CN206245741U - New hole embedded tool - Google Patents

New hole embedded tool Download PDF

Info

Publication number
CN206245741U
CN206245741U CN201621371477.1U CN201621371477U CN206245741U CN 206245741 U CN206245741 U CN 206245741U CN 201621371477 U CN201621371477 U CN 201621371477U CN 206245741 U CN206245741 U CN 206245741U
Authority
CN
China
Prior art keywords
reinforcing bar
built
hush panel
hole
head plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621371477.1U
Other languages
Chinese (zh)
Inventor
谢鸿卫
岑宏
孙富达
陆启波
黄勇
徐茂帮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd
Original Assignee
Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd filed Critical Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd
Priority to CN201621371477.1U priority Critical patent/CN206245741U/en
Application granted granted Critical
Publication of CN206245741U publication Critical patent/CN206245741U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of new hole embedded tool, including two built-in fittings, and described built-in fitting includes hush panel, service sleeve, head plate, reinforcing bar and clamp nut;Being respectively equipped with the middle part of described hush panel and head plate can pass through the reinforced hole of reinforcing bar;Reinforcing bar two ends are provided with screw thread, and hush panel and head plate are fixed on reinforcing bar the two ends of service sleeve by clamp nut;Connected by connection sheet between two built-in fittings, the hush panel of the two ends of connection sheet respectively with two built-in fittings is connected.The pre-buried accuracy in the utility model hole is high, and the pre-buried off normal rate of hole is low, pre-buried hole good waterproof performance, can greatly improve the first-time qualification rate that balcony and air-conditioning plate floor drain are installed, and effectively reduces the phenomenon of balcony and air-conditioning plate floor drain leak.

Description

New hole embedded tool
Technical field
The utility model is related to technical field of building construction, and in particular to one kind is pre- for balcony and the simple floor drain of air-conditioning plate Box out hole construction new hole embedded tool.
Background technology
Traditional simple floor drain hole reserving construction method of balcony and air-conditioning plate is positioned in template using nail, then Sleeve steel wire rope is bundled in the template of flooring, fixes sleeve, does not allow sleeve off normal when floorslab concrete is poured.But The mode of nail and steel wire rope positioning has the following disadvantages:Nail is not accurate enough with the sleeve portion that steel wire rope is fixed, and colligation is not It is enough firm, the phenomenon of built-in fitting off normal is easily caused during casting concrete, so as to have impact on the accuracy of reserving hole position, Cause the simple floor drain preformed hole construction quality of balcony and air-conditioning plate low.
Utility model content
The technical problems to be solved in the utility model is, in view of the shortcomings of the prior art, there is provided one kind is used for balcony And the new hole embedded tool of the simple floor drain preformed hole construction of air-conditioning plate, realize that reserving hole position is accurate, hole is stayed Motility rate high, hole waterproof and good integrity are set as, and solve the leak of the simple floor drain preformed hole construction of balcony and air-conditioning plate Problem, improves the once examination percent of pass of the simple floor drain preformed hole construction of balcony and air-conditioning plate.
The utility model solves the technical scheme taken of above-mentioned technical problem:A kind of new hole embedded tool, bag Two built-in fittings are included, described built-in fitting includes hush panel, service sleeve, head plate, reinforcing bar and clamp nut;Described envelope Being respectively equipped with the middle part of oralia and head plate can pass through the reinforced hole of reinforcing bar;Reinforcing bar two ends are provided with screw thread, and reinforcing bar is led to Cross the two ends that hush panel and head plate are fixed on clamp nut service sleeve;Connected by connection sheet between two built-in fittings, Hush panel of the two ends of connection sheet respectively with two built-in fittings is connected.
Described reinforcing bar is made up of circular reinforcing bar.
Described connection sheet passes through to be welded and fixed with hush panel, to ensure that two built-in fitting positions do not offset.
The pre-buried accuracy in the utility model hole is high, and the pre-buried off normal rate of hole is low, and pre-buried hole good waterproof performance is greatly improved The first-time qualification rate that balcony and air-conditioning plate floor drain are installed, effectively reduces the phenomenon of balcony and air-conditioning plate floor drain leak.
Brief description of the drawings
Fig. 1 is the structural representation of new hole embedded tool described in the utility model.
Reference is:
1. hush panel, 2. reinforced hole, 3. clamp nut, 4. head plate, 5. reinforcing bar, 6. connection sheet, 7. service sleeve.
Specific embodiment
Illustrate below and the technical solution of the utility model is described further with reference to accompanying drawing.
As shown in figure 1, a kind of new hole embedded tool, including head plate 4, hush panel 1 and reinforcing bar 5;Described envelope Head plate 4, hush panel 1 are made circle using steel plate, and described reinforcing bar 5 is made of the threaded reinforcing bar in two.Reinforced hole 2 is The circular port reserved on head plate 4 and hush panel 1, reinforcing bar 5 passes through the reinforced hole 2 of head plate 4 and hush panel 1, and by tight Gu hush panel 1 and head plate 4 are fixed on nut 3 two ends of service sleeve 7.Clamp nut 3 be No. 12 nuts, connection sheet 6 by Steel disc is made, for connecting two built-in fittings, it is ensured that the position of two built-in fittings does not offset.Connection sheet 6 and two built-in fittings Hush panel 1 is fixed using welding manner.

Claims (3)

1. a kind of new hole embedded tool, it is characterised in that including two built-in fittings, described built-in fitting include hush panel, Service sleeve, head plate, reinforcing bar and clamp nut;It is respectively equipped with to pass through in the middle part of described hush panel and head plate and adds Gu the reinforced hole of bar;Reinforcing bar two ends are provided with screw thread, and be fixed on for hush panel and head plate by clamp nut pre-buried by reinforcing bar The two ends of sleeve pipe;Connected by connection sheet between two built-in fittings, the two ends of connection sheet respectively with two hush panels of built-in fitting Connection.
2. new hole embedded tool according to claim 1, it is characterised in that described reinforcing bar is circular reinforcing bar system Into.
3. new hole embedded tool according to claim 1 and 2, it is characterised in that described connection sheet and hush panel By being welded and fixed, to ensure that two built-in fitting positions do not offset.
CN201621371477.1U 2016-12-14 2016-12-14 New hole embedded tool Expired - Fee Related CN206245741U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621371477.1U CN206245741U (en) 2016-12-14 2016-12-14 New hole embedded tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621371477.1U CN206245741U (en) 2016-12-14 2016-12-14 New hole embedded tool

Publications (1)

Publication Number Publication Date
CN206245741U true CN206245741U (en) 2017-06-13

Family

ID=59007451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621371477.1U Expired - Fee Related CN206245741U (en) 2016-12-14 2016-12-14 New hole embedded tool

Country Status (1)

Country Link
CN (1) CN206245741U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502269A (en) * 2020-04-28 2020-08-07 中建三局第三建设工程有限责任公司 Fixing device and fixing method for pipe penetrating of wall pouring mold preformed hole
CN114837410A (en) * 2022-05-31 2022-08-02 中天建设集团有限公司 Beam-penetrating casing pipe positioning construction method for fabricated building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502269A (en) * 2020-04-28 2020-08-07 中建三局第三建设工程有限责任公司 Fixing device and fixing method for pipe penetrating of wall pouring mold preformed hole
CN114837410A (en) * 2022-05-31 2022-08-02 中天建设集团有限公司 Beam-penetrating casing pipe positioning construction method for fabricated building
CN114837410B (en) * 2022-05-31 2024-03-12 中天建设集团有限公司 Beam penetrating sleeve positioning construction method for assembled building

Similar Documents

Publication Publication Date Title
CN208702140U (en) A kind of shear wall joint part formwork reinforcement structure
CN206245741U (en) New hole embedded tool
CN203603452U (en) Folded plate small space formwork assembly
CN203729498U (en) Vertical reinforcement-steel sleeve but joint connection structure of assembled wall
CN207110468U (en) A kind of shear wall joint part template reinforcing device
CN110424529B (en) Prefabricated cantilever beam balcony and construction method
CN202925896U (en) A hole reservation device for constructional engineering
CN202577347U (en) Waterproof structure of basement steel formwork
CN104047423B (en) A kind of mould and construction method of wearing the accurate reserved opening of flooring plate
CN201276842Y (en) Construction barrel mold for reserved opening of simple building
CN201695679U (en) Limiting device for concrete floorslab
CN202767117U (en) Expanded rubber plug for reserved grouting pore channel grouting leak repairing construction method
CN104153464A (en) Steel pipe concrete jacking inserting plate type control device and method for connecting steel pipe concrete jacking inserting plate type control device to steel pipe column
CN201024584Y (en) Water heating ground heat pipeline pavement template
CN107447975A (en) Exterior wall scaffold tapered cup nut wall-connecting piece
CN205591549U (en) Building structure floor plate preformed hole mould
CN209195011U (en) A kind of draining waterstop joint fixed device under the construction system based on aluminum alloy mould plate
CN206091009U (en) Anti fixing device that floats of hollow floor
CN209585295U (en) A kind of tower crane attached wall built-in fitting
CN107514097A (en) Prestressing force bellows component and its construction method of installation
CN211172078U (en) Assembled waterproof lifting hook
CN208267375U (en) A kind of efficient plumbing built-in pipe setting tool
CN203097291U (en) Reinforcing and counter-pulling device of building construction formwork
CN209429531U (en) A kind of tightening formula concrete floor hole reservation device
CN205637590U (en) Template fixed knot of wrong platform constructs between anti -shear power wall floor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170613

Termination date: 20171214