CN220079882U - Concrete belt conveying and pouring device for revetment engineering - Google Patents
Concrete belt conveying and pouring device for revetment engineering Download PDFInfo
- Publication number
- CN220079882U CN220079882U CN202320530175.8U CN202320530175U CN220079882U CN 220079882 U CN220079882 U CN 220079882U CN 202320530175 U CN202320530175 U CN 202320530175U CN 220079882 U CN220079882 U CN 220079882U
- Authority
- CN
- China
- Prior art keywords
- pouring
- guide rail
- construction
- belt conveying
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 claims abstract description 47
- 238000005266 casting Methods 0.000 claims description 5
- 239000004744 fabric Substances 0.000 claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 238000000034 method Methods 0.000 claims 1
- 239000000463 material Substances 0.000 description 6
- 238000006073 displacement reaction Methods 0.000 description 5
- 239000000109 continuous material Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012876 topography Methods 0.000 description 1
Landscapes
- Revetment (AREA)
- Road Paving Machines (AREA)
Abstract
The utility model provides a shore protection engineering concrete belt transport pouring device, this device are constituteed and are included belt transport portion, collecting hopper, pour template portion and sideslip portion, and belt transport portion spanes between the template support body of pouring template portion in construction passageway at foundation ditch top and the foundation ditch, sideslip portion include the upper bracket walking wheel of belt transport portion construction passageway side and its upper rail and the lower carriage walking wheel of belt transport portion pouring template portion side and lower rail thereof. The technical scheme meets the concrete distribution pouring construction requirement between the construction temporary way and the foundation pit bottom, solves the technical problem that the pouring device needs to be completed by auxiliary equipment to move a construction station, and has the technical advantages of continuous pouring operation and construction progress guarantee.
Description
Technical Field
The patent application relates to construction equipment, in particular to concrete pouring construction equipment with a revetment and a slope protection structure of a length direction continuous structure.
Background
How to carry out the concrete placement construction of bank protection, bank protection structure with high efficiency, not only solve the concrete placement problem at construction passageway and foundation ditch bottom, best can also sustainable along length direction continuous construction. The existing concrete pouring construction equipment comprises two major types of pump trucks and belt conveying equipment with linked pump pipes, and the two types of equipment have different technical defects when applied to the concrete pouring construction of a revetment and slope protection structure. The pump truck concrete cast-in-place operation has the advantages of high construction efficiency and less labor consumption, but is limited by casting height, and more importantly, the technical problems of fixed pump truck operation, high construction cost and the like cannot be met when the topography of a construction site is complex. The concrete construction equipment adopting the belt conveyor has the technical problems that the equipment is large and heavy, the moving difficulty is high, after each template structural section is poured, the conveyor is moved by a crane, the standby equipment is more, the operation is complex, the pouring operation also has to be interrupted, and the pouring operation can be continued after being moved to the right place, so that the construction efficiency and the construction progress are greatly influenced.
Disclosure of Invention
The utility model aims to fully adapt to the concrete pouring application of a construction channel and a foundation pit bottom, solve the technical problem of realizing the construction displacement of concrete pouring equipment without using other auxiliary equipment, and provide a shore protection engineering concrete belt conveying pouring device.
The technical scheme of the shore protection engineering concrete belt conveying pouring device provided by the patent application is as follows: the device comprises a belt conveying part, a collecting hopper and a pouring template part,
the belt conveying part spans between the construction channel at the top of the foundation pit and the template frame body of the pouring template part in the foundation pit;
the collecting hopper is fixedly arranged on the conveying belt at the construction passageway end side of the belt conveying part;
the device comprises a transverse moving part;
the transverse moving part comprises an upper bracket travelling wheel on the side of a pavement constructed by the belt conveying part, an upper guide rail of the upper bracket travelling wheel, a lower bracket travelling wheel on the side of a pouring template part of the belt conveying part and a lower guide rail of the lower bracket travelling wheel;
the upper guide rail is arranged on a construction passageway at the top of the foundation pit and paved by taking the length direction of the revetment as a reference;
the lower guide rail is arranged on the template support of the pouring template part, and the upper guide rail is parallel to the lower guide rail.
In one preferable option of the above overall technical solution, the lengths of the upper guide rail and the lower guide rail at least cover the casting fabric section.
One preferable option of the whole technical scheme is that one of the travelling wheels of the upper bracket and one of the travelling wheels of the lower bracket are travelling wheels driven by a traversing motor.
According to one preferred option of the whole technical scheme, the upper guide rail and the lower guide rail are small-sized channel steel.
In one preferable option of the above overall technical solution, the traversing motor is a brake motor.
The technical scheme of the shore protection engineering concrete belt conveying pouring device disclosed by the application meets the concrete pouring construction requirement between a construction channel and a foundation pit bottom, solves the technical problem that the pouring device is required to move a construction station by aid of auxiliary equipment, and particularly adopts small-specification channel steel with good strength and light importance as a transverse moving guide rail, and can transfer a section of guide rail where a pouring cloth construction station section is located to a front section to be constructed station section, so that an extending advancing guide rail is provided for the movement of the device, the construction is not influenced by the displacement structural mode, and conditions are created for continuously pouring cloth construction, improving the construction efficiency and guaranteeing the construction progress.
Drawings
Fig. 1 is a general assembly structure diagram of the construction application of the present patent application.
Detailed Description
As shown in fig. 1, an embodiment of the construction of the shore protection construction concrete belt conveying casting device of the present application is shown. The structure of this device mainly includes: a belt conveying part 1, a collecting hopper 3 and a pouring template part.
The pouring template part comprises a pouring template 5 and a template frame body 4 which are fixedly installed in a foundation pit;
the belt conveying part 1 spans between a construction passageway at the top of the foundation pit and the template frame body 4. The aggregate bin 3 is fixedly arranged above a conveying belt 10 at the construction passageway end side of the belt conveying part 1, the lower port of the conveying belt 10 corresponds to the material distribution port of the pouring template 5 at the foundation pit, the concrete tank truck directly discharges concrete materials to the aggregate bin 3, and the concrete materials are conveyed into the pouring die cavity of the pouring template 5 through the belt conveying part 1.
In order to facilitate continuous material distribution operation and displacement of the front-section station section to be constructed, the device comprises a transverse moving part.
The transverse moving part comprises an upper bracket travelling wheel 21 and an upper guide rail 23 on the side of a construction passageway of the belt conveying part 1, and a lower bracket travelling wheel 41 and a lower guide rail 43 on the side of a pouring template part of the belt conveying part 1.
The upper guide rail 23 is installed on the construction passageway 2 at the top of the foundation pit and paved by taking the length direction of the construction progress of the foundation pit revetment as a reference.
The lower guide rail 43 is arranged on the template support 4 of the pouring template part, the upper guide rail 23 is parallel to the lower guide rail 43, so that the concrete of the belt conveyor 1 can be uniformly discharged and distributed, the concrete is conveniently moved, the laying lengths of the lower guide rail 43 and the lower guide rail at least cover the pouring material distribution section, and the lower guide rail can be continuously extended and laid forward to the station section to be constructed along with the progress of the construction progress.
The upper guide rail 23 and the lower guide rail 43 are preferably small-sized channel steel with light weight and high strength, a section of guide rail where the pouring of the material distribution construction station section is finished is disassembled, and is transferred to the front section to-be-constructed station section for connection, paving and installation, so that the device continuously moves forward to continuously pour the material distribution construction and enter the front guide rail of the to-be-constructed station section, and the station transfer operation without auxiliary equipment is realized.
One of the upper bracket travelling wheels 21 and one of the lower bracket travelling wheels 41 are travelling wheels driven by a traversing motor 22, the traversing motor 22 is started, and the travelling wheels drive the conveyor belt 1 to automatically move a cloth or transfer station. To ensure the safety of displacement, the traversing motor 22 is preferably a brake motor, ensuring the safety of displacement.
Claims (5)
1. The device comprises a belt conveying part, a collecting hopper and a pouring template part;
the belt conveying part spans between the construction channel at the top of the foundation pit and the template frame body of the pouring template part in the foundation pit;
the collecting hopper is fixedly arranged on the conveying belt at the construction passageway end side of the belt conveying part;
it is characterized in that the method comprises the steps of,
the device comprises a transverse moving part;
the transverse moving part comprises an upper bracket travelling wheel on the side of a pavement constructed by the belt conveying part, an upper guide rail of the upper bracket travelling wheel, a lower bracket travelling wheel on the side of a pouring template part of the belt conveying part and a lower guide rail of the lower bracket travelling wheel;
the upper guide rail is arranged on a construction passageway at the top of the foundation pit and paved by taking the length direction of the revetment as a reference;
the lower guide rail is arranged on the template support of the pouring template part, and the upper guide rail is parallel to the lower guide rail.
2. The shore protection construction concrete belt conveyor casting device according to claim 1, wherein the upper guide rail and the lower guide rail have a length at least covering the casting fabric section.
3. The shore protection engineering concrete belt conveying pouring device according to claim 1 or 2, wherein the upper guide rail and the lower guide rail are small-sized channel steel.
4. The revetment engineering concrete belt conveying and pouring device according to claim 1, wherein one of the upper bracket travelling wheels and one of the lower bracket travelling wheels are traversing motor-driven travelling wheels.
5. The revetment engineering concrete belt conveying and pouring device according to claim 4, wherein the traversing motor is a brake motor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320530175.8U CN220079882U (en) | 2023-03-17 | 2023-03-17 | Concrete belt conveying and pouring device for revetment engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320530175.8U CN220079882U (en) | 2023-03-17 | 2023-03-17 | Concrete belt conveying and pouring device for revetment engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220079882U true CN220079882U (en) | 2023-11-24 |
Family
ID=88819023
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320530175.8U Active CN220079882U (en) | 2023-03-17 | 2023-03-17 | Concrete belt conveying and pouring device for revetment engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220079882U (en) |
-
2023
- 2023-03-17 CN CN202320530175.8U patent/CN220079882U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109505630B (en) | Full-hydraulic crawler-type self-propelled trestle and construction method | |
CN104533456B (en) | Super-large section chamber reinforced concrete modelling construction method | |
CN107905254A (en) | Construction method of comprehensive pipe gallery formwork supporting integrated hydraulic internal formwork trolley | |
CN111852521B (en) | Mouth-shaped piece assembling trolley for construction of internal structure of large-section shield tunnel and synchronous construction method | |
CN112879046A (en) | Integral automatic hydraulic moving inverted arch trestle sliding formwork trolley and construction method thereof | |
CN110273695A (en) | A kind of Tunnel Second Lining formwork jumbo and its stage molding pouring procedure | |
CN201176555Y (en) | Pouring machine for curb stone | |
CN205399215U (en) | Bridge deck pavement cloth machine | |
KR100901753B1 (en) | Precast concrete block unit structure of a cross-tie used rail mounted gantry crane and method leveling the uneven precast concrete block unit structure by injecting the grout into a grouting hole | |
CN117536648B (en) | Tunnel lining automatic layering window-by-window pouring trolley and pouring method | |
CN109355983B (en) | Trackless construction method for urban rail | |
CN110863397A (en) | Transfer-free direct pouring construction method for urban rail transit road bed concrete | |
CN220079882U (en) | Concrete belt conveying and pouring device for revetment engineering | |
CN104947674B (en) | Construction method for concrete face dam water stop mortar bed construction trolley | |
CN210564557U (en) | Tunnel secondary lining form trolley | |
CN109339098B (en) | Portable support template of utility tunnel | |
CN113446029B (en) | Tunnel pavement layer whole-width construction device and construction method thereof | |
CN213114202U (en) | Paver for construction of high-speed railway roadbed and bridge protection layer | |
CN211496656U (en) | Purlin hangs equipment | |
CN210637087U (en) | Inner and outer mould trolley lining system for open-cut underground canal | |
CN211395897U (en) | Underdrain external mold lining trolley | |
CN210031563U (en) | Quick construction equipment of mobilizable modularization box culvert | |
CN114991084B (en) | Ecological restoration construction system and method for underwater collapse of canal channel side slope | |
CN217710201U (en) | Full-automatic truss type laser ultrasonic double-control leveling full-width bridge floor paver | |
CN218376482U (en) | Self-propelled hydraulic lifting CRTS III type track slab filling equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |