CN216109859U - Safety net hanging device - Google Patents

Safety net hanging device Download PDF

Info

Publication number
CN216109859U
CN216109859U CN202121960469.1U CN202121960469U CN216109859U CN 216109859 U CN216109859 U CN 216109859U CN 202121960469 U CN202121960469 U CN 202121960469U CN 216109859 U CN216109859 U CN 216109859U
Authority
CN
China
Prior art keywords
safety net
roof truss
supporting
traction mechanism
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121960469.1U
Other languages
Chinese (zh)
Inventor
徐平
李星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN202121960469.1U priority Critical patent/CN216109859U/en
Application granted granted Critical
Publication of CN216109859U publication Critical patent/CN216109859U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a safety net hanging device which comprises three groups of supporting components which are matched for use, wherein each supporting component comprises two vertically arranged supporting columns, an upper roof truss chord and a lower roof truss chord which are used for connecting the two supporting columns are respectively and horizontally arranged between the tops of the two supporting columns, pulley blocks are arranged on the tops of the supporting columns of two groups of adjacent supporting components, a traction mechanism is arranged on the lower roof truss chord of the other group of supporting components, the pulley blocks are connected with the traction mechanism through steel wire ropes, and the steel wire ropes extend downwards along the pulley blocks and are connected with a safety net. Compared with the traditional installation method, the method has the advantages of simple operation and fast construction progress; the tightness of the safety net is controlled by the winch, so that constructors do not need to go up high altitude repeatedly, the safety is high, and accidents are not easy to happen; the winch replaces manual pulling of the pulley, so that the cost is reduced; after the safety net is pulled up, the travelling crane can still freely pass below the safety net.

Description

Safety net hanging device
Technical Field
The utility model belongs to the field of safety protection, and particularly relates to a safety net hanging device.
Background
In the construction of metallurgical industry plants, roofing structures are installed to erect safety nets in order to prevent workers from falling down tools or various building materials and workers themselves from falling down without attention or for other reasons during work. The safety net can guarantee worker's safety, also can reduce the danger of worker and pedestrian on the building site simultaneously, is important safety device in the factory building construction. The safety net is usually hung on a roof beam, and when the safety net is to be erected and dismantled, the safety net is hung on the roof beam, so that the safety net is complex in hanging operation, labor waste and low in working efficiency.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a safety net hanging device which is simple to operate and quick in construction progress compared with a traditional installation method.
In order to solve the technical problems, the technical scheme of the utility model is as follows: the utility model provides a safety net is hung and is established device, includes the supporting component that three groups cooperation were used, and the supporting component includes the support column of two vertical settings, is provided with the roof truss upper chord and the roof truss lower chord of connecting two support columns between two support column tops respectively horizontally, and wherein the support column top of two sets of adjacent supporting components is equipped with the assembly pulley, is equipped with the traction mechanism on another group's support component's the roof truss lower chord, and the assembly pulley passes through wire rope with the traction mechanism to be connected, and wire rope is connected with the safety net along assembly pulley downwardly extending.
A plurality of connecting columns are arranged between the upper chord and the lower chord of the roof truss at equal intervals, the top of each connecting column of the two groups of supporting components provided with the pulley blocks is connected with an additional pulley block, the additional pulley block is connected with a traction mechanism through a steel wire rope, and the steel wire rope extends downwards along the additional pulley block and is connected with a safety net.
The traction device is a winch.
Compared with the prior art, the utility model has the beneficial effects that:
1. compared with the traditional installation method, the method is simple to operate and fast in construction progress.
2. The safety net is controlled to be loose and tight through the winch, so that constructors do not need to go up high altitude repeatedly, safety is high, and accidents are not easy to happen.
3. And the winch replaces manpower to pull the pulley, so that the cost is reduced.
4. After the safety net is pulled up, the travelling crane can still freely pass below the safety net.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is a schematic view of a pulley used in conjunction with a safety net in an embodiment of the utility model;
in the figure, 1-safety net, 2-winch drum, 3-roof truss upper chord, 4-roof truss lower chord, 5-pulley block and 6-travelling crane.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
As shown in fig. 1 and fig. 2, the technical solution of the present invention is: the utility model provides a safety net is hung and is established device, includes the supporting component that three groups cooperation were used, and the supporting component includes the support column of two vertical settings, is provided with roof truss upper chord 3 and the roof truss lower chord 4 of connecting two support columns between two support column tops respectively the level, and wherein the support column top of two sets of adjacent supporting components is equipped with assembly pulley 5, is equipped with the traction mechanism on the roof truss lower chord 4 of another group of supporting component, and assembly pulley 5 passes through wire rope with the traction mechanism to be connected, and wire rope is connected with safety net 1 along assembly pulley 5 downwardly extending.
A plurality of connecting columns are arranged between the upper string 3 and the lower string 4 of the roof truss at equal intervals, the tops of the connecting columns of the two groups of supporting components provided with the pulley blocks 5 are connected with the added pulley blocks 5, the added pulley blocks 5 are connected with the traction mechanism through steel wire ropes, and the steel wire ropes extend downwards along the added pulley blocks 5 and are connected with the safety net 1.
The installation method comprises the following steps:
step 1, placing a safety net 1 on the ground under a roof truss in advance.
And 2, climbing the upper chord 3 of the roof truss by a worker through a crawling ladder welded on the supporting column.
And 3, hanging 8 groups of pulley blocks 5 at the upper chord of a constructor, and arranging two coaxial winch drums 2 at the lower chord of the other span roof truss, wherein the two coaxial winch drums are divided into 4 areas for hanging 4 groups of pulleys.
And 4, connecting one ends of the steel wire ropes of all the pulley blocks 5 to the safety net 1, and connecting the other ends of the steel wire ropes to the winding drum 2 of the winch.
And 5, stopping the winch when the safety net 1 is lifted to a distance lower chord.
And 6, completing installation, starting the winch again after the construction is finished, and putting down the safety net 1.
The above disclosure is only for the purpose of illustrating the preferred embodiments of the present invention, and it is needless to say that the scope of the present invention is not limited by the above disclosure.

Claims (3)

1. The utility model provides a safety net is hung and is established device which characterized in that, includes the supporting component that three groups cooperation were used, and the supporting component includes the support column of two vertical settings, and the roof truss upper chord and the roof truss lower chord of connecting two support columns are provided with the level respectively between two support column tops, and wherein the support column top of two sets of adjacent supporting components is equipped with the assembly pulley, is equipped with the traction mechanism on the roof truss lower chord of another group supporting component, and the assembly pulley passes through wire rope with the traction mechanism to be connected, and wire rope is connected with the safety net along assembly pulley downwardly extending.
2. The safety net hanging device according to claim 1, wherein a plurality of connecting columns are equidistantly arranged between the upper string of the roof truss and the lower string of the roof truss, an additional pulley block is connected to the top of each connecting column of the two sets of supporting components provided with the pulley block, the additional pulley block is connected with the traction mechanism through a steel wire rope, and the steel wire rope extends downwards along the additional pulley block and is connected with the safety net.
3. The safety net hanging device according to claim 1, wherein the pulling device is a winch.
CN202121960469.1U 2021-08-19 2021-08-19 Safety net hanging device Active CN216109859U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121960469.1U CN216109859U (en) 2021-08-19 2021-08-19 Safety net hanging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121960469.1U CN216109859U (en) 2021-08-19 2021-08-19 Safety net hanging device

Publications (1)

Publication Number Publication Date
CN216109859U true CN216109859U (en) 2022-03-22

Family

ID=80727276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121960469.1U Active CN216109859U (en) 2021-08-19 2021-08-19 Safety net hanging device

Country Status (1)

Country Link
CN (1) CN216109859U (en)

Similar Documents

Publication Publication Date Title
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN105226560B (en) A kind of crossing frame and its construction method
CN109881590A (en) Bridge steel box girder high altitude operation operating platform and building method
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN113062584A (en) Multipoint elevator shaft construction lifting platform and construction method
CN102061810B (en) Construction method of safe flat net positioned on periphery of building
CN201908447U (en) Lift-type horizontal safety net
CN216109859U (en) Safety net hanging device
CN209873572U (en) Interim navigation lifting station of adjustable vertical lift height
CN217400394U (en) High-altitude manual hoisting profiled steel sheet construction device
CN108374351B (en) Simple hoisting device and method for dismantling box girder bailey pieces
CN217028004U (en) Annular hanging basket suspension device for curtain wall construction of super high-rise building
CN212771963U (en) Movable suspension operation platform
CN213923842U (en) Wallboard lifting device in assembled
CN111305433B (en) Construction structure and construction method of roof steel structure platform inclined glass curtain wall
CN213536960U (en) Arrangement structure of shaft construction hoisting system
CN209816682U (en) Bridge steel box girder aerial working operation platform
CN210561720U (en) Pier stud maintenance repair operation platform
CN210529505U (en) Circulation device is torn open in ann of wet seam template of bridge concatenation formula
CN210563326U (en) Overhead unit type overhead sliding splicing operation platform
CN210973666U (en) Simple lifting device for upright post construction cylinder of antiaircraft gun billboard
CN107060347A (en) A kind of big encorbelmented across metal decorates prefabricated roof and air translation splicing structure
CN112357743A (en) Manufacturing method of simple hoisting tool for purlines of factory building roof