CN204435843U - A kind of steel tube scaffold linkage - Google Patents

A kind of steel tube scaffold linkage Download PDF

Info

Publication number
CN204435843U
CN204435843U CN201520000447.9U CN201520000447U CN204435843U CN 204435843 U CN204435843 U CN 204435843U CN 201520000447 U CN201520000447 U CN 201520000447U CN 204435843 U CN204435843 U CN 204435843U
Authority
CN
China
Prior art keywords
nodal point
point connecting
cross bar
threaded collar
steel tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520000447.9U
Other languages
Chinese (zh)
Inventor
方圣恩
庄明智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou University
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN201520000447.9U priority Critical patent/CN204435843U/en
Application granted granted Critical
Publication of CN204435843U publication Critical patent/CN204435843U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a kind of steel tube scaffold linkage, comprise the nodal point connecting connecting cross bar and vertical rod, described nodal point connecting is polygon cube, the all sides of described nodal point connecting are provided with some threaded collar, described threaded collar inside is coaxially arranged with annular slot respectively, described nodal point connecting is vertically arranged with cylinder through hole, described nodal point connecting all sides threaded collar is coaxially connected with cross bar sleeve pipe respectively, described cross bar sleeve pipe end side is provided with the screw thread that can be connected with the threaded collar of nodal point connecting, the locating button be fixed in vertical rod is provided with below described nodal point connecting.This steel tube scaffold linkage can realize scaffold fast and stable and be connected, and stress performance is good, connection stiffness is large, easy installation and removal, speed of application are fast, it is various to set up parameter, and working stability safety.

Description

A kind of steel tube scaffold linkage
Technical field
The utility model relates to technical field of building construction, is a kind of steel tube scaffold linkage.
Background technology
Scaffold refers to that engineering construction is on-the-spot for operative and the various supports solving vertical and horizontal transport and set up.According to the difference of used material, scaffold can be divided into bamboo scaffolding, timber scaffolding, steel pipe scaffold, synthetic materials scaffold, and current use is the most general, should belong to steel pipe scaffold.In steel pipe scaffold system, according to the difference of stress performance, door-type scaffold, total sub-semigroup, design of coupler scaffold and spigot-and-socket scaffold can be divided into again.As the interim load-carrying members in construction process, bearing capacity and the stability of what people paid close attention to most is steel pipe scaffold, set up the impact of parameter if do not consider, single from the viewpoint of steel pipe scaffold self, to its bearing capacity and stability influence maximum be its connected node rigidity.According to investigation, the connected node of steel pipe scaffold belongs to semi-rigid, its both non-fully just connect, also imperfect hinged, but between these two kinds of extreme cases, namely connect and there is limited rigidity.For the tolerance of Semi-rigid, countries in the world design specifications generally adopts moment-rotation relation as design considerations.At present, what China's use was maximum is fastener type steel pipe scaffold, and experimental study finds, its node coupling stiffness is relevant with screw-down torque to a great extent, considers the difference of manual operation, and its connection stiffness discreteness is comparatively large, and this is larger to the safety effects of scaffold.In addition, in fastener type steel pipe scaffold, cross bar is connected with vertical rod by fastener, and the load acted on cross bar is equivalent to wobbler action in vertical rod, and its second-order effects produced also can have a negative impact to the bearing capacity of scaffold and stability.The appearance of bowl fastening type, spigot-and-socket scaffold solves the eccentric force problem of design of coupler scaffold, but its vertical rod and cross bar need independent production, cannot share with current conventional scaffolding steel pipe, and it is comparatively single to set up parameter, its scope of application is narrower, therefore uses not general.
Utility model content
The purpose of this utility model is for above weak point, provides a kind of quick release and firmly connects, the steel tube scaffold linkage of stable working, carrying stability and safety.
The scheme that the utility model technical solution problem adopts is, a kind of steel tube scaffold linkage, comprise the nodal point connecting connecting cross bar and vertical rod, described nodal point connecting is polygon cube, the all sides of described nodal point connecting are provided with some threaded collar, described threaded collar inside is coaxially arranged with annular slot respectively, described nodal point connecting is vertically arranged with cylinder through hole, described nodal point connecting all sides threaded collar is coaxially connected with cross bar sleeve pipe respectively, described cross bar sleeve pipe end side is provided with the screw thread that can be connected with the threaded collar of nodal point connecting, the locating button be fixed in vertical rod is provided with below described nodal point connecting.
Further, described locating button is the two semicircular clevis sheet be inter-connected via a bolt joint.
Further, described nodal point connecting is eight limit cubes, and described nodal point connecting all sides threaded collar number is four.
Further, described nodal point connecting, cross bar sleeve pipe are made up of tube material.
Compared with prior art, the utility model has following beneficial effect: this steel tube scaffold linkage is provided with nodal point connecting, stable working, scaffold quick-detachment can be realized, and stress performance is good, connect in length and breadth to steel pipe by nodal point connecting, steel pipe axis is in same plane, there is not wobbler action time stressed; Connection stiffness is large, and cross bar is fixed by the annular slot in threaded collar in nodal point connecting and node, and utilizes cross bar sleeve pipe to retrain its rotational freedom further in periphery, substantially increases connection stiffness; Easy installation and removal, speed of application is fast, during installation, only need fix locating button with torque spanner in vertical rod, and remaining part all can manual installation, nodal point connecting is inserted in vertical rod, and installs cross bar sleeve pipe thereon, just can insert fixed transverse rod.During dismounting, screw out cross bar sleeve pipe, cross bar just can take out; Set up parameter various, applied widely.Because cross bar and vertical rod all need not independently be produced, can share with current conventional scaffolding steel pipe and use, and vertical pole ' s span and step pitch arbitrarily can change, and can meet the different needs of different engineering, both can use as external scaffolding, also can support or full hall scaffold as full hall; Production technology is simple, highly versatile.This means for fastening scaffolding only comprises three parts, nodal point connecting, cross bar sleeve pipe and locating button, and versatility is comparatively strong, arbitrarily can combine, meet the needs of different connecting portion.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model patent is further illustrated.
Fig. 1 is nodal point connecting structural representation;
Fig. 2 is cross bar sleeve structure schematic diagram;
Fig. 3 is locating button structural representation;
Fig. 4 is the working state schematic representation of this utility model;
In figure:
1-nodal point connecting; 11-threaded collar; 12-annular slot; 13-through hole; 2-cross bar sleeve pipe; 21-screw thread; 3-locating button; 31-intermediate plate; 32-bolt; 4-vertical rod; 5-cross bar.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is further illustrated.
As shown in figures 1-4, a kind of steel tube scaffold linkage, comprise the nodal point connecting 1 connecting cross bar 5 and vertical rod 4, described nodal point connecting 1 is polygon cube, described nodal point connecting 1 week side is provided with some threaded collar 11, described threaded collar 11 inside is coaxially arranged with annular slot 12 respectively, described nodal point connecting 1 is vertically arranged with cylinder through hole 13, described nodal point connecting side threaded collar 11 was coaxially connected with cross bar sleeve pipe 2 respectively in 1 week, described cross bar sleeve pipe 2 end side is provided with the screw thread 21 that can be connected with the threaded collar 11 of nodal point connecting 1, the locating button 3 be fixed in vertical rod 4 is provided with below described nodal point connecting 1.
In the present embodiment, described locating button 3 is by bolt 32 interconnective two semicircular clevis sheet 31.
In the present embodiment, described nodal point connecting 1 is eight limit cubes, and described nodal point connecting 1 week side threaded collar 11 number is four.
In the present embodiment, described nodal point connecting 1, cross bar sleeve pipe 2 are made up of tube material.
Specific implementation process: mounting method is as follows: first determine scaffold building parameter, i.e. vertical rod 4 spacing and cross bar 5 step pitch, secondly locating button 3 be inserted in vertical rod 4 and use torque spanner screwed in place button 3, again nodal point connecting 1 is inserted in vertical rod 4 to fix, afterwards cross bar sleeve pipe 2 is screwed in the threaded collar 11 on nodal point connecting 1, finally cross bar 5 is inserted the annular slot 12 on nodal point connecting 1.Method for dismounting is as follows: first, screws out cross bar sleeve pipe 2 just desirable sheer pole 5, then takes out nodal point connecting 1, unload locating button 3.
Above-listed preferred embodiment; the purpose of this utility model, technical scheme and advantage are further described; be understood that; the foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (4)

1. a steel tube scaffold linkage, comprise the nodal point connecting connecting cross bar and vertical rod, it is characterized in that: described nodal point connecting is polygon cube, the all sides of described nodal point connecting are provided with some threaded collar, described threaded collar inside is coaxially arranged with annular slot respectively, described nodal point connecting is vertically arranged with cylinder through hole, described nodal point connecting all sides threaded collar is coaxially connected with cross bar sleeve pipe respectively, described cross bar sleeve pipe end side is provided with the screw thread that can be connected with the threaded collar of nodal point connecting, the locating button be fixed in vertical rod is provided with below described nodal point connecting.
2. steel tube scaffold linkage according to claim 1, is characterized in that: described locating button is the two semicircular clevis sheet be inter-connected via a bolt joint.
3. steel tube scaffold linkage according to claim 1, is characterized in that: described nodal point connecting is eight limit cubes, and described nodal point connecting all sides threaded collar number is four.
4. steel tube scaffold linkage according to claim 1, is characterized in that: described nodal point connecting, cross bar sleeve pipe are made up of tube material.
CN201520000447.9U 2015-01-04 2015-01-04 A kind of steel tube scaffold linkage Expired - Fee Related CN204435843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520000447.9U CN204435843U (en) 2015-01-04 2015-01-04 A kind of steel tube scaffold linkage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520000447.9U CN204435843U (en) 2015-01-04 2015-01-04 A kind of steel tube scaffold linkage

Publications (1)

Publication Number Publication Date
CN204435843U true CN204435843U (en) 2015-07-01

Family

ID=53603728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520000447.9U Expired - Fee Related CN204435843U (en) 2015-01-04 2015-01-04 A kind of steel tube scaffold linkage

Country Status (1)

Country Link
CN (1) CN204435843U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421755A (en) * 2015-12-03 2016-03-23 无锡市晨源建筑器材有限公司 Spiral locking type scaffold
CN106401166A (en) * 2016-11-21 2017-02-15 福州大学 Rapid scaffold connecting device and construction method thereof
CN106592943A (en) * 2016-12-19 2017-04-26 罗逍 Constructing method for scaffold with triangular prism structure
CN107806242A (en) * 2017-09-22 2018-03-16 中建八局第二建设有限公司 A kind of high intensity scaffold fastenings for building
CN108590159A (en) * 2018-05-11 2018-09-28 合肥微信片农业科技有限公司 A kind of means for fastening scaffolding
CN108756205A (en) * 2018-07-02 2018-11-06 福州大学 Simple rack nodal connection device and its installation method
CN115506573A (en) * 2022-11-01 2022-12-23 浙江星辰建筑科技有限公司 Firm type scaffold frame

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421755A (en) * 2015-12-03 2016-03-23 无锡市晨源建筑器材有限公司 Spiral locking type scaffold
CN106401166A (en) * 2016-11-21 2017-02-15 福州大学 Rapid scaffold connecting device and construction method thereof
CN106592943A (en) * 2016-12-19 2017-04-26 罗逍 Constructing method for scaffold with triangular prism structure
CN107806242A (en) * 2017-09-22 2018-03-16 中建八局第二建设有限公司 A kind of high intensity scaffold fastenings for building
CN107806242B (en) * 2017-09-22 2023-06-16 中建八局第二建设有限公司 High strength scaffold connecting piece for building
CN108590159A (en) * 2018-05-11 2018-09-28 合肥微信片农业科技有限公司 A kind of means for fastening scaffolding
CN108756205A (en) * 2018-07-02 2018-11-06 福州大学 Simple rack nodal connection device and its installation method
CN115506573A (en) * 2022-11-01 2022-12-23 浙江星辰建筑科技有限公司 Firm type scaffold frame

Similar Documents

Publication Publication Date Title
CN204435843U (en) A kind of steel tube scaffold linkage
CN103741831B (en) High-strength steel column-common girder steel-low-yield bracing members triple seismic fortification high-performance steel structural system and method for designing thereof
CN204754191U (en) Combination steel form instrument formula spelling device
CN203701323U (en) High-intensity steel column-common steel beam-low-yield-point steel support trebling earthquake fortification high-performance steel structure system
CN202559713U (en) Steel pipe connecting device
CN206220471U (en) A kind of scaffold Quick Connect Kit
CN201428238Y (en) Expansion sleeve type scaffold connecting part
CN202081633U (en) Detachable scaffold locking plate
CN202990407U (en) Quick-release scaffold
CN205276854U (en) A fastener for connecting steel pipe
CN105570261A (en) Detachable screw
CN203793615U (en) Comb-shaped joint structure
CN204456663U (en) A kind of reinforcing pull rod
CN202969583U (en) Connecting structure of pole tower and basic connecting piece
CN203113881U (en) Connecting structure of composite material tubular element and angle iron tower body
CN205956164U (en) Female connection spare
CN205147761U (en) A main equipment instrument of pulling pin
CN204552038U (en) A kind of mortise and tenon type scaffold diagonal brace system
CN205063321U (en) Building cross fastener
CN204878212U (en) Split type brill tail screw
CN214658732U (en) Novel bolt type scaffold fastener
CN204456852U (en) Construction work sinking plate can have enough to meet the need, deformable, scalable, Collapsible mould
CN204781687U (en) Practical balcony building balustrade
CN204848031U (en) A adhere to staple bolt support for tower crane
CN204342323U (en) A kind of novel tower crane attached wall internal overarm support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150701

Termination date: 20180104

CF01 Termination of patent right due to non-payment of annual fee