CN217734775U - But building engineering construction is with portable quick lifting scaffold frame of quick detach - Google Patents

But building engineering construction is with portable quick lifting scaffold frame of quick detach Download PDF

Info

Publication number
CN217734775U
CN217734775U CN202121842319.0U CN202121842319U CN217734775U CN 217734775 U CN217734775 U CN 217734775U CN 202121842319 U CN202121842319 U CN 202121842319U CN 217734775 U CN217734775 U CN 217734775U
Authority
CN
China
Prior art keywords
connecting rod
rod
quick
lifting scaffold
building engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121842319.0U
Other languages
Chinese (zh)
Inventor
崔永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Dinghe Construction Engineering Co ltd
Original Assignee
Tianjin Dinghe Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Dinghe Construction Engineering Co ltd filed Critical Tianjin Dinghe Construction Engineering Co ltd
Priority to CN202121842319.0U priority Critical patent/CN217734775U/en
Application granted granted Critical
Publication of CN217734775U publication Critical patent/CN217734775U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model belongs to a but building engineering construction is with portable quick lifting scaffold frame of quick detach, including bracing piece and connecting rod, the bracing piece with be provided with connection structure between the connecting rod, connection structure, include: folding portion and reinforcing portion, folding portion sets up the bracing piece with on the connecting rod, reinforcing portion sets up vertical pole with between the connecting rod, the utility model discloses a mode of folding concatenation is connected to have firm bearing structure, dismantle simple swift, wholly be portable structure.

Description

But building engineering construction is with portable quick lifting scaffold frame of quick detach
Technical Field
The utility model belongs to the technical field of the scaffold frame, especially, relate to a but portable quick lifting scaffold frame of quick detach for building engineering construction.
Background
Scaffold frame refers to the construction site and operates and solve perpendicular and horizontal transportation and various supports that set up for the workman, and the general term of building world refers to on the building site and is used in the place that outer wall, interior decoration or layer height are higher can't directly be under construction, mainly for constructor upper and lower dry life or peripheral safety net maintenance and high altitude installation component etc. scaffold frame preparation material usually has: bamboo, wood, steel pipe or synthetic material, etc.
Scaffold frame that present building engineering construction used all has safe and reliable's advantage, but scaffold frame that current building engineering construction used all uses connecting device and individual bolt tightening and constitutes, very difficult dismantlement, when changing work place, every scaffold frame of group building all needs a large amount of time and energy to dismantle, extravagant engineering time and constructor's energy very much, and inconvenient user uses, consequently needs to improve.
SUMMERY OF THE UTILITY MODEL
In order to achieve the purpose, the utility model adopts the technical scheme that the utility model provides a quick detachable portable rapid lifting scaffold for building engineering construction, which comprises a support rod and a connecting rod, wherein a connecting structure is arranged between the support rod and the connecting rod;
the connection structure includes: a folding part, a vertical rod and a reinforcing part;
the folding part is arranged on the supporting rod and the connecting rod, and the reinforcing part is arranged between the vertical rod and the connecting rod.
Preferably, the folding part includes: the device comprises a cross frame, an elongated slot, a bottom plate, an internal thread block and a bolt;
the long groove is formed in the bottom surface of the cross frame, the vertical rod is rotatably connected with the long groove and the cross frame through pin shafts, the internal thread block is arranged on the side end surface of the cross frame, the bolt penetrates through the support rod to be connected in the internal thread block in a screwed mode, and the bottom plate pin shaft is rotatably connected to the lower end of the connecting rod.
Preferably, the reinforcing part includes: the device comprises a thread groove, a screwing block, a side hole, a connecting rod, a slot, a movable cavity, an inner rod, a movable block, a spring and an inserting rod;
the thread groove is opened connecting rod side end face, it connects to revolve wrong piece and twist the connection in the thread groove, the side opening is opened the bracing piece side end face, it passes to join the pole the side opening is connected revolve wrong piece side, the slot is opened join the pole surface, the activity chamber is opened in the bracing piece, interior pole sets up the activity intracavity, the activity piece activity suit is in on the pole in, the spring suit is in on the pole in, the inserted bar sets up the relative both ends face of activity piece and lower extreme pass in the slot.
Preferably, the cross section of the inserted bar is of an L-shaped structure.
Preferably, the maximum rotation angle between the connecting rod and the cross frame and the bottom plate is 90 °.
Compared with the prior art, the utility model discloses an advantage lies in with positive effect, adopts the mode of folding concatenation to connect to have firm bearing structure, dismantle the simple swift of mode, wholly be portable structure.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive labor.
Fig. 1 is a schematic structural diagram of a quick-release portable rapid-lifting scaffold for construction in the present embodiment;
fig. 2 is a partially enlarged view of a spring portion of a quick-release portable quick-lifting scaffold for construction in the present embodiment;
in the above figures, 1, a support bar; 2. a connecting rod; 3. a cross frame; 4. a long groove; 5. a base plate; 6. an internal thread block; 7. a bolt; 8. a thread groove; 9. screwing the block; 10. a side hole; 11. a connecting rod; 12. inserting slots; 13. a movable cavity; 14. an inner rod; 15. a movable block; 16. a spring; 17. and (4) inserting the rod.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention more clearly understood, the present invention will be further described with reference to the accompanying drawings and examples. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those specifically described herein, and therefore the present invention is not limited to the limitations of the specific embodiments of the present disclosure.
In the embodiment, as can be seen from fig. 1-2 of the specification, the scheme includes a support rod 1 and a connecting rod 2, and a connecting structure is arranged between the support rod 1 and the connecting rod 2;
the connection structure includes: a folding part, a vertical rod and a reinforcing part;
the folding part is arranged on the supporting rod 1 and the connecting rod 2, and the reinforcing part is arranged between the vertical rod and the connecting rod 2;
the folded portion includes: the device comprises a cross frame 3, an elongated slot 4, a bottom plate 5, an internal thread block 6 and a bolt 7;
the long groove 4 is arranged on the bottom surface of the cross frame 3, the vertical rod is rotatably connected with the long groove 4 and the cross frame 3 through a pin shaft, the internal thread block 6 is arranged on the side end surface of the cross frame 3, the bolt 7 penetrates through the support rod 1 to be screwed and connected into the internal thread block 6, and the bottom plate 5 is rotatably connected with the lower end of the connecting rod 2 through a pin shaft;
the reinforcing part includes: the device comprises a thread groove 8, a screwing block 9, a side hole 10, a connecting rod 11, a slot 12, a movable cavity 13, an inner rod 14, a movable block 15, a spring 16 and an inserting rod 17;
the thread groove 8 is opened 2 side end faces of connecting rod, it connects to revolve wrong piece 9 and revolve to twist in the thread groove 8, the side opening 10 is opened 1 side end faces of bracing piece, it connects to join in marriage pole 11 and pass the side opening 10 and connect and revolve wrong piece 9 side, slot 12 is opened join in pole 11 surfaces, activity chamber 13 is opened in the bracing piece 1, interior pole 14 sets up in the activity chamber 13, the movable suit of movable block 15 is in on interior pole 14, the suit of spring 16 is in on interior pole 14, the setting of inserted bar 17 is in the relative both ends face of movable block 15 and lower extreme pass in the slot 12;
the section of the inserted bar 17 is of an L-shaped structure, and the maximum rotation angle between the connecting bar 2 and the cross frame 3 and between the connecting bar and the bottom plate 5 is 90 degrees.
When in specific use: open crossbearer 3 through the upset of connecting rod 2, make connecting rod 2 be in the vertical state, then put bracing piece 1 in crossbearer 3 side, then pass bracing piece 1 with bolt 7 and twist soon and enter into internal thread piece 6 and fix, then will link up pole 11 and pass side opening 10, twist into thread groove 8 through twisting piece 9 and connect, slot 12 is up simultaneously, makes inserted bar 17 carry out spacing the completion installation through the promotion of 16 power of spring insert in slot 12.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in other forms, and any person skilled in the art may use the above-mentioned technical contents to change or modify the equivalent embodiment into equivalent changes and apply to other fields, but any simple modification, equivalent change and modification made to the above embodiments according to the technical matters of the present invention will still fall within the protection scope of the technical solution of the present invention.

Claims (5)

1. A quick-detachable portable rapid lifting scaffold for building engineering construction comprises a support rod (1) and a connecting rod (2), and is characterized in that a connecting structure is arranged between the support rod (1) and the connecting rod (2);
the connection structure includes: a folding part, a vertical rod and a reinforcing part;
the folding part is arranged on the supporting rod (1) and the connecting rod (2), and the reinforcing part is arranged between the vertical rod and the connecting rod (2).
2. The portable quick lifting scaffold capable of being disassembled for construction of building engineering as claimed in claim 1, wherein said folding part comprises: the device comprises a cross frame (3), an elongated slot (4), a bottom plate (5), an internal thread block (6) and a bolt (7);
the long groove (4) is formed in the bottom surface of the cross frame (3), the vertical rod is rotatably connected with the long groove (4) and the cross frame (3) through pin shafts, the inner thread block (6) is arranged on the side end face of the cross frame (3), the bolt (7) penetrates through the support rod (1) and is connected in the inner thread block (6) in a screwing mode, and the bottom plate (5) is rotatably connected to the lower end of the connecting rod (2) through the pin shaft.
3. The portable quick lifting scaffold capable of being disassembled for construction of building engineering as claimed in claim 1, wherein the reinforcing part comprises: the device comprises a thread groove (8), a screwing block (9), a side hole (10), a connecting rod (11), an inserting groove (12), a movable cavity (13), an inner rod (14), a movable block (15), a spring (16) and an inserting rod (17);
open thread groove (8) connecting rod (2) side end face, revolve wrong piece (9) and twist the connection and be in thread groove (8), side opening (10) are opened bracing piece (1) side end face, it passes to link pole (11) side opening (10) are connected revolve wrong piece (9) side, slot (12) are opened link pole (11) surface, activity chamber (13) are opened in bracing piece (1), interior pole (14) set up in activity chamber (13), activity block (15) activity suit is in on interior pole (14), spring (16) suit is in on interior pole (14), inserted bar (17) set up relative both ends face of activity block (15) and lower extreme pass in slot (12).
4. The quick-detachable portable rapid lifting scaffold for building engineering construction as claimed in claim 3, wherein the section of the inserted rod (17) is L-shaped.
5. A portable quick lifting scaffold for quick release for construction work according to claim 2 characterized in that the maximum rotation angle between the connecting rod (2) and the crossbearers (3) and the bottom plate (5) is 90 °.
CN202121842319.0U 2021-08-09 2021-08-09 But building engineering construction is with portable quick lifting scaffold frame of quick detach Active CN217734775U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121842319.0U CN217734775U (en) 2021-08-09 2021-08-09 But building engineering construction is with portable quick lifting scaffold frame of quick detach

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121842319.0U CN217734775U (en) 2021-08-09 2021-08-09 But building engineering construction is with portable quick lifting scaffold frame of quick detach

Publications (1)

Publication Number Publication Date
CN217734775U true CN217734775U (en) 2022-11-04

Family

ID=83811965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121842319.0U Active CN217734775U (en) 2021-08-09 2021-08-09 But building engineering construction is with portable quick lifting scaffold frame of quick detach

Country Status (1)

Country Link
CN (1) CN217734775U (en)

Similar Documents

Publication Publication Date Title
CN204435843U (en) A kind of steel tube scaffold linkage
CN217734775U (en) But building engineering construction is with portable quick lifting scaffold frame of quick detach
CN203238958U (en) Tool-type building template connecting piece
CN203320918U (en) Square tube scaffold
CN211499678U (en) Construction fastener formula steel pipe template strutting arrangement
CN206220471U (en) A kind of scaffold Quick Connect Kit
CN202081634U (en) Detachable bolt for locking disc of scaffold
CN210032575U (en) Template fixed knot constructs for arched structure construction is built in room
CN203834694U (en) Steel and wood connection structure
CN208347296U (en) A kind of belt lacing rod piece
CN204252518U (en) Scaffold mounting structure
CN206607880U (en) A kind of unidirectional detachable split bolt
CN104358406A (en) Scaffold mounting structure
CN205591507U (en) Scaffold frame of easily dismantling
CN105178447B (en) The concealed energy consumption connector of rectangular-ambulatory-plane timber structure
CN201443198U (en) Plug-in type scaffold
CN207110500U (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
CN217175768U (en) Passive form is exempted from to tear open thermal insulation wall form support frame structure for building
CN204899218U (en) Superimposed sheet support frame
CN206636165U (en) One kind can the simple scaffold of Integral foldable
CN206607844U (en) New house construction engineering building scaffold
CN211597690U (en) Lock piece for connecting bracket
CN208072932U (en) A kind of new type scaffold
CN214658732U (en) Novel bolt type scaffold fastener
CN205531250U (en) Scaffold frame of easily dismantling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant