CN216119238U - Tunnel intelligent control model display device - Google Patents

Tunnel intelligent control model display device Download PDF

Info

Publication number
CN216119238U
CN216119238U CN202122659507.6U CN202122659507U CN216119238U CN 216119238 U CN216119238 U CN 216119238U CN 202122659507 U CN202122659507 U CN 202122659507U CN 216119238 U CN216119238 U CN 216119238U
Authority
CN
China
Prior art keywords
fixedly connected
sides
tunnel
display device
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122659507.6U
Other languages
Chinese (zh)
Inventor
刘国栋
孟洁
刘耀喜
郑和武
陆财康
覃信满
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122659507.6U priority Critical patent/CN216119238U/en
Application granted granted Critical
Publication of CN216119238U publication Critical patent/CN216119238U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Instructional Devices (AREA)

Abstract

The utility model discloses an intelligent control model display device for a tunnel, which comprises an operation table, wherein one side of the operation table is fixedly connected with PCL control equipment, two sides of the top of the operation table are respectively provided with a lane, and arc-shaped plates are fixedly connected to the top of the operation table and positioned on two sides of the lane. This tunnel intelligent control model display device, one side fixedly connected with PCL controlgear through the operation panel, the model can directly develop the skill training of wading the way and emergent rehearsal explanation, the safety risk on wading the way scene has been avoided, promote the safety control level, utilize PLC technique and model technique, restore highway tunnel electromechanical system function, can utilize the model to train in the control room, it is simple and clear, promote new entry electromechanical technical personnel, monitor business level, include the control panel through PCL controlgear, can utilize model simulation tunnel safety rehearsal, the responsibility divides the worker to be clear and definite, ensure that safety rehearsal goes on smoothly.

Description

Tunnel intelligent control model display device
Technical Field
The utility model relates to the technical field of display models, in particular to an intelligent control model display device for a tunnel.
Background
The model is an object (the object is not equal to an object, is not limited to an entity and a virtual object, and is not limited to a plane and a solid) which forms an expression purpose of objectively describing a morphological structure through subjective consciousness by means of entity or virtual representation, the model forming form is divided into an entity model (a physical morphological concept entity object with volume and weight) and a virtual model (a shape formed by electronic data through a digital representation form and other practical expressions), and the model displaying form is divided into plane display and solid display (a mark is one of plane display, such as an illustration chart of an atlas).
The training of the expressway on new tunnel electromechanical technicians and tunnel monitoring personnel at the present stage is mainly theoretical training and lacks on-site practical training, and because the expressway tunnel has complex geographic environment, large traffic flow, high speed and the like, potential safety hazards exist for the on-site training of new personnel.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of the prior art, the utility model provides an intelligent control model display device for a tunnel, which solves the problem of potential safety hazard in field training of new staff to the tunnel.
In order to achieve the purpose, the utility model is realized by the following technical scheme: an intelligent tunnel control model display device comprises an operation platform, wherein one side of the operation platform is fixedly connected with PCL control equipment, lanes are arranged on both sides of the top of the operating platform, arc-shaped plates are fixedly connected with both sides of the lanes on the top of the operating platform, top plates are fixedly connected with the tops of the arc-shaped plates, and both sides between the opposite sides of the two top plates are fixedly connected with a first fixing plate, the middle part between the opposite sides of the two top plates is fixedly connected with a second fixing plate, both sides of the bottom of the first fixing plate are fixedly connected with lane indicating lamps, and the equal fixedly connected with ventilation blower in both sides of second fixed plate bottom, the top of operation panel just is located the equal fixedly connected with platform in the inside bottom of two arcs, two one side that the roof is relative and two one side that the platform is relative all is provided with the light.
Preferably, the PCL control equipment comprises a control console, the top of the control console is fixedly connected with a surrounding plate, and the top of the control console is fixedly connected with a main switch, a guide lamp, a power supply and a PLC host from left to right in sequence.
Preferably, a glass top cover is fixedly connected between the tops of the two top plates, and a tunnel machine room is arranged between the opposite sides of the two arc-shaped plates.
Preferably, the both sides of operation panel inner wall all fixedly connected with riser to one side of riser and one side fixed connection of arc.
Preferably, the top of operation panel just is located the both sides in lane and all is provided with the rail, the operation panel top just is located one side of rail and is provided with the street lamp.
Preferably, a glass cover is arranged on the top of the PCL control device, and a control panel is arranged on one side of the top of the operating platform.
Advantageous effects
The utility model provides a tunnel intelligent control model display device. Compared with the prior art, the method has the following beneficial effects:
(1) the intelligent control model display device for the tunnel is characterized in that PCL control equipment is fixedly connected to one side of an operation table, lanes are arranged on two sides of the top of the operation table, arc-shaped plates are fixedly connected to two sides of the top of the operation table, top plates are fixedly connected to the tops of the arc-shaped plates, first fixing plates are fixedly connected to two sides of two opposite sides of the top plates, second fixing plates are fixedly connected to the middle of two opposite sides of the top plates, lane indicating lamps are fixedly connected to two sides of the bottom of the first fixing plates, ventilators are fixedly connected to two sides of the bottom of the second fixing plates, ground platforms are fixedly connected to the top of the operation table and the bottom of the two arc-shaped plates, illuminating lamps are arranged on one opposite sides of the two top plates and one opposite side of the two ground platforms, and the model can directly develop road training skills and emergency drilling explanation, the safety risk of a road-related field is avoided, the safety management level is improved, the functions of the electromechanical system of the highway tunnel are restored by utilizing a PLC (programmable logic controller) technology and a model technology, the model can be used for training in a monitoring room, simplicity and clarity are realized, and the service levels of new-entry electromechanical technicians and monitors are improved.
(2) This tunnel intelligent control model display device includes the control cabinet through PCL controlgear, the top fixedly connected with bounding wall of control cabinet, the top of control cabinet is from a left side to the right side fixedly connected with master switch in proper order, the guide lamp, power supply ware and PLC host computer, the top of control cabinet and the both sides that are located the lane all are provided with the rail, the control cabinet top just is located one side of rail and is provided with the street lamp, can utilize model simulation tunnel safety rehearsal, the responsibility divides the worker to be clear and definite, ensure that safety rehearsal goes on smoothly.
Drawings
FIG. 1 is a perspective view of the structure of the present invention;
FIG. 2 is a top view of the internal structure of the PCL control device of the present invention;
FIG. 3 is an enlarged view of a portion of the utility model at A in FIG. 1;
FIG. 4 is an enlarged view of a portion of the present invention at B of FIG. 1;
fig. 5 is a partial enlarged view of the utility model at C in fig. 1.
In the figure: 1-operation desk, 2-PCL control equipment, 21-control desk, 22-coaming, 23-master switch, 24-guide lamp, 25-power supply, 26-PLC host, 3-lane, 4-arc plate, 5-top plate, 6-first fixed plate, 7-second fixed plate, 8-lane indicator lamp, 9-ventilator, 10-ground platform, 11-lighting lamp, 12-glass top cover, 13-tunnel machine room, 14-vertical plate, 15-fence, 16-street lamp, 17-glass cover, 18-control panel.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: an intelligent tunnel control model display device comprises an operating platform 1, a PCL control device 2 is fixedly connected to one side of the operating platform 1, lanes 3 are respectively arranged on two sides of the top of the operating platform 1, arc-shaped plates 4 are fixedly connected to the top of the operating platform 1 and two sides of the lanes 3, a top plate 5 is fixedly connected to the tops of the arc-shaped plates 4, and both sides between the opposite sides of the two top plates 5 are fixedly connected with a first fixing plate 6, the middle between the opposite sides of the two top plates 5 is fixedly connected with a second fixing plate 7, both sides of the bottom of the first fixing plate 6 are fixedly connected with lane indicating lamps 8, and the equal fixedly connected with ventilation blower 9 in both sides of second fixed plate 7 bottom, the equal fixedly connected with platform 10 in the top of operation panel 1 and the bottom that is located two arcs 4 inside, and one side that two roof 5 are relative and one side that two platforms 10 are relative all are provided with light 11.
The model can be used for directly carrying out road-related skill training and emergency drill explanation, avoids the safety risk of a road-related field, improves the safety management level, restores the functions of an electromechanical system of a highway tunnel by using a PLC (programmable logic controller) technology and a model technology, can be used for training in a monitoring room, is simple and clear, and improves the service level of new entry electromechanical technicians and monitors.
Specifically, the PCL control device 2 includes a console 21, a surrounding plate 22 is fixedly connected to the top of the console 21, and a main switch 23, a guidance lamp 24, a power supply 25 and a PLC host 26 are fixedly connected to the top of the console 21 from left to right.
The model can be used for simulating the tunnel safety drilling, the responsibilities are divided into specific labor, and the safety drilling is ensured to be smoothly carried out.
Specifically, a glass top cover 12 is fixedly connected between the tops of the two top plates 5, and a tunnel machine room 13 is arranged between the opposite sides of the two arc-shaped plates 4.
Specifically, both sides of the inner wall of the operating platform 1 are fixedly connected with a vertical plate 14, and one side of the vertical plate 14 is fixedly connected with one side of the arc-shaped plate 4.
Specifically, the top of the operation panel 1 and the two sides of the lane 3 are both provided with a fence 15, and one side of the top of the operation panel 1 and the fence 15 is provided with a street lamp 16.
Specifically, a glass cover 17 is provided on the top of the PCL control device 2, and a control panel 18 is provided on one side of the top of the console 1.
And those not described in detail in this specification are well within the skill of those in the art.
When the tunnel simulation system is used, the PLC host 26 controls the control panel 18 to operate simple operation of some equipment, tunnel electromechanical equipment operation is simulated, the lane indicator lamp 8, the ventilator 9, the illuminating lamp 11 and the street lamp 16 are controlled by the tunnel model equipment, scene teaching can be performed by fully utilizing the tunnel model equipment, tunnel business and electromechanical technology training is performed on monitoring personnel and newly-enrolled personnel through the model, and potential safety hazards of tunnel site training are eliminated.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a tunnel intelligent control model display device, includes operation panel (1), one side fixedly connected with PCL controlgear (2) of operation panel (1), its characterized in that: lanes (3) are arranged on two sides of the top of the operating platform (1), arc-shaped plates (4) are fixedly connected to the top of the operating platform (1) and located on two sides of the lanes (3), a top plate (5) is fixedly connected to the tops of the arc-shaped plates (4), and both sides between the opposite sides of the two top plates (5) are fixedly connected with a first fixing plate (6), the middle part between the opposite sides of the two top plates (5) is fixedly connected with a second fixing plate (7), both sides of the bottom of the first fixing plate (6) are fixedly connected with lane indicating lamps (8), and both sides of the bottom of the second fixing plate (7) are fixedly connected with ventilators (9), the top of operation panel (1) just is located equal fixedly connected with ground platform (10) in the bottom of two arcs (4) insides, two one side that roof (5) are relative and two one side that ground platform (10) are relative all is provided with light (11).
2. The intelligent control model display device for the tunnel according to claim 1, wherein: PCL controlgear (2) include control cabinet (21), the top fixedly connected with bounding wall (22) of control cabinet (21), fixedly connected with master switch (23), pilot lamp (24), power supply (25) and PLC host computer (26) are in proper order from a left side to the right side in the top of control cabinet (21).
3. The intelligent control model display device for the tunnel according to claim 1, wherein: two fixedly connected with glass overhead guard (12) between the top of roof (5) to be provided with tunnel computer lab (13) between the relative one side of two arcs (4).
4. The intelligent control model display device for the tunnel according to claim 1, wherein: the equal fixedly connected with riser (14) in both sides of operation panel (1) inner wall to one side of riser (14) and one side fixed connection of arc (4).
5. The intelligent control model display device for the tunnel according to claim 1, wherein: the top of operation panel (1) just is located the both sides of lane (3) and all is provided with rail (15), one side that operation panel (1) top just is located rail (15) is provided with street lamp (16).
6. The intelligent control model display device for the tunnel according to claim 1, wherein: the top of the PCL control device (2) is provided with a glass cover (17), and one side of the top of the operating platform (1) is provided with a control panel (18).
CN202122659507.6U 2021-11-02 2021-11-02 Tunnel intelligent control model display device Expired - Fee Related CN216119238U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122659507.6U CN216119238U (en) 2021-11-02 2021-11-02 Tunnel intelligent control model display device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122659507.6U CN216119238U (en) 2021-11-02 2021-11-02 Tunnel intelligent control model display device

Publications (1)

Publication Number Publication Date
CN216119238U true CN216119238U (en) 2022-03-22

Family

ID=80712353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122659507.6U Expired - Fee Related CN216119238U (en) 2021-11-02 2021-11-02 Tunnel intelligent control model display device

Country Status (1)

Country Link
CN (1) CN216119238U (en)

Similar Documents

Publication Publication Date Title
CN103745624B (en) Track traffic simulation system
KR102213996B1 (en) Environmental information providing system for building smart clean city using adjacent infrastructure
CN109147448A (en) A kind of transmission line high-altitude walking training system and its method
CN111986538A (en) Urban railway train operation comprehensive simulation training system and structure
CN207097273U (en) A kind of track traffic organization of driving real training classroom
CN110969926A (en) Driving safety endangered driving behavior monitoring and testing system
CN107146515A (en) A kind of mine production system comprehensive demonstration simulation model
CN205038836U (en) Outside lighting system simulation teching device of urban rail transit vehicles
CN216119238U (en) Tunnel intelligent control model display device
CN111858220A (en) Test bench for testing ATS system and interlocking system interface information transmission
CN109830165B (en) Combined city disaster simulation experiment device
CN202183181U (en) Comprehensive monitoring dynamic demonstration model system of subway station
CN201117148Y (en) Computer interlocking and traction power supplying simulation sand map
CN107369353A (en) A kind of ten thousand tons of heavy haul train driving simulation training systems
CN107274748A (en) A kind of aircraft light simulation teching training system
CN206115761U (en) Rail transit car station simulation teaching system
CN202795797U (en) Practical training device of intelligent and automatic fire alarm system for buildings
CN211506916U (en) Driving safety endangered driving behavior monitoring and testing system
RU148672U1 (en) RAILWAY MACHINE SIMULATOR
RU147846U1 (en) RAILWAY OPERATOR SIMULATOR
CN210223267U (en) Combined urban disaster simulation experiment device
CN213751610U (en) Simulated tunnel 3D sand table for live simulation
CN103021222A (en) Simulated training device of airport snow removing vehicle
CN206893132U (en) A kind of fire-fighting evacuation instruction and broadcast system experimental bench
CN216486853U (en) Comprehensive training platform for rail transit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220322