CN217204064U - Supporting device for uplift pile operating platform - Google Patents

Supporting device for uplift pile operating platform Download PDF

Info

Publication number
CN217204064U
CN217204064U CN202220942096.3U CN202220942096U CN217204064U CN 217204064 U CN217204064 U CN 217204064U CN 202220942096 U CN202220942096 U CN 202220942096U CN 217204064 U CN217204064 U CN 217204064U
Authority
CN
China
Prior art keywords
jack
fixed mounting
uplift pile
threaded rod
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220942096.3U
Other languages
Chinese (zh)
Inventor
王恒
刘京城
吴小婉
杨林
吴杰
韩源源
赵健成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Group Co Ltd
Original Assignee
Beijing Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Group Co Ltd filed Critical Beijing Urban Construction Group Co Ltd
Priority to CN202220942096.3U priority Critical patent/CN217204064U/en
Application granted granted Critical
Publication of CN217204064U publication Critical patent/CN217204064U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to an uplift pile technical field just discloses an uplift pile operation platform's strutting arrangement, which comprises a platform, fixed mounting has the uplift pile in the middle of the platform bottom, platform bottom both sides fixed mounting has the jack, jack bottom both sides fixed mounting has installation mechanism, the installation mechanism top articulates there is supplementary supporting mechanism, installation mechanism is including the installation piece, installation piece fixed mounting is in the jack both sides, the inside bolt of pegging graft of installation mechanism. This uplift pile operation platform's strutting arrangement includes installation mechanism, installation that can be convenient and dismantlement jack can be changed after the jack damages fast, has avoided the jack to take place phenomenons such as skid, has made things convenient for the jack to carry out work, draws together supplementary supporting mechanism, can assist the jack to support, has promoted the application range of jack, and compressive capacity, is not very heavy under the fast of working a diligent at the platform, can assist the dismantlement of jack.

Description

Supporting device for uplift pile operating platform
Technical Field
The utility model relates to an uplift pile technical field specifically is an uplift pile operation platform's strutting arrangement.
Background
The uplift pile is widely applied to uplift of large basement, uplift of high-rise buildings, anchor pile foundations of suspension bridges and cable-stayed bridges, pile foundations of large ship dock floors, anchor pile foundations in static load test piles and the like, and means that if the underground structure of the construction engineering has a part lower than the water level of surrounding soil, the pile is driven in order to offset the upward buoyancy generated by water in the soil on the structure, and an operation platform of the uplift pile can provide enough weight for the uplift pile.
The existing uplift pile platform is supported by using a jack, but the existing uplift pile jack does not have the rapid installation capacity and is placed on the ground, if the consequences of phenomena such as slipping occur, the assumption is not good, and the existing supporting device only uses the jack and cannot be suitable for the uplift pile platform with higher weight.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an uplift pile operation platform's strutting arrangement to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: a supporting device of an uplift pile operation platform comprises a platform, wherein an uplift pile is fixedly arranged in the middle of the bottom of the platform, jacks are fixedly arranged on two sides of the bottom of the platform, mounting mechanisms are fixedly arranged on two sides of the bottom of the jacks, and auxiliary supporting mechanisms are hinged to the tops of the mounting mechanisms;
the mounting mechanism comprises a mounting block, the mounting block is fixedly mounted on two sides of the jack, a bolt is inserted into the mounting mechanism, a threaded sleeve is fixedly mounted at one end of the bolt, a threaded rod is mounted on the inner threads of the threaded sleeve, a sliding rod is slidably mounted at the bottom of the threaded rod through the threaded sleeve, a side plate is fixedly mounted at one end of the sliding rod, a bearing plate is fixedly mounted at the bottom of the side plate, a handle is fixedly mounted at one end of the threaded rod, and a supporting bottom plate is placed at the bottom of the jack.
Preferably, the inside slot that has seted up of installation piece, the installation piece has the bolt through the slot grafting, conveniently cooperates the threaded rod to accomplish quick installation and dismantlement.
Preferably, threaded rod left side fixed mounting has the bearing, the threaded rod has the curb plate through bearing fixed mounting, threaded rod surface both sides are provided with positive and negative screw thread, thread bush quantity is two, two the thread bush corresponds positive and negative screw thread and installs in the threaded rod surface, influences other parts when the threaded rod rotates, and positive and negative screw thread can be controlled when making the threaded rod rotate and the mutual being close to of thread bush or keep away from.
Preferably, the bearing is fixedly installed on the outer surface of the handle, the handle is fixedly installed inside the side plate through the bearing, the handle is convenient to rotate, and the handle is prevented from rotating to influence other parts.
Preferably, the auxiliary supporting mechanism comprises a connecting rod hinged to the top of the bearing plate, meshing teeth are fixedly mounted on the inner wall of the connecting rod, gears are meshed on the outer surfaces of the meshing teeth, rotating shafts are fixedly mounted inside the gears, ratchets are fixedly mounted on the outer surfaces of the meshing teeth, and pawls are arranged on the left sides of the ratchets.
Preferably, the back of the rotating shaft is fixedly provided with a bar block, and the rotating shaft is fixedly arranged at the bottom of the platform through the bar block, so that the rotating shaft is convenient to install.
Preferably, the connecting rods number is two, two the connecting rod symmetry articulates in bearing plate top, and the connecting rod of being convenient for carries out the height.
Compared with the prior art, the utility model provides an uplift pile operation platform's strutting arrangement possesses following beneficial effect:
1. this uplift pile operation platform's strutting arrangement includes installation mechanism, installation that can be convenient and dismantles the jack, can change fast after the jack damages, has avoided the jack to take place phenomenons such as skidding, has made things convenient for the jack to carry out work.
2. This uplift pile operation platform's strutting arrangement includes supplementary supporting mechanism, can assist the jack to support, has promoted the application range of jack and compressive capacity, is not under the very serious fast of working frequently at the platform, can assist the dismantlement of jack, supports temporarily when dismantling.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without inventive labor:
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic view of the cross-sectional structure of the present invention;
FIG. 3 is an enlarged view of the structure at B in FIG. 2;
fig. 4 is an enlarged schematic view of a portion a in fig. 2.
In the figure: 1. an installation mechanism; 2. an auxiliary support mechanism; 3. a platform; 4. uplift piles; 5. a jack; 11. a bearing plate; 12. a side plate; 13. a slide bar; 14. a threaded sleeve; 15. a threaded rod; 16. a support base plate; 17. mounting blocks; 18. a bolt; 19. a handle; 21. a connecting rod; 22. meshing teeth; 23. a ratchet wheel; 24. a pawl; 25. a gear; 26. a rotating shaft.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the present invention, unless otherwise explicitly specified or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly, e.g., as being fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Referring to fig. 1-4, the present invention provides a technical solution: a supporting device of an uplift pile operation platform comprises a platform 3, uplift piles 4 are fixedly mounted in the middle of the bottom of the platform 3, jacks 5 are fixedly mounted on two sides of the bottom of the platform 3, mounting mechanisms 1 are fixedly mounted on two sides of the bottom of the jacks 5, and auxiliary supporting mechanisms 2 are hinged to the tops of the mounting mechanisms 1;
the mounting mechanism 1 comprises a mounting block 17, a slot is formed in the mounting block 17, a bolt 18 is inserted into the mounting block 17 through the slot, the mounting block 17 is fixedly mounted on two sides of a jack 5, the bolt 18 is inserted into the mounting mechanism 1 and is matched with the mounting block 17 to facilitate mounting of the jack 5, a threaded sleeve 14 is fixedly mounted at one end of the bolt 18, the number of the threaded sleeve 14 is two, two threaded sleeves 14 are mounted on the outer surface of a threaded rod 15 corresponding to positive and negative threads, a threaded rod 15 is mounted on the inner surface of the threaded sleeve 14, a bearing is fixedly mounted on the left side of the threaded rod 15, a side plate 12 is fixedly mounted on the threaded rod 15 through the bearing, the positive and negative threads are arranged on two sides of the outer surface of the threaded rod 15, a sliding rod 13 is slidably mounted at the bottom of the threaded rod 15 through the threaded sleeve 14 to limit the rotation of the threaded sleeve 14, a side plate 12 is fixedly mounted at one end of the sliding rod 13 to provide a supporting point for the threaded rod 15 and the sliding rod 13, curb plate 12 bottom fixed mounting has bearing plate 11, and 15 one end fixed mounting of threaded rod has handle 19, and convenience of customers uses, and 19 outer fixed surface of handle installs the bearing, and handle 19 passes through bearing fixed mounting inside curb plate 12, and supporting baseplate 16 has been placed to jack 5 bottom.
Supplementary supporting mechanism 2 includes connecting rod 21, connecting rod 21 quantity is two, two connecting rod 21 symmetries articulate in 11 tops of bearing plate, connecting rod 21 articulates in 11 tops of bearing plate, connecting rod 21 inner wall fixed mounting has meshing tooth 22, meshing tooth 22 outer surface engagement has gear 25, the inside fixed mounting of gear 25 has pivot 26, pivot 26 back fixed mounting has a strip piece, pivot 26 passes through strip piece fixed mounting in the 3 bottoms of platform, meshing tooth 22 outer surface fixed mounting has ratchet 23, ratchet 23 left side is provided with pawl 24, restriction ratchet 23 rotates, restriction connecting rod 21 downstream.
In the actual operation process, when the device is used, firstly, when the jack 5 is installed, the jack is placed at the bottom of the platform 3, the position of the supporting bottom plate 16 is arranged, then the position of the bolt 18 is just aligned with the installation groove in the installation block 17, the handle 19 is rotated to rotate the threaded rod 15, the threaded rod 15 rotates to drive the threaded sleeve 14, the threaded sleeve 14 moves inwards under the limit of the sliding rod, the bolt 18 is driven to insert the bolt 18 into the installation block 17, the installation of the jack 5 is completed, when the dismounting is needed, the handle 19 is only rotated in the direction opposite to the installation direction, the handle 19 drives the threaded rod 15 to rotate, the threaded sleeve 14 is driven by the threaded rod 15 to move away from each other, the threaded sleeve 14 drives the bolt 18 to be pulled out from the installation block 17, the jack 5 drives the connecting rod 21 to rotate in the process of lifting, the connecting rod 21 rotates to drive the meshing teeth 22 to rotate, the meshing teeth 22 drive the rotating shaft 26 to rotate, when the platform 3 rotates, the ratchet wheel 23 moves upwards and cannot be clamped by the pawl 24, and when the platform rotates downwards, the rotation can be clamped, so that the auxiliary jack 5 can support the platform, and more platforms 3 with different weights can be met.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. The term "comprising", without further limitation, means that the element so defined is not excluded from the group consisting of additional identical elements in the process, method, article, or apparatus that comprises the element.

Claims (7)

1. The utility model provides an uplift pile operation platform's strutting arrangement, includes platform (3), its characterized in that: an uplift pile (4) is fixedly installed in the middle of the bottom of the platform (3), jacks (5) are fixedly installed on two sides of the bottom of the platform (3), installation mechanisms (1) are fixedly installed on two sides of the bottom of the jacks (5), and auxiliary supporting mechanisms (2) are hinged to the tops of the installation mechanisms (1);
installation mechanism (1) is including installation piece (17), installation piece (17) fixed mounting is in jack (5) both sides, installation mechanism (1) inside grafting has bolt (18), bolt (18) one end fixed mounting has thread bush (14), threaded rod (15) are installed to thread bush (14) internal thread, there are slide bar (13) threaded rod (15) bottom through thread bush (14) slidable mounting, slide bar (13) one end fixed mounting has curb plate (12), curb plate (12) bottom fixed mounting has bearing plate (11), threaded rod (15) one end fixed mounting has handle (19), supporting baseplate (16) have been placed to jack (5) bottom.
2. A support arrangement for a uplift pile operation platform according to claim 1, wherein: a slot is formed in the mounting block (17), and a bolt (18) is inserted into the mounting block (17) through the slot.
3. A support arrangement for a uplift pile operation platform according to claim 1, wherein: threaded rod (15) left side fixed mounting has the bearing, threaded rod (15) have curb plate (12) through bearing fixed mounting, threaded rod (15) surface both sides are provided with positive and negative screw thread, thread bush (14) quantity is two, two thread bush (14) correspond positive and negative screw thread and install in threaded rod (15) surface.
4. A support arrangement for a uplift pile operation platform according to claim 1, wherein: the outer surface of the handle (19) is fixedly provided with a bearing, and the handle (19) is fixedly arranged inside the side plate (12) through the bearing.
5. A support arrangement for a uplift pile operation platform according to claim 1, wherein: auxiliary stay mechanism (2) include connecting rod (21), connecting rod (21) articulate in bearing plate (11) top, connecting rod (21) inner wall fixed mounting has meshing tooth (22), meshing tooth (22) surface toothing has gear (25), gear (25) inside fixed mounting has pivot (26), meshing tooth (22) surface fixed mounting has ratchet (23), ratchet (23) left side is provided with pawl (24).
6. A support arrangement for a uplift pile operation platform according to claim 5, wherein: the back of the rotating shaft (26) is fixedly provided with a bar, and the rotating shaft (26) is fixedly arranged at the bottom of the platform (3) through the bar.
7. A support arrangement for a uplift pile operation platform according to claim 5, wherein: the number of the connecting rods (21) is two, and the two connecting rods (21) are symmetrically hinged to the top of the bearing plate (11).
CN202220942096.3U 2022-04-22 2022-04-22 Supporting device for uplift pile operating platform Active CN217204064U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220942096.3U CN217204064U (en) 2022-04-22 2022-04-22 Supporting device for uplift pile operating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220942096.3U CN217204064U (en) 2022-04-22 2022-04-22 Supporting device for uplift pile operating platform

Publications (1)

Publication Number Publication Date
CN217204064U true CN217204064U (en) 2022-08-16

Family

ID=82773798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220942096.3U Active CN217204064U (en) 2022-04-22 2022-04-22 Supporting device for uplift pile operating platform

Country Status (1)

Country Link
CN (1) CN217204064U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117344636A (en) * 2023-09-26 2024-01-05 广东省高速公路有限公司 Pile-beam integrated construction method for tubular pile foundation construction and capping beam-beam plate assembly

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117344636A (en) * 2023-09-26 2024-01-05 广东省高速公路有限公司 Pile-beam integrated construction method for tubular pile foundation construction and capping beam-beam plate assembly

Similar Documents

Publication Publication Date Title
US7470090B2 (en) Lifting bracket system supported on a pier for lifting a foundation
CN217204064U (en) Supporting device for uplift pile operating platform
US2715013A (en) Apparatus for erecting a building
CN207998796U (en) Hydraulic automatic jumping mould bases
CN209243794U (en) A kind of pile foundation building inclination rectification cuts stake and underpins position limiting structure
CN217600214U (en) Steel pipe pile hoisting equipment for buried excavation and hole entering construction of mountain-climbing highway bias tunnel
CN108342984B (en) Soft foundation trestle for mudflat and installation and sedimentation method thereof
CN217325492U (en) Assembled composite sheet hydraulic pressure lift inspection shaft platform
CN111764667B (en) Steel structure truss installation construction equipment and installation construction method
CN211285729U (en) Detection apparatus for foundation pile bearing capacity
KR102156971B1 (en) Gang form lifting device and outdoor wall construction method of building using the same
CN113833030B (en) Corrosion-resistant and waterproof construction positioning device and construction method for filtrate collecting tank of waste incineration pit
CN114855590B (en) Safety positioning device for assembling large-frame concrete building structure
CN201137042Y (en) Bracket placed large girder section location-adjusting rotation device
CN219239024U (en) Auxiliary hanging bracket for bridge and culvert construction
CN220746937U (en) Reinforcing device for building foundation pit in civil engineering
CN205820783U (en) Manhole cover plate open-and-close mechanism based on hydraulic jack
CN213086794U (en) Slag drawing device for pile foundation construction
CN216340774U (en) High-rise building floor concrete placement operation rack
CN115584758B (en) Integral stainless steel well lid of lightweight
CN215053419U (en) Slag discharging device for inclined single-pile foundation construction
CN113968560B (en) Town road construction equipment
CN220116033U (en) Steel sheet pile lifting clamp
CN220335894U (en) Recoverable stock
CN110130383B (en) Precast pile cushion cap structure that grout is connected

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant