CN217811456U - Be used for green building sewage pipe anti-seepage to lay structure - Google Patents

Be used for green building sewage pipe anti-seepage to lay structure Download PDF

Info

Publication number
CN217811456U
CN217811456U CN202221225526.6U CN202221225526U CN217811456U CN 217811456 U CN217811456 U CN 217811456U CN 202221225526 U CN202221225526 U CN 202221225526U CN 217811456 U CN217811456 U CN 217811456U
Authority
CN
China
Prior art keywords
layer
seepage
backfill
pipe ditch
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221225526.6U
Other languages
Chinese (zh)
Inventor
刘佩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yuanchuan Construction Technology Group Co ltd
Original Assignee
Shanghai Yuanchuan Construction Technology Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yuanchuan Construction Technology Group Co ltd filed Critical Shanghai Yuanchuan Construction Technology Group Co ltd
Priority to CN202221225526.6U priority Critical patent/CN217811456U/en
Application granted granted Critical
Publication of CN217811456U publication Critical patent/CN217811456U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides an anti-seepage laying structure for sewage pipelines of green buildings, which comprises a plain soil layer, a cushion layer, a pipe ditch, a first anti-seepage layer, a first cushion layer, a pipeline, a first backfill layer, a second backfill layer, a cover plate, a second anti-seepage layer and a terrace layer; a second cushion layer is poured on the plain soil layer, and a U-shaped cross-section-shaped pipe ditch is arranged on the second cushion layer; a first impermeable layer is fully paved on the inner wall surface of the pipe ditch, a first cushion layer is paved at the bottom in the pipe ditch, a pipeline is arranged on the first cushion layer, a first backfill layer is arranged in the pipe ditch and covers the pipeline, the first backfill layer is backfilled to the middle of the pipe ditch, a second backfill layer is paved on the first backfill layer and is leveled with the top of the pipe ditch, and a cover plate is covered on the top of the pipe ditch; the cover plate is covered with a second impermeable layer in a laminating manner, and the second impermeable layer is provided with a terrace layer.

Description

Be used for green building sewage pipe anti-seepage to lay structure
Technical Field
The utility model relates to a building field especially relates to a be used for green building sewage pipeline prevention of seepage laying structure.
Background
The green building is a high-quality building which saves resources, protects the environment, reduces pollution, provides healthy, applicable and efficient use space for people and furthest realizes harmonious symbiosis between people and nature in the life cycle; the sewage, greasy dirt and other pollutants in the current green building underground pipe ditch easily leak, pollute the surrounding environment, and prior art lays the green building underground pipe ditch and handles relatively poorly, consequently, needs one kind to be used for the green building underground pipe ditch seepage prevention to bury the structure and solve above-mentioned technical problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art's defect and not enough, provide a be used for green building sewage pipeline prevention of seepage to lay structure, adopt the utility model discloses a structure is laid the pipeline in the trench, and the cooperation has first back-filling layer, second back-filling layer, is equipped with first barrier layer, second barrier layer, can effectual control sewage, greasy dirt and other pollutants spread, reduces environmental pollution.
In order to achieve the above object, the utility model adopts the following technical scheme: an anti-seepage laying structure for a sewage pipeline of a green building comprises a plain soil layer, a cushion layer, a pipe ditch, a first anti-seepage layer, a first cushion layer, a pipeline, a first backfill layer, a second backfill layer, a cover plate, a second anti-seepage layer and a terrace layer; a second cushion layer is poured on the plain soil layer, and a U-shaped cross-section-shaped pipe ditch is arranged on the second cushion layer; a first impermeable layer is fully paved on the inner wall surface of the pipe ditch, a first cushion layer is paved at the bottom in the pipe ditch, a pipeline is arranged on the first cushion layer, a first backfill layer is arranged in the pipe ditch and covers the pipeline, the first backfill layer is backfilled to the middle of the pipe ditch, a second backfill layer is paved on the first backfill layer and is leveled with the top of the pipe ditch, and a cover plate is covered on the top of the pipe ditch; the cover plate is covered with a second impermeable layer in a laminating manner, and the second impermeable layer is provided with a terrace layer.
Preferably, the first impermeable layer and the second impermeable layer are both polymer cement waterproof mortar layers with the thickness of 10 mm.
Preferably, the first backfill layer is a coarse sand backfill layer, and the second backfill layer is an original soil backfill layer.
Preferably, the pipe is fixable to the pipe support.
Preferably, the pipe trench is of a prefabricated reinforced concrete structure.
The utility model has the advantages that: adopt the utility model discloses a structure, with the pipe laying in the trench, the cooperation has first back-filling layer, second back-filling layer, is equipped with first barrier layer, second barrier layer, can effectual control sewage, greasy dirt and other pollutants spread, reduces environmental pollution.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the principles of the invention.
Fig. 1 is a schematic diagram of an anti-seepage laying structure for a sewage pipeline of a green building.
Wherein: 1 is a plain soil layer, 2 is a second cushion layer, 3 is a pipe ditch, 4 is a first impermeable layer, 5 is a first cushion layer, 6 is a pipeline bracket, 7 is a pipeline, 8 is a first backfill layer, 9 is a second backfill layer, 10 is a cover plate, 11 is a second impermeable layer, and 12 is a terrace layer.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in the figure, the anti-seepage laying structure for the sewage pipeline of the green building comprises a plain soil layer 1, a cushion layer 2, a pipe ditch 3, a first anti-seepage layer 4, a first cushion layer 5, a pipeline 7, a first backfill layer 8, a second backfill layer 9, a cover plate 10, a second anti-seepage layer 11 and a terrace layer 12; a second cushion layer 2 is poured on the plain soil layer 1, and a U-shaped cross-section-shaped pipe ditch 3 is arranged on the second cushion layer 2; a first impermeable layer 4 is fully paved on the inner wall surface of the pipe ditch 3, a first cushion layer 5 is paved at the bottom in the pipe ditch 3, a pipeline 7 is arranged on the first cushion layer 5, a first backfill layer 8 is arranged in the pipe ditch 3, the first backfill layer 8 covers the pipeline 7, the first backfill layer 8 is backfilled to the middle part of the pipe ditch 3, a second backfill layer 9 is paved on the first backfill layer 8, the second backfill layer 9 is level with the top of the pipe ditch 3, and a cover plate 10 is covered at the top of the pipe ditch 3; the cover plate 10 is covered with a second impermeable layer 11 in an attaching mode, and a terrace layer 12 is arranged on the second impermeable layer 11.
In specific implementation, the first impermeable layer 4 and the second impermeable layer 11 are both polymer cement waterproof mortar layers with the thickness of 10 mm.
In specific implementation, the first backfill layer 8 is a coarse sand backfill layer, and the second backfill layer 9 is an original plain soil backfill layer.
In a specific implementation, the pipeline 7 can be fixed on the pipeline bracket 6.
In specific implementation, the pipe trench 3 is of a prefabricated reinforced concrete structure.

Claims (5)

1. The utility model provides a be used for green building sewage pipeline prevention of seepage to lay structure which characterized in that: the anti-seepage pipeline comprises a plain soil layer, a cushion layer, a pipe ditch, a first anti-seepage layer, a first cushion layer, a pipeline, a first backfill layer, a second backfill layer, a cover plate, a second anti-seepage layer and a terrace layer; a second cushion layer is poured on the plain soil layer, and a U-shaped cross-section-shaped pipe ditch is arranged on the second cushion layer; a first anti-seepage layer is fully paved on the inner wall surface of the pipe ditch, a first cushion layer is paved at the bottom in the pipe ditch, a pipeline is arranged on the first cushion layer, a first backfill layer is arranged in the pipe ditch and covers the pipeline, the first backfill layer is backfilled to the middle of the pipe ditch, a second backfill layer is paved on the first backfill layer, the second backfill layer is level with the top of the pipe ditch, and a cover plate is covered on the top of the pipe ditch; the cover plate is covered with a second impermeable layer in a laminating manner, and the second impermeable layer is provided with a terrace layer.
2. The anti-seepage laying structure for the sewage pipeline of the green building as claimed in claim 1, wherein: and the first impermeable layer and the second impermeable layer are polymer cement waterproof mortar layers with the thickness of 10 mm.
3. The anti-seepage laying structure for the sewage pipeline of the green building as claimed in claim 1, wherein: the first backfill layer is a coarse sand backfill layer, and the second backfill layer is an original plain soil backfill layer.
4. The anti-seepage laying structure for the sewage pipeline of the green building as claimed in claim 1, wherein: the pipe may be fixed to a pipe support.
5. The seepage-proofing laying structure for the sewage pipeline of the green building as claimed in claim 1, wherein: the pipe trench is of a prefabricated reinforced concrete structure.
CN202221225526.6U 2022-05-19 2022-05-19 Be used for green building sewage pipe anti-seepage to lay structure Active CN217811456U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221225526.6U CN217811456U (en) 2022-05-19 2022-05-19 Be used for green building sewage pipe anti-seepage to lay structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221225526.6U CN217811456U (en) 2022-05-19 2022-05-19 Be used for green building sewage pipe anti-seepage to lay structure

Publications (1)

Publication Number Publication Date
CN217811456U true CN217811456U (en) 2022-11-15

Family

ID=83986268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221225526.6U Active CN217811456U (en) 2022-05-19 2022-05-19 Be used for green building sewage pipe anti-seepage to lay structure

Country Status (1)

Country Link
CN (1) CN217811456U (en)

Similar Documents

Publication Publication Date Title
CN105089069B (en) Pipeline foundation and construction method thereof
CN112982300B (en) Seepage-proofing and drainage connecting structure for bank asphalt concrete panel and reservoir bottom geomembrane and construction method
CN105672451A (en) Method for laying percolation type rainwater drainage pipes in Sponge City Construction
CN106759476A (en) A kind of assembled municipal administration comprehensive pipeline passage and its construction method
CN104420480A (en) Collapsible loess area integrated pipe network layout method and structure
CN103572808A (en) Building toilet caisson waterproof device and construction method
CN217811456U (en) Be used for green building sewage pipe anti-seepage to lay structure
CN212104515U (en) Be used for basement percolating water prevention and cure construction structures
CN217399744U (en) Basement side wall sluicing decompression structure
CN106498981A (en) A kind of brick type municipal administration comprehensive pipeline passage and its construction method
CN204825969U (en) Inspection shaft subsides prevents and treats structure
CN213062105U (en) Cable hand hole well theftproof node structure
CN217758972U (en) Be used for prevention of seepage of green building sewage pipe to lay connection structure
CN218091175U (en) Anti-seepage reinforced connection structure for sewage pipe of green building
CN204940330U (en) A kind of pipeline foundation
CN210049283U (en) Wireless communication cable trench inspection well
CN211312560U (en) Simple and easy core section of thick bamboo stepping water conservancy diversion drainage structures
CN211395701U (en) Pipeline channel of easy construction
CN212561820U (en) Secondary floor drain connecting structure of sinking type toilet
CN210507548U (en) Sump pit expansion joint waterproof construction
CN105421499A (en) Anti-floating construction method for basement
CN216428317U (en) Water-resisting and seepage-preventing terrace structure suitable for collapsible loess area
CN212478007U (en) Drainage duplex well structure
CN212248391U (en) Seepage-proofing structure of emergency site wastewater collection facility foundation
CN213142674U (en) Light foam soil roadbed composite drainage structure based on hdpe pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant