CN216194915U - Quick installation mechanism of piping lane prefab - Google Patents

Quick installation mechanism of piping lane prefab Download PDF

Info

Publication number
CN216194915U
CN216194915U CN202122515492.6U CN202122515492U CN216194915U CN 216194915 U CN216194915 U CN 216194915U CN 202122515492 U CN202122515492 U CN 202122515492U CN 216194915 U CN216194915 U CN 216194915U
Authority
CN
China
Prior art keywords
pipe gallery
wall
installation mechanism
positioning
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122515492.6U
Other languages
Chinese (zh)
Inventor
李宝兴
张荣福
郑燚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anshan Sanye Construction Engineering Co ltd
Original Assignee
Anshan Sanye Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anshan Sanye Construction Engineering Co ltd filed Critical Anshan Sanye Construction Engineering Co ltd
Priority to CN202122515492.6U priority Critical patent/CN216194915U/en
Application granted granted Critical
Publication of CN216194915U publication Critical patent/CN216194915U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a quick installation mechanism for a pipe gallery prefabricated part, which comprises a pipe gallery, wherein an upper pipe gallery is arranged on the outer wall of the top of the pipe gallery, hanging rings are arranged at four corners of the outer wall of the top of the upper pipe gallery, the cross sections of the upper pipe gallery and the lower pipe gallery are both of a herringbone structure, mounting grooves distributed equidistantly are formed in the outer wall of the top of the lower pipe gallery, installation mechanisms are arranged on the inner walls of the mounting grooves, positioning columns are fixedly connected to the outer wall of the bottom of the upper pipe gallery, limiting grooves distributed equidistantly are formed in the outer walls of the positioning columns, each installation mechanism comprises an installation column, positioning grooves are formed in the outer wall of the top of the installation column, and the inner walls of two sides of each positioning groove are connected with the same positioning plate in a sliding mode. According to the utility model, the installation mechanism is arranged in the lower pipe gallery, the installation mechanism is matched with the positioning columns on the upper pipe gallery, so that the installation and the positioning are convenient and rapid, and the driving rod, the positioning plate and the locking plate in the installation mechanism are matched.

Description

Quick installation mechanism of piping lane prefab
Technical Field
The utility model relates to the technical field of pipe galleries, in particular to a quick installation mechanism for a pipe gallery prefabricated member.
Background
Pipe gallery, i.e. the corridor of the pipeline. Many of the pipes in chemical and related plants are grouped together and arranged along the outside of the plant or building, typically in the air, supported by supports, in a manner similar to a corridor. The large-scale device is mainly used for centralized laying of pipelines, and is composed of upright columns, cross beams and trusses of steel structures or reinforced concrete structures, and the large-scale device can be divided into single-layer or multi-layer structures according to types, and can be used for passage or non-passage.
The installation is all hoisted through hoisting equipment to the piping lane prefab when installation, but current piping lane prefab is inconvenient to be fixed a position fast in the installation, leads to the efficiency ratio of piping lane installation lower, and the piping lane is not installed well fast because the volume is great relatively and just needs the crane to hang always, not only dangerous but also extravagant resource.
Disclosure of Invention
Based on the technical problems in the background art, the utility model provides a quick installation mechanism for a pipe gallery prefabricated member.
The utility model provides a quick installation mechanism for a pipe gallery prefabricated part, which comprises a pipe gallery, wherein an upper pipe gallery is arranged on the outer wall of the top of the pipe gallery, hanging rings are arranged at four corners of the outer wall of the top of the upper pipe gallery, the cross sections of the upper pipe gallery and the lower pipe gallery are both in a herringbone structure, mounting grooves distributed equidistantly are formed in the outer wall of the top of the lower pipe gallery, installation mechanisms are arranged on the inner walls of the mounting grooves, positioning columns are fixedly connected to the outer wall of the bottom of the upper pipe gallery, limiting grooves distributed equidistantly are formed in the outer walls of the positioning columns, each installation mechanism comprises an installation column, positioning grooves are formed in the outer wall of the top of the installation column, and the inner walls of two sides of each positioning groove are connected with the same positioning plate in a sliding mode.
Preferably, the round mouth has been seted up to constant head tank bottom inner wall, and the inner wall sliding connection T shape structure's of round mouth support column, first spring has been cup jointed to the outer wall of support column, the both sides inner wall of erection column all is fixed with the actuating lever of L shape structure, two through the bearing all be connected with the second spring between one side outer wall of actuating lever and the support column bottom outer wall.
Preferably, its characterized in that, the arc opening has all been seted up to the both sides inner wall of constant head tank, and the equal sliding connection of two arc open-ended inner walls has locking board, two one side outer wall of locking board all is provided with the arc lug, two the one end swing joint of actuating lever is on two locking boards.
Preferably, the arc opening has all been seted up to the both sides inner wall of constant head tank, and the equal sliding connection of two arc open-ended inner walls has a locking board, two one side outer wall of locking board all is provided with the arc lug, the equal fixedly connected with mounting bracket of the both sides inner wall of erection column, and the equal sliding connection of the both sides inner wall of mounting bracket have T shape structure drive post, two all be connected with the third spring between one side outer wall of drive post and the mounting bracket, and two drive bottom of the column portion outer wall swing joint are on two actuating levers.
The beneficial effects of the utility model are as follows:
1. this quick installation mechanism of piping lane prefab and construction method through set up installation mechanism in the lower pipe gallery, mutually supports through the reference column on installation mechanism and the upper pipe gallery, convenient quick installation location.
2. This quick installation mechanism of piping lane prefab and construction method, cooperation through between actuating lever, locating plate and the locking plate in the installation mechanism, conveniently lock the reference column and prevent to appear the clearance between the upper and lower piping lane in the installation, lead to the problem of later stage infiltration, the more that the locating plate descends locks the plate clamp tighter more.
Drawings
Fig. 1 is a schematic structural diagram of a quick installation mechanism for a pipe gallery preform according to the present invention;
FIG. 2 is a schematic structural diagram of a cross-sectional view of a pipe gallery of the quick pipe gallery installation mechanism of the pipe gallery prefabricated member according to the present invention;
FIG. 3 is a schematic structural view of an upper pipe gallery in cross section of a pipe gallery of the quick installation mechanism for a pipe gallery preform provided by the utility model;
FIG. 4 is a schematic structural diagram of a mounting mechanism of an embodiment of a quick mounting mechanism for a pipe gallery preform according to the present invention;
FIG. 5 is a schematic structural diagram of a second installation mechanism of the quick installation mechanism for a pipe gallery preform according to the present invention;
fig. 6 is a schematic structural view of a second mounting frame of an embodiment of a quick mounting mechanism for a pipe gallery preform according to the present invention.
In the figure: 1 lower pipe gallery, 2 upper pipe galleries, 3 rings, 4 installation mechanisms, 5 positioning columns, 6 limiting grooves, 7 installation columns, 8 positioning plates, 9 first springs, 10 supporting columns, 11 driving rods, 12 second springs, 13 positioning grooves, 14 locking plates, 15 convex blocks, 16 installation racks, 17 driving columns and 18 third springs.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Example one
Referring to fig. 1-4, a quick installation mechanism of piping lane prefab, including piping lane 1 down, 1 top outer wall of piping lane is provided with pipe gallery 2 down, the four corners department of 2 top outer walls of pipe gallery all is provided with rings 3, the cross section of pipe gallery 2 and piping lane 1 down is the chevron structure, 1 top outer wall of pipe gallery all sets up the mounting groove that the equidistance distributes down, and the inner wall of mounting groove all is provided with installation mechanism 4, 2 bottom outer walls of pipe gallery all fixedly connected with reference column 5, and reference column 5's outer wall all sets up the spacing groove 6 that the equidistance distributes, installation mechanism 4 includes erection column 7, and the top outer wall of erection column 7 has seted up constant head tank 13, the both sides inner wall sliding connection of constant head tank 13 has same locating plate 8.
In the utility model, a round opening is arranged on the inner wall of the bottom of a positioning groove 13, the inner wall of the round opening is connected with a support column 10 with a T-shaped structure in a sliding manner, the outer wall of the support column 10 is sleeved with a first spring 9, driving rods 11 with L-shaped structures are fixed on the inner walls of two sides of an installation column 7 through bearings, a second spring 12 is connected between the outer wall of one side of each of the two driving rods 11 and the outer wall of the bottom of the support column 10, the inner walls of two sides of the positioning groove 13 are respectively provided with an arc-shaped opening, the inner walls of the two arc-shaped openings are respectively connected with a locking plate 14 in a sliding manner, the radian of each locking plate is just matched with that of a positioning column, the positioning column pushes a positioning plate to descend under the action of the gravity of an upper pipe gallery, the outer wall of one side of each of the two locking plates 14 is provided with an arc-shaped lug 15, one end of each of the two driving rods 11 is movably connected on each of the two locking plates 14,
a construction method for a quick installation mechanism of a pipe gallery prefabricated member comprises the following steps:
s1: firstly, digging a mounting groove of a lower pipe gallery at a specified position, and then arranging a mounting base of the lower pipe gallery in the mounting groove;
s2: hoisting the lower pipe gallery into the mounting groove through a hoisting mechanism, fixedly mounting the lower pipe gallery through a mounting base, and fixing the mounting mechanism in the mounting groove through cement after the lower pipe gallery is mounted;
s3: after cement is solidified, the upper pipe gallery is installed on the lower pipe gallery through the hanging ring on the upper pipe gallery, and the upper pipe gallery is conveniently and quickly positioned and installed through the matching between the positioning column on the upper pipe gallery and the installation mechanism;
s4: when the positioning column on the upper pipe gallery is inserted into the positioning groove in the installation mechanism, the positioning column is locked through the locking plate in the installation mechanism, and meanwhile, the positioning column is conveniently locked by the linkage mechanism in the installation mechanism, and the driving rod, the positioning plate and the locking plate in the installation mechanism are matched with each other; the two driving rods drive the locking plate to lock the positioning column in a rotating mode, and the convex block on the locking plate and the limiting groove on the positioning column are mutually clamped;
s5: after the installation of upper pipe gallery location is accomplished, the outer wall of upper pipe gallery and lower pipe gallery is consolidating through the concrete, accomplishes the installation of pipe gallery prefab, in S1, when installing lower pipe gallery, the location of lower pipe gallery will be confirmed earlier, prevent that the deviation from appearing in the lower pipe gallery from influencing the installation of upper pipe gallery, in S5, when dismantling rings down after the installation of upper pipe gallery is accomplished, carrying out the concrete reinforcement, treat when the concrete solidifies the burying of managing the portion.
Example two
Referring to fig. 1-3, 5 and 6, a quick installation mechanism of piping lane prefab, including lower piping lane 1, 1 top outer wall of lower piping lane is provided with pipe gallery 2, the four corners department of 2 top outer walls of pipe gallery all is provided with rings 3, the cross section of pipe gallery 2 and lower piping lane 1 is the chevron structure, 1 top outer wall of pipe gallery all sets up the mounting groove that the equidistance distributes down, and the inner wall of mounting groove all is provided with installation mechanism 4, 2 bottom outer walls of pipe gallery all fixedly connected with reference column 5, and reference column 5's outer wall all sets up the spacing groove 6 that the equidistance distributes, installation mechanism 4 includes erection column 7, and the top outer wall of erection column 7 has seted up constant head tank 13, the both sides inner wall sliding connection of constant head tank 13 has same locating plate 8.
In the utility model, a round opening is arranged on the inner wall of the bottom of a positioning groove 13, the inner wall of the round opening is connected with a support column 10 with a T-shaped structure in a sliding manner, a first spring 9 is sleeved on the outer wall of the support column 10, driving rods 11 with an L-shaped structure are fixed on the inner walls of two sides of an installation column 7 through bearings, a second spring 12 is connected between the outer wall of one side of each of the two driving rods 11 and the outer wall of the bottom of the support column 10, arc-shaped openings are arranged on the inner walls of two sides of the positioning groove 13, locking plates 14 are connected on the inner walls of the two arc-shaped openings in a sliding manner, the radian of each locking plate is just matched with that of each positioning column, the positioning columns are pushed to descend under the action of the gravity of an upper pipe gallery, arc-shaped convex blocks 15 are arranged on the outer wall of one side of each of the two locking plates 14, installation frames 16 are fixedly connected on the inner walls of two sides of the installation column 7, and driving columns 17 with T-shaped structures are connected on the inner walls of two sides of each installation frame 16 in a sliding manner, a third spring 18 is connected between the outer wall of one side of each of the two driving columns 17 and the mounting rack 16, the outer wall of the bottom of each of the two driving columns 17 is movably connected to the two driving rods 11,
a construction method for a quick installation mechanism of a pipe gallery prefabricated member comprises the following steps:
s1: firstly, digging a mounting groove of a lower pipe gallery at a specified position, and then arranging a mounting base of the lower pipe gallery in the mounting groove;
s2: hoisting the lower pipe gallery into the mounting groove through a hoisting mechanism, fixedly mounting the lower pipe gallery through a mounting base, and fixing the mounting mechanism in the mounting groove through cement after the lower pipe gallery is mounted;
s3: after cement is solidified, the upper pipe gallery is installed on the lower pipe gallery through the hanging ring on the upper pipe gallery, and the upper pipe gallery is conveniently and quickly positioned and installed through the matching between the positioning column on the upper pipe gallery and the installation mechanism;
s4: when the positioning column on the upper pipe gallery is inserted into the positioning groove in the installation mechanism, the positioning column is locked through the locking plate in the installation mechanism, and meanwhile, the positioning column is conveniently locked by the linkage mechanism in the installation mechanism, and the driving rod, the positioning plate and the locking plate in the installation mechanism are matched with each other; the two driving rods drive the locking plate to lock the positioning column in a rotating mode, and the convex block on the locking plate and the limiting groove on the positioning column are mutually clamped;
s5: after the installation of upper pipe gallery location is accomplished, the outer wall of upper pipe gallery and lower pipe gallery is consolidating through the concrete, accomplishes the installation of pipe gallery prefab, in S1, when installing lower pipe gallery, the location of lower pipe gallery will be confirmed earlier, prevent that the deviation from appearing in the lower pipe gallery from influencing the installation of upper pipe gallery, in S5, when dismantling rings down after the installation of upper pipe gallery is accomplished, carrying out the concrete reinforcement, treat when the concrete solidifies the burying of managing the portion.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (4)

1. A quick installation mechanism for a pipe gallery prefabricated part is characterized by comprising a lower pipe gallery (1), an upper pipe gallery (2) is arranged on the outer wall of the top of the lower pipe gallery (1), hanging rings (3) are arranged at four corners of the outer wall of the top of the upper pipe gallery (2), the cross sections of the upper pipe gallery (2) and the lower pipe gallery (1) are both in a Chinese character 'shan' shape, the outer wall of the top of the lower pipe gallery (1) is provided with mounting grooves distributed equidistantly, and the inner walls of the mounting grooves are all provided with mounting mechanisms (4), the outer walls of the bottoms of the upper pipe gallery (2) are all fixedly connected with positioning columns (5), the outer walls of the positioning columns (5) are provided with limit grooves (6) which are distributed at equal intervals, the mounting mechanism (4) comprises mounting columns (7), and the outer wall of the top of the mounting column (7) is provided with a positioning groove (13), and the inner walls of two sides of the positioning groove (13) are connected with the same positioning plate (8) in a sliding manner.
2. The quick installation mechanism of pipe gallery prefab according to claim 1, characterized in that the locating groove (13) bottom inner wall is equipped with a round mouth, and the inner wall of the round mouth is connected with the support column (10) of the T-shaped structure in a sliding manner, the outer wall of the support column (10) is sleeved with the first spring (9), the inner walls of two sides of the installation column (7) are fixed with the driving rods (11) of the L-shaped structure through bearings, and the second spring (12) is connected between the outer wall of one side of the two driving rods (11) and the outer wall of the bottom of the support column (10).
3. The quick installation mechanism for pipe gallery prefabricated members as claimed in claim 2, wherein the positioning groove (13) is provided with two arc-shaped openings on the inner walls at two sides, the inner walls of the two arc-shaped openings are slidably connected with locking plates (14), the outer wall of one side of each of the two locking plates (14) is provided with an arc-shaped convex block (15), and one end of each of the two driving rods (11) is movably connected with the two locking plates (14).
4. The quick installation mechanism of piping lane prefab of claim 2, characterized in that, the arc opening has all been seted up to the both sides inner wall of constant head tank (13), and the inner wall of two arc openings all has sliding connection locking plate (14), two one side outer wall of locking plate (14) all is provided with arc lug (15), the both sides inner wall of erection column (7) all fixedly connected with mounting bracket (16), and the both sides inner wall of mounting bracket (16) all sliding connection has T shape structure drive post (17), two all be connected with third spring (18) between one side outer wall of drive post (17) and mounting bracket (16), and two drive post (17) bottom outer wall swing joint are on two actuating levers (11).
CN202122515492.6U 2021-10-19 2021-10-19 Quick installation mechanism of piping lane prefab Active CN216194915U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122515492.6U CN216194915U (en) 2021-10-19 2021-10-19 Quick installation mechanism of piping lane prefab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122515492.6U CN216194915U (en) 2021-10-19 2021-10-19 Quick installation mechanism of piping lane prefab

Publications (1)

Publication Number Publication Date
CN216194915U true CN216194915U (en) 2022-04-05

Family

ID=80884437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122515492.6U Active CN216194915U (en) 2021-10-19 2021-10-19 Quick installation mechanism of piping lane prefab

Country Status (1)

Country Link
CN (1) CN216194915U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113863370A (en) * 2021-10-19 2021-12-31 鞍山三冶建筑工程有限公司 Rapid installation mechanism and construction method for pipe gallery prefabricated member

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113863370A (en) * 2021-10-19 2021-12-31 鞍山三冶建筑工程有限公司 Rapid installation mechanism and construction method for pipe gallery prefabricated member

Similar Documents

Publication Publication Date Title
CN107989227B (en) Assembled steel reinforced concrete shear wall structure and preparation and installation methods thereof
CN104453197B (en) High Large Cantilever concrete structural steel shape supports platform
CN216194915U (en) Quick installation mechanism of piping lane prefab
CN109162437B (en) Integral steel platform for multi-cylinder steel plate shear wall and construction method thereof
CN103510541A (en) Device and method for installing steel pipe column to interior of lifting frame hole
CN110904956B (en) Cast-in-place pile construction process
CN113863370A (en) Rapid installation mechanism and construction method for pipe gallery prefabricated member
CN218479176U (en) A outer frame post installation node for in reinforced concrete foundation ditch supports
CN103938755A (en) Shock insulation structure for under-shaft hanging type transfer girders, and construction method of shock insulation structure
CN113235795B (en) Rapid mounting and dismounting construction method for laminated slab
CN210685110U (en) Assembled novel bidirectional ribbed profiled steel sheet composite floor
CN108643388A (en) A kind of construction wall
KR20150120779A (en) Bracket for the horizontal frame of a one-way steel structure
CN105401598B (en) Automatic formwork lowering system hoisting device and method for top-down construction
CN212743356U (en) Reverse construction method hangs mould system
CN210597326U (en) Precast concrete bearing structure that can assemble
CN209817462U (en) Overhanging type supporting and positioning device for field installation of prefabricated air conditioner plate
CN106948841A (en) High ferro tunnel pre-buried channel flow installation mold automatic lifting system and installation method
CN113737843A (en) Section steel structure combined support construction method for automatic coupling installation of submersible sewage pump
CN208184021U (en) A kind of construction wall
CN205205860U (en) Automatic all hoist device of module system that fall of reverse construction method
CN221027356U (en) Reverse hanging bracket
CN111074921A (en) Prefabricated ring beam reinforcing system for prefabricated slab disassembly-free thin slab tire mold and construction method
CN213869194U (en) Bearing support for construction
CN213805484U (en) Assembled underground pipe gallery for municipal administration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant