CN216275666U - Quick pile driving equipment for constructional engineering - Google Patents
Quick pile driving equipment for constructional engineering Download PDFInfo
- Publication number
- CN216275666U CN216275666U CN202122322202.6U CN202122322202U CN216275666U CN 216275666 U CN216275666 U CN 216275666U CN 202122322202 U CN202122322202 U CN 202122322202U CN 216275666 U CN216275666 U CN 216275666U
- Authority
- CN
- China
- Prior art keywords
- hammer
- pile
- fixedly connected
- driving wheel
- pile driving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Cleaning In General (AREA)
Abstract
The utility model discloses a quick piling device for constructional engineering, which relates to the technical field of constructional engineering and comprises a shell, wherein a dust suction device is arranged at the lower end of the left side of the shell, a motor is fixedly connected to the upper surface of the shell, a rotating rod is fixedly connected to a rotating shaft of the lower surface of the motor, a first driving wheel is fixedly connected to the front end of the rotating rod, a connecting rod is rotatably connected to the lower end of the rotating rod, a piling hammer is rotatably connected to the lower end of the connecting rod, a damping device is arranged on the front surface of the piling hammer, a first spring is fixedly connected to the lower surface of the piling hammer, and a base plate is fixedly connected to the lower surface of the first spring, compared with the traditional explosive striking method, the impact frequency of the device is far higher than that of the traditional piling equipment.
Description
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a quick piling device for constructional engineering.
Background
Piling, which means that piles are driven into the ground to make the foundation of the building firm, because if the ground building is built on the ground and the ground is subjected to great pressure, the ground must have enough strength to resist the pressure, which is often difficult to achieve, so that the ground bearing the building must be reinforced or the bearing mode of the ground must be improved, so that it is thought that piles are driven on the foundation to transfer most of the weight of the building to a position deep below the ground through the piles, and the foundation at the position has a much larger bearing capacity than the ground.
In the prior art, the piling equipment usually adopts large-scale equipment to pile the ground pile body, so that the time and labor are wasted, the larger waste gas pollution is generated, the piling equipment is not suitable for any scene, and the piling frequency is lower.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides a quick piling device for construction engineering, which solves the problems mentioned in the background technology.
(II) technical scheme
In order to achieve the purpose, the utility model is realized by the following technical scheme: the utility model provides a building engineering is with equipment of piling fast, includes the shell, dust extraction is installed to the left side lower extreme of shell, the last fixed surface of shell is connected with the motor, the lower surface pivot department fixedly connected with bull stick of motor, the front end fixedly connected with drive wheel of bull stick is one, the lower extreme of bull stick rotates and is connected with the connecting rod, the lower extreme of connecting rod rotates and is connected with the pile hammer, the front surface mounting of pile hammer has damping device, the lower fixed surface of pile hammer is connected with spring one, the lower fixed surface of spring one is connected with the bottom plate.
Preferably, the outer surface of the first driving wheel is in transmission connection with a second driving wheel, the front surface of the second driving wheel is fixedly connected with a third driving wheel, and the front end of the third driving wheel is rotatably connected with a fixed rod.
Preferably, the dust collection device comprises a waste material box, a through hole is formed in the right side of the waste material box and is arranged as a dust collection port, a filter screen is fixedly connected to the right end of the inner surface of the waste material box, an air inlet is formed in the upper end of the filter screen, a baffle is arranged on the right side of the air inlet, and a wind wheel is connected to the outer surface of the third driving wheel in a transmission mode.
Preferably, damping device includes the shock-absorbing rod, the lower extreme of shock-absorbing rod rotates and is connected with the slider, the right fixed surface of slider is connected with spring two, the left fixed surface of slider is connected with elastic telescopic link.
Preferably, the number of the shock absorption rods is two, and the shock absorption rods are symmetrically arranged at the front end of the pile driving hammer by taking the center line of the pile driving hammer as a symmetry axis.
Preferably, the number of the elastic telescopic rods is two, and the elastic telescopic rods are symmetrically arranged at the left side and the right side of the pile driving hammer by taking the center line of the pile driving hammer as a symmetry axis.
(III) advantageous effects
The utility model provides a quick piling device for constructional engineering. The method has the following beneficial effects:
(1) this quick pile equipment for building engineering adopts motor drive pile, compares in traditional large-scale equipment can not produce exhaust pollution to because the equipment volume is less can be applicable to the construction site that most need carry out the pile, compare in the method that traditional explosion type struck, the frequency of the impact of this device is far greater than traditional pile equipment.
(2) This building engineering is with equipment of piling fast is provided with damping device and can be suitable for the stake pile of various material sizes, thereby can drive shock attenuation pole downstream when the pile hammer pushes down and promote the slider right, and the ascending buffer power of pile hammer can be given to spring two this moment, and the slider still can drive elastic telescopic link right motion simultaneously right, and this elastic telescopic link's elasticity can be to the secondary buffering of piling hammer.
Drawings
FIG. 1 is a schematic cross-sectional view of the structure of the present invention;
FIG. 2 is a schematic view of the dust collector of the present invention;
FIG. 3 is a schematic view of the shock absorbing device of the present invention.
In the figure: 1. a housing; 2. a dust collection device; 3. a damping device; 4. a third driving wheel; 5. a second driving wheel; 6. a motor; 7. a first transmission wheel; 8. a rotating rod; 9. a connecting rod; 10. a pile hammer; 11. a base plate; 12. a first spring; 13. fixing the rod; 201. an air inlet; 202. a waste material box; 203. a filter screen; 204. a baffle plate; 205. a wind wheel; 206. a dust suction port; 301. a shock-absorbing lever; 302. an elastic telescopic rod; 303. a slider; 304. and a second spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a quick pile driving device for construction engineering comprises a shell 1, a dust suction device 2 is installed at the lower end of the left side of the shell 1, the dust suction device 2 comprises a waste material box 202, a through hole penetrating through the right side of the waste material box 202 is formed in the right side of the waste material box 202 and is arranged to be a dust suction port 206, a filter screen 203 is fixedly connected to the right end of the inner surface of the waste material box 202, the filter screen 203 can be designed to be capable of isolating dust through air, the dust suction device 2 is prevented from being damaged due to the fact that dust is sucked into a wind wheel 205, an air inlet 201 is formed in the upper end of the filter screen 203, a baffle 204 is arranged on the right side of the air inlet 201, the wind wheel 205 can be isolated to be in a closed state through the baffle 204, the dust suction effect is increased, the outer surface of a driving wheel three 4 is in a transmission mode and is connected with the wind wheel 205, a motor 6 is fixedly connected to the upper surface of the shell 1, the quick pile driving device for construction engineering adopts the motor 6 to drive pile driving, and can not produce waste gas pollution compared with a traditional large-scale device, and because the equipment volume is smaller and can be suitable for most construction sites needing piling, compared with the traditional explosive type beating method, the frequency of the impact of the device is far greater than that of the traditional piling equipment, a rotating rod 8 is fixedly connected at the rotating shaft of the lower surface of a motor 6, when the motor 6 drives the rotating rod 8 to rotate, a connecting rod 9 is pulled to do reciprocating motion up and down to realize high-frequency piling of a piling hammer 10, the front end of the rotating rod 8 is fixedly connected with a driving wheel I7, the outer surface of the driving wheel I7 is in transmission connection with a driving wheel II 5, the front surface of the driving wheel II 5 is fixedly connected with a driving wheel III 4, the front end of the driving wheel III 4 is in transmission connection with a fixed rod 13, the lower end of the rotating rod 8 is in transmission connection with the connecting rod 9, the lower end of the connecting rod 9 is in transmission connection with the piling hammer 10, a damping device 3 is arranged on the front surface of the piling hammer 10, and the damping device 3 comprises a damping rod 301, the quick piling device for building engineering is provided with the damping device 3 which can be suitable for wood piles of various materials, when the piling hammer 10 is pressed down, the damping rod 301 is driven to move downwards so as to push the sliding block 303 to the right, the spring II 304 can give an upward damping force to the piling hammer 10, the sliding block 303 can drive the elastic telescopic rod 302 to move rightwards, the elastic force of the elastic telescopic rod 302 can perform secondary buffering to the piling hammer 10, and therefore longitudinal pressure and the elastic force of the ground can be transmitted to the transverse damping device 3, the lower surface of the pile hammer 10 is fixedly connected with a first spring 12, and the lower surface of the first spring 12 is fixedly connected with a base plate 11.
During operation (or during the use), need earlier put this equipment to the position that needs to carry out the pile, then open motor 6 this motor 6 can drive bull stick 8 and rotate, thereby it is fore-and-aft reciprocating motion to drive connecting rod 9, pile the operation to the soil, also can drive front end drive wheel 7 rotatory when bull stick 8 rotates, thereby the wind wheel 205 that drives dust extraction 2 through the transmission of driving belt rotates the wind-force that produces the dust absorption and use, the dust is then taken in waste material box 202 through dust absorption mouth 206, simultaneously can drive shock attenuation pole 301 downstream when pile hammer 10 pushes down thereby promote slider 303 to the right, spring two 304 can give the ascending buffer power of pile hammer 10 this moment, slider 303 still can drive elastic expansion link 302 right side motion right side simultaneously, this elastic expansion link 302's elasticity can do the secondary buffering to pile hammer 10.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. A quick pile driving equipment for building engineering, includes shell (1), its characterized in that: dust extraction (2) are installed to the left side lower extreme of shell (1), the last fixed surface of shell (1) is connected with motor (6), the lower surface pivot department fixedly connected with bull stick (8) of motor (6), the front end fixedly connected with drive wheel (7) of bull stick (8), the lower extreme of bull stick (8) is rotated and is connected with connecting rod (9), the lower extreme of connecting rod (9) is rotated and is connected with pile hammer (10), the front surface mounting of pile hammer (10) has damping device (3), the lower fixed surface of pile hammer (10) is connected with spring (12), the lower fixed surface of spring (12) is connected with bottom plate (11).
2. The rapid piling device for building engineering according to claim 1, wherein: the outer surface of the first driving wheel (7) is connected with a second driving wheel (5) in a transmission mode, the front surface of the second driving wheel (5) is fixedly connected with a third driving wheel (4), and the front end of the third driving wheel (4) is rotatably connected with a fixing rod (13).
3. A rapid pile driving apparatus for construction engineering according to claim 2, wherein: dust extraction (2) include waste material box (202), the through-hole that runs through is seted up and is set up to dust absorption mouth (206) on the right side of waste material box (202), the internal surface right-hand member fixedly connected with filter screen (203) of waste material box (202), the upper end of filter screen (203) is provided with air intake (201), the right side of air intake (201) is provided with baffle (204), the surface transmission of drive wheel three (4) is connected with wind wheel (205).
4. The rapid piling device for building engineering according to claim 1, wherein: damping device (3) include shock attenuation pole (301), the lower extreme of shock attenuation pole (301) is rotated and is connected with slider (303), the right fixed surface of slider (303) is connected with spring two (304), the left fixed surface of slider (303) is connected with elasticity telescopic link (302).
5. The rapid piling device for building engineering according to claim 4, wherein: the number of the shock absorption rods (301) is two, and the shock absorption rods are symmetrically arranged at the front end of the pile driving hammer (10) by taking the center line of the pile driving hammer (10) as a symmetry axis.
6. The rapid piling device for building engineering according to claim 4, wherein: the number of the elastic telescopic rods (302) is two, and the elastic telescopic rods are symmetrically arranged at the left side and the right side of the pile driving hammer (10) by taking the center line of the pile driving hammer (10) as a symmetry axis.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122322202.6U CN216275666U (en) | 2021-09-25 | 2021-09-25 | Quick pile driving equipment for constructional engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122322202.6U CN216275666U (en) | 2021-09-25 | 2021-09-25 | Quick pile driving equipment for constructional engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216275666U true CN216275666U (en) | 2022-04-12 |
Family
ID=81065848
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122322202.6U Active CN216275666U (en) | 2021-09-25 | 2021-09-25 | Quick pile driving equipment for constructional engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216275666U (en) |
-
2021
- 2021-09-25 CN CN202122322202.6U patent/CN216275666U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111893998B (en) | Building punching pile equipment | |
CN216275666U (en) | Quick pile driving equipment for constructional engineering | |
CN107855217B (en) | Efficient mining deironing equipment | |
CN109229293B (en) | Energy-saving and environment-friendly marine pipeline floating body device | |
CN208430514U (en) | A kind of building piling machine | |
CN217998235U (en) | Hydraulic excavator convenient to use | |
CN216532128U (en) | Installation device for mobile electrical equipment of ocean platform | |
CN116084343A (en) | Large-scale prefabricated reinforced concrete ecological slope protection | |
CN113249569B (en) | Rare earth waste recycling oxide extraction equipment's measuring device | |
CN211948361U (en) | Ramming machine for earth backfilling | |
CN210341879U (en) | Constructional engineering is with battering ram convenient to remove | |
CN110952514A (en) | River sewage treatment ship convenient to salvage | |
CN221518246U (en) | Roadbed tubular pile curing device | |
CN211973485U (en) | Impact hammer | |
CN215977197U (en) | Civil construction foundation detection device | |
CN113062238A (en) | Flood-proof energy-saving sand-fixing box based on wind power | |
CN220503893U (en) | Support frame for pile driver convenient to installation | |
CN110424367A (en) | A kind of building weight rammer compacter auxiliary pressure device | |
CN115155783B (en) | Recovery plant is used in afforestation discarded object processing | |
CN216474896U (en) | Cement prefabricated product groove for irrigation | |
CN217963430U (en) | Impurity screening equipment in seasoning powder production process | |
CN220079971U (en) | Foundation tamping device for constructional engineering | |
CN113928743B (en) | Resonance type raw coal bucket vibration beating mechanism applied to thermal power coal supply system | |
CN217849927U (en) | Novel thing networking gateway equipment of high-efficient heat dissipation formula | |
CN217629818U (en) | Automatic cleaning device of ram of crawler-type dynamic compactor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |