CN216947889U - 一种用于墩柱模板施工的导向牵引机构 - Google Patents
一种用于墩柱模板施工的导向牵引机构 Download PDFInfo
- Publication number
- CN216947889U CN216947889U CN202220049401.6U CN202220049401U CN216947889U CN 216947889 U CN216947889 U CN 216947889U CN 202220049401 U CN202220049401 U CN 202220049401U CN 216947889 U CN216947889 U CN 216947889U
- Authority
- CN
- China
- Prior art keywords
- cage body
- ladder cage
- pier
- guiding
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 27
- 238000009415 formwork Methods 0.000 claims description 18
- 229910001335 Galvanized steel Inorganic materials 0.000 claims description 4
- 239000008397 galvanized steel Substances 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 abstract description 31
- 239000010959 steel Substances 0.000 abstract description 31
- 238000000034 method Methods 0.000 abstract description 15
- 230000000694 effects Effects 0.000 abstract description 3
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000001179 sorption measurement Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220049401.6U CN216947889U (zh) | 2022-01-10 | 2022-01-10 | 一种用于墩柱模板施工的导向牵引机构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220049401.6U CN216947889U (zh) | 2022-01-10 | 2022-01-10 | 一种用于墩柱模板施工的导向牵引机构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216947889U true CN216947889U (zh) | 2022-07-12 |
Family
ID=82315119
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220049401.6U Expired - Fee Related CN216947889U (zh) | 2022-01-10 | 2022-01-10 | 一种用于墩柱模板施工的导向牵引机构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216947889U (zh) |
-
2022
- 2022-01-10 CN CN202220049401.6U patent/CN216947889U/zh not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20070107620A1 (en) | Method and a device for the rail traffic on multiply, parallel guide-ways also as toys | |
US4257491A (en) | Scaffold apparatus | |
CN106437130A (zh) | 一种用于超高层建筑施工的内顶外爬式模架施工平台 | |
CN106400951B (zh) | 一种超高层建筑的水平与竖向结构同步施工方法 | |
CN211142839U (zh) | 自行式防撞墙施工模板台车 | |
CN107100074A (zh) | 一种下承式拱桥混凝土桥面施工方法 | |
CN112411380A (zh) | 一种预制箱梁多机联吊跨河架设施工方法 | |
CN116136122A (zh) | 一种集成型附着式倾斜升降爬架系统及使用方法 | |
CN216947889U (zh) | 一种用于墩柱模板施工的导向牵引机构 | |
CN201546176U (zh) | 遮板安装小车 | |
CN112160773A (zh) | 一种隧道衬砌钢筋台车及衬砌钢筋绑扎施工方法 | |
CN116949946A (zh) | 小半径曲线桥梁架桥施工方法 | |
CN216662305U (zh) | 超高层塔吊底部附着式液压自爬升硬防护平台 | |
CN205348005U (zh) | 斜拉桥牵索挂篮的施工操作组合平台 | |
CN215714714U (zh) | 一种安装桥梁护栏用吊篮设备 | |
CN216515141U (zh) | 一种新悬挑施工爬模装置 | |
CN2079205U (zh) | 模板提升架 | |
CN210886923U (zh) | 一种双索面斜拉桥直塔柱的检修系统 | |
CA2557554A1 (en) | A method and a device for the rail traffic on multiply, parallel guide-ways also as toys | |
CN110230265A (zh) | 一种用于高墩的施工方法 | |
CN114703987B (zh) | 一种高层剪力墙浇筑方法及高层楼梯间浇筑方法 | |
CN217710358U (zh) | 钢混组合梁箱间横联及端横梁自行式安装台车 | |
CN218757249U (zh) | 一种用于码头施工的悬挑平台 | |
CN220202481U (zh) | 一种桥梁施工承台作业平台 | |
CN218286084U (zh) | 一种立式预制墩柱翻身装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Lin Kaisheng Inventor after: Li Bin Inventor after: Jiang Youling Inventor after: Zou Meifang Inventor after: Yang Yuanzheng Inventor before: Lin Kaisheng Inventor before: Li Bin Inventor before: Jiang Youling Inventor before: Zou Meifang Inventor before: Yang Yunzheng |
|
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 530000 floors 11 and 12, No. 39, Yunjing Road, Qingxiu District, Nanning City, Guangxi Zhuang Autonomous Region Patentee after: Guangxi Guitong Engineering Management Group Co.,Ltd. Address before: 530000 floors 11 and 12, No. 39, Yunjing Road, Qingxiu District, Nanning City, Guangxi Zhuang Autonomous Region Patentee before: GUANGXI GUITONG ENGINEERING CONSULTING Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220712 |