CN217760068U - Concrete auxiliary pouring equipment - Google Patents
Concrete auxiliary pouring equipment Download PDFInfo
- Publication number
- CN217760068U CN217760068U CN202221329013.XU CN202221329013U CN217760068U CN 217760068 U CN217760068 U CN 217760068U CN 202221329013 U CN202221329013 U CN 202221329013U CN 217760068 U CN217760068 U CN 217760068U
- Authority
- CN
- China
- Prior art keywords
- funnel
- lower funnel
- pulley
- fixed
- walking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Supplementary equipment of pouring of concrete relates to a supplementary equipment of pouring of concrete. Mainly be for solving the poor problem of concreting quality of adopting the mode of crane bucket to pour when the topography is restricted at present and design. The trolley comprises a walking trolley, wherein a vertical handle is arranged on the walking trolley, and I-shaped steel is arranged at the top of the walking trolley; the top parts of the left lower funnel and the right lower funnel are provided with upper funnels, the bottom parts of the upper funnels are provided with walking wheel brackets, walking wheels are arranged on the walking wheel brackets, and the walking wheels are arranged on the upper surfaces of the I-shaped steel bars; a left pulley mounting frame is fixed on the left lower funnel, and a left pulley is mounted on the left pulley mounting frame; a right pulley mounting frame is fixed on the right lower funnel, a right pulley is mounted on the right pulley mounting frame, and the left pulley and the right pulley are respectively contacted with the left side surface and the right side surface of the I-steel; discharge pipes at the bottoms of the left lower funnel and the right lower funnel are provided with valves, and reinforcing mesh sheets are arranged in the left lower funnel and the right lower funnel. The top of the upper funnel is provided with a baffle plate; the upper funnel is also provided with a transverse handle. The method has the advantage of ensuring that the pouring quality of the concrete meets the requirements.
Description
The technical field is as follows:
the utility model relates to a concrete is supplementary to pour equipment.
Background art:
with the continuous increase of the basic construction of China, a large number of construction projects exist. The quantity of concrete engineering construction is great, because of the reason of the construction topography, generally adopt the mode of crane hoist bucket to pour the concrete when the topography is restricted at present, not only the speed of pouring is slow, and the quality of pouring the concrete also can not obtain guaranteeing. For a structure with a large width, a concrete delivery pump is generally adopted to complete pouring work, and construction cost is high.
The invention content is as follows:
the utility model aims to solve the technical problem that a concrete auxiliary pouring equipment that pouring speed is fast, construction cost is low is provided.
The above object is achieved by: it is fixed with vertical handle, characterized by including the walking dolly on the walking dolly: i-shaped steel is welded at the top of the walking trolley; the funnel type funnel device also comprises a left lower funnel and a right lower funnel, wherein the tops of the left lower funnel and the right lower funnel are connected with an upper funnel, and the upper funnel is communicated with the left lower funnel and the right lower funnel; the upper funnel is positioned above the I-steel, the left funnel is positioned on the left side of the I-steel, the right funnel is positioned on the right side of the I-steel, a walking wheel support extending downwards is fixed at the bottom of the upper funnel, a walking wheel is installed on the walking wheel support through a shaft, and the walking wheel is arranged on the upper surface of the I-steel; a left pulley mounting frame extending rightwards is fixed on the right side surface of the left lower funnel, a left pulley is mounted on the left pulley mounting frame through a shaft, and the left pulley is in contact with the left side surface of the I-shaped steel; a left pulley mounting frame extending leftwards is fixed on the left side face of the right lower hopper, a right pulley is mounted on the right pulley mounting frame through a shaft, and the right pulley is in contact with the right side face of the I-steel; the bottom of funnel and right lower funnel all is equipped with the discharging pipe down in a left side, installs the valve on the discharging pipe, and the upper portion in funnel and the right lower funnel all is fixed with reinforcing bar net piece down in a left side. The top of the periphery of the upper funnel is fixed with a baffle plate which extends upwards and inclines outwards gradually; the upper funnel is also fixed with a transverse handle.
The utility model has the advantages that: a rail is longitudinally arranged at the pouring position, and the device walks on the rail. The device moves to a position to be poured with concrete through the travelling trolley, and the crane is used for hoisting and transporting the concrete to be placed into the funnel for pouring the concrete. The transverse handle on the funnel is pushed, so that the funnel can walk on the I-shaped steel. And when the funnel runs to a specified pouring position, the valve is opened to pour concrete. After the pouring of the pouring section is finished, the whole equipment is pushed to travel to the next pouring section through the vertical handle on the traveling device, and the procedure is repeated to finish the next pouring task.
The left pulley and the right pulley are arranged, so that the funnel can be ensured to be stable and stable in the walking process. The baffle that has installed the outside slope on funnel upper portion can prevent that the concrete from spilling over the funnel, falls into the entity engineering in, influences entity engineering quality. And reinforcing mesh sheets are arranged in the left lower hopper and the right lower hopper, so that impurities or large-particle-size blocks in concrete can be prevented from entering the interior of the solid engineering, and the quality of the poured concrete is ensured.
Utilize this device to carry out concrete placement, not restricted by the topography condition, greatly reduced construction cost has ensured that concrete placement quality meets the demands.
Description of the drawings:
fig. 1 is a schematic front view of the present invention;
fig. 2 is a side view schematic diagram of the present invention.
The specific implementation mode is as follows:
the present invention will be further explained with reference to fig. 1 and 2;
the trolley comprises a walking trolley 1, wherein a vertical handle 2 is fixed on the walking trolley, and an I-shaped steel 3 is welded at the top of the walking trolley; the funnel type funnel device also comprises a left lower funnel 4 and a right lower funnel 5, wherein the tops of the left lower funnel and the right lower funnel are connected with an upper funnel 6, and the upper funnel is communicated with the left lower funnel and the right lower funnel; the upper funnel is positioned above the I-steel, the left funnel is positioned on the left side of the I-steel, the right funnel is positioned on the right side of the I-steel, a walking wheel support 7 extending downwards is fixed at the bottom of the upper funnel, a walking wheel 8 is arranged on the walking wheel support through a shaft, and the walking wheel is arranged on the upper surface of the I-steel; a left pulley mounting frame 9 extending rightwards is fixed on the right side surface of the left lower funnel, a left pulley 10 is mounted on the left pulley mounting frame through a shaft, and the left pulley is in contact with the left side surface of the I-shaped steel; a right pulley mounting frame 11 extending leftwards is fixed on the left side face of the right lower hopper, a right pulley 12 is mounted on the right pulley mounting frame through a shaft, and the right pulley is in contact with the right side face of the I-steel; the bottom of the left lower funnel and the bottom of the right lower funnel are both provided with a discharge pipe 13, the discharge pipes are provided with valves 14, and the upper parts of the left lower funnel and the right lower funnel are both fixed with reinforcing mesh sheets 15. A baffle plate 16 which extends upwards and inclines outwards gradually is fixed at the top of the periphery of the upper funnel; a transverse handle 17 is also fixed on the upper funnel.
A rail is longitudinally arranged at the pouring position, and the device walks on the rail. The device moves to a position to be poured with concrete through the travelling trolley, and the crane is used for hoisting and transporting the concrete to be placed into the funnel for pouring the concrete. The transverse handle on the funnel is pushed, so that the funnel can walk on the I-shaped steel. And when the funnel runs to a specified pouring position, the valve is opened to pour concrete. After the pouring of the pouring section is finished, the whole equipment is pushed to travel to the next pouring section through the vertical handle on the traveling device, and the procedure is repeated to finish the next pouring task.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and variations can be made without departing from the technical principle of the present invention, and these modifications and variations should also be regarded as the protection scope of the present invention.
Claims (1)
1. Concrete auxiliary pouring equipment, including walking dolly (1), be fixed with vertical handle (2), characterized by on the walking dolly: the top of the walking trolley is welded with an I-shaped steel (3); the funnel is characterized by further comprising a left lower funnel (4) and a right lower funnel (5), wherein the tops of the left lower funnel and the right lower funnel are connected with an upper funnel (6), and the upper funnel is communicated with the left lower funnel and the right lower funnel; the upper funnel is positioned above the I-steel, the left funnel is positioned on the left side of the I-steel, the right funnel is positioned on the right side of the I-steel, a walking wheel support (7) extending downwards is fixed at the bottom of the upper funnel, a walking wheel (8) is installed on the walking wheel support through a shaft, and the walking wheel is arranged on the upper surface of the I-steel; a left pulley mounting frame (9) extending rightwards is fixed on the right side surface of the left lower funnel, a left pulley (10) is mounted on the left pulley mounting frame through a shaft, and the left pulley is in contact with the left side surface of the I-shaped steel; a right pulley mounting frame (11) extending leftwards is fixed on the left side face of the right lower hopper, a right pulley (12) is mounted on the right pulley mounting frame through a shaft, and the right pulley is in contact with the right side face of the I-shaped steel; discharge pipes (13) are arranged at the bottoms of the left lower funnel and the right lower funnel, valves (14) are mounted on the discharge pipes, and reinforcing mesh sheets (15) are fixed at the upper parts of the left lower funnel and the right lower funnel; a baffle (16) which extends upwards and inclines outwards gradually is fixed at the top of the periphery of the upper funnel; a transverse handle (17) is also fixed on the upper funnel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221329013.XU CN217760068U (en) | 2022-05-31 | 2022-05-31 | Concrete auxiliary pouring equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221329013.XU CN217760068U (en) | 2022-05-31 | 2022-05-31 | Concrete auxiliary pouring equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217760068U true CN217760068U (en) | 2022-11-08 |
Family
ID=83888288
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221329013.XU Active CN217760068U (en) | 2022-05-31 | 2022-05-31 | Concrete auxiliary pouring equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217760068U (en) |
-
2022
- 2022-05-31 CN CN202221329013.XU patent/CN217760068U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103042202B (en) | Automatic pouring system | |
CN102635369A (en) | Construction method for integrally pouring inverted arch concrete by matching trestle with top formwork | |
CN109680953A (en) | A kind of automatic moving type regenerates blanking and the mixing tamping equipment of block | |
CN107661977A (en) | It is a kind of that the method for changing conticaster ladle pivoting support is integrally lifted according to crane gear | |
CN204492198U (en) | Concrete slip cylinder | |
CN217760068U (en) | Concrete auxiliary pouring equipment | |
CN108526455A (en) | Pouring product line | |
CN102704360B (en) | Construction method for ballastless track base plate | |
CN209760820U (en) | Blanking and mixed vibrating device for self-moving type regeneration block | |
CN216002625U (en) | Trolley for transporting large-size slope protection bricks | |
CN206408625U (en) | A kind of Prefabricated Concrete feeding device of use conveyer belt | |
CN206034300U (en) | Move liangping car and with moving large -tonnage precast beam sideslip device that liangping car was made | |
CN202401427U (en) | Integrated slip form equipment for paving concrete and sand and vibrating sand for bed of canal | |
CN205347466U (en) | Pouring blast furnace tap drain is with there being rail dolly | |
CN205772938U (en) | A kind of transport, the device of dismounting boiler feed pump | |
CN104727268B (en) | A kind of city river diversion dirt removal device and sewage water treatment method thereof | |
CN202766936U (en) | Multifunctional transporting device for ballastless track base plate construction | |
CN113152309A (en) | Self-supporting synchronous hanging bracket system for corrugated steel web construction and construction method | |
CN217761018U (en) | Two-lining side wall and cable groove synchronous pouring slip form | |
CN216444595U (en) | Shallow pit shakeout system | |
CN220079882U (en) | Concrete belt conveying and pouring device for revetment engineering | |
CN211948214U (en) | Concrete panel regularization template | |
CN212927070U (en) | Trolley for concrete pouring | |
CN111794055B (en) | Construction method for cast-in-place road shoulder of movable chute trolley | |
CN214117538U (en) | New jersey guardrail hydraulic pressure distributing device for horizontal prefabrication method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |