CN217151322U - Detachable and portable guy rope fixing device - Google Patents

Detachable and portable guy rope fixing device Download PDF

Info

Publication number
CN217151322U
CN217151322U CN202123381976.2U CN202123381976U CN217151322U CN 217151322 U CN217151322 U CN 217151322U CN 202123381976 U CN202123381976 U CN 202123381976U CN 217151322 U CN217151322 U CN 217151322U
Authority
CN
China
Prior art keywords
rope
fixing device
steel
bolt
detachable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123381976.2U
Other languages
Chinese (zh)
Inventor
阮新伟
郭中华
荆奎
张双健
周光波
郑志坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN202123381976.2U priority Critical patent/CN217151322U/en
Application granted granted Critical
Publication of CN217151322U publication Critical patent/CN217151322U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Abstract

The utility model provides a detachable, portable guy rope fixing device, belongs to the fixed safe field of first section post installation guy rope of steel construction with steel bar basis. Comprises a steel bar (1), a rope (2), a steel plate (3), a fixing device (4) and a bolt (5); the rope (2) is bent and connected with the fixing device (4), the rope (2) is sleeved on the steel bar (1), and the steel plate (3) clamps the two sides of the steel bar (1) and is fixed by the bolt (5); the rope (2) is arranged at the lower side of the steel plate (3). The fixing function of the cable rope can be realized after the installation of the column is hoisted. The fixing device has the advantages of simple structure, simple and convenient manufacture, no processing measure material, no pre-embedding and later cutting condition. Convenient operation, convenient use, safety and reliability.

Description

Detachable and portable guy rope fixing device
Technical Field
The utility model belongs to the fixed safe field of steel construction first festival post installation cable wind rope on belted steel bar basis provides a detachable, portable, practical cable wind rope fixing device very much, and it is fixed to be applicable to steel construction first festival post installation cable wind rope.
Background
With the continuous development of economy and technology, the building groups are higher and larger at present. The steel structure is the preferred structure form of large buildings by virtue of the advantages of the steel structure. In steel construction building, the steel column is indispensable, and the column bottom plate is connected with rag bolt (after civil engineering unit embedded reinforcement parcel post take a definite height, pour the operation after the steel column installation is fixed) at present, and the steel column is after taking one's place in the hoist and mount, before the unhooking, generally pull earlier at four directions of steel column and establish cable wind rope and carry out interim fixed to the steel column, and cable wind rope also plays the effect of an adjustment steel column straightness that hangs down simultaneously. In the actual work progress, the guy rope is fixed with many modes: the hanging ring is pre-embedded in advance. The lifting lugs are pre-embedded in advance. There is also a fixing to the weight. The above methods are troublesome, and the material cost and the later cutting cost of technical measures are increased, and the adverse effects such as influence on the appearance effect exist.
Disclosure of Invention
An object of the utility model is to provide a detachable, portable guy rope fixing device for to having the fixed of steel reinforcement basis steel column, and to the straightness's that hangs down of steel column correction.
The utility model discloses a reinforcing bar 1, rope 2, steel sheet 3, fixing device 4 (constitute by bolt and nut), bolt 5. The rope 2 is connected with the fixing device 4 in a bending mode, the rope 2 is sleeved on the steel bar 1, and the steel plate 3 clamps the two sides of the steel bar 1 and is fixed by the bolt 5; 3 two-sided package of steel sheet presss from both sides 1 bolts of reinforcing bar and screws up, and rope 2 guarantees that the rope can not drop at 3 downside of steel sheet. Rope 2 and steel column connection can play the cable wind rope fixed action after the hoist and mount post.
Rope 2 cover is just in 3 below steel sheet on reinforcing bar 1, 2 and steel column connection of rope.
This cable steel column wind rope fixing device utilizes simple and easy material fast assembly, can realize the quick preparation of job site. And the steel columns are butted with the connecting plates, and the two sides of the connecting plates are clamped on the steel bars. The conditions of processing measures, materials, pre-embedding in advance and later-stage cutting do not exist. The work of pre-embedding in advance, cutting off afterwards and the like is avoided, the use is convenient, and the operation is safe and reliable.
The utility model has the advantages of, this fixing device, simple structure, preparation are simple and convenient, do not have the processing measure material, do not have pre-buried and later stage excision condition in advance. Convenient operation, convenient use, safety and reliability.
Drawings
Fig. 1 is a schematic structural diagram of the present invention. Wherein, reinforcing bar 1, rope 2, steel sheet 3, fixing device (by the bolt, the nut is constituteed) 4, bolt 5.
Detailed Description
The utility model discloses a: comprises a steel bar 1, a rope 2, a steel plate 3, a fixing device (consisting of a bolt and a nut) 4 and a bolt 5. The rope 2 is connected with the fixing device 4 in a bending mode, the rope 2 is sleeved on the steel bar 1, and the steel plate 3 clamps the two sides of the steel bar 1 and is fixed by the bolt 5; 3 two-sided package of steel sheet presss from both sides 1 bolts of reinforcing bar and screws up, and rope 2 guarantees that the rope can not drop at 3 downside of steel sheet. Rope 2 and steel column connection can play the cable wind rope fixed action after the hoist and mount post.

Claims (3)

1. A detachable and portable guy rope fixing device is characterized in that a steel bar (1), a rope (2), a steel plate (3), a fixing device (4) and a bolt (5); the rope (2) is bent and connected with the fixing device (4), the rope (2) is sleeved on the steel bar (1), and the steel plate (3) clamps the two sides of the steel bar (1) and is fixed by the bolt (5); the rope (2) is arranged at the lower side of the steel plate (3).
2. The detachable, portable hawser line fixture of claim 1, wherein the rope (2) is sleeved on the steel bar (1) and under the steel plate (3), and the rope (2) is connected with the steel column.
3. A detachable, portable hawser fixing device according to claim 1, characterised in that the fixing device (4) consists of a bolt and a nut.
CN202123381976.2U 2021-12-29 2021-12-29 Detachable and portable guy rope fixing device Active CN217151322U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123381976.2U CN217151322U (en) 2021-12-29 2021-12-29 Detachable and portable guy rope fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123381976.2U CN217151322U (en) 2021-12-29 2021-12-29 Detachable and portable guy rope fixing device

Publications (1)

Publication Number Publication Date
CN217151322U true CN217151322U (en) 2022-08-09

Family

ID=82687668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123381976.2U Active CN217151322U (en) 2021-12-29 2021-12-29 Detachable and portable guy rope fixing device

Country Status (1)

Country Link
CN (1) CN217151322U (en)

Similar Documents

Publication Publication Date Title
CN101177959A (en) Curtain wall unit hanging equipment and construction method thereof
CN111188497A (en) Autoclaved aerated concrete wallboard mounting construction machine tool and using method thereof
CN213774554U (en) Assembled self-control sliding lifting construction unloading platform
CN208023710U (en) A kind of connection structure of assembly concrete shear wall
CN213173317U (en) Be used for T roof beam wet seam construction equipment of encorbelmenting
CN213011533U (en) Assembled concrete prefabricated staircase hoist
CN217151322U (en) Detachable and portable guy rope fixing device
CN1048065C (en) Method and equipment for construction of concrete cylinder
CN203461720U (en) Simple cantilever hoisting machine
CN207957611U (en) A kind of small members are mobile and install equipment
CN105819352B (en) Lifting device for detachable door type mast building and construction method thereof
CN212176617U (en) Evaporate and press aerated concrete wallboard installation construction machines
CN103982046A (en) Lifting and installation method of buckling restrained braces
CN210152143U (en) A connection structure for concrete cladding panel hoist and mount construction
CN209228053U (en) Large cantilever combined type anchor curable type steel operation platform
CN215519871U (en) Combined elevator shaft operating frame
CN203188612U (en) Beam frame type building template system
CN208648517U (en) Cladding glass installation self-control electric hoist hanger system
CN202194364U (en) Light-weight oblique-pull type scaffold
CN102733612B (en) Mounting method of electric hoist orbit
CN115370096B (en) Large-sized clear water concrete slab-based ultra-large space dry-hanging wall surface mounting construction method
CN220285363U (en) Assembled superimposed sheet installation device
CN206033014U (en) Lever apparatus is taken off to anchor clamps formula
CN220201243U (en) ALC board installation auxiliary machine
CN214935296U (en) Lifting device convenient to big inclination steel column does not have support equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant