CN2167974Y - Rail-less lifter for construction - Google Patents
Rail-less lifter for construction Download PDFInfo
- Publication number
- CN2167974Y CN2167974Y CN 93234370 CN93234370U CN2167974Y CN 2167974 Y CN2167974 Y CN 2167974Y CN 93234370 CN93234370 CN 93234370 CN 93234370 U CN93234370 U CN 93234370U CN 2167974 Y CN2167974 Y CN 2167974Y
- Authority
- CN
- China
- Prior art keywords
- cab
- cam
- building structure
- elevator
- liangping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model relates to a rail-less lifter for construction, which belongs to a person and goods loading and vertical transport device for high-rise building construction. The utility model comprises safety protection devices of a guiding bearing structure, a lifter car, an overhead beam platform and a fall preventing device, a control part and a drawing mechanism. The utility model has no need of a derrick or a rail. The lifter car is lifted by using a vertical continuous building structure as a guide. Compared with the existing lifter for construction, the utility model has the advantages of saving a large quantity of steel bars used for derricks and orbits and decreasing the cost price of the lifter, and the advantages of simple, direct and quick installation, heightening, demolition and transportation, low cost, economy, suitability, safety.
Description
The utility model belongs to elevator machinery, is a kind of people's goods elevator that is used for high-building construction.
Continuous development along with urban construction, urban land day is becoming tight, skyscraper can get more and more, skyscraper is most important in manufacture process also to be that one of the most basic problem is to resolve vertical transport, at present in the high-building construction, as the construction elevator of vertical transport, its load-bearing and guiding all are to rely on the floor type derrick that sets up, and the consumption steel material of derrick is very big, account for about 90% of the total consumption of construction elevator steel, along highly heavily about 500Kg/m, therefore high-rise construction elevator cost is very high, costs an arm and a leg, in addition, its installation, increase, dismounting and transportation are also very loaded down with trivial details, and the consumption time is long, the expense height; The formal elevator that uses in the elevator, because of its rising or falling speed requires very fast, the rail road must be installed in stair shaft, because friction and the influence of expanding with heat and contract with cold, guide rail can produce strut buckling and flexure stress, so track generally all adopts extraordinary I-beam section, and processing and heat treatment requirements are higher, in addition because the influence of building micro-deformation, guide rail and the setting accuracy of leading boots are all had relatively high expectations, so the cost of this class elevator is also very expensive.
The purpose of this utility model is few for a kind of consumption steel, mounting or dismounting and the transportation high-building construction personnel selection goods elevator that saves time easily.
The utility model is realized by following solution.The trackless construction elevator mainly is made up of guiding load larrying member, cab, day Liangping platform, safety device, control part, carrying means etc. such as anti-fall, its feature part is, the constraint cab move guiding load larrying member of track effect and load-bearing, partly by or all form by vertical continuous building structure.The dead front type that the guiding load larrying member can surround for building structure, as elevator, courtyard etc., also can be untight open, three faces that surround as skin have wall and one side opens wide or there is wall on two opposites, and in addition the two sides does not have the open of wall, when agent structure is an open, when being not enough to that cab sealed constraint and guiding, can be to rely on point to increase simple and easy guide rail with building structure at the face of opening wide, to form sealing constraint and guiding; Being fixed with on the cab of this elevator can lifting have moved the elastic telescopic trackless kinematic mechanism of flexible constraint and directional tagging to cab with building structure; Liangping, the sky platform of this elevator is connected in the building structure of cab top, and a day Liangping platform has and can repeat repeatedly to fix and tear open the active connection that takes off with building structure, makes a day Liangping platform become the movable decking that can move according to operating needs under moving; The disconnected rope of the anti-fall employing cam of the safety of this elevator safety guard, this device mainly is made up of cam, messenger, spring, the axle of cam is connected on the cab, cam can rotate around its axle, end at cam is connected with messenger, messenger links to each other with the hoist ropes of cab, messenger is tensioned when hoist ropes is worked, also be connected with on the cam and can fracture take place and messenger rotates cam when lax and makes cam contact the spring that is adjacent to building structure at the hoist ropes of cab, the profile of cam is a rough surface; Other parts such as the carrying means of this elevator, control part, safety guard all can adopt the similar means and the device that have elevator now.
For the trackless construction elevator more clearly is described, special embodiment with accompanying drawing is further described.
Fig. 1 is the schematic side view of operating elevator, the essential structure and the composition of signal elevator.
Among the figure: 1. cab; 2. building structure (body of wall); 3. elastic telescopic trackless kinematic mechanism; 4. traction steel-cable; 5. day Liangping platform; 6. fixed pulley on day beam; 7. fixed pulley; 8. winch; 9. cone disk type hypervelocity automatic brake; 10. cam; The limit switch 11. rush to summit; Meet and discuss 12. rush to summit; 13. pedal lowest limit bit switch; 14. bearing plate; 15. spring; 16. overload switch; 17. master cock; 18. control and illumination pigtail; 19. electric light.
Fig. 2 is a kind of embodiment constructional drawing of elastic telescopic trackless kinematic mechanism.
Among the figure: 20. are fixed on the sleeve pipe on the cab casing; 21. insert the guide rod in the sleeve pipe (20); 22. runner; 23. runner shaft support; 24. compression spring.
Fig. 3 is another instance constructs figure of elastic telescopic trackless kinematic mechanism.
Among the figure: 25. show the flexible steel ring that is fixed on the cab.
Fig. 4 is day Liangping platform and building structure relation and lifting or day Liangping platform method scheme drawing that descends.
Among the figure: the detachable interim suspension bracket that Liangping, 26. lifting sky platform is used; 27. jack; 28. steel rope; 29. it beam flat-bed active connection; 30. preformed hole;
Fig. 5 is day constructional drawing of a kind of embodiment of beam flat-bed active connection (29).
Among the figure: 31. are fixed on the sleeve pipe on day Liangping platform (5); 32. the scalable latch in the sleeve pipe.
Fig. 6 is the constructional drawing of another example in day beam flat-bed active connection (29).
Among the figure: 33. are fixed on the link on day Liangping platform (5); 34. hook bolt nut assembly.
Fig. 7 is the disconnected rope of a cam anti-fall device constructional drawing.
Among the figure: 35. is camshaft; 36. messenger; 37. torsion spring; 38. block; 39. wire line shoe; 40. cab back timber.
Referring to Fig. 2, a kind of embodiment of the elastic telescopic trackless kinematic mechanism (3) among Fig. 1 is configured to, has the sleeve pipe (20) that is fixed on cab (1) casing, be inserted with long guide rod (21) in the sleeve pipe (20), one end of guide rod (21) is fixed with baffle plate, the other end of guide rod (21) is connected mutually with the runner shaft support (23) of a runner (22), is with compression spring (24) on the guide rod (21) between sleeve pipe (20) and the runner shaft support (23).Referring to Fig. 3, another embodiment of the elastic telescopic trackless kinematic mechanism (3) among Fig. 1 is configured to, be connected in the side of cab (1) diameter than this side of cab (1) and the distance between the building structure (2) bigger and rubber-like steel ring (25).
Referring to Fig. 5, the structure of a kind of embodiment of the active connection (29) of the sky Liangping platform (5) among Fig. 4 is, have a sleeve pipe (31) that is connected mutually with day Liangping platform (5), a latch (32) that can stretch out and withdraw from Liangping, sky platform (5) edge is housed in the sleeve pipe (31).Referring to Fig. 6, the structure of the another kind of embodiment of the active connection (29) of the sky Liangping platform (5) among Fig. 4 is, on Liangping, sky platform (5), be fixed with link (33), collude in the link (33) and hang with hook bolt nut assembly (34), the preformed hole that the other end of hook bolt is passed in the building structure (2) is connected with its nut.
Referring to Fig. 7, when fracture takes place in traction steel-cable (4), messenger (36) is relaxed, cam (10) will be under the effect of torsion spring (37) as figure in the direction of arrow rotate, cam edge is contacted with body of wall is adjacent to, this moment, cam was under the whereabouts of casing drives, and the friction force that produces between the body of wall will make cam continue to take place a small amount of the rotation, cam changes will push up between itself and the body of wall tight more more, and friction force will be big more, and makes cam continue to produce new rotation; New rotation makes friction force further increase again, till directly causing cab and stopping falling, and plays the effect of disconnected rope safety guard-safeguard.
The utility model provides the trackless construction elevator to compare with existing construction elevator, has following outstanding advantage and good effect.
1, because need not to install derrick, track, compares with construction elevator with existing skyscraper, can save about 90% steel of elevator gross weight, the cost decrease of elevator; The installation of this elevator, increase and remove and simple and do not need the basis rapidly, its installation, increase and remove and freight also significantly reduces;
2, feasible, suitable.
1. the arrangement of elevator is easy to select.The skyscraper civil engineering stage, elevator all is idle or is used as and draws the rubbish road to use generally speaking, therefore elevator is the desirable preferred location that this elevator is installed, when treating that formal elevator begins to install, engineering is basically completed, the tailing in work of only remaining lower which floor is got ready as long as in advance used building materials is transported, and elevator will not influence normal construction after removing; The courtyard of building or the outdoor space that has the above body of wall in two sides to surround are all to be installation sites preferably in addition.
2. elevator slightly rocking in lifting process do not have any influence to manned loading in the normal construction.When the carrying means of this elevator drives the vertical building structure oscilaltion continuously operation of cab edge, because building structure has bigger deviation at relative rail road or derrick aspect squareness, the planeness, therefore cab will shake, but as long as disappear sudden change place of fabric structure deviation flat by the method for shaving cutter and mending ash, these work be accomplish easily in the building operation and take a lot of work few, even building structure has the very big horizontal displacement deviation of 20mm in the high scope of 2m.When cab operates in this scope, because the runner of corresponding offset deviation one side and the runner on its opposite all will be compressed or be loosened simultaneously on the cab at this moment, and the reason that has inertia owing to cab, the rocking displacement and will be not more than 10mm of cab, and the general 60cm/s of the rising or falling speed of construction elevator, its liter or fall the 2m rise from needing for 3 seconds approximately, so the cab speed of rocking only is about about 3.3mm/s.This will not influence the manned loading in the construction.
3, safety, reliable.This elevator can adopt the safety guard of cam disconnected rope anti-dropping safety device and multiple existing elevator, and therefore safety is guaranteed.
4, use is not influenced by inclement weather.When this elevator is satisfied with not to be subjected to the influence of weather such as blowing and raining, when particularly blowing hard when indoor, general vertical transport construction mechanism all can not use, this moment, engineering was forced to stop work, and this elevator this moment still can normal manned loading, still can satisfy normally carrying out of indoor decorating work.
5, purposes increases.In the time of in this elevator is installed on elevator, as long as when the design of cab body, consider the installation of formal elevator simultaneously; Reserve the position of the track etc. of formal elevator, this elevator also can be used for work such as the installation of formal elevator rail etc. and adjustment.
Claims (8)
1, the trackless construction elevator is made up of guiding load larrying member, cab, day Liangping platform, safety guard, control part, carrying means etc. such as anti-fall; it is characterized in that; the constraint cab move guiding load larrying member of track effect and load-bearing, partly by or all form by vertical continuous building structure.
2, elevator according to claim 1 is characterized in that: be fixed with on the cab that lifting has moved the elastic telescopic trackless kinematic mechanism of flexible constraint and directional tagging to cab with building structure.
3, elevator according to claim 2, it is characterized in that: being configured to of elastic telescopic trackless kinematic mechanism, has the sleeve pipe that is fixed on the cab casing, be inserted with long guide rod in the sleeve pipe, one end of guide rod is fixed with baffle plate, the other end of guide rod is connected mutually with the runner shaft support of a runner, is with compression spring on the guide rod between sleeve pipe and the runner shaft support.
4, elevator according to claim 2 is characterized in that, being configured to of elastic telescopic trackless kinematic mechanism, the side of cab be connected a diameter than this side of cab and building structure between distance bigger and the rubber-like steel ring.
5, elevator according to claim 1 is characterized in that, a day Liangping platform is connected in the building structure of cab top, a day Liangping platform have can and building structure between repeat fixing and tear the active connection that takes off open.
6, elevator according to claim 5 is characterized in that, being configured to of day beam flat-bed active connection has a sleeve pipe that is connected mutually with Liangping, sky platform, and a latch that can stretch out and withdraw from Liangping, sky edge of table is housed in the sleeve pipe.
7, elevator according to claim 5, it is characterized in that being configured to of day beam flat-bed active connection is fixed with link on the platform of Liangping, sky, collude in the link and hang with the hook bolt nut assembly, the preformed hole that the other end of hook bolt is passed in the building structure is connected with its nut.
8, elevator according to claim 1; it is characterized in that; falling-proof safety device adopts the disconnected rope of cam safety guard; this device is made up of cam, messenger, spring etc.; the axle of cam is connected on the cab; cam can rotate around its axle; end at cam is connected with messenger; messenger links to each other with the hoist ropes of cab; messenger is tensioned when hoist ropes is worked; also be connected with on the cam and can fracture take place and messenger rotates cam when loose and makes cam contact the spring that is adjacent to building structure at the hoist ropes of cab, camb contour is a rough surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 93234370 CN2167974Y (en) | 1993-07-22 | 1993-07-22 | Rail-less lifter for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 93234370 CN2167974Y (en) | 1993-07-22 | 1993-07-22 | Rail-less lifter for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2167974Y true CN2167974Y (en) | 1994-06-08 |
Family
ID=33810065
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 93234370 Expired - Fee Related CN2167974Y (en) | 1993-07-22 | 1993-07-22 | Rail-less lifter for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2167974Y (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102745577A (en) * | 2012-07-06 | 2012-10-24 | 金建勇 | Installation and using method for high-rise construction elevator |
CN102941459A (en) * | 2012-12-11 | 2013-02-27 | 桂林电力电容器有限责任公司 | Installation tool and installation process of suspension type capacitor tower device |
CN103754730A (en) * | 2014-01-29 | 2014-04-30 | 杨志宏 | Household trackless lifting platform |
CN103754731A (en) * | 2014-01-29 | 2014-04-30 | 杨志宏 | Household trackless elevator |
CN103863919A (en) * | 2012-12-13 | 2014-06-18 | 株式会社日立制作所 | Load support beam holding device of elevator |
CN105645224A (en) * | 2016-03-25 | 2016-06-08 | 李为民 | Safety lifting mechanism |
CN105645213A (en) * | 2016-03-25 | 2016-06-08 | 李为民 | Stable lifting mechanism |
CN107816970A (en) * | 2017-12-04 | 2018-03-20 | 三洋电梯(珠海)有限公司 | The built-in fitting divergence component and method of a kind of exterior wall elevator |
CN108413322A (en) * | 2018-02-12 | 2018-08-17 | 卢爱珠 | A kind of building construction protective device |
CN108975177A (en) * | 2018-10-08 | 2018-12-11 | 焦卫宁 | A kind of New Type Construction Hoist |
CN109502455A (en) * | 2018-11-05 | 2019-03-22 | 郑州弘展智能科技有限公司 | A kind of lifting device of steel construction elevator well frame installation |
CN110127550A (en) * | 2019-05-23 | 2019-08-16 | 广州市机电安装有限公司 | A kind of hanging method of super high-rise building tubing |
CN110424543A (en) * | 2019-07-24 | 2019-11-08 | 中冶天工集团有限公司 | A kind of motor driven building module structure and construction method |
CN111661767A (en) * | 2020-05-29 | 2020-09-15 | 许伟虎 | Reinforcement type hoist and mount instrument for building |
-
1993
- 1993-07-22 CN CN 93234370 patent/CN2167974Y/en not_active Expired - Fee Related
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102745577A (en) * | 2012-07-06 | 2012-10-24 | 金建勇 | Installation and using method for high-rise construction elevator |
CN102941459A (en) * | 2012-12-11 | 2013-02-27 | 桂林电力电容器有限责任公司 | Installation tool and installation process of suspension type capacitor tower device |
CN102941459B (en) * | 2012-12-11 | 2014-10-01 | 桂林电力电容器有限责任公司 | Installation tool and installation process of suspension type capacitor tower device |
CN103863919A (en) * | 2012-12-13 | 2014-06-18 | 株式会社日立制作所 | Load support beam holding device of elevator |
CN103863919B (en) * | 2012-12-13 | 2016-03-30 | 株式会社日立制作所 | the load bearing beam holding device of elevator |
CN103754730B (en) * | 2014-01-29 | 2016-08-17 | 杨志宏 | A kind of trackless Domestic lift platform |
CN103754730A (en) * | 2014-01-29 | 2014-04-30 | 杨志宏 | Household trackless lifting platform |
CN103754731A (en) * | 2014-01-29 | 2014-04-30 | 杨志宏 | Household trackless elevator |
CN103754731B (en) * | 2014-01-29 | 2016-06-01 | 杨志宏 | A kind of family expenses trackless elevator |
CN105645224A (en) * | 2016-03-25 | 2016-06-08 | 李为民 | Safety lifting mechanism |
CN105645213A (en) * | 2016-03-25 | 2016-06-08 | 李为民 | Stable lifting mechanism |
CN107816970A (en) * | 2017-12-04 | 2018-03-20 | 三洋电梯(珠海)有限公司 | The built-in fitting divergence component and method of a kind of exterior wall elevator |
CN108413322A (en) * | 2018-02-12 | 2018-08-17 | 卢爱珠 | A kind of building construction protective device |
CN108975177A (en) * | 2018-10-08 | 2018-12-11 | 焦卫宁 | A kind of New Type Construction Hoist |
CN109502455A (en) * | 2018-11-05 | 2019-03-22 | 郑州弘展智能科技有限公司 | A kind of lifting device of steel construction elevator well frame installation |
CN110127550A (en) * | 2019-05-23 | 2019-08-16 | 广州市机电安装有限公司 | A kind of hanging method of super high-rise building tubing |
CN110424543A (en) * | 2019-07-24 | 2019-11-08 | 中冶天工集团有限公司 | A kind of motor driven building module structure and construction method |
CN111661767A (en) * | 2020-05-29 | 2020-09-15 | 许伟虎 | Reinforcement type hoist and mount instrument for building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2167974Y (en) | Rail-less lifter for construction | |
CN109024291A (en) | A kind of integration Bridge Erector and its working method | |
WO2022262667A1 (en) | Separated brake shoe anti-wind apparatus for rail-mounted crane | |
CN2457268Y (en) | Climbing scaffold with lifting mechanism | |
CN210001523U (en) | variable space lifting system | |
CN205170212U (en) | Semi -portal crane | |
CN209260561U (en) | A kind of integration Bridge Erector | |
CN101037175B (en) | Weight-balancing type lifting method and equipment | |
CN2184684Y (en) | Self lifting high speed derrick lift | |
CN205820706U (en) | A kind of gantry crane's supporting legs | |
CN106677060B (en) | A kind of bridge inspection car | |
CN2895368Y (en) | Small-sized storey slings | |
CN112499502A (en) | Column type lifter | |
CN205187694U (en) | Novel tower crane equipment | |
CN2295725Y (en) | Mineral safeguard for preventing break-off of winding rope | |
CN2345520Y (en) | Construction hoist with safety protector and capable of self-dismounting | |
CN220012048U (en) | Bridge pier construction lifter | |
CN219196823U (en) | Building structure roof beam reinforced structure | |
CN213597291U (en) | Necking type floor support plate | |
CN220487142U (en) | High-rise large-tonnage stay cable tensioning fixture | |
CN2120840U (en) | Bridging support lift scaffold | |
CN112878656B (en) | Electric lifting climbing frame device for building engineering | |
CN211846916U (en) | Novel trackless portal crane | |
CN215886271U (en) | Maintenance platform for mounting and dismounting construction elevator | |
CN221319039U (en) | Main machine lifting device of escalator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C57 | Notification of unclear or unknown address | ||
DD01 | Delivery of document by public notice |
Addressee: Shen Haiyan Document name: payment instructions |
|
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |