CN217106140U - Bolt rod mold hanging device for post-pouring of assembled laminated slab joint - Google Patents
Bolt rod mold hanging device for post-pouring of assembled laminated slab joint Download PDFInfo
- Publication number
- CN217106140U CN217106140U CN202220849655.6U CN202220849655U CN217106140U CN 217106140 U CN217106140 U CN 217106140U CN 202220849655 U CN202220849655 U CN 202220849655U CN 217106140 U CN217106140 U CN 217106140U
- Authority
- CN
- China
- Prior art keywords
- sets
- bolt
- post
- groups
- pouring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to an assembly type building structure technical field specifically is a shank of bolt hangs mould device that is used for watering behind assembled superimposed sheet piece department, including two sets of prefabricated bottom plates and die block, the inside of two sets of prefabricated bottom plates all is provided with the bolt sleeve, and the equal activity spiro union in two sets of bolt sleeve's top has the block, and the inside of two sets of bolt sleeves is propped through corresponding bolt jib and rigidity respectively and is carried out movable mounting, and the top that the rigidity propped all installs the mounting panel by the position of both sides, and the equal activity in inside of two sets of mounting panels is provided with the movable rod, and the grip block is all installed to the one end of two sets of movable rods, and the slide bar is all installed by the position of one side to the surface of two sets of movable rods. The method for hoisting the formwork by using the traditional suspender can be effectively solved under the setting action of the components such as the prefabricated bottom plate, the bolt sleeve, the rigid support and the bolt suspender, so that the concrete embedded part quantity is large, and the suspender needs to be cut off when the formwork is dismantled, so that the problem of incapability of recycling is solved.
Description
Technical Field
The utility model relates to an assembly type building structure technical field specifically is a shank of bolt hangs mould device that is used for watering behind assembly type superimposed sheet piece.
Background
The wet workload of the splicing seams of the assembled composite slabs in the existing assembled building structure is large, the main form of the template is that a post-pouring bottom plate template is arranged by taking the bottom floor as a support, and the method has large workload, occupies the lower space and is inconvenient for the construction of the lower floor. The method also comprises the steps of utilizing the surface of the prefabricated bottom plate as a support, arranging a support cross rod at the upper part, and hoisting the template through the suspender.
The existing bolt bar mold hanging device for post-pouring of the splicing seams of the assembled composite slabs has the problems that the traditional method for hanging the template by the hanging rod is large in concrete embedded part quantity, the hanging rod needs to be cut off when the template is dismounted, and the hanging rod cannot be reused, and inconvenience is brought to actual operation; the bolt bar mold hanging device that waters after present being used for assembled superimposed sheet piece department exists the die block board and places when the rigidity props on the surface, and is not stable enough, and easily rocks to the problem of the follow-up post-watering operation of influence has brought inconvenience for in-service operation, for this, the utility model provides a bolt bar mold hanging device that waters after being used for assembled superimposed sheet piece department is used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a shank of bolt hangs mould device that is used for assembled superimposed sheet splice department post-cast to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a bolt bar mold hanging device for post-pouring of a splicing part of an assembled composite slab comprises two groups of prefabricated bottom plates and bottom mold plates, wherein two groups of prefabricated bottom plates are respectively provided with a bolt sleeve, the top ends of the two groups of bolt sleeves are movably screwed with a cover cap, the insides of the two groups of bolt sleeves are respectively movably installed through corresponding bolt hanging rods and rigid supports, the top ends of the rigid supports are respectively provided with an installation plate by the positions of two sides, the insides of the two groups of installation plates are respectively and movably provided with movable rods, one ends of the two groups of movable rods are respectively provided with a clamping plate, the outer surfaces of the two groups of movable rods are respectively provided with a sliding rod by the position of one side, the top ends of the rigid supports are respectively provided with a limiting plate by the position of one side corresponding to the movable rods, the insides of the two groups of limiting plates are respectively provided with a sliding groove, the top ends of the rigid supports are respectively provided with a fixed block by the other side corresponding to the movable rods, the inside of two sets of the fixed block all activity spiro union has the screw rod, and is two sets of the one end of screw rod all is provided with the magnet piece.
Preferably, the two groups of prefabricated bottom plates are equal in size, are arranged in an axisymmetric mode and are internally provided with end steel bars.
Preferably, the sizes of two sets of mounting panels are equal, and two sets of mounting panels are axisymmetric, and the height of two sets of mounting panels and die block plate thickness size looks adaptation.
Preferably, the two groups of slide bars are equal in size, and the outer diameters of the two groups of slide bars are respectively matched with the distance between the inner walls of the corresponding two sides of the corresponding sliding groove.
Preferably, one end of each of the two sets of screws is sleeved with a bearing, and one end of each of the two sets of screws is installed on the corresponding side of the corresponding magnet block through the corresponding bearing.
Preferably, two sets of the size of magnet piece equals, and the shape of two sets of magnet pieces is the arc setting, and the radian size of one side that corresponds of two sets of magnet pieces is respectively with the surface radian size looks adaptation that corresponds the movable rod.
Preferably, the two groups of clamping plates are equal in size, and the two groups of clamping plates are respectively arranged on the corresponding side of the corresponding mounting plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the method for hoisting the formwork by using the traditional suspender can be effectively solved under the setting action of the components such as the prefabricated bottom plate, the bolt sleeve, the rigid support and the bolt suspender, so that the concrete embedded part quantity is large, and the suspender needs to be cut off when the formwork is dismantled, so that the problem of incapability of recycling is solved.
2. Through the setting of spare parts such as mounting panel, movable rod, grip block, slide bar, limiting plate, spout, fixed block, screw rod and magnet piece, can effectual solution die block board place when the rigidity props the surface, not stable enough, and easily rock to the problem of the follow-up post-cast operation of influence.
Drawings
Fig. 1 is a schematic structural perspective view of the main body of the present invention;
FIG. 2 is an enlarged view of the point A in FIG. 1;
fig. 3 is a schematic structural perspective view of the rigid support of the present invention;
fig. 4 is an enlarged schematic view of B in fig. 3.
In the figure: 1. prefabricating a bottom plate; 11. a bolt bushing; 12. capping; 2. a bottom template; 3. a rigid support; 30. a bolt boom; 31. mounting a plate; 32. a movable rod; 33. a clamping plate; 34. a slide bar; 4. a limiting plate; 41. a chute; 5. a fixed block; 51. a screw; 52. and a magnet block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: a bolt bar mold hanging device for post-pouring of assembled composite slab joints comprises two groups of prefabricated bottom plates 1 and bottom mold plates 2, wherein the bottom mold plates 2 can be steel molds, aluminum molds or wood mold plates, bolt sleeves 11 are arranged inside the two groups of prefabricated bottom plates 1, caps 12 are movably screwed at the top ends of the two groups of bolt sleeves 11, the two groups of caps 12 are arranged to prevent post-pouring materials from pouring into the corresponding bolt sleeves 11, the two groups of caps 12 can also be directly fixed with the corresponding sleeves 11, the post-pouring concrete is automatically embedded in the concrete, the two groups of prefabricated bottom plates 1 are equal in size, the two groups of prefabricated bottom plates 1 are axially symmetrically arranged, end reinforcing steel bars are arranged inside the two groups of prefabricated bottom plates 1, the insides of the two groups of bolt sleeves 11 are movably installed with rigid supports 3 through corresponding bolt suspenders 30 respectively, and one set of the bolt suspenders 30 and the rigid supports 3 can be recycled after being disassembled, the top end of the rigid support 3 is provided with mounting plates 31 at positions close to two sides, the two sets of mounting plates 31 are equal in size, the two sets of mounting plates 31 are arranged in an axial symmetry manner, the height of the two sets of mounting plates 31 is matched with the thickness of the bottom formwork 2, movable rods 32 are movably arranged inside the two sets of mounting plates 31, the two sets of movable rods 32 are made of iron products, clamping plates 33 are arranged at one ends of the two sets of movable rods 32, the sizes of the two sets of clamping plates 33 are equal, the two sets of clamping plates 33 are respectively arranged at one side corresponding to the mounting plates 31, slide rods 34 are arranged at positions close to one side of the outer surfaces of the two sets of movable rods 32, the sizes of the two sets of slide rods 34 are equal, the outer diameters of the two sets of slide rods 34 are respectively matched with the distance between the inner walls at two corresponding sides of the corresponding chutes 41, and a limiting plate 4 is arranged at a position close to one side corresponding movable rod 32 at the top end of the rigid support 3, spout 41 has all been seted up to two sets of limiting plates 4's inside, fixed block 5 is all installed by the opposite side that corresponds movable rod 32 on the top that the rigidity propped 3, the equal activity spiro union in inside of two sets of fixed blocks 5 has screw rod 51, two sets of screw rod 51's one end overlaps respectively and is equipped with the bearing, and two sets of screw rod 51's one end is installed through corresponding bearing and the corresponding one side that corresponds magnet piece 52 respectively, two sets of screw rod 51's one end all is provided with magnet piece 52, two sets of magnet piece 52's size equals, and two sets of magnet piece 52's shape is the arc setting, two sets of magnet piece 52's the corresponding one side radian size respectively with the surface radian size looks adaptation that corresponds movable rod 32.
During the use process, two groups of prefabricated bottom plates 1 can be firstly hoisted on corresponding positions, at the moment, a user can place the bottom template 2 at a position between the two groups of mounting plates 31, at the moment, two groups of movable rods 32 can move towards one corresponding side of the bottom template 2, and then two groups of clamping plates 33 can correspondingly move along with the bottom template, so that one corresponding side of the two groups of clamping plates 33 can be tightly attached to one corresponding side surface of the bottom template 2, thereby the bottom template 2 is clamped in a limiting manner, during the moving process of the two groups of movable rods 32, the corresponding sliding rods 34 respectively slide in the corresponding sliding grooves 41, so that the corresponding movable rods 32 are more stable and are not easy to shake in the moving process, thereby the corresponding clamping plates 33 can stably move, after the two groups of clamping plates 33 carry out limiting clamping on one corresponding side of the bottom template 2, user of service alright rotate and correspond screw rod 51, thereby make and to correspond magnet piece 52 and can remove to the surface correspondence position that corresponds movable rod 32, and then make two sets of magnet pieces 52 can adsorb fixedly with corresponding movable rod 32, and then make and correspond grip block 33 and can not remove at will, and then can be stable carry out spacing centre gripping to die block board 2, after this, user of service accessible two sets of bolt jibs 30 and correspond bolt sleeve 11 and carry out the spiro union fixedly, prop 3 stable fixed backs when the rigidity, alright water the operation after carrying out to die block board 2, water the intensity that the part reaches the designing requirement after treating, can demolish the template.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a shank of bolt hangs mould device that is used for assembled superimposed sheet splice department post-cast, includes two sets of prefabricated bottom plates (1) and die block board (2), its characterized in that: the prefabricated bottom plate comprises a prefabricated bottom plate body (1), and is characterized in that bolt sleeves (11) are arranged inside the prefabricated bottom plate body (1), the top ends of the bolt sleeves (11) are movably screwed with caps (12), the insides of the bolt sleeves (11) are movably mounted with rigid supports (3) through corresponding bolt hanging rods (30), mounting plates (31) are mounted on the top ends of the rigid supports (3) by the positions of two sides, movable rods (32) are movably arranged inside the mounting plates (31), clamping plates (33) are mounted at one ends of the movable rods (32), slide rods (34) are mounted on the outer surfaces of the movable rods (32) by the positions of one sides, limiting plates (4) are mounted on the top ends of the rigid supports (3) by the positions of one sides of the corresponding movable rods (32), and sliding grooves (41) are formed in the limiting plates (4), the top of rigidity props (3) and all installs fixed block (5), two sets of by the opposite side that corresponds movable rod (32) the inside spiro union that all moves about of fixed block (5) has screw rod (51), and is two sets of the one end of screw rod (51) all is provided with magnet piece (52).
2. The bolt rod mould hanging device for post-pouring at the splicing seams of the fabricated composite slabs as claimed in claim 1, wherein: the size of two sets of prefabricated bottom plate (1) equals, and two sets of prefabricated bottom plate (1) are the axisymmetric setting, and are two sets of the inside of prefabricated bottom plate (1) all is provided with the end reinforcing bar.
3. The bolt rod mould hanging device for post-pouring at the splicing seams of the fabricated composite slabs as claimed in claim 1, wherein: two sets of the size of mounting panel (31) equals, and two sets of mounting panel (31) are the axisymmetric setting, and the height of two sets of mounting panel (31) is big or small with the thickness of die block board (2) size looks adaptation.
4. The bolt rod mould hanging device for post-pouring at the splicing seams of the fabricated composite slabs as claimed in claim 1, wherein: the two groups of sliding rods (34) are equal in size, and the outer diameters of the two groups of sliding rods (34) are respectively matched with the distance between the inner walls of the two corresponding sides of the corresponding sliding grooves (41).
5. The bolt rod mould hanging device for post-pouring at the splicing seams of the fabricated composite slabs as claimed in claim 1, wherein: one end of each of the two groups of screw rods (51) is sleeved with a bearing, and one end of each of the two groups of screw rods (51) is installed on the corresponding side of the corresponding magnet block (52) through the corresponding bearing.
6. The bolt rod mould hanging device for post-pouring at the splicing seams of the fabricated composite slabs as claimed in claim 1, wherein: the sizes of two sets of magnet piece (52) are equal, and the shape of two sets of magnet piece (52) is the arc setting, and the corresponding one side radian size of two sets of magnet piece (52) is respectively with the surface radian size looks adaptation that corresponds movable rod (32).
7. The bolt rod mould hanging device for post-pouring at the splicing seams of the fabricated composite slabs as claimed in claim 1, wherein: the two groups of clamping plates (33) are equal in size, and the two groups of clamping plates (33) are respectively arranged on one side corresponding to the mounting plate (31).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220849655.6U CN217106140U (en) | 2022-04-12 | 2022-04-12 | Bolt rod mold hanging device for post-pouring of assembled laminated slab joint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220849655.6U CN217106140U (en) | 2022-04-12 | 2022-04-12 | Bolt rod mold hanging device for post-pouring of assembled laminated slab joint |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217106140U true CN217106140U (en) | 2022-08-02 |
Family
ID=82582239
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220849655.6U Active CN217106140U (en) | 2022-04-12 | 2022-04-12 | Bolt rod mold hanging device for post-pouring of assembled laminated slab joint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217106140U (en) |
-
2022
- 2022-04-12 CN CN202220849655.6U patent/CN217106140U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631706B (en) | One kind exempts from form removal concrete column and its construction method | |
CN102561681B (en) | Casting molding template and casting molding process for constructional columns of infilled walls | |
CN204703498U (en) | Wall of High-building deformation joint template construction structure | |
CN204040458U (en) | A kind of aluminum template system aluminium extruded sections | |
CN204098486U (en) | The concrete of building basement roof ater-casting hangs mould | |
CN204041080U (en) | General formula needle beam lining trolley in a kind of | |
CN102505839A (en) | Arc-shaped mold plate for casting arc-shaped shear wall of industrial factory building and manufacture method of arc-shaped mold plate | |
CN109797969B (en) | Construction method of post-cast strip tool type advanced formwork lifting system | |
CN109024987A (en) | Construction method is poured after a kind of toilet shear wall | |
CN103195241B (en) | Early removal support device for constructional engineering | |
CN217106140U (en) | Bolt rod mold hanging device for post-pouring of assembled laminated slab joint | |
CN208702139U (en) | A kind of construction template structure of toilet wall | |
CN202467181U (en) | Pouring-molding template of constructional column of infill wall | |
CN203129626U (en) | Early-removal supporting device for beam template | |
CN110056190A (en) | A kind of two-part slab thickness control sealing up screw | |
CN206048484U (en) | A kind of lightweight plate pours device | |
CN203097283U (en) | Early-dismantling support device for slab formwork | |
CN204703499U (en) | Wall of High-building deformation joint template | |
CN210032577U (en) | Light steel light concrete wall form support frame | |
CN208633518U (en) | Prestressed concrete laminated floor slab hangs mould pouring construction structure | |
CN209832088U (en) | Combined curing kiln for concrete product production line | |
CN203669378U (en) | Casting device used for necking of constructional column top and large-section beam column | |
CN102650157A (en) | Detachable anchor device for cantilever section steel beam | |
CN207436515U (en) | The hoisting beam of efficient construction of precast floorslab | |
CN207193782U (en) | A kind of pole type box culvert supporting embedded part of primary concreting Underground Culvert |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |