CN104358406A - Scaffold mounting structure - Google Patents

Scaffold mounting structure Download PDF

Info

Publication number
CN104358406A
CN104358406A CN201410616582.6A CN201410616582A CN104358406A CN 104358406 A CN104358406 A CN 104358406A CN 201410616582 A CN201410616582 A CN 201410616582A CN 104358406 A CN104358406 A CN 104358406A
Authority
CN
China
Prior art keywords
connector
mounting structure
scaffold mounting
scaffold
connecting hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410616582.6A
Other languages
Chinese (zh)
Inventor
冯庭辉
王峥
丁有汉
袁明
黄金
魏志勇
刘长东
宋洁
吴静娴
陈爱芹
束过
冯遵刚
叶浩
戴红娟
朱艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Construction Decoration Co Ltd
Original Assignee
Suzhou Gold Mantis Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Construction Decoration Co Ltd filed Critical Suzhou Gold Mantis Construction Decoration Co Ltd
Priority to CN201410616582.6A priority Critical patent/CN104358406A/en
Publication of CN104358406A publication Critical patent/CN104358406A/en
Pending legal-status Critical Current

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The invention discloses a scaffold mounting structure. The scaffold mounting structure comprises an upright rod, a cross rod, first connecting components, second connecting components and third connecting components, wherein the first connecting components are uniformly arranged along the peripheral direction of the upright rod; along the axial direction of the upright rod, first connecting holes are formed in the first connecting components; the second connecting components are arranged on the end part of the cross rod and comprise connecting parts which are arranged up and down; second connecting holes are formed in the connecting parts; the connecting parts are respectively connected to the first connecting components up and down in a clamping way; the third connecting components are sequentially inserted into the second connecting holes, the first connecting holes and the second connecting holes to be fixed. By the scaffold mounting structure provided by the invention, a scaffold can be quickly detached and mounted, time is saved, the connection strength after mounting is high, and the safety coefficient of construction is improved.

Description

Scaffold mounting structure
Technical field
The present invention relates to a kind of mounting structure, specifically, relate to a kind of scaffold mounting structure.
Background technology
Scaffold refers to that job site is the various supports that operative also solves vertically and horizontal transport is set up.The generic term on building circle, refers to building site be used in the higher place that cannot directly construct of exterior wall, interior decoration or floor height.To work up and down mainly for constructor or perimeter security net is gone along with sb. to guard him and high-altitude installation component etc.
In current building operations, use steel tube fastener formula scaffold the most extensive, it is primarily of steel pipe, fastener and base composition, and when building, connection fastener is easily lost or damages, and installation effectiveness is lower, and the cycle of setting up is longer, and security performance is general.
Summary of the invention
For solving the problems of the technologies described above, the object of the present invention is to provide one to dismantle scaffold rapidly and to install, saving time, and bonding strength after installing is good, improves the scaffold mounting structure of safety factor of construction.
For achieving the above object, technical scheme of the present invention is as follows: scaffold mounting structure, comprise vertical rod, cross bar, the first connector, the second connector and the 3rd connector, described first connector is along the uniform setting of circumference of described vertical rod, and along the axis of described vertical rod, described first connector is provided with the first connecting hole; Described second connector is arranged at the end of described cross bar, comprises connecting portion setting up and down, and described connecting portion offers the second connecting hole, and described connecting portion is the first connector described in upper and lower clamping respectively; Described 3rd connector inserts fixing successively from described second connecting hole, the first connecting hole and the second connecting hole.
Adopt technique scheme, the beneficial effect of technical solution of the present invention is: due to the setting of the first connector in vertical rod, the setting of the second connector on cross bar, when scaffolding erecting, only need the correspondence position up and down connecting portion of the second connector being connected in respectively the first connector, again the 3rd connector is inserted successively from the second connecting hole, the first connecting hole and the second connecting hole afterwards, achieve a fixed connection, the installation completing vertical rod and cross bar is built, convenient and swift, save time, bonding strength is good; During dismounting, only the 3rd connector need be taken out, the first connector and the second connector be separated, the disassemble and assemble work of vertical rod and cross bar can be completed; Generally speaking, adopt this scaffold mounting structure, can dismantle scaffold rapidly and install, save time, and install after bonding strength good, improve construction safety factor.
On the basis of technique scheme, the present invention also can do following improvement:
As preferred scheme, described scaffold mounting structure also comprises brace and the 4th connector for being connected described brace, described 4th connector is arranged at the sidewall of described first connector, it comprises connecting rod or connecting axle, the free end of described connecting rod or connecting axle is provided with backing pin, connecting rod or connecting axle described in described backing pin grafting.
Adopt above-mentioned preferred scheme, brace can be used for the adjacent cross bar of connection two, during connection, due to the setting of the 4th connector, brace two ends can directly with the 4th connector, namely be connected with connecting rod or connecting axle, use backing pin socket connection bar or connecting axle more afterwards, strengthen the bonding strength of scaffold.
As preferred scheme, the two ends of described brace are provided with the 3rd connecting hole.
Adopt above-mentioned preferred scheme, when brace is connected with the 4th connector, can directly the 3rd connecting hole at its two ends is placed on connecting rod or connecting axle, again backing pin grafting is entered connecting rod or connecting axle afterwards, convenient and fast connection, and improve its bonding strength, safety and firmness.
As preferred scheme, described first connector is in " U " type or " V " type.
Adopt above-mentioned preferred scheme, arrange the first connector in " U " type or " V ", when making the second connector and its clamping, upper and lower connecting portion fully can contact with the first connector, and connects more firm.
As preferred scheme, described second connector is in " U " type, and opening is arranged outwardly, and is symmetricly set in the two ends of described second connector.
Adopt above-mentioned preferred scheme, the second connector is set to " U " type, during installation, the two ends of the second connector are directly connected on the first connector of adjacent crossbars, connect more convenient.
As preferred scheme, described vertical rod and described first connector are integral type structure.
Adopt above-mentioned preferred scheme, vertical rod and the first connector are set to integral structure, can the set-up time be saved, improve its bonding strength simultaneously, strengthen stable degree.
As preferred scheme, described cross bar and described second connector are integral type structure.
Adopt above-mentioned preferred scheme, cross bar and the second connector are set to integral structure, can the set-up time be saved, improve its bonding strength simultaneously, strengthen stable degree.
As preferred scheme, described second connecting hole is square opening.
As preferred scheme, the described shape of the 3rd connector and the mating shapes of described square opening, and the top length of described 3rd connector is greater than bottom lengths.
Adopt above-mentioned preferred scheme, during connection, 3rd connector can under the effect of external force, have and slight move down action, in the process that this moves down, 3rd connector can slowly clamp the second connector, and then improves the bonding strength of the first connector and the second connector, improves the safety factor of scaffold; Loosening phenomenon can not be produced.
As preferred scheme, the length of described square opening is between the top length and bottom lengths of described 3rd connector.
Adopt above-mentioned preferred scheme, the clamping best results of the 3rd connector and the second connecting hole can be made.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in embodiment of the present invention technology, be briefly described to the accompanying drawing used required in the description of embodiment technology below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of vertical rod in scaffold mounting structure of the present invention;
Fig. 2 is the structural representation of cross bar in scaffold mounting structure of the present invention;
Fig. 3 is the structural representation of the first connector in scaffold mounting structure of the present invention;
Fig. 4 is the structural representation of the second connector in scaffold mounting structure of the present invention;
Fig. 5 is the structural representation of the 3rd connector in scaffold mounting structure of the present invention;
Fig. 6 is the structural representation of the 4th connector in scaffold mounting structure of the present invention;
Fig. 7 is the scheme of installation of scaffold mounting structure of the present invention.
Wherein, 1, vertical rod, 2, cross bar, the 3, first connector, the 31, first connecting hole, the 4, second connector, 41, connecting portion, the 42, second connecting hole, the 5, the 3rd connector, 6, brace, 71, connecting axle, 72, backing pin, 73, connecting hole.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
In order to reach object of the present invention, as shown in Fig. 1-5, Fig. 7, in some embodiments of scaffold mounting structure of the present invention, it comprises vertical rod 1, cross bar 2, first connector 3, second connector 4 and the 3rd connector 5, first connector 3 is along the uniform setting of circumference of vertical rod 1, and along the axis of vertical rod 1, the first connector 3 is provided with the first connecting hole 31; Second connector 4 is arranged at the end of cross bar 2, comprises connecting portion 41 setting up and down, and connecting portion 41 offers the second connecting hole 42, and connecting portion 41 is upper and lower clamping first connector 3 respectively; 3rd connector 5 inserts fixing successively from the second connecting hole 42, first connecting hole 31 and the second connecting hole 42.Wherein, the 3rd connector 5 selects latch best results.First connector 3 arranges four, and every two are symmetrical arranged.
Adopt technique scheme, the beneficial effect of technical solution of the present invention is: due to the setting of the first connector 3 in vertical rod 1, the setting of the second connector 4 on cross bar 2, when scaffolding erecting, only need the correspondence position up and down connecting portion 41 of the second connector 4 being connected in respectively the first connector 3, afterwards again by the 3rd connector 5 successively from the second connecting hole 42, insert in first connecting hole 31 and the second connecting hole 42, achieve a fixed connection, the installation completing vertical rod 1 and cross bar 2 is built, the connected node of vertical rod 1 and cross bar 2 is in center line of the bar plane, power transmission that can be evenly strong, and it is convenient and swift, save time, bonding strength is good, during dismounting, only the 3rd connector 5 need be taken out, the first connector 3 and the second connector 4 be separated, the disassemble and assemble work of vertical rod 1 and cross bar 2 can be completed, generally speaking, adopt this scaffold mounting structure, can dismantle scaffold rapidly and install, simple, that improves scaffold builds speed, saves time, do not need the operation of professional during installation yet, and install after bonding strength good, improve construction safety factor, be conducive to standardized work, meet the development need of industry, save a large amount of man power and materials, reduce the cost of engineering.
On the basis of technique scheme, the present invention also can do following improvement:
In order to optimize implementation result of the present invention further, as shown in fig. 6-7, in the other embodiment of scaffold mounting structure of the present invention, scaffold mounting structure also comprises brace 6 and the 4th connector for bracing diagonal 6,4th connector is arranged at the sidewall of the first connector 3, it comprises connecting axle 71, and the free end of connecting axle 71 is provided with backing pin 72, in the connecting hole 73 of backing pin 72 socket connection axle 71.Wherein, connecting axle 71 can be replaced by connecting rod.
Adopt above-mentioned preferred scheme, brace 6 can be used for the adjacent cross bar 2 of connection two, during connection, due to the setting of the 4th connector, brace 6 two ends can directly with the 4th connector, be namely connected with connecting axle 71, use backing pin 72 socket connection axle 71 afterwards again, strengthen the bonding strength of scaffold.
In order to optimize implementation result of the present invention further, as shown in Figure 7, in the other embodiment of scaffold mounting structure of the present invention, the two ends of brace 6 are provided with the 3rd connecting hole (scheming not shown).
Adopt above-mentioned preferred scheme, when brace 6 is connected with the 4th connector, can directly the 3rd connecting hole at its two ends is placed on connecting axle 71 or connecting rod, again backing pin 72 grafting is entered connecting rod or connecting axle 71 afterwards, convenient and fast connection, and improve its bonding strength, safety and firmness.
In order to optimize implementation result of the present invention further, as shown in Figure 3, in the other embodiment of scaffold mounting structure of the present invention, the first connector 3 is in " U " type, or " V " type (scheming not shown).
Adopt above-mentioned preferred scheme, arranged by the first connector 3 in " U " type or " V " type, when making the second connector 4 with its clamping, upper and lower connecting portion 41 fully can contact with the first connector 3, and connects more firm.
In order to optimize implementation result of the present invention further, as shown in Figure 4, in the other embodiment of scaffold mounting structure of the present invention, the second connector 4 is in " U " type, and opening is arranged outwardly, and is symmetricly set in the two ends of the second connector 4.
Adopt above-mentioned preferred scheme, the second connector 4 is set to " U " type, during installation, the two ends of the second connector 4 are directly connected on the first connector 3 of adjacent crossbars 2, connect more convenient.
In order to optimize implementation result of the present invention further, in the other embodiment of scaffold mounting structure of the present invention, vertical rod 1 and the first connector 3 are integral type structure.
Adopt above-mentioned preferred scheme, vertical rod 1 and the first connector 3 are set to integral structure, can the set-up time be saved, improve its bonding strength simultaneously, strengthen stable degree, and convenient in carrying, not easily lose.
In order to optimize implementation result of the present invention further, in the other embodiment of scaffold mounting structure of the present invention, cross bar 2 and the second connector 4 are integral type structure.
Adopt above-mentioned preferred scheme, cross bar 2 and the second connector 4 are set to integral structure, can the set-up time be saved, improve its bonding strength simultaneously, strengthen stable degree, and convenient in carrying, not easily lose.
In order to optimize implementation result of the present invention further, as shown in Figure 4, in the other embodiment of scaffold mounting structure of the present invention, the second connecting hole 42 is square opening.
In order to optimize implementation result of the present invention further, as shown in Figure 7, in the other embodiment of scaffold mounting structure of the present invention, the shape of the 3rd connector 5 and the mating shapes of square opening, and the top length of the 3rd connector 5 is greater than bottom lengths.
Adopt above-mentioned preferred scheme, during connection, 3rd connector 5 can under the effect of external force, have and slight move down action, in the process that this moves down, 3rd connector 5 slowly can clamp the second connector 4, and then improves the bonding strength of the first connector 3 and the second connector 4, improves the safety factor of scaffold; Loosening phenomenon can not be produced.
In order to optimize implementation result of the present invention further, in the other embodiment of scaffold mounting structure of the present invention, the length of square opening is between the top length and bottom lengths of the 3rd connector 5.
Adopt above-mentioned preferred scheme, the clamping best results of the 3rd connector 5 and the second connecting hole 42 can be made.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the present invention.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein can without departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (10)

1. scaffold mounting structure, it is characterized in that, comprise vertical rod, cross bar, the first connector, the second connector and the 3rd connector, described first connector is along the uniform setting of circumference of described vertical rod, and along the axis of described vertical rod, described first connector is provided with the first connecting hole; Described second connector is arranged at the end of described cross bar, comprises connecting portion setting up and down, and described connecting portion offers the second connecting hole, and described connecting portion is the first connector described in upper and lower clamping respectively; Described 3rd connector inserts fixing successively from described second connecting hole, the first connecting hole and the second connecting hole.
2. scaffold mounting structure according to claim 1, it is characterized in that, described scaffold mounting structure also comprises brace and the 4th connector for being connected described brace, described 4th connector is arranged at the sidewall of described first connector, it comprises connecting rod or connecting axle, the free end of described connecting rod or connecting axle is provided with backing pin, connecting rod or connecting axle described in described backing pin grafting.
3. scaffold mounting structure according to claim 2, is characterized in that, the two ends of described brace are provided with the 3rd connecting hole.
4., according to the arbitrary described scaffold mounting structure of claim 1-3, it is characterized in that, described first connector is in " U " type or " V " type.
5., according to the arbitrary described scaffold mounting structure of claim 1-3, it is characterized in that, described second connector is in " U " type, and opening is arranged outwardly, and is symmetricly set in the two ends of described second connector.
6. scaffold mounting structure according to claim 4, is characterized in that, described vertical rod and described first connector are integral type structure.
7. scaffold mounting structure according to claim 5, is characterized in that, described cross bar and described second connector are integral type structure.
8., according to the arbitrary described scaffold mounting structure of claim 1-3, it is characterized in that, described second connecting hole is square opening.
9. scaffold mounting structure according to claim 8, is characterized in that, the described shape of the 3rd connector and the mating shapes of described square opening, and the top length of described 3rd connector is greater than bottom lengths.
10. scaffold mounting structure according to claim 9, is characterized in that, the length of described square opening is between the top length and bottom lengths of described 3rd connector.
CN201410616582.6A 2014-11-05 2014-11-05 Scaffold mounting structure Pending CN104358406A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410616582.6A CN104358406A (en) 2014-11-05 2014-11-05 Scaffold mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410616582.6A CN104358406A (en) 2014-11-05 2014-11-05 Scaffold mounting structure

Publications (1)

Publication Number Publication Date
CN104358406A true CN104358406A (en) 2015-02-18

Family

ID=52525703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410616582.6A Pending CN104358406A (en) 2014-11-05 2014-11-05 Scaffold mounting structure

Country Status (1)

Country Link
CN (1) CN104358406A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804389A (en) * 2016-03-17 2016-07-27 苏交科集团股份有限公司 Clamping groove type scaffold and manufacturing and mounting method thereof
CN108643419A (en) * 2018-07-31 2018-10-12 江苏广源幕墙工程有限公司 A kind of curtain wall installing structure
CN110914508A (en) * 2017-05-09 2020-03-24 At-Pac中国商业信托公司 Improved ledger and modular scaffolding system with continuous work surface

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4525096A (en) * 1983-04-18 1985-06-25 Weldtec, Inc. Connecting clamp for builder's scaffolding
US4549634A (en) * 1983-04-15 1985-10-29 Waco International Corporation Scaffold connector assembly
CN1397702A (en) * 2002-08-21 2003-02-19 李志华 Plug-in type scaffold assembly
CN202359809U (en) * 2011-12-08 2012-08-01 冯仕朋 Combined and lapped scaffold
CN202380713U (en) * 2011-12-12 2012-08-15 开平市优赢金属制品有限公司 Connecting structure of scaffold and scaffold adopting same
CN202882393U (en) * 2012-10-16 2013-04-17 郑其雄 Pitch point connecting structure of inclined draw rod of scaffold
CN103669825A (en) * 2013-12-31 2014-03-26 天津市固安建筑设备租赁有限公司 Scaffold joint
CN204252518U (en) * 2014-11-05 2015-04-08 苏州金螳螂建筑装饰股份有限公司 Scaffold mounting structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4549634A (en) * 1983-04-15 1985-10-29 Waco International Corporation Scaffold connector assembly
US4525096A (en) * 1983-04-18 1985-06-25 Weldtec, Inc. Connecting clamp for builder's scaffolding
CN1397702A (en) * 2002-08-21 2003-02-19 李志华 Plug-in type scaffold assembly
CN202359809U (en) * 2011-12-08 2012-08-01 冯仕朋 Combined and lapped scaffold
CN202380713U (en) * 2011-12-12 2012-08-15 开平市优赢金属制品有限公司 Connecting structure of scaffold and scaffold adopting same
CN202882393U (en) * 2012-10-16 2013-04-17 郑其雄 Pitch point connecting structure of inclined draw rod of scaffold
CN103669825A (en) * 2013-12-31 2014-03-26 天津市固安建筑设备租赁有限公司 Scaffold joint
CN204252518U (en) * 2014-11-05 2015-04-08 苏州金螳螂建筑装饰股份有限公司 Scaffold mounting structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804389A (en) * 2016-03-17 2016-07-27 苏交科集团股份有限公司 Clamping groove type scaffold and manufacturing and mounting method thereof
CN105804389B (en) * 2016-03-17 2017-12-12 苏交科集团股份有限公司 Clamping groove type scaffold and manufacturing and mounting method thereof
CN110914508A (en) * 2017-05-09 2020-03-24 At-Pac中国商业信托公司 Improved ledger and modular scaffolding system with continuous work surface
CN110914508B (en) * 2017-05-09 2021-12-03 At-Pac中国商业信托公司 Improved ledger and modular scaffolding system with continuous work surface
CN108643419A (en) * 2018-07-31 2018-10-12 江苏广源幕墙工程有限公司 A kind of curtain wall installing structure

Similar Documents

Publication Publication Date Title
CN204212399U (en) Flip-shell is to clasp
CN104358406A (en) Scaffold mounting structure
CN204139593U (en) A kind of Combined cylindrical steel form
CN204252518U (en) Scaffold mounting structure
CN205476375U (en) Construction scaffold
CN202081634U (en) Detachable bolt for locking disc of scaffold
CN210217069U (en) Card insertion type steel pipe support
CN104120868B (en) The collapsible scaffold of a kind of building iron structure
CN202925879U (en) Multidirectional combined connector
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN205875657U (en) Plug -in type steel pipe scaffold frame
CN204059909U (en) With the horizontal truss of avoiding structure
CN204126232U (en) The collapsible scaffold of a kind of building iron structure
CN207847063U (en) A kind of scaffold easy to disassemble with installation
CN203394003U (en) Scaffold
CN205224557U (en) Lift scaffold pole setting connection structure
CN204662981U (en) Steel form shelf type suspension scaffold
CN205822779U (en) A kind of dish buckle type scaffold floor side bar template install structure
CN205804922U (en) A kind of novel embedded tool formula scaffold wall connecting piece
CN204940827U (en) A kind of scaffold oblique pull fixed head for building
CN217734775U (en) But building engineering construction is with portable quick lifting scaffold frame of quick detach
CN204552038U (en) A kind of mortise and tenon type scaffold diagonal brace system
CN204552069U (en) A kind of novel combination type scaffold
CN212249133U (en) Bolt type telescopic cross rod of bowl buckle type scaffold
CN204326501U (en) A kind of monolithic scaffold node

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150218

RJ01 Rejection of invention patent application after publication