CN210256645U - Prefabricated wallboard stores pylon preformed hole concurrently hangs and uses device - Google Patents
Prefabricated wallboard stores pylon preformed hole concurrently hangs and uses device Download PDFInfo
- Publication number
- CN210256645U CN210256645U CN201920787159.0U CN201920787159U CN210256645U CN 210256645 U CN210256645 U CN 210256645U CN 201920787159 U CN201920787159 U CN 201920787159U CN 210256645 U CN210256645 U CN 210256645U
- Authority
- CN
- China
- Prior art keywords
- screw rod
- pipe
- hoisting
- nut
- preformed hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- CWFOCCVIPCEQCK-UHFFFAOYSA-N Chlorfenapyr Chemical compound BrC1=C(C(F)(F)F)N(COCC)C(C=2C=CC(Cl)=CC=2)=C1C#N CWFOCCVIPCEQCK-UHFFFAOYSA-N 0.000 title claims abstract description 26
- 230000000149 penetrating Effects 0.000 claims description 15
- 238000003466 welding Methods 0.000 claims description 13
- 229910000831 Steel Inorganic materials 0.000 claims description 11
- 239000010959 steel Substances 0.000 claims description 11
- 229920003023 plastic Polymers 0.000 claims description 6
- 239000004567 concrete Substances 0.000 abstract description 7
- 230000000694 effects Effects 0.000 abstract description 2
- 238000004080 punching Methods 0.000 abstract 2
- 238000009434 installation Methods 0.000 description 6
- 239000011178 precast concrete Substances 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000002360 preparation method Methods 0.000 description 4
- 210000001138 Tears Anatomy 0.000 description 3
- 241000120694 Thestor Species 0.000 description 3
- 229920000915 polyvinyl chloride Polymers 0.000 description 3
- 241000893018 Armeria Species 0.000 description 1
- 230000037250 Clearance Effects 0.000 description 1
- 230000035512 clearance Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 231100000241 scar Toxicity 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Images
Abstract
The utility model discloses a prefabricated wallboard outer hanging rack preformed hole and hoisting device, which comprises a base fixed on the surface of a mould, a positioning nut, a through pipe for forming a perforated hole on a prefabricated wallboard, and a hoisting piece for horizontal hoisting; the utility model discloses a prefabricated wallboard component, including the pipe, the pipe is connected through the screw rod and is rotated to the set nut position with electric spanner behind the poling, and it makes its wearing and fixing effect to continue to rotate the screw rod when concrete reaches the initial set after waiting prefabricated wallboard component to produce and makes its downstream, produces reaction force and upwards pushes out the poling and make it become flexible, demolishs the poling, forms required stores pylon hole of punching a hole, has solved the unsafe problem of punching a hole location. After the screw rod and the through pipe are disassembled, the horizontal hoisting piece is installed and hoisted at the same position, an embedded horizontal hoisting piece is not needed to be additionally used, the hoisting piece can be repeatedly used, and the embedded hoisting piece can only be used once. Saves the hoisting cost and is convenient to use.
Description
Technical Field
The utility model relates to a building field, concretely relates to prefabricated wallboard stores pylon preformed hole holds concurrently device for hoist and mount.
Background
At present, the integral assembling concrete structure in China mainly comprises an integral assembling frame structure, an integral assembling shear wall structure and the like, wherein the integral assembling shear wall structure is most widely applied. Because the outer wall of this structural system is mostly precast concrete wallboard, its outer protection adopts assembled stores pylon more, assembled stores pylon is fixed through drawing building bolt and precast wallboard, precast wallboard need reserve the stores pylon when the production in mill and perforate in order to satisfy stores pylon installation needs, in addition for improving production efficiency, some prefabricated component manufacturing enterprise adopts the flat drawing of patterns when producing precast wallboard, and need pre-buried the piece of burying that is used for the flat drawing of patterns when precast wallboard production.
The pre-buried toper ironware preparation that adopts the PVC pipe or have the drawing of patterns chamfer of reserving of current prefabricated wallboard stores pylon perforation, clearance PVC pipe work load is great when later stage shutoff hole when adopting PVC pipe preparation, and when adopting toper ironware preparation, toper ironware expense is higher, is used for the flat piece of burying of hanging the drawing of patterns of prefabricated wallboard to bury in the prefabricated component in addition, and it is big to bury the piece quantity, and the expense is higher.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prefabricated wallboard stores pylon preformed hole holds concurrently and hangs and uses device, can reserve the stores pylon perforation when prefabricated wallboard preparation, can do prefabricated wallboard flat drawing of patterns device that hangs simultaneously, avoids a large amount of pre-buried flat drawing of patterns of hanging of wallboard to bury, practices thrift the cost, and the device all can adopt the electric spanner operation at the installation with dismantling, and ann tears efficiently open, has good technical and economic nature.
The utility model provides a technical scheme that its technical problem adopted as follows:
the utility model provides a prefabricated wallboard stores pylon preformed hole concurrently hangs and uses device which characterized in that: the die comprises a hollow base fixed on a die table surface, wherein an inner thread is arranged on the annular inner wall of the upper part of the base; the die comprises a positioning nut which is fixed on a die table surface and is positioned in a base, wherein the inner wall of the upper part of the positioning nut is provided with an internal thread, and the inner wall of the lower part of the positioning nut is an annular smooth surface; the base is sleeved with a through pipe, a nut is fixed on the inner wall of the middle part of the through pipe, and the center lines of the nut, the positioning nut and the base are all positioned on the same straight line; the screw rod positioning device comprises a screw rod, wherein a section of a thread-free round rod section is arranged at the lower part of the screw rod, the distance between the bottom of the thread-free round rod section and the bottom of the screw rod corresponds to the height of the lower part of a positioning screw cap, and the length of the thread-free round rod section corresponds to the height of the upper part of the positioning screw cap; the hoisting device comprises a horizontal hoisting piece, wherein the horizontal hoisting piece comprises a steel plate and a large screw rod fixed on the steel plate.
The prefabricated wall panel stores pylon preformed hole concurrently for hoist and mount use device, its characterized in that: the base comprises an integrated hollow cylinder positioned at the upper part and a hollow cone positioned at the lower part, and the internal thread is positioned on the annular inner wall of the cylinder; the penetrating pipe is sleeved outside the cylinder body.
The prefabricated wall panel stores pylon preformed hole concurrently for hoist and mount use device, its characterized in that: the poling is including lower part sleeve pipe, and lower part sleeve pipe top overcoat has upper portion sleeve pipe and welds as an organic whole and the inside welding position is fixed with the nut, and outside crater position is equipped with the chamfer.
The prefabricated wall panel stores pylon preformed hole concurrently for hoist and mount use device, its characterized in that: the screw rod comprises a screw cap and a small screw rod which are welded into a whole, and a section of wire-free round rod section is arranged at the lower part of the small screw rod.
The prefabricated wall panel stores pylon preformed hole concurrently for hoist and mount use device, its characterized in that: the top of the pipe-through is sleeved with a plastic cover.
A prefabricated wallboard outer hanging rack preformed hole and hoisting device comprises a base fixed on a die table surface, a positioning nut fixed on the die table surface in a welding mode, a through pipe used for forming a through hole in a prefabricated wallboard, a screw used for mounting and dismounting, a plastic cover used for preventing concrete from entering, and a hoisting piece used for horizontal hoisting; the pipe penetrating device comprises an upper sleeve, a lower sleeve, an internal welding gasket and a nut, a screw rod for mounting and dismounting is formed by welding the nut and a small screw rod, and a horizontal hoisting piece is formed by welding a steel plate and a large screw rod.
The gasket on the through pipe is welded with the screw cap to form an upper positioning point of the screw, and the positioning screw cap is connected with the screw thread of the screw to form a lower positioning point, so that the screw does not deviate in vertical movement; the upper sleeve and the lower sleeve are sleeved by a section and are fully welded, and a weld scar is polished into a chamfer after welding; the sleeve with the large upper part and the small lower part is formed, so that the device with the reserved hole is convenient to disassemble upwards, and the perforated hole formed by the chamfer has a certain waterproof effect.
The screw rod includes welded connection's nut, little lead screw, and there is one section to process into the no silk round bar little lead screw lower part, and the prefabricated wallboard stores pylon preformed hole of concurrently hoist and mount is installed and is dismantled with the device.
The plastic cover is arranged on the pipe penetrating and used for sealing the pipe penetrating hole and preventing concrete from entering.
The utility model discloses a wallboard component, including the screw rod, the screw rod is connected the poling and is made its rotatory screw thread position on the positioning nut with electric spanner behind the poling, realize the fixed action, continue rotatory screw rod downstream when concrete reaches the initial set after waiting prefabricated wallboard component to produce, screw rod lower part no silk round bar section overlaps with positioning nut upper portion screw thread and forms the idle running, the screw rod bottom can continue to apply downwards and support the die table, produce the reaction force and push up the poling through the screw-nut principle and make it become flexible, backward rotation again can take out poling and screw rod realization device and demolish.
The lower part of the internal thread with larger diameter is processed into a conical oblique angle on the upper part of the base, the larger internal thread on the upper part is matched and connected with the horizontal hoisting piece, the upper part of the conical oblique angle on the lower part is narrow and wide, and can be used as a bottom support for horizontally hoisting the prefabricated wallboard, and after the horizontal hoisting process of the prefabricated wallboard is completed and the horizontal hoisting piece is disassembled, the conical oblique angle form of the base is convenient to disassemble from the prefabricated wallboard.
The horizontal hoisting piece comprises a steel plate welding screw rod, and the horizontal hoisting piece is connected with a screw thread on the base after the screw rod and the penetrating pipe are disassembled, so that the horizontal hoisting function is realized.
The utility model has the advantages that:
the utility model provides a prefabricated wallboard stores pylon preformed hole of assembled and hoist and mount function simultaneously realize and can form a complete set current electric spanner ann through one set of device and tear a difficult technical problem open, had both guaranteed the accuracy of stores pylon perforation installation, had avoided the prefabricated wallboard flat hanging drawing of patterns to bury the piece pre-buried again, and convenient operation, the ann tears efficiently open, and the level lifts by crane safe and reliable.
Drawings
The embodiments of the present invention will be further explained with reference to the drawings.
Fig. 1 is a schematic view of the installation of the present invention.
Figure 2 is a schematic view of the sling installation.
Figure 3 is the stores pylon uses the utility model discloses form the wall hole and install the sketch map.
Fig. 4 is a cross-sectional view of a poling tube.
Fig. 5 is a cross-sectional view of the screw.
Fig. 6 is a cross-sectional view of the base.
Figure 7 is a cross-sectional view of the retaining nut.
Figure 8 is a front view of the sling
The reference numbers in the figures are: 1. the wall-mounted type building block comprises a pipe penetrating device, 2 parts of screw rods, 3 parts of positioning screw caps, 4 parts of a base, 5 parts of plastic covers, 6 parts of a mould table, 7 parts of prefabricated wall board components, 8 parts of horizontal hoisting pieces, 9 parts of screw caps, 10 parts of round chamfers, 11 parts of lower sleeves, 12 parts of upper sleeves, 13 parts of gaskets, 14 parts of wire-free round rods, 15 parts of screw rod screw caps, 16 parts of small screw rods, 17 parts of conical bevel angles, 18 parts of inner screw threads, 19 parts of wire-free round walls, 20 parts of screw cap screw threads, 21 parts of large screw rods, 22 parts of steel plates, 23 external hanging frames, 24 floor slabs, 25 wall penetrating holes and 26 wall penetrating.
Detailed Description
See the drawings.
A prefabricated wall panel outer hanging rack preformed hole and hoisting device comprises a base 4 fixed on a mould table surface 6, a positioning nut 3 fixed on the mould table surface 6 in a welding mode, a through pipe 1 used for forming a perforated hole in a prefabricated wall panel 7, a screw rod 2 used for mounting and dismounting, a plastic cover 5 used for preventing concrete from entering and a hoisting piece 8 used for horizontal hoisting; the pipe penetrating 1 comprises an upper sleeve 12, a lower sleeve 11, an inner welding gasket 13 and a nut 9, the screw 2 for mounting and dismounting is formed by welding a screw nut 15 and a small screw rod 16, and the horizontal hoisting piece 8 is formed by welding a steel plate 22 and a large screw rod 21.
The gasket 13 on the pipe penetrating 1 is formed by cutting a 10mm thick steel plate by laser, wherein the outer circle phi is 41mm, the inner circle phi is 20mm, the nut 9 is an M16 nut, the upper sleeve is a round pipe with phi 48mm multiplied by 150mm and a wall thickness of 3mm, the lower sleeve is a round pipe with phi 40mm multiplied by 132mm and a wall thickness of 3mm, the gasket 13 and the nut 9 are welded at the upper and lower middle positions to form a whole, the gasket is welded in the upper sleeve 12 and used for positioning the upper part of the screw rod 2, the gasket 13 welded in the upper sleeve 12 is welded on the nut 9 to form the upper half part of the pipe penetrating 1, the upper half part of the pipe penetrating 1 and the lower sleeve 11 are sleeved by 20mm and welded, and; the sleeve with the large upper part and the small lower part is formed, so that the device with the reserved hole is convenient to disassemble upwards, and the perforated hole formed by the grinded chamfer 10 has certain water-blocking and water-proof functions.
The screw rod 2 comprises a small screw rod 16 adopting an M16 screw cap 15 and an M16, the lower part of the small screw rod 16 starts to process a section of a threadless round rod 14 with the length of 15mm from the bottom to the upper 16mm, and the installation and the disassembly of the device for prefabricating the wall panel outer hanger preformed hole and the hanging are realized.
The positioning nut 3 is connected with the thread 20 of the screw rod 2 by adopting an M16 nut to form lower positioning, so that the screw rod 2 does not deviate in vertical movement. The lower half is machined 15mm apart to form a wire-free circular wall 19.
The horizontal hoisting piece 8 comprises a steel plate 22 with the thickness of 150mm multiplied by 200mm multiplied by 10mm and an M22 screw rod 21, and the lower part of the steel plate 22 is provided with a groove with the thickness of 24mm multiplied by 70mmU for welding the screw rod 21.
The upper part of the base 4 is processed into a conical bevel angle 17 with the diameter of 50mm at the upper part, the diameter of 70mm at the lower part and the height of 40mm at the lower part, and the inner wire 18 at the upper part is connected with the horizontal lifting piece 8.
Make it rotatory to 3 upper portion threads 20 positions of positioning nut with electric spanner behind the poling 1 is connected to screw rod 2, realize the fixed action, concrete when reaching the initial set after the prefabricated wallboard component produces continues to rotate screw rod downstream screw rod 2 lower part does not have silk round bar 14 part and positioning nut 3 upper portion threads 20 and overlaps and form the idle running, 2 bottoms of screw rod can continue to utilize downwards and support die table 6, produce reaction force and push up poling 1 and make it become flexible, can take out poling 1 and screw rod 2 realization device spare at reverse rotation and demolish, form required pylon perforation hole.
The horizontal hoisting piece 8 is connected with a screw thread 18 on the base 4 after the screw rod 2 and the through pipe 1 are disassembled, the lower conical oblique angle 17 form realizes the horizontal hoisting function, and the back part is convenient to disassemble after the horizontal hoisting piece 8 is disassembled in the horizontal hoisting process.
The precast concrete wall panel 7 is manufactured in a factory, and after the precast concrete wall panel 7 and the outer hanging frame 23 are installed on a construction site with strength, the precast concrete wall panel 7 and the outer hanging frame 23 are installed and fixed through a wall penetrating hole 25 formed by machining a preformed hole of the precast concrete wall panel outer hanging frame and a device for hoisting through a wall penetrating screw 26.
Claims (5)
1. The utility model provides a prefabricated wallboard stores pylon preformed hole concurrently hangs and uses device which characterized in that: the die comprises a hollow base fixed on a die table surface, wherein an inner thread is arranged on the annular inner wall of the upper part of the base; the die comprises a positioning nut which is fixed on a die table surface and is positioned in a base, wherein the inner wall of the upper part of the positioning nut is provided with an internal thread, and the inner wall of the lower part of the positioning nut is an annular smooth surface; the base is sleeved with a through pipe, a nut is fixed on the inner wall of the middle part of the through pipe, and the center lines of the nut, the positioning nut and the base are all positioned on the same straight line; the screw rod positioning device comprises a screw rod, wherein a section of a thread-free round rod section is arranged at the lower part of the screw rod, the distance between the bottom of the thread-free round rod section and the bottom of the screw rod corresponds to the height of the lower part of a positioning screw cap, and the length of the thread-free round rod section corresponds to the height of the upper part of the positioning screw cap; the hoisting device comprises a horizontal hoisting piece, wherein the horizontal hoisting piece comprises a steel plate and a large screw rod fixed on the steel plate.
2. The prefabricated wall panel pylon preformed hole and hoisting device of claim 1, wherein: the base comprises an integrated hollow cylinder positioned at the upper part and a hollow cone positioned at the lower part, and the internal thread is positioned on the annular inner wall of the cylinder; the penetrating pipe is sleeved outside the cylinder body.
3. The prefabricated wall panel pylon preformed hole and hoisting device of claim 1, wherein: the poling is including lower part sleeve pipe, and lower part sleeve pipe top overcoat has upper portion sleeve pipe and welds as an organic whole and the inside welding position is fixed with the nut, and outside crater position is equipped with the chamfer.
4. The prefabricated wall panel pylon preformed hole and hoisting device of claim 1, wherein: the screw rod comprises a screw cap and a small screw rod which are welded into a whole, and a section of wire-free round rod section is arranged at the lower part of the small screw rod.
5. The prefabricated wall panel pylon preformed hole and hoisting device of claim 1, wherein: the top of the pipe-through is sleeved with a plastic cover.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920787159.0U CN210256645U (en) | 2019-05-29 | 2019-05-29 | Prefabricated wallboard stores pylon preformed hole concurrently hangs and uses device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920787159.0U CN210256645U (en) | 2019-05-29 | 2019-05-29 | Prefabricated wallboard stores pylon preformed hole concurrently hangs and uses device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210256645U true CN210256645U (en) | 2020-04-07 |
Family
ID=70039133
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920787159.0U Active CN210256645U (en) | 2019-05-29 | 2019-05-29 | Prefabricated wallboard stores pylon preformed hole concurrently hangs and uses device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210256645U (en) |
-
2019
- 2019-05-29 CN CN201920787159.0U patent/CN210256645U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102979304B (en) | Construction method of double shear wall formworks at deformation joint of high-rise building | |
CN112012340B (en) | Suspension connection node for large-span cantilever steel truss and construction method thereof | |
CN201292665Y (en) | Concrete floor pre-arranged hole apparatus | |
CN104141318B (en) | A kind of Large-diameter Steel tubing string suspension column construction method of installation | |
CN106639336A (en) | Prefabricated concrete wall panel installation and emplacement orientation adjustment device and construction method thereof | |
CN206157913U (en) | Assembled square steel tube concrete post and girder steel connected node | |
CN110103326A (en) | A kind of prefabricated panel pylon preformed hole and device for hoisting | |
CN210256645U (en) | Prefabricated wallboard stores pylon preformed hole concurrently hangs and uses device | |
CN103552911B (en) | A kind of movable boom hoisting and the construction installation method of use thereof | |
CN2751105Y (en) | Special mould for preformed pipe hole | |
CN202380746U (en) | Concrete watering maintenance device below large molding board | |
CN212743424U (en) | Nuclear power steel lining installation buttress post device | |
CN203145122U (en) | Drain pipe pre-embedding base | |
CN210619969U (en) | Prefabricated staircase hoist and mount subassembly | |
CN210032102U (en) | Support for mounting external hanging piece of building | |
CN210529735U (en) | Building steel structure platform base | |
CN204173804U (en) | A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure | |
CN207673006U (en) | A kind of horizontal convex concrete construction joint hangs mould support device | |
CN206902768U (en) | A kind of post-cast strip adjustable supporting | |
CN206800970U (en) | A kind of integral lifting elevator hoistways operating platform | |
CN109629821A (en) | The support construction of concrete overhanging component top scaffold outlet steel pipe | |
CN216475848U (en) | Pre-buried porous concrete slab who lifts by crane structure | |
CN215803087U (en) | Safe operation platform for open caisson | |
CN212554342U (en) | Magnetic device for hoisting prefabricated wall board | |
CN107965145A (en) | A kind of horizontal convex concrete construction joint hangs mould support device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |