CN217000957U - Pre-buried mould of aluminium mould spool location - Google Patents

Pre-buried mould of aluminium mould spool location Download PDF

Info

Publication number
CN217000957U
CN217000957U CN202123136527.1U CN202123136527U CN217000957U CN 217000957 U CN217000957 U CN 217000957U CN 202123136527 U CN202123136527 U CN 202123136527U CN 217000957 U CN217000957 U CN 217000957U
Authority
CN
China
Prior art keywords
template
mould
pipe
aluminum
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123136527.1U
Other languages
Chinese (zh)
Inventor
陈满
姚云磊
冯健军
张时钊
唐靖
张海鹏
汪开虎
卢智聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Zhuhuahui Construction Technology Co ltd
Original Assignee
Anhui Zhuhuahui Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Zhuhuahui Construction Technology Co ltd filed Critical Anhui Zhuhuahui Construction Technology Co ltd
Priority to CN202123136527.1U priority Critical patent/CN217000957U/en
Application granted granted Critical
Publication of CN217000957U publication Critical patent/CN217000957U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an aluminum mould wire pipe positioning and embedding die which comprises an embedding wall body, an embedding template and a direct pipe, wherein the upper end of the embedding wall body is provided with an aluminum template, the upper surface of the aluminum template is provided with an aluminum mould groove, the embedding template is connected inside the aluminum mould groove, the outer side of the embedding template is provided with a lower wire return pipe, the direct pipe is connected to the upper end of the lower wire return pipe, the upper end of the embedding wall body is provided with a beam rib, and the outer side of the beam rib is provided with a binding wire. This pre-buried mould of aluminium mould spool location is provided with pre-buried template, returns the relevant position of spool disect insertion pre-buried template down and carries out the block installation to abandon traditional aluminium mould trompil operation technology, improved pre-buried quality and location accuracy, reduce the disability rate and the loss rate of aluminium mould material, avoided the labour cost that electromechanical trompil and secondary were taken over, and changed traditional trompil and destroyed the template mode, from the damage that reduces the template to a certain extent, reduce the head stock flow, improve the impression of concrete simultaneously.

Description

Pre-buried mould of aluminium mould spool location
Technical Field
The utility model relates to the technical field of aluminum formwork embedding construction, in particular to an aluminum formwork wire pipe positioning embedding die.
Background
The aluminum template is a new generation template system appearing behind a log template and a steel template, is designed according to modulus, is extruded and molded by special equipment, and can be freely combined according to different structural sizes. At present, the aluminum template system is widely applied to buildings such as residential buildings, office buildings and the like. The aluminum template has short construction period; the repeated use times are many, and the average use cost is low; convenient construction, high efficiency and the like.
The floor trompil position aluminium template that has once fix a position behind the trompil in the aluminium template in market installs the dislocation very easily in follow-up floor installation, leads to needing secondary trompil and a hole to leak thick liquid, in addition demolish the in-process at the aluminium mould very easily directly just lead to subsequent secondary piping to break with the neat root of spool to hardly add the joint again, has increased the disability rate and the rate of loss of aluminium template greatly increased the problem of material and cost of labor more, for this reason, we propose aluminium mould spool location pre-buried mould.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an aluminum mould wire tube positioning and pre-embedding mould to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: pre-buried mould in aluminium mould spool location, including pre-buried wall body, pre-buried template and direct pipe, pre-buried wall body upper end is provided with the aluminium template, and the aluminium template upper surface has seted up the aluminium die cavity, pre-buried template connects in the inside of aluminium die cavity, and the pre-buried template outside is provided with down returns the spool, direct union coupling returns spool upper end down, pre-buried wall body upper end is provided with the beam muscle, and installs in the beam muscle outside and prick the silk.
Further, the embedded template is connected with the lower return wire pipe in a clamping mode, and the outer wall connecting surface of the embedded template is attached to the opening connecting surface of the aluminum mould groove.
Furthermore, the direct pipe penetrates through the inner part of the lower return pipe, and the lower return pipe is in a curved arc shape.
Further, pre-buried template includes base, self tapping screw and mould block, and the base middle part is connected with the self tapping screw, the mould block is installed to the base upper end.
Furthermore, the base passes through to constitute fixed knot between self tapping screw and the aluminum mould board and constructs, and the base is connected with the mould block buckle.
The utility model provides an aluminum mould wire pipe positioning embedded mould which has the following beneficial effects: according to the positioning and embedding die for the aluminum mould wire pipes, the wire pipes are reserved and fixed through directly installing the wire pipe reserving and fixing die on the aluminum mould groove plate to perform downward return reservation and embedding, so that the problems that the aluminum mould is scrapped and the loss rate is increased due to direct hole opening on an aluminum template and secondary hole opening of later-stage template dislocation are avoided, the cost protection problem of the aluminum template is well solved, in addition, the labor for mechanically opening a floor slab is saved, and the wire pipes are prevented from being broken uniformly when the template is disassembled later;
the aluminum mould wire pipe positioning embedded mould is provided with the embedded template, and the lower return wire pipe is directly inserted into the corresponding position of the embedded template for clamping installation, so that the traditional aluminum mould hole opening operation process is abandoned, the embedded quality and the positioning accuracy are improved, the rejection rate and the loss rate of aluminum mould materials are reduced, the labor cost of electromechanical hole opening and secondary pipe connection is avoided, the traditional hole opening template damage mode is changed, the damage of the template is reduced to a certain extent, the flow pulp flow is reduced, and the impression of concrete is improved;
the aluminum mould wire pipe positioning and embedding die is provided with the lower return wire pipe, the direct pipe and the lower return wire pipe are integrated through butt joint, the direct pipe and the lower return wire pipe are convenient to bind and install the direct pipe and the lower return wire pipe through binding wires, pouring forming of a reserved hole is guaranteed, the distance of the lower return wire pipe on a beam and a wall edge can be effectively controlled, the accuracy of a reserved position is guaranteed, and the lower return wire pipe is guaranteed to enter a masonry wall;
this pre-buried mould in aluminum mould spool location is provided with the base, and the base is whole through being fixed in the aluminum mould board upper end of self tapping screw, and the corresponding reverse spiral that also is convenient for carry out to it dismantles, demolishs pre-buried template and aluminum mould board after being convenient for to accept qualified concrete placement maintenance shaping, overcomes the difficult shortcoming of repairing after returning the spool fracture under traditional construction process.
Drawings
FIG. 1 is a schematic view of a connection structure of a lower return pipe and an aluminum template according to the present invention;
FIG. 2 is a schematic overall side view of the present invention;
fig. 3 is a schematic diagram of the structure of the embedded template of the utility model.
In the figure: 1. pre-burying a wall body; 2. an aluminum template; 3. an aluminum die cavity; 4. pre-burying a template; 401. a base; 402. self-tapping screws; 403. a mold cap; 5. a lower return pipe; 6. a direct pipe; 7. a beam rib; 8. and (6) binding the wires.
Detailed Description
As shown in figure 1, the aluminum mould wire tube positioning embedded mould comprises an embedded wall body 1, an embedded template 4 and a direct pipe 6, wherein the upper end of the embedded wall body 1 is provided with an aluminum template 2, the upper surface of the aluminum template 2 is provided with an aluminum mould groove 3, the embedded template 4 is connected inside the aluminum mould groove 3, the outer side of the embedded template 4 is provided with a lower wire return pipe 5, the embedded template 4 is connected with the lower wire return pipe 5 in a clamping manner, the outer wall connecting surface of the embedded template 4 is mutually attached to the opening connecting surface of the aluminum mould groove 3, the lower wire return pipe 5 is directly inserted into the corresponding position of the embedded template 4 for clamping installation, so that the traditional aluminum mould hole opening operation process is abandoned, the embedded quality and the positioning accuracy are improved, the rejection rate and the loss rate of aluminum mould materials are reduced, the labor cost of electromechanical hole opening and secondary connection pipe is avoided, the traditional hole opening template damage mode is changed, and the damage of the template is reduced to a certain extent, reduce the flow and improve the appearance of the concrete.
As shown in fig. 1 and fig. 2, the direct pipe 6 is connected to the upper end of the lower return pipe 5, the direct pipe 6 penetrates through the lower return pipe 5, the lower return pipe 5 is in a curved arc shape, the direct pipe 6 and the lower return pipe 5 are in butt joint to be integrated, the direct pipe 6 and the lower return pipe 5 are convenient to subsequently bind and install the direct pipe and the lower return pipe through the binding wire 8, pouring forming of a reserved hole is guaranteed, the distance of the lower return pipe 5, which is attached to a wall edge of a beam, can be effectively controlled, the reserved position is guaranteed to be accurate, and the lower return pipe 5 is guaranteed to enter a masonry wall. The upper end of the embedded wall body 1 is provided with a beam rib 7, and the outer side of the beam rib 7 is provided with a binding wire 8.
As shown in fig. 1 and 3, the pre-buried template 4 includes a base 401, self-tapping screws 402 and a mold cap 403, and the middle part of the base 401 is connected with the self-tapping screws 402, the mold cap 403 is installed on the upper end of the base 401, the base 401 forms a fixed structure with the aluminum template 2 through the self-tapping screws 402, and the base 401 is connected with the mold cap 403 in a buckling manner, the base 401 is integrally fixed on the upper end of the aluminum template 2 through the self-tapping screws 402, and accordingly, reverse spiral disassembly is conveniently performed on the base, the pre-buried template 4 and the aluminum template 2 are disassembled after qualified concrete is inspected, and the defect that the return pipe 5 is difficult to repair after being broken under the traditional construction process is overcome.
In conclusion, when the aluminum mould wire pipe positioning embedded mould is used, firstly, an aluminum template 2 is laid at an embedded wall body 1, the position of a corresponding aluminum mould groove 3 is marked in a fixed point mode according to the positioning and the pipe diameter of a lower return wire pipe 5 of an electromechanical drawing, meanwhile, the size and the direction of a secondary masonry under a rechecking beam are required to be positioned in the embedded wall body 1 strictly, the wall is positioned out, after the positioning of the lower return wire pipe 5 is finished, a corresponding embedded template 4 is selected according to the pipe diameter size of a corresponding loop, generally, the models are DN20, DN25 and DN32, a corresponding wire pipe positioning mould is selected according to the field positioning pipe diameter and quantity, then, the mould is placed at a corresponding point, a base 401 of the embedded template 4 is fixed on the aluminum template 2 by using a self-tapping screw 402 by using an electric tool, after the firm fixing is ensured, a mould cover cap 403 is buckled and fastened, then, a direct pipe 6 of the corresponding loop model is installed on the lower return wire pipe 5, sleeving a lower return pipe 5 and a direct pipe 6 into a positioning mould of an aluminum template 2, sleeving all the direct pipes 6 into the mould and tightly adhering to the aluminum template 2, fixing a pipe loop on a beam rib 7 firmly by using binding wires 8, fixing the pipe loop on the middle parts of the direct pipe 6 and the lower return pipe 5 and bending parts of the lower return pipe 5 respectively, then performing positioning dimension secondary rechecking and binding firmness inspection and acceptance, directly connecting a secondary pipe arrangement by using the pre-embedded direct pipe 6 after the checked and formed aluminum template is removed, finally performing striking numbering marking at the bottom of the corresponding aluminum template 2, installing the aluminum templates 2 at all the numbered positions according to the original sequence and direction, strictly prohibiting dislocation reverse installation, actively following and inspecting the installation positions and the integrity degree of the corresponding positioning mould at any time, and inspecting the corresponding dimension and the integrity degree of the corresponding points after a new layer of aluminum template is paved, and replacing the damaged die, and then embedding and fixing the die in the next layer, so that the use process of the whole aluminum die line pipe positioning embedded die is completed.

Claims (5)

1. Pre-buried mould in aluminium mould spool location, including pre-buried wall (1), pre-buried template (4) and direct pipe (6), its characterized in that, pre-buried wall (1) upper end is provided with aluminium template (2), and aluminium template (2) upper surface has seted up aluminium matrix groove (3), pre-buried template (4) are connected in the inside of aluminium matrix groove (3), and pre-buried template (4) outside is provided with down return line pipe (5), direct pipe (6) are connected in down return line pipe (5) upper end, pre-buried wall (1) upper end is provided with beam muscle (7), and installs in the beam muscle (7) outside and prick silk (8).
2. The aluminum mould spool positioning embedded mould as claimed in claim 1, wherein the embedded template (4) is connected with the lower return pipe (5) in a clamping manner, and the outer wall connecting surface of the embedded template (4) is attached to the opening connecting surface of the aluminum mould groove (3).
3. The aluminum mould wire pipe positioning and embedding die as claimed in claim 1, wherein the direct pipe (6) penetrates through the lower return pipe (5), and the lower return pipe (5) is in an arc shape.
4. The aluminum conduit pipe positioning embedded die as claimed in claim 1, wherein the embedded die plate (4) comprises a base (401), a self-tapping screw (402) and a die cap (403), the self-tapping screw (402) is connected to the middle of the base (401), and the die cap (403) is installed at the upper end of the base (401).
5. The aluminum mould conduit positioning embedded mould as claimed in claim 4, wherein the base (401) forms a fixing structure with the aluminum mould plate (2) through self-tapping screws (402), and the base (401) is connected with the mould cap (403) in a buckling manner.
CN202123136527.1U 2021-12-14 2021-12-14 Pre-buried mould of aluminium mould spool location Active CN217000957U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123136527.1U CN217000957U (en) 2021-12-14 2021-12-14 Pre-buried mould of aluminium mould spool location

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123136527.1U CN217000957U (en) 2021-12-14 2021-12-14 Pre-buried mould of aluminium mould spool location

Publications (1)

Publication Number Publication Date
CN217000957U true CN217000957U (en) 2022-07-19

Family

ID=82382941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123136527.1U Active CN217000957U (en) 2021-12-14 2021-12-14 Pre-buried mould of aluminium mould spool location

Country Status (1)

Country Link
CN (1) CN217000957U (en)

Similar Documents

Publication Publication Date Title
CN101392560A (en) Construction method once and for all for installing pipe sleeve pipe for construction
CN108858665A (en) A kind of porcelain plate facing is counter to beat molding external wall panel/hanging plate production technology
CN103061504A (en) Concrete board pipeline installation reserved hole construction mould and construction method
CN217000957U (en) Pre-buried mould of aluminium mould spool location
CN210483035U (en) Reserved sleeve die for reserved hole of prefabricated laminated slab
CN217537868U (en) Modular floor drain pipe entrance to a cave reservation device
CN116498084A (en) Construction method of large-span special-shaped hyperboloid facing bare concrete
CN111535482A (en) Aluminum mould construction concrete structure and tool and electromechanical reservation pre-embedding construction method
CN212428082U (en) Electromechanical pre-buried device of high-rise apartment building
CN100507174C (en) Pre-embedded construction method for PVC casing pipe of prestressed hollow slab hanger rod
CN109667389A (en) A kind of slab thickness control module and construction method
CN206245741U (en) New hole embedded tool
CN211736370U (en) Quick positioner of water and electricity embedded pipe
CN210563409U (en) Face wall and hang hole construction structures
CN209798553U (en) Be applicable to quick accurate mounting structure of cast-in-place case roof beam air vent embedded pipe
CN101122174A (en) Architecture pipeline preformed hole production method
CN209429531U (en) A kind of tightening formula concrete floor hole reservation device
CN201116396Y (en) Die for manufacturing building pipeline preformed pore
CN108547447B (en) Side die fixing device
CN214195554U (en) Concrete preformed hole casting die sleeve
CN219138366U (en) Interlayer drain pipe reservation sleeve structure for cyclic utilization
CN219864060U (en) Water supply pipe indent mould based on template construction
CN111236641A (en) Aluminum alloy template top plate water supply and drainage reserved hole die and construction method thereof
CN213330093U (en) Hollow superstructure rib beam mark mould
CN216896089U (en) Positioning installation groove supplementing die

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant