ceilings, roofs, arches, or beams
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/20—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/20—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
- E04C3/22—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members built-up by elements jointed in line
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/04—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C2003/023—Lintels
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
The invention discloses a lintel, a ring beam and a horizontal tie beam of a BM interlocking block and a construction method thereof, relating to the technical field of building construction, in particular to a shaped lintel supporting plate and a bracket, a BM interlocking block U-shaped block, a special building adhesive for the BM interlocking block, a steel bar framework of the beam and concrete poured in the U-shaped block. The invention also discloses a construction method of the BM interlocking building block U-shaped block lintel, the ring beam and the horizontal tie beam, when the lintel at the top of the opening is constructed, firstly a shaped lintel supporting plate and a bracket are manufactured according to the size of the opening and are erected below the lintel to be constructed, and a special building adhesive for the BM interlocking building block is used for building the BM interlocking building block U-shaped block with an upward opening on the supporting plate and the built building block. According to the invention, the integrally-formed lintel supporting plate and the bracket can be turned over for many times, so that the complex processes of template assembly, reinforcement, dismantling and the like in each time of the existing cast-in-place lintel construction are avoided.
Description
Technical Field
The invention belongs to the technical field of building construction, and particularly relates to a U-shaped block lintel, a ring beam and a horizontal tie beam of BM interlocking building blocks and a construction method thereof.
Background
In the construction of the existing masonry structure, the lintel adopts two methods of cast-in-place and prefabrication, the ring beam and the horizontal tie beam are both cast-in-place, the cast-in-place lintel, the ring beam and the horizontal tie beam are constructed, templates need to be processed and manufactured in advance, the templates need to be assembled, erected and reinforced, the upper wall body can be built after the concrete reaches the specified strength and the templates are removed, the process is complex, the technical intermittence time is long, the construction speed is slow, the resources such as materials, manpower, machinery and the like are consumed, the construction of the precast lintel needs to be provided with special component prefabrication sites or areas, the templates still need to be erected, and the civilized image of the; the prefabricated and formed lintel needs a plurality of people to lift to the top of the opening, is inconvenient to construct and is not beneficial to construction safety.
Based on the factors of the construction speed, efficiency, economy, safety, civilization and the like, the invention can utilize a construction site as a building entity material and a material of a concrete pouring mold, and achieves the effects of avoiding formwork support, reducing working procedures, shortening technical intermittence time, realizing rapid construction, reducing resource waste and being beneficial to site safety civilized construction.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a lintel, a ring beam and a horizontal tie beam of a BM interlocking building block U-shaped block and a construction method thereof, which solve the problems that the BM interlocking building block U-shaped block in the construction site is used as a building entity material and a concrete pouring mold for the lintel, the ring beam and the horizontal tie beam, so that the effects of no formwork support, reduced working procedures, shortened technical intermittence time, quick construction, reduced resource waste and contribution to on-site safe civilized construction are achieved, and the problems that the existing lintel, the ring beam and the horizontal tie beam are complicated in cast-in-place and prefabrication working procedures, long in technical intermittence time, low in construction speed, unfavorable for safe civilized construction, high in resource consumption and the like are solved.
In order to achieve the purpose, the invention is realized by the following technical scheme:
1. a lintel, a ring beam and a horizontal tie beam of a BM interlocking building block U-shaped block comprise a shaped lintel supporting plate and a bracket, the BM interlocking building block U-shaped block, a special masonry adhesive for the BM interlocking building block, a steel bar framework of the beam and concrete poured in the U-shaped block.
2. A construction method of a U-shaped block lintel of BM interlocking building blocks comprises the following construction steps:
and ①, manufacturing a shaped lintel supporting plate and a bracket, namely manufacturing the shaped lintel supporting plate and the bracket according to the design file of the construction drawing and the opening size of the construction site, and fixing the shaped lintel supporting plate and the bracket under the lintel.
And ②, building the BM interlocking blocks, namely building the U-shaped blocks of the BM interlocking blocks by using a special building adhesive for the BM interlocking blocks, wherein the openings of the U-shaped blocks of the BM interlocking blocks are upwards assembled, the thickness of the special building adhesive for the BM interlocking blocks between the U-shaped blocks of the BM interlocking blocks is 5mm, and the thickness of the special building adhesive for the BM interlocking blocks between the U-shaped blocks at the end part of the lintel and other wall blocks is 8-12 mm.
And ③, manufacturing and placing a steel bar framework of the beam, namely processing longitudinal steel bars and stirrups designed according to construction drawings, manufacturing the steel bar framework of the lintel, and placing the steel bar framework in a through long groove formed by building the U-shaped blocks of the BM interlocking building blocks.
And ④, pouring concrete, namely pouring the concrete with the designed strength grade and type into the through long groove formed by building the U-shaped blocks of the BM interlocking building blocks.
And ⑤, removing the shaped lintel supporting plate and the bracket, namely removing the shaped lintel supporting plate and the bracket after the concrete reaches the specified strength, and transferring the whole body for use.
3. A construction method of a U-shaped block ring beam and a horizontal tie beam of BM interlocking building blocks comprises the following construction steps of:
①, building a BM interlocking block U-shaped block, namely, laying 8-12 mm of special building binder for BM interlocking blocks on the top of blocks at the positions marked with the bottoms of a ring beam and a horizontal tie beam of a built wall, assembling and building the U-shaped blocks of each BM interlocking block U-shaped block with the openings facing upwards, wherein the special building binder for BM interlocking blocks between the U-shaped blocks is 5mm thick, when the end of the ring beam or the horizontal tie beam intersects with a concrete wall or a concrete column, the U-shaped block at the end is tightly propped against the concrete wall or the concrete column and is built by the special building binder for BM interlocking blocks with the thickness of 5mm, the ring beam and the horizontal tie beam of the crossed wall are connected with the construction columns at the intersection, if no construction column exists at the crossed wall, a U-shaped block is removed from the center of the intersection point of the crossed wall, a flange of a U-shaped block is cut off at the intersection point of the L-shaped crossed wall to form an inverted L-shaped block and integrally plug the special building binder for building blocks at the intersection points, and the U-shaped blocks are cut off the special building vertical joints of the building blocks to form the interlocking blocks for plugging the chain joining of the building blocks and the building blocks at the joint of the building blocks.
And ②, manufacturing and placing a steel bar framework of the beam, namely processing longitudinal steel bars and stirrups designed according to construction drawings, manufacturing the steel bar framework of the lintel, and placing the steel bar framework in a through long groove formed by building the U-shaped blocks of the BM interlocking building blocks.
And ③, pouring concrete, namely pouring the concrete with the designed strength grade and type into the through long groove formed by building the U-shaped blocks of the BM interlocking building blocks.
The BM interlocking building block U-shaped block selected by the invention is an existing material in a construction site, has the characteristics of light weight and high strength, and can be used as a permanent building entity material and a concrete pouring mould.
The formed lintel supporting plate and the bracket are processed and manufactured in batches according to the size of the opening, the supporting force and the stability are good, and the whole lintel supporting plate and the bracket can be used repeatedly.
A construction method of a U-shaped block ring beam and a horizontal tie beam of BM interlocking blocks provides a construction method of the U-shaped block ring beam and the horizontal tie beam of the BM interlocking blocks when a straight line wall body, a T-shaped intersecting wall body, an L-shaped intersecting wall body and a cross-shaped intersecting wall body do not have constructional columns at corners, and ensures that the ring beam and the horizontal tie beam of the T-shaped, L-shaped and cross-shaped intersecting wall bodies are integrally cast and molded.
A construction method for a lintel, a ring beam and a horizontal tie beam of a BM interlocking block selects a special building adhesive for the BM interlocking block with higher adhesive strength, and the special building adhesive for the BM interlocking block is used for building among U-shaped blocks and among other blocks and the U-shaped blocks, so that the adhesive strength among the U-shaped blocks of the BM interlocking block and among other blocks and the U-shaped blocks of the BM interlocking block can be fully ensured.
Has the advantages that:
1. according to the BM interlocking building block U-shaped block lintel, the ring beam, the horizontal tie beam and the construction method thereof, the lintel supporting plate and the support are shaped, so that the integral repeated turnover can be realized, the complex processes of template loose assembly, reinforcement, dismantling and the like in the conventional cast-in-place lintel construction are avoided, and the efficient construction of the lintel of the masonry structure is realized.
2. The existing light high-strength BM interlocking block U-shaped block in a construction site is fully utilized to be used as a permanent building entity material and a concrete pouring mold, so that the purposes of no formwork support and no formwork removal, less working procedures, shortened technical intermittence time, high construction speed, contribution to safe and civilized construction image and resource saving in the construction of the lintel, the ring beam and the horizontal tie beam are achieved, efficient construction and economic construction are realized, and the quick construction and green construction concept is met.
Drawings
FIG. 1 is a three-dimensional axial side view of a U-shaped block ring beam and a horizontal tie beam of the straight line wall BM interlocking building block of the invention;
FIG. 2 is a three-dimensional axial view of a U-shaped block of the BM interlocking block of the present invention;
FIG. 3 is a three-dimensional axial view of a lintel of a U-shaped block of the BM interlocking block of the invention;
FIG. 4 is a front view of a lintel of a U-shaped block of the BM interlocking block of the present invention;
FIG. 5 is a top view of a lintel of a U-shaped block of the BM interlocking block of the present invention;
FIG. 6 is a three-dimensional isometric view of a shaped lintel pallet and brace of the present invention;
FIG. 7 is a three-dimensional axial view of a U-shaped block ring beam and a horizontal tie beam of the T-shaped intersecting wall BM interlocking blocks of the present invention;
FIG. 8 is a three-dimensional axial view of a U-shaped block ring beam and a horizontal tie beam of the L-shaped intersecting wall BM interlocking blocks of the present invention;
FIG. 9 is a three-dimensional axial view of a U-shaped block ring beam and a horizontal tie beam of the crossed intersecting wall BM interlocking blocks of the invention.
In the figure: 1. shaping a lintel supporting plate and a bracket; 101. a wooden template supporting plate; 102. a wood purlin back edge of the supporting plate; 103. a vertical supporting plate; 104. vertical wood purlin back edges; 105. oblique wooden purlin supporting; 106. supporting a horizontal wood purlin; 2. BM interlocking building blocks are U-shaped blocks; 201. an inverted L-shaped block; 202. l-shaped building blocks which are vertically placed; 3. a special masonry binder for BM interlocking blocks; 4. a steel reinforcement cage; 5. and (3) concrete.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1 to 9, the present invention provides a technical solution: a BM interlocking building block U-shaped block lintel, ring beam and horizontal tie beam comprises: the building block comprises a shaped lintel supporting plate and bracket 1, a BM interlocking block U-shaped block 2, a special building adhesive 3 for the BM interlocking block, a steel reinforcement framework 4 of the beam and concrete 5 poured in the U-shaped block.
The invention relates to a construction method of a U-shaped block lintel of BM interlocking building blocks, which comprises the following construction steps of:
and ①, manufacturing a shaped lintel supporting plate and a bracket, namely manufacturing the shaped lintel supporting plate and the bracket 1 according to the design file of the construction drawing and the opening size of the construction site, and fixing the shaped lintel supporting plate and the bracket under the lintel.
②, building the BM interlocking blocks, namely, building the openings of the BM interlocking blocks U-shaped blocks 2 upwards by using the special building adhesive 3 for the BM interlocking blocks, wherein the thickness of the special building adhesive 3 for the BM interlocking blocks among the BM interlocking blocks U-shaped blocks 2 is 5mm, the thickness of the special building adhesive 3 for the BM interlocking blocks among the lintel end BM interlocking blocks U-shaped blocks 2 and other wall blocks is 8 mm-12 mm, the BM interlocking blocks U-shaped blocks 2 which are continuously built form a through long groove, and the two ends of the groove can be normally built with other wall blocks to block the end of the groove, thereby being beneficial to concrete pouring and forming.
And ③, manufacturing and placing a steel bar framework of the beam, namely processing longitudinal steel bars and stirrups designed according to construction drawings, manufacturing a steel bar framework 4 of the lintel, and placing the steel bar framework in a through long groove formed by building the BM interlocking building block U-shaped blocks 2.
And ④, pouring concrete, namely pouring the concrete with the designed strength grade and type into the through long groove formed by the building of the BM interlocking building block U-shaped block 2.
And ⑤, removing the shaped lintel supporting plate and the bracket, namely removing the shaped lintel supporting plate and the bracket 1 after the concrete reaches the specified strength, and recycling the concrete.
The invention relates to a construction method 7 of a U-shaped block ring beam and a horizontal tie beam of BM interlocking building blocks, which comprises the following construction steps of:
①, building the BM interlocking block U-shaped blocks 2, namely laying 8mm to 12mm of special building binder 3 for the BM interlocking blocks on the top of blocks at the positions marked with the heights of the bottom of a ring beam and a horizontal tie beam of a built wall, building the opening of each BM interlocking block U-shaped block 2 upwards, wherein the thickness of the special building binder 3 for the BM interlocking blocks between the BM interlocking block U-shaped blocks 2 is 5mm, when the end part of the ring beam or the horizontal tie beam intersects with a concrete wall or a concrete column, the end U-shaped block is tightly propped against the concrete wall or the concrete column and is built by the special building binder 3 for the BM interlocking blocks with the thickness of 5mm, the ring beam and the horizontal tie beam of the crossed wall are connected with a construction column at the intersection, if no construction column exists at the crossed wall, a U-shaped block is removed from the center of the intersection point of the crossed wall, a flange of the crossed connection point of the U-shaped blocks is cut off at the intersection point to form an inverted L-shaped block 201 and the integral L-shaped block is arranged at the corner, a U-shaped block connection point of the crossed wall is cut off, and a U-shaped block 202 for forming the continuous connection of the interlocking blocks, and the vertical connection point of the BM interlocking blocks is cut off, and the building blocks for forming the connection of the interlocking blocks for the connection of the interlocking blocks, and the interlocking blocks for forming the connection of the interlocking blocks, and the interlocking blocks for the interlocking blocks.
And ②, manufacturing and placing the steel bar framework 4 of the beam, namely processing the longitudinal steel bars and stirrups designed according to the construction drawing, manufacturing the steel bar framework 4 of the lintel, and placing the steel bar framework 4 in a through long groove formed by building the U-shaped blocks of the BM interlocking building blocks.
And ③, pouring concrete 5, namely pouring the concrete 5 with designed strength grade and type into the through long groove formed by building the U-shaped block of the BM interlocking building block.
In conclusion, when the BM interlocking building block U-shaped block lintel, ring beam and horizontal tie beam and the construction method thereof are used, firstly, a shaped lintel supporting plate and a bracket 1 are manufactured according to the size of a hole, and are erected below the lintel to be constructed, a special building adhesive 3 for BM interlocking blocks is used for building and assembling a BM interlocking block U-shaped block 2 with an upward opening on the supporting plate and the built block to form a through long groove, a manufactured lintel reinforcement framework 4 is placed in the through long groove of the assembled and built U-shaped block, concrete is poured in the through long groove of the U-shaped block, when the ring beam and the horizontal tie beam are constructed, the BM interlocking block U-shaped block is assembled and built on the built block wall with the upward opening to form the through long groove, the manufactured lintel reinforcement framework 4 is placed in the through long groove of the assembled and built U-shaped block, and the lintel can be built in the through long groove after the concrete in the through long groove of the U-shaped block is initially set, Ring beam and wall above the horizontal tie beam.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.
Claims (9)
1. A BM interlocking building block U-shaped block lintel, ring beam and horizontal tie beam and a construction method thereof are characterized in that: the method comprises a shaped lintel supporting plate and a bracket (1), a BM interlocking block U-shaped block (2), a special masonry adhesive (3) for the BM interlocking block, a steel bar framework (4) of a beam, concrete (5) poured in the U-shaped block, a BM interlocking block U-shaped block lintel construction method (6), a BM interlocking block U-shaped block ring beam and horizontal tie beam construction method (7).
2. The BM interlocking block U-shaped block lintel, ring beam and horizontal tie beam as well as the construction method thereof according to claim 1, characterized in that: the regularization lintel layer board and support for the lintel construction, including being located wooden template layer board (101), layer board wood purlin back arris (102), the layer board both ends lean on vertical fagging (103), vertical wood purlin back arris (104), the slant wood purlin of entrance to a cave side wall body and supporting (105), the horizontal wood purlin of slant wood purlin support (105) lower extreme supports (106), the horizontal wood purlin of bottom supports (107) to it is firm to assemble with the nail, regularization lintel layer board and support (1) can have enough to meet the need the use many times.
3. The BM interlocking block U-shaped block lintel, ring beam and horizontal tie beam as well as the construction method thereof according to claim 1, characterized in that: BM interlocking block U type piece belongs to BM interlocking block series, can select its size according to the wall thickness, and has the characteristic of light weight high strength, and this embodiment is according to 200mm thick wall body, selects its opening to be up for long x wide x high size: 190mm by 195 mm.
4. The BM interlocking block U-shaped block lintel, ring beam and horizontal tie beam as well as the construction method thereof according to claim 1, characterized in that: the special masonry adhesive for the BM interlocking blocks belongs to the special masonry adhesive for the BM interlocking blocks, and is high in adhesive strength.
5. The BM interlocking block U-shaped block lintel, ring beam and horizontal tie beam as well as the construction method thereof according to claim 1, characterized in that: the steel bar frameworks of the lintel, the ring beam and the horizontal tie beam are made by reinforcing the steel bars according to the design of construction drawings, and comprise longitudinal stressed steel bars and stirrups.
6. The BM interlocking block U-shaped block lintel, ring beam and horizontal tie beam as well as the construction method thereof according to claim 1, characterized in that: the concrete poured in the U-shaped block is concrete with strength grade and type designed according to construction drawings, and the concrete is C20 fine-grained concrete in the embodiment.
7. A construction method of a U-shaped block lintel of BM interlocking building blocks is characterized in that: using the materials, tools, measures as described in the above claims 1-6, the lintel is constructed according to the following construction steps:
①, manufacturing a shaped lintel supporting plate and a bracket, namely manufacturing the shaped lintel supporting plate and the bracket (1) according to a construction drawing design file and the opening size of a construction site, and fixing the shaped lintel supporting plate and the bracket (1) under the lintel;
②, building the BM interlocking block U-shaped blocks, namely, using special building binder (3) for the BM interlocking blocks to build the BM interlocking blocks U-shaped blocks (2) with the openings facing upwards, wherein the special building binder (3) for the BM interlocking blocks among the BM interlocking blocks U-shaped blocks (2) is 5mm thick, building the BM interlocking blocks U-shaped blocks at the end parts of lintel and other wall blocks by using special building binder (3) for the BM interlocking blocks with the thickness of 8 mm-12 mm, forming through long grooves for the continuously built BM interlocking blocks U-shaped blocks (2), and normally building other wall blocks at the two ends of the grooves to plug the end parts of the grooves, thus being beneficial to concrete pouring and forming;
step ③, manufacturing and placing a steel bar framework of the beam, namely processing longitudinal steel bars and stirrups designed according to construction drawings, manufacturing a steel bar framework (4) of the lintel, and placing the steel bar framework in a through long groove built by the BM interlocking building block U-shaped blocks (2);
④, pouring concrete, namely pouring concrete with designed strength grade and type into a through long groove formed by building the BM interlocking building block U-shaped block (2);
and ⑤, removing the shaped lintel supporting plate and the bracket, namely removing the shaped lintel supporting plate and the bracket (1) after the concrete reaches the specified strength, and recycling the shaped lintel supporting plate and the bracket.
8. A construction method of a BM interlocking building block U-shaped block ring beam and a horizontal tie beam is characterized in that: using the materials, tools, measures as defined in any of the above claims 1-6, the ring beam and the horizontal tie beam are built according to the following construction steps:
①, building a BM interlocking block U-shaped block, namely paving 8-12 mm of special building binder (3) for the BM interlocking blocks at the top of blocks at the positions marked at the bottoms of a ring beam and a horizontal tie beam of a built wall, building the opening of each BM interlocking block U-shaped block (2) upwards, wherein the thickness of the special building binder (3) for the BM interlocking blocks between the BM interlocking block U-shaped blocks (2) is 5mm, when the end part of the ring beam or the horizontal tie beam intersects with a concrete wall or a column, the end part U-shaped block is tightly propped against the concrete wall or the column, and the special building binder (3) for the BM interlocking blocks with the thickness of 5mm is used for building, the ring beam and the horizontal tie beam of the crossed wall are connected with a construction column at the crossed position, if no construction column exists at the crossed wall, a U-shaped block is arranged in the center of the crossed point of the crossed wall, a U-shaped block is cut off at the integral flange of a U-shaped block at the crossed point of the crossed wall to form an inverted L-shaped (201) and a U-shaped block is cut off at the crossed point, and a U-shaped joint of the building block is formed by cutting off the concrete at the vertical joint of the U-shaped block at the crossed point, and the joint of the crossed point, and the building block (5 mm, and the concrete is beneficial to form a continuous joint of the building block, and the joint of the building block, and the special building block for forming the joint;
step ②, manufacturing and placing a steel bar framework of the beam, namely processing longitudinal steel bars and stirrups designed according to construction drawings, manufacturing a steel bar framework (4) of the lintel, and placing the steel bar framework in a through long groove built by the BM interlocking building block U-shaped blocks (2);
and ③, pouring concrete, namely pouring the concrete with the designed strength grade and type into the through long groove formed by building the BM interlocking building block U-shaped block (2).
9. The BM interlocking block U-shaped lintel, ring beam and horizontal tie beam of claim 1 and their construction method are suitable for various block walls, especially for the wall with 200mm block height and BM interlocking block wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911275565.XA CN111075101A (en) | 2019-12-12 | 2019-12-12 | BM interlocking building block U-shaped block lintel, ring beam and horizontal tie beam and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911275565.XA CN111075101A (en) | 2019-12-12 | 2019-12-12 | BM interlocking building block U-shaped block lintel, ring beam and horizontal tie beam and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111075101A true CN111075101A (en) | 2020-04-28 |
Family
ID=70314157
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911275565.XA Pending CN111075101A (en) | 2019-12-12 | 2019-12-12 | BM interlocking building block U-shaped block lintel, ring beam and horizontal tie beam and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111075101A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112982735A (en) * | 2021-02-25 | 2021-06-18 | 中建八局第四建设有限公司 | Construction method for assembling integral ring beam, lintel, waist beam and constructional column |
CN116335331A (en) * | 2023-04-10 | 2023-06-27 | 中国二十二冶集团有限公司 | Horizontal tie beam construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FI77297B (en) * | 1983-05-24 | 1988-10-31 | Gryts Bruk Ab | FOERFARANDE FOER AOSTADKOMMANDE AV EN ARMERAD TEGELBALK ELLER LIKNANDE, JAEMTE ANORDNING FOER GENOMFOERANDE AV FOERFARANDET. |
CN105484421A (en) * | 2015-12-14 | 2016-04-13 | 二十二冶集团第一建设有限公司 | Ring beam formwork bricks and building secondary structure filler wall ring beam construction method |
CN108166679A (en) * | 2018-03-01 | 2018-06-15 | 中建八局第建设有限公司 | A kind of concrete lintel constructing structure and its construction method |
CN207934328U (en) * | 2018-03-01 | 2018-10-02 | 中建八局第一建设有限公司 | A kind of concrete lintel constructing structure |
CN109779144A (en) * | 2019-02-28 | 2019-05-21 | 广西建工集团建筑工程总承包有限公司 | Utilize the prefabricated lintel of U-shaped building block and its construction method |
-
2019
- 2019-12-12 CN CN201911275565.XA patent/CN111075101A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FI77297B (en) * | 1983-05-24 | 1988-10-31 | Gryts Bruk Ab | FOERFARANDE FOER AOSTADKOMMANDE AV EN ARMERAD TEGELBALK ELLER LIKNANDE, JAEMTE ANORDNING FOER GENOMFOERANDE AV FOERFARANDET. |
CN105484421A (en) * | 2015-12-14 | 2016-04-13 | 二十二冶集团第一建设有限公司 | Ring beam formwork bricks and building secondary structure filler wall ring beam construction method |
CN108166679A (en) * | 2018-03-01 | 2018-06-15 | 中建八局第建设有限公司 | A kind of concrete lintel constructing structure and its construction method |
CN207934328U (en) * | 2018-03-01 | 2018-10-02 | 中建八局第一建设有限公司 | A kind of concrete lintel constructing structure |
CN109779144A (en) * | 2019-02-28 | 2019-05-21 | 广西建工集团建筑工程总承包有限公司 | Utilize the prefabricated lintel of U-shaped building block and its construction method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112982735A (en) * | 2021-02-25 | 2021-06-18 | 中建八局第四建设有限公司 | Construction method for assembling integral ring beam, lintel, waist beam and constructional column |
CN116335331A (en) * | 2023-04-10 | 2023-06-27 | 中国二十二冶集团有限公司 | Horizontal tie beam construction method |
CN116335331B (en) * | 2023-04-10 | 2024-04-26 | 中国二十二冶集团有限公司 | Horizontal tie beam construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201738443U (en) | Prefabricated concrete double-overlapping beam | |
CN203213346U (en) | Connecting structure for assembling integral concrete frame and shear wall | |
CN110761441B (en) | Construction method of prefabricated serrated racking concrete module of constructional column | |
CN111075101A (en) | BM interlocking building block U-shaped block lintel, ring beam and horizontal tie beam and construction method thereof | |
CN106968366B (en) | Construction method for pouring constructional column without dismantling formwork | |
CN111663695A (en) | Assembly type template-free box-type floor system and construction process thereof | |
CN209760597U (en) | Precast concrete shear connector and self-supporting precast member thereof | |
CN111058628A (en) | Construction method of post-cast strip formwork support system | |
CN207647033U (en) | A kind of precast reinforced basket structure | |
CN212957172U (en) | Template box-type superstructure is exempted from to assembled | |
CN212957612U (en) | Assembly type formwork-dismantling-free structural body formwork and cast-in-place formwork-dismantling-free structural body | |
CN212926589U (en) | Assembly type formwork-dismantling-free structural body formwork and cast-in-place formwork-dismantling-free structural body | |
CN216810424U (en) | Prefabricated assembled formwork-free building block wall ring beam and constructional column structure | |
CN212802189U (en) | Assembly type disassembly-free template | |
CN214530760U (en) | Precast concrete equipment basis side forms | |
CN215594345U (en) | Assembled house | |
CN209975803U (en) | Ecological composite wall structure | |
CN213234008U (en) | Improved rib frame stud stirrup structure | |
CN111851804A (en) | Assembly type formwork-dismantling-free structural body formwork and cast-in-place formwork-dismantling-free structural body | |
CN203782872U (en) | Hollow reinforced concrete prefabricated wall body module and building utilizing module | |
CN113738157A (en) | Temporary supports on two sides of post-cast strip of building and method for constructing constructional column by using temporary supports | |
CN108590026B (en) | Inverted V-shaped reinforced concrete prefabricated bottom plate for laminated floor slab and laminated slab manufactured by same | |
CN113323262A (en) | 3D printed prefabricated wall module, wall and construction method of wall | |
CN107762071B (en) | Prefabricated reinforcement cage structure, pouring structure body and structure body construction method | |
CN111851830A (en) | Assembly type disassembly-free template and manufacturing method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200428 |
|
RJ01 | Rejection of invention patent application after publication |