CN206245741U - New hole embedded tool - Google Patents
New hole embedded tool Download PDFInfo
- Publication number
- CN206245741U CN206245741U CN201621371477.1U CN201621371477U CN206245741U CN 206245741 U CN206245741 U CN 206245741U CN 201621371477 U CN201621371477 U CN 201621371477U CN 206245741 U CN206245741 U CN 206245741U
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- built
- hush panel
- hole
- head plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model is related to a kind of new hole embedded tool, including two built-in fittings, and described built-in fitting includes hush panel, service sleeve, head plate, reinforcing bar and clamp nut;Being respectively equipped with the middle part of described hush panel and head plate can pass through the reinforced hole of reinforcing bar;Reinforcing bar two ends are provided with screw thread, and hush panel and head plate are fixed on reinforcing bar the two ends of service sleeve by clamp nut;Connected by connection sheet between two built-in fittings, the hush panel of the two ends of connection sheet respectively with two built-in fittings is connected.The pre-buried accuracy in the utility model hole is high, and the pre-buried off normal rate of hole is low, pre-buried hole good waterproof performance, can greatly improve the first-time qualification rate that balcony and air-conditioning plate floor drain are installed, and effectively reduces the phenomenon of balcony and air-conditioning plate floor drain leak.
Description
Technical field
The utility model is related to technical field of building construction, and in particular to one kind is pre- for balcony and the simple floor drain of air-conditioning plate
Box out hole construction new hole embedded tool.
Background technology
Traditional simple floor drain hole reserving construction method of balcony and air-conditioning plate is positioned in template using nail, then
Sleeve steel wire rope is bundled in the template of flooring, fixes sleeve, does not allow sleeve off normal when floorslab concrete is poured.But
The mode of nail and steel wire rope positioning has the following disadvantages:Nail is not accurate enough with the sleeve portion that steel wire rope is fixed, and colligation is not
It is enough firm, the phenomenon of built-in fitting off normal is easily caused during casting concrete, so as to have impact on the accuracy of reserving hole position,
Cause the simple floor drain preformed hole construction quality of balcony and air-conditioning plate low.
Utility model content
The technical problems to be solved in the utility model is, in view of the shortcomings of the prior art, there is provided one kind is used for balcony
And the new hole embedded tool of the simple floor drain preformed hole construction of air-conditioning plate, realize that reserving hole position is accurate, hole is stayed
Motility rate high, hole waterproof and good integrity are set as, and solve the leak of the simple floor drain preformed hole construction of balcony and air-conditioning plate
Problem, improves the once examination percent of pass of the simple floor drain preformed hole construction of balcony and air-conditioning plate.
The utility model solves the technical scheme taken of above-mentioned technical problem:A kind of new hole embedded tool, bag
Two built-in fittings are included, described built-in fitting includes hush panel, service sleeve, head plate, reinforcing bar and clamp nut;Described envelope
Being respectively equipped with the middle part of oralia and head plate can pass through the reinforced hole of reinforcing bar;Reinforcing bar two ends are provided with screw thread, and reinforcing bar is led to
Cross the two ends that hush panel and head plate are fixed on clamp nut service sleeve;Connected by connection sheet between two built-in fittings,
Hush panel of the two ends of connection sheet respectively with two built-in fittings is connected.
Described reinforcing bar is made up of circular reinforcing bar.
Described connection sheet passes through to be welded and fixed with hush panel, to ensure that two built-in fitting positions do not offset.
The pre-buried accuracy in the utility model hole is high, and the pre-buried off normal rate of hole is low, and pre-buried hole good waterproof performance is greatly improved
The first-time qualification rate that balcony and air-conditioning plate floor drain are installed, effectively reduces the phenomenon of balcony and air-conditioning plate floor drain leak.
Brief description of the drawings
Fig. 1 is the structural representation of new hole embedded tool described in the utility model.
Reference is:
1. hush panel, 2. reinforced hole, 3. clamp nut, 4. head plate, 5. reinforcing bar, 6. connection sheet, 7. service sleeve.
Specific embodiment
Illustrate below and the technical solution of the utility model is described further with reference to accompanying drawing.
As shown in figure 1, a kind of new hole embedded tool, including head plate 4, hush panel 1 and reinforcing bar 5;Described envelope
Head plate 4, hush panel 1 are made circle using steel plate, and described reinforcing bar 5 is made of the threaded reinforcing bar in two.Reinforced hole 2 is
The circular port reserved on head plate 4 and hush panel 1, reinforcing bar 5 passes through the reinforced hole 2 of head plate 4 and hush panel 1, and by tight
Gu hush panel 1 and head plate 4 are fixed on nut 3 two ends of service sleeve 7.Clamp nut 3 be No. 12 nuts, connection sheet 6 by
Steel disc is made, for connecting two built-in fittings, it is ensured that the position of two built-in fittings does not offset.Connection sheet 6 and two built-in fittings
Hush panel 1 is fixed using welding manner.
Claims (3)
1. a kind of new hole embedded tool, it is characterised in that including two built-in fittings, described built-in fitting include hush panel,
Service sleeve, head plate, reinforcing bar and clamp nut;It is respectively equipped with to pass through in the middle part of described hush panel and head plate and adds
Gu the reinforced hole of bar;Reinforcing bar two ends are provided with screw thread, and be fixed on for hush panel and head plate by clamp nut pre-buried by reinforcing bar
The two ends of sleeve pipe;Connected by connection sheet between two built-in fittings, the two ends of connection sheet respectively with two hush panels of built-in fitting
Connection.
2. new hole embedded tool according to claim 1, it is characterised in that described reinforcing bar is circular reinforcing bar system
Into.
3. new hole embedded tool according to claim 1 and 2, it is characterised in that described connection sheet and hush panel
By being welded and fixed, to ensure that two built-in fitting positions do not offset.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621371477.1U CN206245741U (en) | 2016-12-14 | 2016-12-14 | New hole embedded tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621371477.1U CN206245741U (en) | 2016-12-14 | 2016-12-14 | New hole embedded tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206245741U true CN206245741U (en) | 2017-06-13 |
Family
ID=59007451
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621371477.1U Expired - Fee Related CN206245741U (en) | 2016-12-14 | 2016-12-14 | New hole embedded tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206245741U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111502269A (en) * | 2020-04-28 | 2020-08-07 | 中建三局第三建设工程有限责任公司 | Fixing device and fixing method for pipe penetrating of wall pouring mold preformed hole |
CN114837410A (en) * | 2022-05-31 | 2022-08-02 | 中天建设集团有限公司 | Beam-penetrating casing pipe positioning construction method for fabricated building |
-
2016
- 2016-12-14 CN CN201621371477.1U patent/CN206245741U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111502269A (en) * | 2020-04-28 | 2020-08-07 | 中建三局第三建设工程有限责任公司 | Fixing device and fixing method for pipe penetrating of wall pouring mold preformed hole |
CN114837410A (en) * | 2022-05-31 | 2022-08-02 | 中天建设集团有限公司 | Beam-penetrating casing pipe positioning construction method for fabricated building |
CN114837410B (en) * | 2022-05-31 | 2024-03-12 | 中天建设集团有限公司 | Beam penetrating sleeve positioning construction method for assembled building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208702140U (en) | A kind of shear wall joint part formwork reinforcement structure | |
CN206245741U (en) | New hole embedded tool | |
CN203603452U (en) | Folded plate small space formwork assembly | |
CN203729498U (en) | Vertical reinforcement-steel sleeve but joint connection structure of assembled wall | |
CN207110468U (en) | A kind of shear wall joint part template reinforcing device | |
CN110424529B (en) | Prefabricated cantilever beam balcony and construction method | |
CN202925896U (en) | A hole reservation device for constructional engineering | |
CN202577347U (en) | Waterproof structure of basement steel formwork | |
CN104047423B (en) | A kind of mould and construction method of wearing the accurate reserved opening of flooring plate | |
CN201276842Y (en) | Construction barrel mold for reserved opening of simple building | |
CN201695679U (en) | Limiting device for concrete floorslab | |
CN202767117U (en) | Expanded rubber plug for reserved grouting pore channel grouting leak repairing construction method | |
CN104153464A (en) | Steel pipe concrete jacking inserting plate type control device and method for connecting steel pipe concrete jacking inserting plate type control device to steel pipe column | |
CN201024584Y (en) | Water heating ground heat pipeline pavement template | |
CN107447975A (en) | Exterior wall scaffold tapered cup nut wall-connecting piece | |
CN205591549U (en) | Building structure floor plate preformed hole mould | |
CN209195011U (en) | A kind of draining waterstop joint fixed device under the construction system based on aluminum alloy mould plate | |
CN206091009U (en) | Anti fixing device that floats of hollow floor | |
CN209585295U (en) | A kind of tower crane attached wall built-in fitting | |
CN107514097A (en) | Prestressing force bellows component and its construction method of installation | |
CN211172078U (en) | Assembled waterproof lifting hook | |
CN208267375U (en) | A kind of efficient plumbing built-in pipe setting tool | |
CN203097291U (en) | Reinforcing and counter-pulling device of building construction formwork | |
CN209429531U (en) | A kind of tightening formula concrete floor hole reservation device | |
CN205637590U (en) | Template fixed knot of wrong platform constructs between anti -shear power wall floor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170613 Termination date: 20171214 |