CN217537501U
CN217537501U CN202220844455.1U CN202220844455U CN217537501U CN 217537501 U CN217537501 U CN 217537501U CN 202220844455 U CN202220844455 U CN 202220844455U CN 217537501 U CN217537501 U CN 217537501U
Authority
CN
China
Prior art keywords
dome
steel
pipe bracket
steel pipe
concrete structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220844455.1U
Other languages
Chinese (zh)
Inventor
魏文
马凯
陈奇
王健
刘忆杭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Long Run Construction Ltd By Share Ltd
Original Assignee
Long Run Construction Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Long Run Construction Ltd By Share Ltd filed Critical Long Run Construction Ltd By Share Ltd
Priority to CN202220844455.1U priority Critical patent/CN217537501U/en
Application granted granted Critical
Publication of CN217537501U publication Critical patent/CN217537501U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses an integral dome mounting structure, the installation is fixed in on building concrete structure, including building concrete structure main part, steel pipe bracket, dome steelframe base, dome molding body, taper bolt, the dome molding body attaches on dome steelframe base after carrying out the fretwork processing, dome steelframe base connects on steel pipe bracket after forming through the welding by several steel square pipes, steel pipe bracket is formed through the welding by several horizontal steel square pipes and vertical steel square pipe and is passed through taper bolt fastening in building concrete structure main part after. The taper bolts are connected and fixed through bolt holes. The utility model discloses it is high-efficient convenient to construct the installation, and the dome surface does not have the piece, makes the dome become a whole, increases beautifully and fastness, promotes show and artistic effect, and the dome carries out fretwork processing in the mill, and on-the-spot integral hoisting has the construction swiftly, and reduction of erection time reduces the cost of labor, improves advantages such as construction quality.

Description

Integral dome mounting structure
Technical Field
The utility model relates to an architectural decoration technical field to it is more specific, relate to an integral dome mounting structure.
Background
With the improvement of buildings such as museums, memorial halls and the like and the increase of new-built projects, many attractive projects are emerged, such as three-door canyon ditch museums, shaoxing Dayu memorial halls and the like in the buildings, the dome is used as the top of the center, and the dense places visited by people have the feeling of being high and deep.
The dome structure is attractive in shape and widely applied, but as a special-shaped structure, how to control construction quality, guarantee construction safety, select a construction method, an operation platform and the like is undoubtedly a difficult problem in site construction, and the whole construction quality and progress are influenced.
Modern building design, building structure is more and more complicated, has the continuous curved surface of curvature or has the cambered surface, and for the dome structure, the support keel who forms the dome is not good construction installation design, and the overlap joint of large-scale metal component is comparatively troublesome, and the cost of transportation of overlap joint method are all higher. In addition, the unit metal plates can have splicing seams in the splicing process, and the splicing seams are different in size, so that the overall attractiveness of the dome can be influenced.
Chinese patent document CN202120712207.7 discloses a metal sheet dome outer vertical face mounting structure, including building steel structure main part, basic unit's steelframe, the sound absorption layer, steel mesh fixed bed and a plurality of outside metal sheet, outside metal sheet attaches on basic unit's steelframe, wherein basic unit's steelframe passes through angle steel structure threaded fixation on building steel structure main part, the surface on sound absorption layer is provided with the steel mesh fixed bed, set up on building steel structure main part through the steel mesh fixed bed, outside metal sheet adopts the piecemeal mounting mode concatenation to form, two piece adjacent outside metal sheet junctions are provided with piece processing apparatus.
But its complicated steel truss structure, there are the construction welding point many, the difficult scheduling problem of construction survey location, a plurality of metal sheets adopt the mode concatenation of on-the-spot piecemeal installation in addition, because unit metal sheet area is little, a large amount, lead to that the later stage concatenation work load is big and the piece needs the special messenger to handle, the installation deviation between the unit metal sheet also needs the special messenger to adjust, the whole installation degree of difficulty is big, the construction period is long, construction quality is difficult to guarantee the scheduling problem.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the purpose provides an integral dome mounting structure in order to compensate the defect that prior art exists, simple to operate, and is swift high-efficient.
In order to achieve the purpose, the utility model discloses an integral dome mounting structure, including building concrete structure main part, steel pipe bracket, dome steelframe base, dome molding body, taper bolt, the dome molding body attaches on dome steelframe base, dome steelframe base is connected on steel pipe bracket, steel pipe bracket passes through the crab-bolt to be fixed in building concrete structure main part, steel pipe bracket is formed through welding by several horizontal steel side pipes and vertical steel side pipe. The taper bolts are connected through bolt holes.
Furthermore, the dome steel frame base is formed by welding a plurality of steel square pipes.
Further, the dome-shaped body is subjected to hollow-out artistic treatment in a stainless steel forging mode.
Furthermore, the dome-shaped body is fixed on the dome steel frame base in a binding and welding combined mode.
Further, the steel pipe bracket is fixed on the main body of the building concrete structure through an inverted cone bolt.
The utility model has the advantages that: the utility model discloses structural installation is high-efficient convenient, and the molding dome surface does not have the piece, makes the dome become a whole, increases pleasing to the eye and fastness, has promoted show and artistic effect. The dome is subjected to hollow modeling artistic treatment in a factory, and is integrally hoisted on site, so that the method has the advantages of being rapid in construction, shortening the construction period, reducing the labor cost and improving the construction quality.
Drawings
In order to more clearly illustrate the technical solution of the present invention, the drawings required for the description of the present invention will be briefly introduced below, and it is obvious that the drawings described below are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic view of the installation structure of the dome of the present invention;
FIG. 2 is a schematic plan view of the dome steel frame base of the present invention;
fig. 3 is a schematic view of the vertical surface of the steel pipe bracket of the present invention.
Wherein, 1-building a concrete structure main body; 2-steel pipe bracket; 3-dome steel frame base; 4-dome-shaped body; 5-a taper bolt; 6-steel square pipe.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts shall fall within the protection scope of the present invention.
An integral dome mounting structure as shown in fig. 1 comprises a building concrete structure main body 1, a steel pipe bracket 2, a dome steel frame base 3, a dome modeling body 4 and a taper bolt 5, wherein the dome modeling body 4 is attached to the dome steel frame base 3, the dome steel frame base 3 is connected to the steel pipe bracket 2, and the steel pipe bracket 2 is fixed on the building concrete structure main body 1. The dome-shaped body 4 is fixed on the dome steel frame base 3 in a binding and welding combined mode. The dome-shaped body 4 is subjected to hollow-out molding art treatment in a stainless steel forging mode. The taper bolt 5 is bolted through a bolt hole.
As shown in fig. 2, the dome steel frame base 3 is formed by welding a plurality of steel square pipes 6.
As shown in fig. 3, the steel pipe bracket 2 is fixed on the building concrete structure body 1 through the inverted cone bolt 5, wherein the steel pipe bracket 2 is formed by welding a plurality of horizontal steel square pipes and vertical steel square pipes 6.
While embodiments of the invention have been disclosed above, it is not intended that they be limited to the applications set forth in the specification and examples. It can be applicable to various and be fit for the utility model discloses a field completely. Additional modifications will readily occur to those skilled in the art. The invention is therefore not to be limited to the specific details and illustrations shown and described herein, without departing from the general concept defined by the claims and their equivalents.

Claims (5)

1. The utility model provides an integral dome mounting structure, the installation is fixed in on building concrete structure, its characterized in that, includes building concrete structure main part (1), steel pipe bracket (2), dome steelframe base (3), dome body (4), taper bolt (5) of modelling, dome body (4) attach on dome steelframe base (3), dome steelframe base (3) are connected on steel pipe bracket (2), steel pipe bracket (2) are fixed in building concrete structure main part (1), steel pipe bracket (2) are formed by several horizontal steel square pipes (6) and vertical steel square pipe (6) welding, taper bolt (5) are connected fixedly through the bolt hole.
2. An integral dome mounting structure as claimed in claim 1, wherein said dome steel frame base (3) is formed by welding a plurality of square steel tubes (6).
3. An integral dome mounting structure as claimed in claim 1, wherein the dome-shaped body (4) is openworked by means of stainless steel forging.
4. An integral dome mounting structure as claimed in claim 1 wherein the dome-shaped body (4) is secured to the dome steel frame base (3) by a combination of lashing and welding.
5. A unitary dome mounting structure according to claim 1, wherein said steel pipe bracket (2) is fixed to the construction concrete structure body (1) by means of taper bolts (5).
CN202220844455.1U 2022-04-14 2022-04-14 Integral dome mounting structure Active CN217537501U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220844455.1U CN217537501U (en) 2022-04-14 2022-04-14 Integral dome mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220844455.1U CN217537501U (en) 2022-04-14 2022-04-14 Integral dome mounting structure

Publications (1)

Publication Number Publication Date
CN217537501U true CN217537501U (en) 2022-10-04

Family

ID=83430184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220844455.1U Active CN217537501U (en) 2022-04-14 2022-04-14 Integral dome mounting structure

Country Status (1)

Country Link
CN (1) CN217537501U (en)

Similar Documents

Publication Publication Date Title
CN102359180B (en) Truss combined beam and upper and layer connected light steel structure and construction method thereof
CN104727476B (en) The light body 3D steel bar girders floor plates of assembled and its manufacture method
CN106991248A (en) A kind of wide span house cap coordinates the design method of stress with supporting structure
CN110318490A (en) A kind of construction method that superimposed sheet is connect with secondary beam and node connecting structure
CN106351445B (en) A kind of strengthening concrete sloping core form assembly bracing reinforcement system and construction method of installation
CN112695952A (en) Building roof truss support structure and construction method
CN217537501U (en) Integral dome mounting structure
CN108894329B (en) Overhanging type pipe truss and mounting method of supporting rod thereof
CN214531887U (en) Template reinforcing system for arc-shaped wall
CN106869379A (en) A kind of assembling type steel structure Side fascia subiculum upper hanging type attachment structure
CN110130551A (en) A kind of bolt method cell cube GRC curtain wall construction and its construction method
CN1737288A (en) Fixing device and building method for outer decorative stone curtain wall of steel pipe truss tower
CN213268816U (en) Assembled shaped steel horizontal protection platform of encorbelmenting
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN215594561U (en) A super large curved surface furred ceiling structure for spatial grid structure
CN2561842Y (en) Cast in situs reinforced concrete assebled walls
CN210032102U (en) Support for mounting external hanging piece of building
CN206299015U (en) Assembled composite floor
CN113089820B (en) Construction method of single-layer oblique-crossing special-shaped curved surface aluminum alloy structure in limited space
CN214498388U (en) Assembled overhanging formwork support bent
CN210316169U (en) Hyperboloid aluminum plate furred ceiling structure
CN211313311U (en) Assembled concrete structure regularization stair protection platform
CN210256645U (en) Prefabricated wallboard stores pylon preformed hole concurrently hangs and uses device
CN107130519A (en) The making of concrete prefabricated flat board and handling method
CN209293173U (en) Module-type steel structure trestle external verandahs