CN107661977A - It is a kind of that the method for changing conticaster ladle pivoting support is integrally lifted according to crane gear - Google Patents
It is a kind of that the method for changing conticaster ladle pivoting support is integrally lifted according to crane gear Download PDFInfo
- Publication number
- CN107661977A CN107661977A CN201710864298.4A CN201710864298A CN107661977A CN 107661977 A CN107661977 A CN 107661977A CN 201710864298 A CN201710864298 A CN 201710864298A CN 107661977 A CN107661977 A CN 107661977A
- Authority
- CN
- China
- Prior art keywords
- pivoting support
- column
- ladle
- panoramic tables
- bale panoramic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D41/00—Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
- B22D41/12—Travelling ladles or similar containers; Cars for ladles
- B22D41/13—Ladle turrets
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
Abstract
It is a kind of that the method for changing conticaster ladle pivoting support is integrally lifted according to crane gear, it is characterized in, commands ladle under traveling crane first, removes bale panoramic tables periphery wall brick, site clearing greasy dirt;Forks arm is risen into extreme higher position, steel plate positioning is filled between forks arm and principal arm gap, jacking cylinder is installed above cement beam and column, column upper end are determined with forks arm decorated fire solid welding;Remove locking device, hydraulic slip ring, electric slip ring and the inside and outside circle connecting bolt of pivoting support on pivoting support;Control bale panoramic tables to rise, reinforced jacking column with scissors fork, then protection column is installed;Chain block is fixed on bale panoramic tables lower end and lifts pivoting support, the insertion sliding steel pipe on base, then pivoting support inner ring bolt is up lifted while inserts ready thin plate, then pivoting support is placed on sliding steel pipe;A platform is built concordant with base, pivoting support level is pulled out among platform with chain block, the dismounting of pivoting support is completed, then new pivoting support is installed.Present invention operation has the characteristics of repair time is short, light labor intensity.
Description
Technical field
The present invention relates to a kind of method for integrally being lifted according to crane gear and changing conticaster ladle pivoting support.
Background technology
Ladle turret is that most common delivery and support ladle are poured into a mould in present continuously casting and steelmaking process
Equipment, it is generally arranged at molten steel and receives between casting bay colonnade, the designed ladle radius of gyration so that pour ladle nozzle
In tundish stated above position.Ladle is placed on panoramic table by the driving received with molten steel across side, passes through panoramic table
Turning round, which makes ladle be parked on tundish, supplies its molten steel.The empty Bao Ze poured transports molten steel back by panoramic table revolution and received again
Across.
Replacing for pivoting support, be usually fragmentary dismounting method, i.e. each fragmentary component to ladle turret and its attached
Category equipment is progressively removed, installed, and this method wastes time and energy, when needing even tens of days a couple of days according to specification of equipment size is estimated
Between.
The content of the invention
Its purpose of the invention is that a kind of integrally lifted according to crane gear of offer changes conticaster ladle pivoting support
Method, the replacing options for solving traditional pivoting support exist and waste time and energy, and need a couple of days according to specification of equipment size is estimated
The problem of even tens of days time.
Adopt the technical scheme that to achieve the above object, a kind of integrally lifted according to crane gear changes conticaster steel
The method of bag pivoting support, including step:
(1)Ladle under traveling crane is commanded first, is removed bale panoramic tables periphery wall brick, site clearing greasy dirt, is conveniently replaceable operation;
(2)Forks arm is risen into extreme higher position, steel plate positioning is filled between forks arm and principal arm gap, then on cement beam
Side's installation jacking cylinder and column, adjustment make column keep plumbness, and column upper end is determined with forks arm decorated fire solid welding;
(3)Remove locking device, hydraulic slip ring, electric slip ring and the inside and outside circle connecting bolt of pivoting support on pivoting support;
(4)Control jacking cylinder jacks examination top simultaneously, after confirming that bale panoramic tables leave base, increases the operation of jacking amount, until
After bale panoramic tables ascending amount reach a certain height, pitched with scissors and reinforce column, then protection column is installed;
(5)Bale panoramic tables lower end is fixed on chain block to lift pivoting support, the insertion sliding steel pipe on base, then
Pivoting support inner ring bolt is up lifted while inserts ready thin plate, allows inner ring bolt to fall on thin plate, then will revolution
Supporting is placed on sliding steel pipe;
(6)A platform is concordantly built in base side, pivoting support level is pulled out on platform with chain block, completed back
Turn the dismounting of supporting, then new pivoting support is installed.
Beneficial effect
The present invention has advantages below compared with prior art.
The present invention proposes a kind of method for integrally being lifted according to crane gear and changing conticaster ladle pivoting support, this method
It is simple with technique, it is easy to operate, securely and reliably, it is time saving and energy saving the advantages of.
Brief description of the drawings
Below in conjunction with accompanying drawing, the invention will be further described.
Fig. 1 is the structural representation of conticaster of the present invention;
Fig. 2 jacks schematic diagram for bale panoramic tables in the present invention;
Fig. 3 is pivoting support partial structural diagram in the present invention;
Fig. 4 reinforces top lift post schematic diagram for scissors fork in the present invention;
Fig. 5 lifts schematic diagram for pivoting support in the present invention;
Fig. 6 places schematic diagram to slide steel pipe in the present invention;
Fig. 7 removes schematic diagram for pivoting support in the present invention.
Embodiment
It is a kind of that the method for changing conticaster ladle pivoting support, including step are integrally lifted according to crane gear:
(1)Ladle under traveling crane is commanded first, is removed bale panoramic tables periphery wall brick, site clearing greasy dirt, is conveniently replaceable operation;
(2)Forks arm is risen into extreme higher position, steel plate positioning is filled between forks arm and principal arm gap, then on cement beam
Side's installation jacking cylinder and column, adjustment make column keep plumbness, and column upper end is determined with forks arm decorated fire solid welding;
(3)Remove locking device, hydraulic slip ring, electric slip ring and the inside and outside circle connecting bolt of pivoting support on pivoting support;
(4)Control jacking cylinder jacks examination top simultaneously, after confirming that bale panoramic tables leave base, increases the operation of jacking amount, until
After bale panoramic tables ascending amount reach a certain height, jacking column is reinforced with scissors fork, then protection column is installed;
(5)Bale panoramic tables lower end is fixed on chain block to lift pivoting support, the insertion sliding steel pipe on base, then will
Pivoting support inner ring bolt up lifts while inserts ready thin plate, allows inner ring bolt to fall on thin plate, then will turn round branch
Hold and be placed on sliding steel pipe;
(6)A platform is concordantly built in base side, pivoting support level is pulled out on platform with chain block, is completed
The dismounting of pivoting support, then new pivoting support is installed.
Embodiment
It is a kind of that the method for changing conticaster ladle pivoting support is integrally lifted according to crane gear, as shown in Fig. 1-Fig. 7, more
It is as follows to change method:
1) ladle under traveling crane is commanded first, is removed bale panoramic tables periphery wall brick, site clearing greasy dirt, is conveniently replaceable operation;
2) forks arm 9 is risen into extreme higher position, steel plate 2 is filled between forks arm 9 and the gap of principal arm 1 and is positioned, in cement beam 8
Jacking cylinder 4 and column 5 are installed in top, and adjustment makes column 5 keep plumbness, the upper end of column 5 and the decorated fire solid welding of forks arm 9
It is fixed;
3) locking device, hydraulic slip ring, electric slip ring and the inside and outside circle connecting bolt of pivoting support on pivoting support 3 are removed;
4) control two jacking cylinders 4 of a lower end of forks arm 9 to jack about 10mm examinations top simultaneously, then control other end forks arm
Two jacking cylinders 4 of 9 lower ends jack about 10mm examinations top simultaneously, and pay attention to oil pressure change at any time, confirm that bale panoramic tables 6 leave
After base 7, the operation of jacking amount can be increased, until after the ascending amount of bale panoramic tables 6 reaches 300mm, is added column 5 with scissors fork 11
Gu then protection column is installed;
5) cucurbit is fixed on the lower end of bale panoramic tables 6 and pivoting support 3 is lifted into about 60mm, the insertion sliding steel on base 7
Pipe 12, then the inner ring bolt of pivoting support 3 is up lifted while inserts ready thin plate 13, allow inner ring bolt to fall in thin plate 13
On, then pivoting support 3 is placed on and slid on steel pipe 12;
6) platform 15 is built concordant with base 7, the level of pivoting support 3 is pulled out in platform 15 with chain block 14
Between, the dismounting of pivoting support 3 is completed, then new pivoting support is installed.
The invention provides a kind of method for integrally being lifted according to crane gear and changing conticaster ladle pivoting support, have
Repair time is short, the characteristics of light labor intensity.
Claims (1)
1. a kind of integrally lift the method for changing conticaster ladle pivoting support according to crane gear, it is characterised in that including step
Suddenly:
Ladle under traveling crane is commanded first, is removed bale panoramic tables periphery wall brick, site clearing greasy dirt, is conveniently replaceable operation;
Forks arm is risen into extreme higher position, steel plate positioning is filled between forks arm and principal arm gap, then above cement beam
Jacking cylinder and column are installed, adjustment makes column keep plumbness, and column upper end is determined with forks arm decorated fire solid welding;
Remove locking device, hydraulic slip ring, electric slip ring and the inside and outside circle connecting bolt of pivoting support on pivoting support;
Control jacking cylinder jacks examination top simultaneously, after confirming that bale panoramic tables leave base, increases the operation of jacking amount, until big bag
After panoramic table ascending amount reach a certain height, jacking column is reinforced with scissors fork, then protection column is installed;
Bale panoramic tables lower end is fixed on chain block to lift pivoting support, the insertion sliding steel pipe on base, then will return
Turn supporting inner ring bolt up to lift while insert ready thin plate, allow inner ring bolt to fall on thin plate, then by pivoting support
It is placed on sliding steel pipe;
A platform is concordantly built in base side, pivoting support level is pulled out on platform with chain block, completes revolution
The dismounting of supporting, then new pivoting support is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710864298.4A CN107661977A (en) | 2017-09-22 | 2017-09-22 | It is a kind of that the method for changing conticaster ladle pivoting support is integrally lifted according to crane gear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710864298.4A CN107661977A (en) | 2017-09-22 | 2017-09-22 | It is a kind of that the method for changing conticaster ladle pivoting support is integrally lifted according to crane gear |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107661977A true CN107661977A (en) | 2018-02-06 |
Family
ID=61098636
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710864298.4A Pending CN107661977A (en) | 2017-09-22 | 2017-09-22 | It is a kind of that the method for changing conticaster ladle pivoting support is integrally lifted according to crane gear |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107661977A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108500251A (en) * | 2018-06-28 | 2018-09-07 | 五冶集团上海有限公司 | The method for replacing sliding bearing in continuous casting machine revolving platform weighing arm support shaft |
CN109604576A (en) * | 2018-12-17 | 2019-04-12 | 中国十七冶集团有限公司 | Con casting ladle revolving platform hydraulic slip ring mounting device and method |
CN110479999A (en) * | 2018-05-15 | 2019-11-22 | 中冶宝钢技术服务有限公司 | The replacing options of ladle turret lifting cylinder |
CN110642146A (en) * | 2018-06-27 | 2020-01-03 | 上海梅山钢铁股份有限公司 | Method for improving alignment precision of casting crane and continuous casting ladle revolving platform |
CN113955663A (en) * | 2021-09-30 | 2022-01-21 | 上海二十冶建设有限公司 | Method for horizontally pushing and integrally jacking upper revolving body of bale revolving platform in place |
CN114535557A (en) * | 2022-01-10 | 2022-05-27 | 新余钢铁股份有限公司 | Method for disassembling oscillating arm joint bearing of continuous casting ladle turret |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5750256A (en) * | 1980-09-11 | 1982-03-24 | Kawasaki Steel Corp | Swiveling tower device in continuous casting installation |
CN201109020Y (en) * | 2007-08-27 | 2008-09-03 | 上海梅山钢铁股份有限公司 | Revolving bearing replacing mechanism for disk bale traverse platform |
CN101269462A (en) * | 2008-05-09 | 2008-09-24 | 中国第二冶金建设有限责任公司 | Method for quickly replacing pivotal bearing of bale panoramic tables |
CN202129438U (en) * | 2011-06-08 | 2012-02-01 | 宁波中超机器有限公司 | Bale rotary table |
CN104786002A (en) * | 2015-04-30 | 2015-07-22 | 泰富重工制造有限公司 | Maintenance method and device for slewing bearing part of gantry crane |
-
2017
- 2017-09-22 CN CN201710864298.4A patent/CN107661977A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5750256A (en) * | 1980-09-11 | 1982-03-24 | Kawasaki Steel Corp | Swiveling tower device in continuous casting installation |
CN201109020Y (en) * | 2007-08-27 | 2008-09-03 | 上海梅山钢铁股份有限公司 | Revolving bearing replacing mechanism for disk bale traverse platform |
CN101269462A (en) * | 2008-05-09 | 2008-09-24 | 中国第二冶金建设有限责任公司 | Method for quickly replacing pivotal bearing of bale panoramic tables |
CN202129438U (en) * | 2011-06-08 | 2012-02-01 | 宁波中超机器有限公司 | Bale rotary table |
CN104786002A (en) * | 2015-04-30 | 2015-07-22 | 泰富重工制造有限公司 | Maintenance method and device for slewing bearing part of gantry crane |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110479999A (en) * | 2018-05-15 | 2019-11-22 | 中冶宝钢技术服务有限公司 | The replacing options of ladle turret lifting cylinder |
CN110479999B (en) * | 2018-05-15 | 2021-07-13 | 中冶宝钢技术服务有限公司 | Method for replacing lifting oil cylinder of ladle turret |
CN110642146A (en) * | 2018-06-27 | 2020-01-03 | 上海梅山钢铁股份有限公司 | Method for improving alignment precision of casting crane and continuous casting ladle revolving platform |
CN110642146B (en) * | 2018-06-27 | 2020-10-23 | 上海梅山钢铁股份有限公司 | Method for improving alignment precision of casting crane and continuous casting ladle revolving platform |
CN108500251A (en) * | 2018-06-28 | 2018-09-07 | 五冶集团上海有限公司 | The method for replacing sliding bearing in continuous casting machine revolving platform weighing arm support shaft |
CN109604576A (en) * | 2018-12-17 | 2019-04-12 | 中国十七冶集团有限公司 | Con casting ladle revolving platform hydraulic slip ring mounting device and method |
CN109604576B (en) * | 2018-12-17 | 2021-01-05 | 中国十七冶集团有限公司 | Continuous casting ladle turret hydraulic slip ring installation device and method |
CN113955663A (en) * | 2021-09-30 | 2022-01-21 | 上海二十冶建设有限公司 | Method for horizontally pushing and integrally jacking upper revolving body of bale revolving platform in place |
CN113955663B (en) * | 2021-09-30 | 2023-08-25 | 上海二十冶建设有限公司 | Method for horizontally pushing and integrally jacking upper revolving body of ladle turret to be in position |
CN114535557A (en) * | 2022-01-10 | 2022-05-27 | 新余钢铁股份有限公司 | Method for disassembling oscillating arm joint bearing of continuous casting ladle turret |
CN114535557B (en) * | 2022-01-10 | 2023-11-03 | 新余钢铁股份有限公司 | Disassembling method for swing arm knuckle bearing of continuous casting ladle turret |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107661977A (en) | It is a kind of that the method for changing conticaster ladle pivoting support is integrally lifted according to crane gear | |
CN102816891B (en) | Hoisting method for overhauling and dismantling vaporization flue fixed at first section of converter | |
CN107165191A (en) | City comprehensive pipe gallery die and using method thereof | |
CN108035594A (en) | The prefabricated decompression cone construction method of concrete silo structure | |
CN101634197B (en) | Novel construction method for hoisting reverse cone-shape water-tower water tank | |
CN204899180U (en) | Steel construction jar body aerial working platform simply sets up device | |
CN111749714A (en) | Window-by-window layered pouring system for circular water delivery tunnel wall and construction method | |
CN107829370A (en) | High pier self-climbing hydraulic rollover construction process | |
CN109989406A (en) | Foundation pit support replacement construction | |
CN106368714A (en) | Tire type automatic lifting assembly rack for tunnel excavation construction | |
CN102493446A (en) | Steel tube column capable of preventing concrete spillover and method for mounting steel tube column | |
CN109826235B (en) | Replacement method for municipal well lid mounting frame | |
CN105328173A (en) | Vehicle-mounted fixed-point twice-tilting poured steel ladle and molten steel pouring method | |
CN107815971A (en) | High mound is from climbing hydraulic pressure mould system that turns over | |
CN105951683A (en) | Construction method for corbel steel reinforcements of gate pier | |
CN202117031U (en) | Hydraulic slip form construction device for gate pier | |
CN203875329U (en) | Lifting ladle support | |
CN205099290U (en) | Saddle arm jacking device is changed to continuous casting revolving platform floating bearing | |
CN106948841A (en) | High ferro tunnel pre-buried channel flow installation mold automatic lifting system and installation method | |
CN109622932A (en) | The quick change method of large-scale continuous casting ladle turret floating bearing | |
CN206917668U (en) | High ferro tunnel pre-buried channel flow installation mold automatic lifting system | |
CN101344004B (en) | Mounting method of deep well high pressure aeration reactor steel drum | |
CN210459305U (en) | Municipal administration well lid replacement device | |
CN211191999U (en) | L type steel ladle car and ladle storage device | |
CN106639152A (en) | Concrete construction method for concrete-filled steel tubular columns of steel making workshop |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180206 |
|
WD01 | Invention patent application deemed withdrawn after publication |