CN201738250U - Arch culvert and arch ring steel die trolley - Google Patents

Arch culvert and arch ring steel die trolley Download PDF

Info

Publication number
CN201738250U
CN201738250U CN2010202994396U CN201020299439U CN201738250U CN 201738250 U CN201738250 U CN 201738250U CN 2010202994396 U CN2010202994396 U CN 2010202994396U CN 201020299439 U CN201020299439 U CN 201020299439U CN 201738250 U CN201738250 U CN 201738250U
Authority
CN
China
Prior art keywords
arch
die
steel
construction
culvert
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202994396U
Other languages
Chinese (zh)
Inventor
郝晋新
杜永清
李勇
邵小江
王民焕
黄枝花
谢中文
尹国梁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Original Assignee
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP, China Railway Sixth Group Co Ltd filed Critical TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
Priority to CN2010202994396U priority Critical patent/CN201738250U/en
Application granted granted Critical
Publication of CN201738250U publication Critical patent/CN201738250U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model belongs to the arch culvert construction technical field, in particular to an arch culvert and arch ring steel die trolley which solves the problem that the arch ring bracket and die plate are repeatedly mounted and dismounted during the arch culvert construction in prior art. The arch culvert and arch ring steel die trolley comprises a die frame in steel truss structure, four steel wheels symmetrically mounted at the bottom of the die frame, a plurality of jack support points arranged at the bottom of the die frame, an arc-shaped inner die and an arc-shaped outer die respectively mounted on the top of the die frame, and a pull rod arranged between the inner die and the outer die, wherein a lead screw is connected between the arch foot part and the top part of the die frame. The utility model has the beneficial effects that: the time of repeated mounting and dismounting of brackets and die plates is saved, the construction procedure and workload are greatly reduced, the steel die trolley has good strength, rigidity and stability and is not easy to have deformation; the steel die trolley has simple structure and is easy to be machined, the surface steel plates have tight joint seams consistent arc-shape and integral adjustability; the construction progress and safety are effectively controlled, and the design of the steel die trolley better meets the construction demands.

Description

Arch culvert arch ring steel form carrier
Technical field
The utility model belongs to the technical field of arch culvert construction, is specifically related to a kind of arch culvert arch ring steel form carrier.
Background technology
Fast development along with the highway construction of China Higher level, the job practices of arch culvert also begins to diversified development, the main job practices of arch culvert has: column bow member method, support type bow member method, clay ox method etc., but, because the construction and installation of bow member method, striking and shuttering work repeat, workload is big, and construction period is longer, so that above-mentioned job practices also requires further improvement is perfect.
Certain expressway works of undertaking the construction of of applicant for example, the K119+065 culvert, 134.6 meters of total lengths are divided into 22 joints.The center pile No. is: K119+065, oblique 120 degree, form of structure is: 1-3.0m steel bar concrete arch culvert, this culvert is monolithic reinforced-concrete basis, gravity abutment body, semicircular arch ring, and wherein arch ring, arch springing adopt the C30 concrete, and basis, abutment body, cap stone adopt the C25 concrete.Because this culvert is longer, and the duration is very tight, engineering quantity is bigger, therefore select which kind of support and arch template, just seem particularly important.
Bow member method construction disassemble and assemble work amount is bigger, and required construction period is longer, can not satisfy the requirement of on-site actual situations and duration, mainly has following problem:
1, because construction height is higher, the basis is pushed up to the distance of vault and is: 5 meters, every joint arch ring support and template all need be installed, be removed, and it is not easy to operate to construct, and repetitive operation is many, and workload is big, and construction speed is slower, and construction cost is bigger;
2, the arch ring concrete is in work progress, need split into loose mail earlier when installation, striking and template, and be transported to ground, reinstall again, and fall easily pipe fitting or punching block assort, the accident that causes casualties takes place, and big potential safety hazard is arranged;
3, it is wayward that quality is propped up, torn open to the circular arc template of arch ring both sides arch springing part, and produce seam, faulting of slab ends with the abutment body body of wall easily, can not satisfy and construct and code requirement;
4, promptly become waste product after the circular arc assembled formwork of bow member method construction uses up, can not reuse, cause the waste of material, construction cost strengthens;
5, support and template deformation phenomenon easily take place in the construction of bow member method, and the difficult installation of circular arc template, easily cause the concrete external surface height of every joint arch ring inconsistent, and the concrete presentation quality of building is relatively poor, is easy to generate faulting of slab ends and spillage phenomenon.
Summary of the invention
The problem that the utility model is installed repeatedly, removed for the existing arch culvert work progress hogging coil support of solution, template provides a kind of arch culvert arch ring steel form carrier.
The utility model adopts following technical scheme to realize:
Arch culvert arch ring steel form carrier, the mould bases that comprises steel truss structure, mould bases bottom symmetry is installed four steel wheels, the mould bases bottom also is provided with some jack supporting-points, the internal mold and the external mold of circular arc installed at the mould bases top, and internal mold comprises by the vault part of bearing pin connection and the arch springing part of both sides, between internal mold and the external mold pull bar is set, the two ends up and down of pull bar are connected with external mold, internal mold respectively, are connected with leading screw between the arch springing part of internal mold and the mould bases top.The pull bar upper/lower terminal uses taper sealing bolt, the outside butterfly card that uses with the part inside that is connected of external mold, internal mold.
When using, the supporting jack of pallet bottom described in the utility model is regulated the height of mould bases.
The utlity model has following beneficial effect: saved the time of propping up, tearing open support and template repeatedly, significantly reduced working procedure and workload, steel form carrier intensity, rigidity and stability are all fine simultaneously, are difficult for producing distortion; This chassis mould bases is simple in structure, be easy to processing, the surface steel sheet seam is tight, the arc unanimity, and whole adjustability is good, template need not to carry out propping up of repetition and tears operation open after standing well, after a last joint arch ring construction finishes, directly run to down the construction location of joint arch ring, the construction of following joint arch ring, thereby shortened construction period effectively, accelerate construction speed, reduced construction cost, improved economic benefit; After construction was finished, chassis mould bases material was all reusable after disintegrating; The concrete arch astragal type unanimity of constructing, concrete surface is smooth, smooth, so in the construction bigger practical value is arranged at the scene, can large-scale popularization use in similar engineering; Construction speed, safety all are controlled effectively, and the construction demand has all been satisfied in every design preferably.
Description of drawings
Fig. 1 is the utility model structural representation
Among the figure: 1-steel wheel, 2-jack, 3-mould bases, 4-bearing pin, 5-pull bar, 6-internal mold, 7-external mold, 8-leading screw, 9-taper sealing bolt.
The specific embodiment
In conjunction with the accompanying drawings the specific embodiment of the present utility model is described further.
Arch culvert arch ring steel form carrier, it is characterized in that comprising the mould bases 3 of steel truss structure, mould bases 3 bottoms symmetry is installed four steel wheels 1, mould bases 3 bottoms also are provided with some jack supporting-points, the internal mold 6 and the external mold 7 of circular arc installed at mould bases 3 tops, and internal mold 6 comprises by the vault part of bearing pin 4 connections and the arch springing part of both sides, between internal mold 6 and the external mold 7 pull bar 5 is set, the two ends up and down of pull bar 5 are connected with external mold 7, internal mold 6 respectively, are connected with leading screw 8 between the arch springing part of internal mold 6 and mould bases 3 tops.The pull bar upper/lower terminal uses taper sealing bolt, the outside butterfly card that uses with the part inside that is connected of external mold, internal mold.When using, supporting 6 jack of pallet bottom are regulated the height of bow member.
Below specify each ingredient of the present utility model:
1) steel wheel (outpacking rubber skin): be positioned at the bottom of steel form carrier, be used for finishing vertical traveling of steel form carrier, can run to the suitable position that to build arch ring easily;
2) jack: the jacking steel form carrier reaches the height that will build concrete, unloads steel form carrier, makes steel wheel contact basic end face, finishes form removable;
3) mould bases: form by girder, framed bent and bow member three parts,, play the load-bearing effect simultaneously, guarantee intensity, rigidity and the stability of arch template for the upright platform of the frame of arch template; The framed bent of mould bases is welded on two girders, with the bolt assembly unit by 1 meter spacing; Every girder is welded relatively by two 22cm channel-section steels, and two girders play bearing load and mobile, and every girder is divided into 3 jack supporting-points;
4) bearing pin: the connecting portion of arch ring internal mold vault part and both sides arch springing part, utilize bearing pin that the arch ring internal mold is divided into 3 parts, the vault part that comprises central authorities, the arch springing part of both sides, for next step accurate location of regulating both sides arch springing segment template by leading screw provides rotating shaft, also be convenient to a upright and dismounting of arch template;
5) pull bar: be arranged between the inside and outside template of arch ring, control inside and outside template, prevent to run mould;
6) internal mold: the arch ring internal mold, be divided into 3 parts, comprise the vault part of central authorities, the arch springing part of both sides;
7) external mold: arch ring external mold;
8) leading screw: an end partly is connected with the arch springing of internal mold, and the other end is connected with the framed bent top, and the distance of being convenient to regulate between both sides arch springing part internal mold and the abutment body body of wall guarantees to be close to the abutment body body of wall, also plays crucial effects for the stamping die of steel form carrier simultaneously;
9) taper sealing bolt: be positioned on the pull bar, and the distance between the inside and outside mould of pull bar engages adjustable arch ring, the thickness requirement of assurance arch ring concrete size.
Operating principle of the present utility model and work progress:
(1) build before: the simple and easy steel form carrier that the arch culvert arch ring uses, at first utilize manually to push away and hold up chassis mould bases (because of the bottom is provided with steel wheel), reach the effect of the vertical traveling of steel form carrier, after arrival need be built the assigned address of arch ring, utilize jack with the steel form carrier jacking, after reaching the design height of arch ring, the locking jack is located steel form carrier.Then the arch ring internal mold is regulated by leading screw, hold out against the abutment body body of wall, adjust the surface finish of internal mold simultaneously, after reaching code requirement, carry out the arch ring laid reinforcement binding, prop up upright arch ring external mold then, and control distance between inside and outside template by pull bar and sealing bolt, guarantee the requirement of arch ring concrete gauge and prevent to run mould, finish arch ring and build preceding preparation, build the arch ring concrete.
(2) build the back: treat arch ring build finish and reach design strength 75% after, can carry out steel form carrier unload and the demoulding.When unloading the demoulding, at first remove external mold, and with the pull bar dismounting, will tighten up with the arch ring both sides arch springing part internal mold leading screw that the abutment body body of wall is close to again, inwardly retract both sides arch springing part internal mold about 20cm, 6 jack with chassis mould bases bottom unclamp the lock-bit switch simultaneously then, slowly the whereabouts jack falls steel form carrier steadily, contacts basic end face until the steel wheel of chassis mould bases, finish the dismounting of template, enter next working cycles.
Arch culvert has been saved the time of founding, tearing open support and template repeatedly after using the utility model, has significantly reduced working procedure and workload, and steel form carrier intensity, rigidity and stability are all fine simultaneously, is difficult for producing distortion.This chassis mould bases is simple in structure, be easy to processing, the surface steel sheet seam is tight, the arc unanimity, and whole adjustability is good, template need not to carry out propping up of repetition and tears operation open after standing well, after a last joint arch ring construction finishes, directly run to down the construction location of joint arch ring, the construction of following joint arch ring, thereby shortened construction period effectively, accelerate construction speed, reduced construction cost, improved economic benefit.After construction was finished, chassis mould bases material was all reusable after disintegrating.The concrete arch astragal type unanimity of constructing, concrete surface is smooth, smooth, so in the construction bigger practical value is arranged at the scene, can large-scale popularization use in similar engineering.Construction speed, safety all are controlled effectively, and the construction demand has all been satisfied in every design preferably.

Claims (2)

1. arch culvert arch ring steel form carrier, it is characterized in that comprising the mould bases (3) of steel truss structure, mould bases (3) bottom symmetry is installed four steel wheels (1), mould bases (3) bottom also is provided with some jack supporting-points, the internal mold (6) and the external mold (7) of circular arc installed at mould bases (3) top, internal mold (6) comprises by the vault part of bearing pin (4) connection and the arch springing part of both sides, between internal mold (6) and the external mold (7) pull bar (5) is set, the two ends up and down of pull bar (5) respectively with external mold (7), internal mold (6) connects, and is connected with leading screw (8) between the arch springing part of internal mold (6) and mould bases (3) top.
2. arch culvert arch ring steel form carrier according to claim 1 is characterized in that the pull bar upper/lower terminal uses taper sealing bolt, the outside butterfly card that uses with the part inside that is connected of external mold, internal mold.
CN2010202994396U 2010-08-21 2010-08-21 Arch culvert and arch ring steel die trolley Expired - Fee Related CN201738250U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202994396U CN201738250U (en) 2010-08-21 2010-08-21 Arch culvert and arch ring steel die trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202994396U CN201738250U (en) 2010-08-21 2010-08-21 Arch culvert and arch ring steel die trolley

Publications (1)

Publication Number Publication Date
CN201738250U true CN201738250U (en) 2011-02-09

Family

ID=43553528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202994396U Expired - Fee Related CN201738250U (en) 2010-08-21 2010-08-21 Arch culvert and arch ring steel die trolley

Country Status (1)

Country Link
CN (1) CN201738250U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966121A (en) * 2012-12-14 2013-03-13 中铁二十三局集团有限公司 Integrally movable mould frame for pipe rack cast-in-site construction
CN103243691A (en) * 2013-04-24 2013-08-14 葛洲坝集团第五工程有限公司 Prefabricated steel formwork for gallery top arch of dam absorption basin
CN110593136A (en) * 2019-10-23 2019-12-20 中铁七局集团有限公司 Arch ring walking type formwork trolley of deck arch bridge and construction method
CN111206517A (en) * 2020-02-18 2020-05-29 山西三建集团有限公司 Arc-shaped template system of cast-in-place culvert vault and culvert vault pouring method
CN111501570A (en) * 2020-05-08 2020-08-07 黑龙江省龙建路桥第三工程有限公司 Automatic adjusting and supporting die frame for small-span arch bridge
CN113309017A (en) * 2021-07-08 2021-08-27 甘肃路桥建设集团有限公司 Culvert template trolley
CN113338417A (en) * 2021-05-19 2021-09-03 湖南大兴加固改造工程有限公司 Pressure grouting process for semi-structural reinforcement of arch culvert of masonry

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966121A (en) * 2012-12-14 2013-03-13 中铁二十三局集团有限公司 Integrally movable mould frame for pipe rack cast-in-site construction
CN103243691A (en) * 2013-04-24 2013-08-14 葛洲坝集团第五工程有限公司 Prefabricated steel formwork for gallery top arch of dam absorption basin
CN110593136A (en) * 2019-10-23 2019-12-20 中铁七局集团有限公司 Arch ring walking type formwork trolley of deck arch bridge and construction method
CN111206517A (en) * 2020-02-18 2020-05-29 山西三建集团有限公司 Arc-shaped template system of cast-in-place culvert vault and culvert vault pouring method
CN111501570A (en) * 2020-05-08 2020-08-07 黑龙江省龙建路桥第三工程有限公司 Automatic adjusting and supporting die frame for small-span arch bridge
CN113338417A (en) * 2021-05-19 2021-09-03 湖南大兴加固改造工程有限公司 Pressure grouting process for semi-structural reinforcement of arch culvert of masonry
CN113338417B (en) * 2021-05-19 2022-08-30 湖南大兴加固改造工程有限公司 Pressure grouting process for semi-structural reinforcement of arch culvert of masonry
CN113309017A (en) * 2021-07-08 2021-08-27 甘肃路桥建设集团有限公司 Culvert template trolley
CN113309017B (en) * 2021-07-08 2022-09-23 甘肃路桥建设集团有限公司 Culvert template trolley

Similar Documents

Publication Publication Date Title
CN201738250U (en) Arch culvert and arch ring steel die trolley
CN202627506U (en) Formwork for cast-in-place concrete connecting beams
CN104594204B (en) Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN206607863U (en) A kind of post-cast strip temporary support structure
CN104831756B (en) A kind of construction method utilizing template jacking instrument to carry out Bars In Poured Concrete Slab post-cast strip formwork
CN105133487B (en) Construction method for using combined type bridge temporary support to rapidly build continuous beams
CN106968435A (en) A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN207974601U (en) A kind of large size earthing concrete tank dome steel support structure
CN112227218A (en) Stainless steel-wood combined template applied to bare concrete and manufacturing method thereof
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN105780922A (en) Construction method for segmental formwork hoisting system of large-span steel reinforced concrete transfer truss
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN107724671A (en) A kind of monoblock type climbing form system and its construction method
CN203834370U (en) Arch ring steel formwork trolley for circular arch culvert
CN204343319U (en) Cableway pipe patten pre-embedded anchoring bolts jig
CN106381810B (en) With the cast-in-place outstanding method for filling beam of beam-column type bracket
CN219080981U (en) Non-support fixing device for post-pouring strip of superimposed sheet
CN202108296U (en) Assembled segmental water tank tower
CN114277672B (en) Large-span prestressed concrete bent cap structure and construction method thereof
CN205224420U (en) Anticorrosive industry factory building precast concrete stand
CN215889453U (en) Temporary support for two sides of post-cast strip of building floor
CN214245382U (en) Stainless steel-wood combined template applied to bare concrete
CN108661301A (en) Derrick stand modularization assembling platform and application method
CN107724672A (en) A kind of steel construction skyscraper cast-in-situ floor formwork support structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110209

Termination date: 20130821